Building Plan Check Comments
It is the responsibility of the applicant to satisfy the requirements and comments listed in this
document. Corrections shall be made on the original plans. If you make changes to the original plan
other than or in addition to what Plan Check has requested, yellow highlight the changes on the re-
submitted plans.
Payment of a new plan check deposit may be required for all plans on which no action is taken by the
applicant for a period of 180 days. Applications for which no permit is issued within 180 days following
the date of submittal shall expire by limitation and shall be discarded.
To view your project status and the latest comments list, please visit: myOCeServices.ocgov.com.
Please note that the OC Development Services Public Counter Hours are open Monday through Friday
from 8:00 a.m. to 4:00 p.m. except holidays.
Project Number: OC19-08688 - Norouzian Residences
Permit Number: BLD19-2396
Description: Addition to Kitchen (256 sqft) and Garage Areas (140 sqft).
Code Year: 2016
Job Address: 94 ARCHIPELAGO DR,NEWPORT
COAST,CA,92657
Owner Address:
Reza Norouzian
Architect of Record:
Bruce Shindelus
bruceshindelus@sbcglobal.net
(818) 735-9437
Engineer of Record:
Project Manager:
OCPW PROD Site Guest User
, ,
noreply-myoceservices@ocgov.com
OC DEVELOPMENT SERVICES
2
Other Reviewers:
Review Name Review Owner Status Due Date Completed
Date
Building & Safety Review-
BLD19-2396
Behrouz Azarvand Corrections
Required
12-11-2019 12-10-2019
Planning Review-BLD19-
2396
Martin Angel Approved 12-11-2019 12-04-2019
GENERAL INFORMATION
• Plans will not be rechecked at the counter, allow a minimum of ten (10) working days for recheck.
• Application for which no permit is issued within 180 days following the date of application shall expire by
limitation.
• An extension of 180 days may be granted upon written request showing circumstances beyond the
control of the applicant have prevented action being taken. In order to renew action for an appli cation
after expiration, the applicant shall resubmit plans and pay a new plan check fee.
• Valid Worker's Compensation Certificate or Owner-Builder Verification is required prior to issuance of
building permits.
• Authorized agents for owner-builders must have a notarized statement from the owner authorizing the
agent to act on behalf of the owner. A copy of the form may be obtained from
http://www.ocgov.com/gov/pw/ds/.
• Obtain all clearances as noted on the MyOCeServices permit portal. Prompt attention is suggested as
there can be delays from other departments reviewing the project.
• Upon receiving the inspection report from grading inspection and based on the determination made by
the Building Official, a grading permit and rough grading approval may be required.
• Building permit will not be issued until Rough Grading approval is obtained from the grading inspector.
Contact the plan checker for additional information.
It is the contractor or owner-builder's responsibility to provide one hard copy set of plans with the County
approval stamp in the field for the inspector to view.
HOW TO RESUBMIT ONLINE
1. Log into www.myOCeServices.ocgov.com.
2. Select the “myOC eServices Account” tile on the homepage or click “Dashboard” at the top of page.
3. Use the left-hand menu bar to locate the application in question, either under “Permit Applications” or
“Projects and Packages”.
4. Once on the Permit or Package detail page, select the “Resubmittals” tab.
5. Attach* all submittal requirements identified by selecting the “Add Attachment” button. Provide a
comment in the “Applicant Comment” field, if applicable.
OC DEVELOPMENT SERVICES
3
6. Respond to all comments on the “Comments & Responses” tab.
7. Once steps 5 and 6 are complete, click “Submit”. Please verify that your resubmittal is complete, as all
incomplete resubmittals will not be accepted for plan check review.
8. Note that you can save your work at any time by clicking “Save” at the bottom, to resume at a later ti me.
* The PDF files submitted must be stamped and signed by the responsible registered professional (e.g. civil
engineer, architect, engineering geologist, etc.).
* A 4”X4” space located 1” from the top paper edge and 5” from the right paper edge of all full sized plan sheets,
either 24”x36” or 30”x42”, shall be left blank to receive the County's electronic approval stamp. Other page sizes
shall be scaled accordingly.
4
Notes must be shown as worded, on the title sheet of the plan.
1. In the case of emergency, call
at Work Phone #
or Home Phone #
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent
properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP’s for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to
streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment
and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good
housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed
in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site.
Discharges of material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution,
contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR Parts 117
and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, sta ins, sealants, glues, limes,
pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and
hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or
floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and super chlorinated potable water line
flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporary area on-site,
physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal
requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-
contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional
Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day.
Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where
impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved
plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of
chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall
be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is
imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast
exceeds 40%.
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of erosion and sediment
controls to the maximum extent practicable, and stockpiles of soil shall be properly contained to minimize sediment transport from
the site to streets, drainage facilities or adjacent properties via runoff, vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff.
300 N. Flower Street, Santa Ana, CA 92703 www.ocpublicworks.com
P.O. Box 4048, Santa Ana, CA 92702-4048 P: 714.667.8888 I F: 714.667.7575
Revised 02/2017 ocpCustomerCare@ocpw.ocgov.com
NPDES Notes
OC DEVELOPMENT SERVICES
5
PLAN CHECK COMMENTS
Permit Application No. BLD19-2396
Plan Check No. First Submittal-BLD19-2396
Plan Check Date 12-10-2019
Applicant Milad Alvandi
Submittal Date 11-18-2019
# Review Category Comment Applicant Response Status File Name
& Page
1.001 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
All plans shall be to scale, show scale of
the drawings on all sheets of plans.
Required
1.002 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
Provide cross sections and show locations
of the sections on floor plans.
Required
1.003 Building &
Safety
Review-
BLD19-2396
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
shower and toilet compartment shall be
30" wide minimum, show dimensions on
Required
shown on all sheets all
1 and 2 on a2
noted a2 a2
OC DEVELOPMENT SERVICES
6
# Review Category Comment Applicant Response Status File Name
& Page
Behrouz
Azarvand
plans.
1.004 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
Provide Title 24 Energy calculations.
Required
1.005 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
show sizes of the insulation in walls and
floors as per the recommendations of the
T-24
Required
1.006 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
Provide County of Orange special
inspection and structural observation form.
Forms shall be completed, signed and
dated.
Required
provided by contractor
noted a2
t24
a2
OC DEVELOPMENT SERVICES
7
# Review Category Comment Applicant Response Status File Name
& Page
1.007 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
Specify concrete to be 4,500 psi with
water cement ratio of .45 and cement type
V (County of Orange Policy)
Required
1.008 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
Add weight of the folding door of dead
loads of the HDR # 5, check max
deflection allow by the door manufacturer.
Required
1.009 Building &
Safety
Review-
BLD19-2396
Behrouz
Azarvand
Residential Plan
Check List
2016 Residential Plan Check List -
General Construction Requirements
See plans for additional comments.
Required