HomeMy WebLinkAboutX2021-1810 - Alternative Material & Methods (2)a
xaozk-\%ko
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www newoortbeachca aov 1 (949) 644-3200
��A. 6
u
JvN C ✓.
4�
✓ C�
REQUEST FOR MODIFICATION TO PROVISIONS-
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
FOR STAFF USE Y 'iLJ. ,�
—
y --
Plan Check # I$(eo- 20914 of Ste isN`t
�`J�j�--
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $276)
REQUEST
Occupancy Classification
Use of Building $
FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
# of Units
Project Status L)
(See Reverse for Basis for Approval) (Fee $276)
Construction Type V &
REQUEST FOR EXEMPTION FROM DISABLED
Verified by
ACCESS DUE TO PHYSICAL OR LEGAL
No. of Items j
Fee due
CONSTRAINT (Fee $1,535)
(Ratification by the Board of Appeals will be required.)
DISTRIBUTION:
❑ Owner Plan Check
For above requests, comp/etc Sections 1, 2 8 3
❑ Petitioner ❑Inspector
below by printing in ink or typing.
❑ Fire ❑Other
1 JOB ADDRESS:
PETITIONER ADDRESS
SITE ADDRESS: 438 Angelita Drive
Petitioner Roy Reed (Engineer)
Owner Greg Gabriel
(Petitioner to be architect o eeagineer)
Address 3615 Seabreeze Lane
Address 7727 Caminito Liliana
Newport Beach, CA Zip 92625
San Diego, CA Zip 92129
Daytime Phone ( )
Daytime Phone (760 ) 586-8121
2 REQUEST: Submit plans if necessary to illustrate request. Additional Sheets or data may be attached.
orrosion protection of steel soldier piles in direct contact being achieved by use of carboline epoxy coating.
3 USTIFICATION/FINDINGS OF EQUIVALENCY:
CODE SECTIONS:
See attached product spec sheet. A small portion of soldier beam web/flange
section does not have concrete cover because of the need to install lagging.
Corrosion protection is rovided through the use of carboline epoxy aint.
Petitioner's Position Principle Engineer
Signature CA Professional Lic. # C80503 Date 9/1/2021
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8
(Alternate materials & methods) (CBC Modification)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached
BY: Date
❑ Request (DOES) (DOES NOT) lessen any fire protection requirements.
❑ Request (DOES) (DOES NOT) lessen the structural integrity
The Request is Granted ❑ Denied (See reverse for
❑ Granted (Ratification required) appeal information)
Conditions of Approval:
Signature Po tionCHIEF BUILDING OFFICl/tte 1 3 O2
Print Name
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: 1-0 01 t LS Ill F.micniodif 11102/2016
Xt02A'1$ (1)
Guidelines for Approval of Alternate Materials Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that
such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:, I ` '
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed 'alternative' versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate
method to ensure continued compliance.
• State how and where alternate proposal is Incorporated within construction plans and prepare plan
amendments as necessary. The design professional has the responsibility to coordinate all construction
documents and ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design ReviewfVerification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant
to the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to'legal 'or"physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship. -
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
EXISTING RESIDENCE
I
L
1/� 4 O —` — IDL PROPERN LINE (SEEELELA DN)OPERTY LINE SEE ELEVpTON FOR SPACING i EPDXY COAT ENTIflE BACK MNGE
VOIDSh9'OF WEB, E9INC ZES IN TOE TIMBER WGGINI FILL CONCRETE
TE OR L\GGING WITH [ONCgETE TOE "H"r I 5
11 TI LEAN CONCRETE OR COMPACTED $OIL
6"MIN.
_ WATER REPORTING-
PROPOSED TEMPORggy "" _ B DRAINAGE BOARDS
REINING (SEE SHEET 5X2) BY OTHERS) PROPOSED SUBTERMNEAN
- ' 1 - BUILDING WALL (BY OTHERS)
J _ — BLOCK 0 RY TIMBER ,. BURN HOLES THROUGH SOLDIER
BLOOM OUTS PIACED qT --- 2 CLR'J BUILDING WALL LONGITUDINAL REINFORCEMENT
INTERIOR FACE OF WALLEON MIN BEAM WEBS FOR LONGINGLUAL RD— TO ARUL I URAL DRAWINGS)
F SOLDIER BEAM REMOVAL RESAR(1"DN.M .,
SHORING(SEESHEETRH3) I CUT E REMOVE PROTRUDING WEB E MNGE UPON
COMPLL ONOFNEPROPOSEDSTRUCTIIIANO)OR
INSTALI6 RFA,OVE NP OF SOIdIEq BEAMS p16 FOR 45 DIRECTED BYTHE STRUCNRAL ENGINEER OF
_ BL.PKLATON OF ppOPOSED SITE WALL RECORD. FILLALL VOIDS WITHCN APPROVED
PROPOSED LOWER LEVEL = _ BLOCK OUT SOLDIER BEAMS p)-Ij AS SHOWN, NON /y I SHRINK GROUT ACCORDING TO PROJECT
_ II I\ �� SPECIFI[pTONS.
PER
TT:MPORARY 1.1 SLOPE `PROPERTY LINE F=t— hWNENTLY ENCASED SOLDIER BEAM PUN DETAIL -SB# 7-13
(BY OTHE
a =+• 4 - — —
Rs TYPICAL) 1 �4J
I I -I
" — — - RE UEST FOR ALTERNATE MATERIAL
T 21 ASNALLPORTION OFSOLOIER 06VAS XJ9J BEAA1)FWNGESECTION GOES NOT E411 CONCRETE COVER BECAUSE OFTXE NEED TO
INSTgLL LiGGING. CORROSION PROTECTION IS PROVIpfD THROUGH THE USE OF
A I CARBOLINE PROXY PAINT, AS 1H0`NN IN DETAIL 2)SH,0
y:�-
TG1PORgflY 1 1 SLOPE
IBY OTHERS TYPICAL) _
/0 R 1O 20
�i0
CIiAPHIC SCPLE/t"
fdrCITY OF NEWPORT BEACH
I {^r%) COMMUNITY DEVELOPMENT DEPARTMENT
1, „AMc UIL.TDOWDRIC,
C
m " w9 PIUS
IN 1 0,P9
Cp5E N0,:
K`AA— FOR
etl Ta
PARAA-P oe og
OF x'F NNAASnz ePA� °.Ie° E:O �oo.I Dae<
� NE4E,9i ANR"wIN' ISIPAFIC . co FAA PAID
%.FarvmuP 4F �mrgppue9 z 9ee AT, I ry e. ur
�nmu� HAD
N+�meNerx,�emanPAWAL OR�cvn0. sEo..stsu] n
P slow 6Y I.
A.,n I ITolz ,]69 p Fre ppNceLO�F
PICK LjIM
I.. PII11cU
(�
`O"`• `P. ❑APP,a.a ❑D'eP w..a m Kae m
PROPERTYLINI
MATING RESIDENCE
C�b®e Carboguard® 890
jjjjnw
Carboguard® 890
noxlw:u
AN
w4 O�sK
T^•i
anum.u'z _
m
o0" . eirto�e
.m.M
�.�....
..._
....m.,m.,�. .,.....,,,_,
NO
ui.
w..w
a..ne vm
u rw
wnrenm
vw.. a.aowu.,
Wam
a
AnaP.
AN n,ot n ,m ,,,. a,ummxm
o. e.e.vm e
rvvvsamm
nt ae
sue..
PAT
"�
"4lua wN�
+v „ an
IAA
d nu .,. m, x nmaon oz
AK.
il
emeral IdY
amr..ew
In ounavnPT
wrxM9 f'tWP z.,,
A'
R T
,+P—PA—A..,....c,nwm
nm. o,wan.emi,`,,,imy
AGO= n.
PA
PIPES
carbo„ ee
_.n m..
. AA. a,
SHORING DESIGN GROUP
��
)J GM,INITOI(760S
$AN OIEGO, Cp 9$139, (J60)586 B1)1
I1-22-2021
Mm
I II SHEET
cu n
a4
EXISTING RESIDENCE
PROPOSED TLI10 ARY J
SHORING (SEE SHEET SH2) l
JJJ _ PROPOSED INABO ARY
SHORING (SEE SHEET SH31
PROPOSED LOWER LEVEL 1
v 1
f T A J (BYMOTHERS 1 1 SLOPE
- 21
TEMPORARY 1 1 SLOPE
I YOTHERS —CALI v=
°+PROPOSED GUEST HOUSE /'
PROPERT'
GUSHING NCSIW.CE
—
Know what's below,
Call before you dig.
DR9 At ERTII TWO WORKIN VS SEFO0.E
ALL IXISTING UTILRIES ... NOTOESHOWN ON THESE PLAN$
DIG ALERT GENERAL CONTRACTOR SHALL LOCATE 1 POTHOLE
(AS NEEDED). ALL EXISTING UTNTIES BEFORE SHORING WALL
CONSTRUCTION BEGINS.
STAT OF A IFORNIA
DEPARTMENT OF INDUSTRIAL RELATIONS
DIVISION OF OCCUPATIONAL SAFETE AND HEALTH
TRENCH/EXCAVATION PERMIT NO.
l.T
PROPOSED IMPROVEMENTS
IMPROVEMENT SYMBOL
TEMPORARYSOLDIERREAM I
TEMPOURY TIMBER LAGGING
SOLDIER BE" COUNT
�PROPEAIY LINE
P
.. DETAIL/SECTION CANGETS %
SX%
3,12 DFQ TIMBER LAGGING
SHORING DESIGN GROUP
��
712LILIANA
AN OIEGO CAMINITO . CA 92129, (76p)5B60121
LEGEND
T.O.W.. TOP OF WALL
B. D.W = BOTTOM OF TEMPORARY SOLDIER BEAM WALL (BOTTOM OF LAGGING)
BY OTHERS- WORK OUTSIDE SHORING SCOPE
BE)PROPOSED
(E)=EXISTING
SCOPE OF WORK
TEMPORARY SOLDIER BEAM SHORING WALL. APPROXIMATELY 162 LF AND
AN IXPOSEp SURFACE AREA TOTALING 2,090 SQUARE FEET, AS SHOWN IN
SHEETSSH M5 HEREIN.
I[ New CunOm Hums 11
11-23-2021
SHEET
SS1
D .C.fB50R
I„D21
IX3'BI3 DAf
(all
H—1