HomeMy WebLinkAbout06 - Gateway Park Improvements — Rejection of All Bids for Contract No.8791-1 (23L01)Q SEW Pp�T CITY OF z NEWPORT BEACH c�<,FORN'P City Council Staff Report October 25, 2022 Agenda Item No. 6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. Assistant City Engineer, tandefur@newportbeachca.gov PHONE: 949-644-3321 TITLE: Gateway Park Improvements — Rejection of All Bids for Contract No.8791-1 (231-01) ABSTRACT: The City of Newport Beach (City) recently advertised a project for various improvements to Gateway Park at the intersection of Newport Boulevard and Via Lido. The City received eight bids for the project. However, the three lowest bidders failed to comply with the contract documents requirement that the general contractor be responsible for more than half the work. Staff recommends rejecting all the bids and re -advertising the bids with certain bid items reclassified as specialty subcontract items. By reclassifying the bid items as specialty items, more contractors will comply with the bidding requirements. RECOMMENDATION: a) Determine this action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because this action will not result in a physical change to the environment, directly or indirectly; b) Reject all bids received for Contract No. 8791-1 and direct staff return all bidders bonds; and c) Direct staff to modify the bid documents and re -advertise the Gateway Park Improvements Project for construction. DISCUSSION: Gateway Park comprises of two areas of landscaping on either side of Newport Boulevard at Via Lido. The park requires some significant renovation to repair/replace damaged planter walls and the electrical system, freshen up the landscaping, and update the signage. Based on this scope, staff produced plans, specifications and an estimate for the project. At 10 a.m. on October 6, 2022, the City Clerk opened and read the following bids for this project: 6-1 Gateway Park Improvements — Rejection of All Bids for Contract No. 8791-1 (231_01) October 25, 2022 Page 2 BIDDER TOTAL BID AMOUNT Low Diamond Construction $ 477,128.00 2nd Bitech Construction Co., Inc. $ 595,959.00 3rd MMG Engineering, Inc. $ 657,657.00 4th California Landscape and Design $ 658,800.00 5th MBC Enterprises, Inc. $ 759,492.40 6th C.S. Legacy Construction, Inc. $ 739,000.68 7th MLC Constructors $ 921,695.20 8th Klassic Engineering and Construction, Inc. $ 1,022,323.30 While the low bid was under the project estimate of $482,448, a review of the bids determined that the lowest three bidders failed to comply with the project specification that require the prime contractor to perform more than half the required value of construction work. This self -performance requirement is part of the Standard Specifications for Public Works Construction. This section reads, in part: 2-3.2 Self Performance The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or in the Special Provisions. The low bidder was proposing to perform only 37% of the work with its own forces. The second low bidder 44% and the third low bidder 40%. Based on the bid analysis and current tight contracting market, certain bid items are more likely to be subcontracted. These include signage, electrical work, and some landscaping items. Due to the narrow nature of the work and the type of contractors and suppliers involved, these items will now be considered specialty. It is recommended that City staff now reclassify certain bid items as "Specialty Items" for subcontracting, and re -advertise the project. FISCAL IMPACT: There is no fiscal impact related to this item. ENVIRONMENTAL REVIEW: Environmental review will occur as appropriate as part of the redesign of the project and will be presented to the City Council at that time. Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. 6-2 Gateway Park Improvements — Rejection of All Bids for Contract No. 8791-1 (231-01) October 25, 2022 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 6-3 ATTACHMENT A nmm�n� � ► �° nnnnnN IIIIIIIIII/ '� i�� IIIIIIII/: _ � �j�i - LIMITS OF WORK GATEWAY PARK ENHANCEMENT LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8791-2 221-01 10/25/22