Loading...
HomeMy WebLinkAboutPA2022-0242_20221122_PRR_BLDGTmplt: 06/07/19 P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: Building/Tonee Thai Public Works /David Keely Date: November 16, 2022 Please return PRR and Plans to Staff Planner Caitlyn Curley, Planning Technician 949-644-3235 or ccurley@newportbeachca.gov Applicant: Joseph Remick Contact: Joseph Remick (415) 730-4444 joseph@sagemodern.com Project Name 1123 Balboa Partners LLC Address: 1123 E Balboa Blvd PA2022-0242 The demolition of an existing duplex and construction of a new, 3- story 3,003 sq. ft. single family home with a 2-car garage and a 235 sq. ft. junior ADU on an ocean front parcel. REPORT REQUESTED BY: November 22, 2022 ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply:  No comments on the project as presented. Notes: 1) Drainage from Ocean Front Public Way not permitted to drain towards private property. Existing conditions drained away from private property. 2) The top of any exterior foundation shall extend above the elevation of the street gutter at point of discharge or the inlet of an approved drainage devise a minimum of 12 inches plus 2 percent. Drainage shall conform to Section 15.10.120 of the NBMC. (NBMC 15.10.060, CBC 1808.7.4) 3) Provide minimum 3 feet deep landings at doors. 4) Clarify whether proposed design is for an Accessory Dwelling Unit or Junior Accessory Dwelling Unit. Project description is for JADU but plans show ADU. Fire and sound separation required between ADU and main dwelling. Tonee Thai 1867 11-22-2022 Signature Ext. Date X Application of Standard Code requirements are not expected to alter the project design.  Recommended conditions of approval are attached.  Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project.  I contacted the applicant on  To schedule an appt. for Code review  To discuss the following (see notes)