HomeMy WebLinkAbout12 - Via Lido Soud and Nord Pavement Rehabilitation (Project No. 21R11) — NOC for Contract No. 7992-1Q �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report November 29, 2022 Agenda Item No. 12 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Michael J. Sinacori, Assistant City Engineer, msinacori@newportbeachca.gov PHONE: 949-644-3342 TITLE: Via Lido Soud and Nord Pavement Rehabilitation (Project No. 21 R11) — Notice of Completion for Contract No. 7992-1 ABSTRACT: On January 11, 2022, the City Council awarded Contract No. 7992-1 for the Via Lido Soud and Nord Pavement Rehabilitation project to All American Asphalt. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Total Contract Total Contract Percent Contract Amount Amount Change Amount Cost Change $958,859.00 $1,111,864.85 +$153,005.85 +16% Allowed Contract Time + Approved 80 Actual Time Used (Days) 59 Extensions (Days) _ 12-1 Via Lido Soud and Nord Pavement Rehabilitation (Project No. 21 R11) — Notice of Completion for Contract No. 7992-1 November 29, 2022 Page 2 The Via Lido Soud and Nord Pavement Rehabilitation Project (Contract No. 7992-1) included cold milling and overlaying the existing asphalt street pavement on Via Lido Soud, Via Lido Nord and Via Antibes with new asphalt concrete pavement. Deteriorated sidewalks, cross gutter and curb access ramps at isolated locations were reconstructed, impacted utility structures were adjusted to grade, and new pavement striping was installed. The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final Contract Cost: $958,859.00 $891,956.18 $219,908.67 $1,111,864.85 Four change orders totaling $219,908.67 were approved as part of this project that provided for additional sewer cleanout adjustments, rolled curb and gutter replacement, additional asphalt concrete required for paving, striping for a new crosswalk located at Via Lido Soud and Via Koron, pavement replacement on Park Avenue between Collins Avenue and Ruby Avenue, and full depth asphalt concrete pavement repairs in Newport Heights. On February 8, 2022, the City Council awarded Contract No. 8792-1 in the amount of $429,748 to Excel Paving for the Street Pavement Repair Program, of which most work was to be in Newport Heights ahead of the annual slurry seal program. As part of this project, the City Council authorized an additional 25 percent contingency as bid prices were good and additional necessary pavement work had been identified. Unfortunately, Excel declined or overpriced most of the requested extra work and thus it was not completed. On June 23, 2022, a budget amendment was authorized by the City Council increasing these projects' (Via Lido Soud and Nord Pavement Rehabilitation) contract contingency to 20 percent in order to have All American Asphalt complete the necessary pavement repairs in Newport Heights that were not addressed by Excel Paving. The pavement replacement related increases for Park Avenue and Newport Heights represent 10.8 percent ($148,674.75) of the total change orders. With contract savings associated with reductions in some of the original bid items, approximately $66,902.83, the final contract cost was approximately 16 percent higher than the original bid amount. The final contract cost was $1,111,864.85. The savings on the original bid items included fewer grade adjustments for water valves, manholes, and less full depth asphalt concrete pavement repairs. 12-2 Via Lido Soud and Nord Pavement Rehabilitation (Project No. 21 R11) — Notice of Completion for Contract No. 7992-1 November 29, 2022 Page 3 A summary of the project schedule is as follows: Estimated Start of Construction per Annual Baseline Schedule February 14, 2022 Actual Start of Construction Per Notice to Proceed February 7, 2022 Extended Contract Completion Date Inclusive of Extra Work July 9, 2022 Actual Substantial Construction Completion Date April 29, 2022 Post construction close-out items and pavement repairs in Newport Heights (change order No. 4) delayed the close-out of this contract. The project was substantially completed to the satisfaction of the Public Works Department by April 29, 2022. FISCAL IMPACT: Funds for the construction contract were expended from the following account(s): Account Description Account Number Amount General Fund (GF) 01201927-980000-21R11 $ 513,150.00 Water Enterprise Capital 70201931-980000-21 R11 503,714.85 Wastewater - Sewer Grade 71101-980000-20R09 $ 45,000.00 Adjustments 01201927-980000-22R03 50,000.00 GF - Street Pavement Repair Program Total: $ 1,111,864.85 ENVIRONMENTAL REVIEW: On January 11, 2022, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301(b)(c) Class 1 (maintenance of existing public facilities involving negligible or no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 12-3