NOTICE OF COMPLETION & AVAILABILITY
OF DRAFT ENVIRONMENTAL IMPACT REPORT (SCH# 2010051094)
FOR UPTOWN NEWPORT
DATE: September 10, 2012
TO: Draft EIR Distribution List
SUBJECT: Notice of Completion and Availability of the Draft Environmental
Impact Report (SCH# 2010051094) for Uptown Newport, 4311-
4321 Jamboree Road, Newport Beach
PROJECT APPLICANT: Shopoff Management, Inc.
DRAFT EIR REVIEW PERIOD: September 10, 2012–October 24, 2012
Pursuant to the State of California Public Resources Code Section 21165 and the “Guidelines for
Implementation of the California Environmental Quality Act” as amended to date, as Lead
Agency, the City of Newport Beach is circulating for public review a Draft Environmental Impact
Report (DEIR) for the proposed Uptown Newport project.
Project Title: Uptown Newport (PA2011-134)
Project Location: The 25.05-acre project site is within the Airport Business Area of the City of
Newport Beach. It is bounded by Jamboree Road on the east and is within an area bounded by
Birch Street on the north, and Von Karman Avenue and MacArthur Boulevard on the west. The
site is currently developed with light industrial/manufacturing uses and associated surface parking
lots.
Project Description: The proposed Uptown Newport project would consist of mixed uses with up
to 1,244 residential units, 11,500 square feet of neighborhood-serving retail space, and
approximately two acres of park space. Residential product types would be for-sale and rent with
a mix of townhomes, mid- and high-rise condominiums, and affordable housing. Proposed
buildings would range from 30 feet to 75 feet in height; with residential towers up to 150 feet high.
Of the 1,224 housing units, 184 units would be set aside for affordable housing. Two parks
totaling approximately two acres would be developed and accessible to the public. Vehicular
access to the site would be from Jamboree Road, Birch Street, and Von Karman Avenue.
The project would be developed in two phases. Phase 1 would involve demolition of the existing
single-story office building at 4311 Jamboree Road to accommodate approximately 680
residential units, 11,500 square feet of neighborhood-serving commercial development, and a
one-acre park. The TowerJazz Semiconductor facility (4321 Jamboree Road) would continue
operating during construction and initial operation of Phase 1. Development of Phase 1 is
projected to start in 2013 and be completed in 2018. Phase 2 would include demolition of the
TowerJazz facility and construction of the remaining 564 residential units and a one-acre park.
Timing for Phase 2 would be contingent on the existing lease of the TowerJazz building, which is
currently set to expire in March 2017, but could be extended to as late as March 2027. The DEIR
conservatively assumed that Phase 2 could commence as early as spring 2017 with buildout
through 2021.
The project approvals required from the City include: Planned Community Development Plan
amendment and adoption, Tentative Tract Map, Development Agreement, Traffic Study,
Affordable Housing Implementation Plan, Phasing Plan, and Design Guidelines.
The Draft EIR indicates there may be significant unavoidable adverse environmental impacts
associated with three environmental categories: short-term, construction-related air quality
impacts; land use impacts related to a determination of consistency with the Airport Environs
Land Use Plan by the Airport Land Use Commission; and short-term, construction-related noise
impacts. Upon compliance with regulatory requirements and recommended mitigation measures
(as appropriate), all other environmental impacts were found to be less than significant.
Notice of Completion & Availability: The DEIR will be available for a 45-day public review
period beginning on Monday, September 10, 2012. All interested parties are invited to submit
written comments on the DEIR for consideration by the Planning Commission. Due to the time
limits mandated by state law, comments on the DEIR will be received from September 10, 2012
through October 24, 2012. Agencies should provide the name of a contact person with their
response.
Copies of the document are available for review at the City of Newport Beach Planning Division,
3300 Newport Boulevard, Newport Beach, CA 92658. The document can also be accessed online
at: http://www.newportbeachca.gov/ceqadocuments. Additionally, copies of the document are
also available for review at the following City public libraries:
Newport Beach Public Library
Central Library
1000 Avocado Avenue
Newport Beach, CA 92660
Newport Beach Public Library
Mariners Branch
2005 Dover Drive
Newport Beach, CA 92660
Newport Beach Public Library
Balboa Branch
100 East Balboa Boulevard
Newport Beach, CA 92660
Newport Beach Library
Corona Del Mar Branch
420 Marigold Avenue
Corona Del Mar, CA 92625
All comments and responses to this notice should be submitted in writing to:
Rosalinh Ung, Associate Planner
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92658-8915
The City will also accept responses to this notice submitted via email received through the close
of business on October 24, 2012. Email responses to this notice may be sent to
rung@newportbeachca.gov.
A Planning Commission study session is tentatively scheduled for October 4, 2012. The meeting
date, time and location will be noticed separately. For additional information, please contact
Rosalinh Ung at (949) 644-3208 or via the aforementioned email.