Loading...
HomeMy WebLinkAboutPA2022-0215_20221205_PRR_Public WorksCITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT December 5, 2022 2nd Review October 18, 2022 TO: Caitlyn Curley, Planning Technician Community Development Department FROM: David Keely Senior Civil Engineer SUBJECT: FINDINGS AND CONDITIONS OF APPROVAL FOR TENTATIVE PARCEL MAP (PA2022-0215) 1511 Cliff Drive FINDINGS: 1. That the design of the development will not conflict with any easements acquired by the public at large for access through or use of property within the proposed development. 2. That public improvements will be required of the Applicant per the Municipal Code and the Subdivision Map Act. CONDITIONS: 1. A parcel Map shall be recorded. The Map shall be prepared on the California coordinate system (NAD83). Prior to recordation of the Map, the surveyor/engineer preparing the Map shall submit to the County Surveyor and the City of Newport Beach a digital-graphic file of said map in a manner described in Section 7-9-330 and 7-9-337 of the Orange County Subdivision Code and Orange County Subdivision Manual, Subarticle 18. The Map to be submitted to the City of Newport Beach shall comply with the City’s CADD Standards. Scanned images will not be accepted. 2. Prior to recordation of the parcel map, the surveyor/engineer preparing the map shall tie the boundary of the map into the Horizontal Control System established by the County Surveyor in a manner described in Section s 7-9-330 and 7-9-337 of the Orange County Subdivision Code and Orange County Subdivision Manual, Subarticle 18. Monuments (one inch iron pipe with tag) shall be set On Each Lot Corner unless otherwise approved by the Subdivision Engineer. Monuments shall be protected in place if installed prior to completion of construction project. 3. All improvements shall be constructed as required by Ordinance and the Public Works Department. PA2022-0215 4. An encroachment permit is required for all work activities within the public right- of-way. 5. Reconstruct the existing broken and/or otherwise damaged concrete curb and gutter along the Cliff Drive frontage per City Standard. 6. Install a 5-foot wide sidewalk along the Cliff Drive project frontage. 7. Each unit shall be served by its individual water service/meter and sewer lateral/cleanout. Each water meter and sewer cleanout shall be installed with a traffic-grade box and cover. 8. All existing overhead utilities shall be undergrounded. 9. Install new sod or low groundcovers of the type approved by the City throughout the Cliff Drive parkway fronting the development site. 10. Install two new 36-in box street tree along the Cliff Drive parkway. 11. All improvements shall comply with the City’s sight distance requirement. See City Standard 110. 12. In case of damage done to public improvements surrounding the development site by the private construction, additional reconstruction within the public right- of-way could be required at the discretion of the Public Works Inspector. PA2022-0215