Loading...
HomeMy WebLinkAboutPA2022-0220_20221012_PRR_FireTmplt: 06/07/19 P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: Building – Tonee Thai Public Works – David Keely Fire – Kevin Bass Date: October 10, 2022 Please return PRR and Plans to Staff Planner Jenny Tran, Assistant Planner 949-644-3212, jtran@newportbeachca.gov Applicant: Forkert Engineering & Surveying, Inc. Contact: Thomas E. Decker 714-963-6793 ext. 244 tomd@forkertengineering.com Project Name Thomas James Real Estate Services, Inc. Condominiums Address: 708 & 708 ½ Larkspur Avenue PA2022-0220 Tentative Parcel Map A request for a tentative parcel map for residential condominium purposes. The tentative parcel map will allow for the two units of a duplex that is under review to be sold individually. REPORT REQUESTED BY: October 20, 2022 Zoning Administrator: Hearing Date: TBD Check all that apply:  No comments on the project as presented. Notes: No fire sprinkler systems are required for the existing residences. Any demolition and construction of a new residence(s) will require installation of a fire sprinkler system. A 3-foot wide fire department access way is required on one side of the property from the street to the alley. Kevin Bass 3108 10/12/22 Signature Ext. Date  Application of Standard Code requirements are not expected to alter the project design.  Recommended conditions of approval are attached.  Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project.  I contacted the applicant on  To schedule an appt. for Code review  To discuss the following (see notes) PA2022-0220