SUBJECT: FINDINGS AND CONDITIONS OF APPROVAL FOR
TENTATIVE PARCEL MAP (PA2022-0215)
1511 Cliff Drive
FINDINGS:
1. That the design of the development will not conflict with any easements acquired
by the public at large for access through or use of property within the proposed
development.
2. That public improvements will be required of the Applicant per the Municipal
Code and the Subdivision Map Act.
CONDITIONS:
1. A parcel Map shall be recorded. The Map shall be prepared on the California
coordinate system (NAD83). Prior to recordation of the Map, the
surveyor/engineer preparing the Map shall submit to the County Surveyor and
the City of Newport Beach a digital-graphic file of said map in a manner
described in Section 7-9-330 and 7-9-337 of the Orange County Subdivision
Code and Orange County Subdivision Manual, Subarticle 18. The Map to be
submitted to the City of Newport Beach shall comply with the City’s CADD
Standards. Scanned images will not be accepted.
2. Prior to recordation of the parcel map, the surveyor/engineer preparing the map
shall tie the boundary of the map into the Horizontal Control System established
by the County Surveyor in a manner described in Section s 7-9-330 and 7-9-337
of the Orange County Subdivision Code and Orange County Subdivision Manual,
Subarticle 18. Monuments (one inch iron pipe with tag) shall be set On Each Lot
Corner unless otherwise approved by the Subdivision Engineer. Monuments
shall be protected in place if installed prior to completion of construction project.
3. All improvements shall be constructed as required by Ordinance and the Public
Works Department.
PA2022-0215
4. An encroachment permit is required for all work activities within the public right-
of-way.
5. Reconstruct the existing broken and/or otherwise damaged concrete curb and
gutter along the Cliff Drive frontage per City Standard.
6. Install a 5-foot wide sidewalk along the Cliff Drive project frontage.
7. Each unit shall be served by its individual water service/meter and sewer
lateral/cleanout. Each water meter and sewer cleanout shall be installed with a
traffic-grade box and cover.
8. All existing overhead utilities shall be undergrounded.
9. Install new sod or low groundcovers of the type approved by the City throughout
the Cliff Drive parkway fronting the development site.
10. Install two new 36-in box street tree along the Cliff Drive parkway.
11. All improvements shall comply with the City’s sight distance requirement. See
City Standard 110.
12. In case of damage done to public improvements surrounding the development
site by the private construction, additional reconstruction within the public right-
of-way could be required at the discretion of the Public Works Inspector.