AT&T Project Number: CLL00938
Project Name: TBD
City of Newport Beach
Application for a Wireless Communication Facility
Project Information, Justification, Alternative Site Analysis
AT&T Mobility (AT&T) is requesting approval of a Conditional Use Permit for the construction and operation of an
unmanned wireless telecommunications facility (cell site), and presents the following project information for your
consideration:
Project Location
Address: 1300 Irvine Ave, Newport Beach, CA 92660
APN: 425-071-06
Zoning: Parks and Recreation
Project Representative
Chris Doheny
Smartlink Group
3300 Irvine Ave., S-300
Newport Beach, CA 92660
619-994-8528 cellular
chris.doheny@smartlinkgroup.com
AT&T Contact
Christie Asari-Price, Project Manager
1452 Edinger Ave.
Tustin, CA 92780-6246
ch0897@att.com
714-476-3479
Project Description
AT&T proposes to build an unmanned wireless telecommunications facility consisting of a three (3) sector array
with four (4) panel antennas per sector that is disguised within the branches of a 50’ tall (Includes 5 Feet of Top
Branches) faux pine tree, designed to blend in with and compliment the surroundings vicinity. All associated
equipment will be located within an equipment enclosure. AT&T will work with the city and the community to
install a state-of-the-art stealth structure that will improve communications services for the residents and visitors
in the community area and city as a whole.
PA2022-0162
Page 2 of 5
Project Objectives
A wireless carrier requires the installation of a cell site within a specified area to close a “significant gap in
coverage.” Other criteria for selecting sites include the following:
•The radio signal must be of sufficient strength to achieve consistent, sustainable, and reliable service to
customers at a level sufficient for outdoor, in-vehicle, and in-building penetration with good voice quality
(Threshold, 15.85 db).
•When nearby other sites become overloaded and more enhanced voice and data services are used (4G
and other high-speed data services), signal contracts and a gap is created. With heavy use it is intensified
due to the unique properties of digital radio transmissions.
In this specific case, AT&T’s radio-frequency engineers (RF) identified a significant gap in coverage in the vicinity
between Santiago Dr. south to Mariners Dr community . See enclosed radio-signal propagation maps.
Alternative Site Analysis
AT&T’s gap in coverage in this instance includes a search ring of predominantly residential homes, within the city
of Newport Beach. The area that includes PR zoning on the south edge of the search ring provide a location to
serve the community.
Exhausted Search Ring
AT&T conducted an extensive search in the community of Newport Beach and Costa Mesa to locate a
candidate that would meet both zoning and interest in a proposed facility. The zoning for both the City of
Costa Mesa and Newport Beach included in our search ring consist primarily of residential zoning, which
limited our options to propose a facility.
1.Jordan Park – City of Costa Mesa – Unable to move forward with proposed facility, height and setback
limitations.
Figure 1
Current Gap in Coverage and New Coverage
PA2022-0162
Page 3 of 5
Findings/Burden of Proof
The site for the proposed use is adequate in size and shape.
AT&T is proposing a stealth design for this project which is concealed within the branches of the mono-
tree and in accordance with the City of Newport Beach Municipal Code. All cellular equipment and
antennas are disguised and screened from public view. The requested height of the faux mono-pine tree
is the minimum height needed to fill the significant gap in coverage for this project. AT&T uses the most
advanced technology to design the equipment shelter to blend the architecture with the surrounding
community and thereby minimizing the visual impact of the site.
The proposed location has sufficient access to streets and highways that are adequate in width and pavement type
to carry the quantity and quality of traffic generated by the proposed use.
The proposed project is east of Irvine Ave. and South of Dover Dr., in a PR zone. The proposed
project is in an area of primarily residential communities. The location and height provide
adequate line of sight to meet the gap in coverage of the surrounding communities requiring
coverage. There are adequate access routes directly to the proposed facility.
The proposed use will not have an adverse effect upon adjacent or abutting properties.
The project is proposed within an PR zone and will not have an adverse effect upon adjacent or
abutting properties as it is a stealth design that will blend naturally with the subject property and
the surrounding community. The project will provide a public benefit of better wireless
telecommunications and data services to the surrounding neighborhoods and community.
The proposed use is deemed essential and desirable to the public convenience or welfare.
The new wireless telecommunications facility is in high demand to the residents and visitors of
the community of Newport Beach. Wireless communications are vastly used in this area and the
need for this site was established entirely from increased usage of AT&T services in the vicinity of
the requested project.
GENERAL INFORMATION
Site Selection
Customer demand drives the need for new cell sites. Data relating to incomplete and dropped calls is gathered,
drive-tests are conducted, and scientific modeling using sophisticated software is evaluated. Once the area
requiring a new site is identified, a target ring on a map is provided to a real estate professional to begin a search
for a suitable location.
During an initial reconnaissance, properties selected for evaluation for installation of a cell site must be located in
the general vicinity of the ring, possess an appropriate zoning designation, and appear to have enough space to
accommodate an antenna structure and supporting radio equipment. The size of this space will vary depending
on the objective of the site. The owners of each prospective location are notified to assess their interest in
partnering with AT&T.
PA2022-0162
Page 4 of 5
Four key elements are considered in the selection process:
•Leasing: The property must have an owner who is willing to enter into a long-term lease agreement
under very specific terms and conditions.
•Zoning: It must be suitably zoned in accordance with local land-use codes to allow for a successful
permitting process.
•Construction: Construction constraints and costs must be reasonable from a business perspective, and
the proposed project must be capable of being constructed in accordance with local building codes and
safety standards.
•RF: It must be strategically located to be able to achieve the RF engineer’s objective to close the
significant gap with antennas at a height to clear nearby obstructions.
The Benefits to the Community
Approximately 90-percent of American adults subscribe to cell phone service. People of all ages rely increasingly
on their cell phones to talk, text, send media, and search the Internet for both personal and business reasons.
More and more, they conduct these activities in their homes, therefore, becoming reliant on adequate service
within residential neighborhoods. In fact, 50-percent of people who relocate are not signing up for landline
service at their new location and are using their cell phone as their primary communication method.
The installation and operation of the proposed facility will offer improved:
•Communications for local, state, and federal emergency services providers (i.e., police, fire, paramedics,
and other first-responders).
•Personal safety and security for community members in an emergency, or when there is an urgent need
to reach family members or friends. Safety is the primary reason parents provide cell phones to their
children. Currently 25 percent of all preteens, ages 9 to 12, and 75 percent of all teens, aged 13 to 19,
have cell phones.
•Capability of local businesses to better serve their customers.
•Opportunity for a city or county to attract businesses to their community for greater economic
development.
•Enhanced 911 Services (E911) – The FCC mandates that all cell sites have location capability. Effective site
geometry within the overall network is needed to achieve accurate location information for mobile users
through triangulation with active cell sites. (Over half of all 911 calls are made using mobile phones.)
Safety – RF is Radio
The FCC regulates RF emissions to ensure public safety. Standards have been set based on peer-reviewed
scientific studies and recommendations from a variety of oversight organizations, including the National Council
on Radiation Protection and Measurements (NCRP), American National Standards Institute (ANSI), Institute of
Electrical and Electronics Engineers (IEEE), Environmental Protection Agency (EPA), Federal Drug Administration
(FDA), Occupational Safety and Health Administration (OSHA), and National Institute for Occupational Safety and
Health (NIOSH).
Although the purview of the public safety of RF emissions by the FCC was established by the Telecommunications
Act of 1996, these standards remain under constant scrutiny. All AT&T cell sites operate well below these
standards, and the typical urban cell site operates hundreds or even thousands of times below the FCC’s limits for
safe exposure.
AT&T Company Information
PA2022-0162
Page 5 of 5
AT&T is one of the fastest growing nationwide service providers offering all digital voice, messaging, and high-
speed data services to nearly 30 million customers in the United States.
AT&T is a “telephone corporation”, licensed by the Federal Communications Commission (FCC) to operate in the
872-1962 MHz and 827-1877 MHz frequencies, and a state-regulated Public Utility subject to the California Public
Utilities Commission (CPUC). The CPUC has established that the term “telephone corporation” can be extended
to wireless carriers, even though they transmit signals without the use of telephone lines.
AT&T will operate this facility in full compliance with the regulations and licensing requirements of the FCC,
Federal Aviation Administration (FAA) and the CPUC, as governed by the Telecommunications Act of 1996, and
other applicable laws.
The enclosed application is presented for your consideration. AT&T requests a favorable determination and
approval of this Conditional Use Permit application to build the proposed facility.
Please contact me at 619-994-8528 or chris.doheny@smartlinkgroup.com for any questions or requests for
additional information.
Respectfully submitted,
Chris Doheny, Smartlink Group
Authorized Agent for AT&T