Loading...
HomeMy WebLinkAboutX2021-1827 - Alternative Material & Methods (3)xaba►- 14a-1- CITY OF NEWPORT BEACH O , COMMUNITY DEVELOPMENT DEPARTMENT 6 yk, S BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 C'1LIFo0.Ny4 www.newoortbeachca.cov i (949) 644-3200 rnec hun . %,jr,GEIVEO &y COMMUNITY DEVELOPMENT OCT 12 2022 CITY OF FOR STAFF USE ONLY OR❑REQUEST FOR MODIFICATION TO PROVISIONS 21 OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE) ck #O # of Stories OF THE NEWPORT BEACH MUNICIPAL CODE y Classif cation ii (Sea Reverse for Basis for Approval) (Fee $297) ilding# of Units /tatus rFfItems � ROVAnREQUEST FOR ALTERNATE MATERIAL ion TypeIOR METHOD OF CONSTRUCTION y ('�. '4i, e / (See Reverse for Basis for Approval) (Fee $297) ms Fee due For above requests, complete Sections 1, 2 & 3 DISTRIBUTION: below by printing in ink or typing. ❑ Owner ❑ Plan Check Petitioner ❑ Inspector ff Fire ❑ Other JOB ADDRESS: PETITIONER: SITE ADDRESS: 3001 Carob St. Petitioner AMK Studios Architect Owner Marco Loures (Peddoner he he architect or engine) Address 3001 Carob Street Address 1401 Dove St. Suite 230 Zip 92660 Zip 92660 Daytime Phone ( ) Daytime Phone ( 949) 863-3000 Email: aediourian@amkstudio.com 2 REQUEST: Submit plans if necessaryto illustrate request. Additional sheets or data may be attached. To provide less than the code minimum vertical separations between earth and exterior wall sill plate, and exterior hardscape and stucco weep screed. 3JJUSTIFICATIONIFINDINGS OF EQUIVALENCY: CODE SECTIONS: 1 2019 CRC. R. 703.7.2.1 The moisture barrier and S.S. flashing shown in the attached detail provide protection of the wood structure equivalent to the separationsprescribed in the building code. Pe"e Position Partner/Officer of AMK Studio, Inc rine Edjourian , AIA natunCA Professional Lie. # C33819 Date: Oct 3, 2022 FOR STAFF USE ONLY DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8 (Alternate materials & methods) (CBC Modification) ❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached By: Date ❑ Request (DOES) (DOES NOT) lessen any fire protection requirements. ❑ Request (DOES) (DOES NOT) lessen the structural integrity The Request is: ❑ Granted ❑ Denied (See reverse for appeal information) ❑ Granted (Ratification required) Conditions of Approval: Signaiz i� —= ' Position CHIEF BUILDING OFFICM' . Print Name APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) (Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.) CASHIER RECEIPT NUMBER: LEC —00 37Z re1—Zo-z2, Formstmodif 07/08/22 B�PG� Guidelines for Approval of Alternate Materials. Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made. Requirements for Submittals The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the applicable data listed below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative is compatible with balance of code requirements. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information). • Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as necessary. The design professional has the responsibility to coordinate all construction documents and ensure compatibility between documents. • The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal procedure. • For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to start of design. Alternative Design Review/Verification The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to the Building Division prior to commencing the review. • Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that evaluation and design methods used by designer are appropriate to the alternative proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and possible flaws that could affect performance of material in its installed state. • The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable reason(s). Inspection/Field Verification The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as follows: • To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturers and engineer's installation procedures, inspectors should check product labeling, certification, quality assurance processes, and testing, as applicable. • When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved plans. Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or providing equivalency would create an unreasonable hardship. Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date. 2x FRAMING BUILDING PAPERS 0/ WRB 0/ C.R. METAL FLASHING 0/ C.R. METAL BASE SCREED — 2X BACKING PRESSURE TREATED SILL PLATE C.R. METAL BASE SCREED WITH WEEP HOI FS 3 1/ 2" tal4�I+c d PER CODE REQUIREMENTSmuj4g. 2Cr.R763.73.I - Swc a PWz CONCRETE WALK —� E I i SL ` FLEXIBLE SEALANT PROTECTOWRAP" Min I`b" abConTn PROTECTO SEAL 45 MOISTURE BARRIER S.ST. C.R. METAL FLASHING- bv-cr , bi�dH"h EXTEND UP BEHIND BASE SCREED " ul�r T (GUh�mvuvs weep scree 3 COAT STUCCO - NO TRIM AT PORCH/PATIO SCALE. 3"-I'-0" k-C)• zz . ?,311100 IU¢<] AM