Loading...
HomeMy WebLinkAboutRS061252_068t0000003ZSm0AAG_Correction ListCounty of Orange Resources & Development Management Department Building Permits Division Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 Residential Plan Check Corrections It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document. Normally, each section will stamp your plans indicating their approval. To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on 'Plan Check Status' Link Project Number:RS061252 Submittal Date:Jul 31, 2006 CBC Edition: 2001 Plan Check Date: 8/22/2006 9:55 AM Description:Room Addition Job Address 90 ARCHIPELAGO DR NEWPORT COAST, CA Owner Address Joann Cohn 90 Archipelago Newport Beach CA92657 Current - 1st Plan Check Architect of Record Zachary Sham Architect 2600 Newport Blvd suite 154 Newport Beach CA92663 949-675-7322 HYE4USC@earthlink.net Plan Checked By Ken Higbee ken.higbee@pdsd.ocgov.com 714-834-5960 Contact Address Zachary Sham Architect 2600 Newport Blvd suite 154 Newport Beach CA92663 949-675-7322 HYE4USC@earthlink.net Page 1 of 6 RS061252 OBTAIN CLEARANCES (approvals) from: School Fees See attached school fee worksheet Irvine Ranch Water District (949) 453-5300 Fire Authority Becky Schade, (714) 573-6134 1 Fire Authority Road, Building A (Jamboree @ Tustin Ranch Road) Irvine, California 92606 GENERAL INFORMATION This correction list covers plan check of residential occupancies (R-1, R-3) and garage/carports only. Recreational buildings, sales offices, retaining walls, etc. will require separate plan submittals to Commercial/Industrial Plan Check Section for approval. Application for which no permit is issued within 180 days following the date of application shall expire by limitation. An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant have prevented action being taken. In order to renew action for an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. Sec. 107.4. Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building permits. The Structural or Civil Engineer or Architect responsible for this project shall sign three final sets of plans. The third set is for the Assessor´s Office. Plans cannot be rechecked at the counter. Resubmit and allow additional time for recheck. The section Nos. and table Nos. called out in this correction list are from the 2001 California Building Code unless noted otherwise. Page 2 of 6 8/22/2006 9:55 AM RS061252 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES Notes must be shown as worded, on the title sheet of the plan 1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________ __________. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants. 6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated construction staging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporary area on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. Page 3 of 6 8/22/2006 9:55 AM RS061252 17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff, vehicle tracking, or wind. 18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff. Page 4 of 6 8/22/2006 9:55 AM RS061252 Residential Plan Check Corrections Sheet Comments By General K. Higbeec0.1 In your responses, please refer to the alpha-numeric reference numbers that are shown at the start of each of the following correction items. K. Higbeec6.2 Note on Plans: K. Higbeec7.2.1 Occupancy group, construction type. K. Higbeec8.2.2 Assessor´s parcel number. K. Higbeec5.3 Plans for single-family dwellings and duplexes are not checked for plumbing, mechanical and electrical code compliance. These disciplines are subject to field inspection. K. Higbeec9.4 See red notes on your plans for clarification of corrections or comments, and for additional corrections. K. Higbeec15.5 Place Form 00-01 to be completed by the architect, engineer or owner on the 1st sheet of plans (the site plan). If no special inspection and/or structural observation are required, the architect or engineer needs to include a note on the Site Plan to indicate that it is not required. NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM K. Higbeec11.6 Include "National Pollutant Discharge Elimination System Notes" on first sheet of plans. (This information is provided in the beginning of this document) K. Higbeec12.7 Provide Erosion and Sediment Control (ESCP) plan. Plot Plan K. Higbeec14.8 Show drainage of the site and disposal point on your site plan. Reference RDMD standard plan 1320. Roof K. Higbeec17.9 All new buildings and additions within the Special Fire Protection Areas shall have a Class A roof covering. All other new building roofing shall have minimum Class B. Clarify. O.C. Building Ordinance No. 03-003. K. Higbeec18.10 The unincorporated area of the County is considered to be a "Special Wind Region." All roof fasteners shall be installed per manufacturer´s instructions. Call out fasteners to resist wind loads for winds over 80 mph. O.C. Bldg. Ord. No. 03-003. Page 5 of 6 8/22/2006 9:55 AM = Indicates line item not Cleared. RS061252 Residential Plan Check Corrections Sheet Comments By Wind and Earthquake Design K. Higbeec20.11 Show the length of each shear wall. Page 6 of 6 8/22/2006 9:55 AM = Indicates line item not Cleared.