HomeMy WebLinkAbout06 - City Bridge Deck Maintenance (Project No. 21R13) — NOC for Contract No. 7679-2Q SEW Pp�T CITY OF O � z NEWPORT BEACH <,FORN'P City Council Staff Report January 10, 2023 Agenda Item No. 6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, Assistant City Engineer, tandefur@newportbeachca.gov PHONE: 949-644-3321 TITLE: City Bridge Deck Maintenance (Project No. 21 R13) — Notice of Completion for Contract No. 7679-2 ABSTRACT: On September 13, 2022, the City Council awarded Contract No. 7679-2, City Bridge Deck Maintenance Project, to Peterson -Chase General Engineering Construction Inc. (Peterson -Chase) of Irvine, California. The project included deck maintenance work to bridges throughout the City. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Award Contract Final Cost at Total Contract Percent Contract Amount Completion Change Amount Cost Change $ 270,800.00 $ 242,053.29 -$28,746.71 -10.6% Allowed Contract Time (days) 30 Actual Time -21 Under (-) or Over (+) 6-1 City Bridge Deck Maintenance (Project No. 21 R13) — Notice of Completion for Contract No. 7679-2 January 10, 2023 Page 2 The work necessary for the completion of this contract consisted of removing the striping on the bridge decks, cleaning the decks, applying the surface coating, conducting a friction test, and re -striping the bridge decks. The contract has been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: $ 270,800.00 Actual Cost of Bid Items Constructed: $ 238,000.00 Total Change Orders: $ 4,053.29 Final Contract Cost: $ 242,053.29 The final total contract amount was $242,053.29, which was approximately 10.6% less than the original bid amount. The contract cost change is due to the removal of the cost of repairing the bridge joints on the Balboa Island Bridge. During operations to replace the bridge deck joints on Balboa Island Bridge, it was discovered that the existing joints under the asphalt were covered in metal plates. This unknown condition requires additional work to ensure the joint repair work is properly designed. The joint repair work at this bridge will take place as part of a future project. A summary of the project schedule is as follows: Estimate Start of Construction per Annual Baseline Schedule October 10, 2022 Actual Start of Construction per Notice to Proceed November 14, 2022 Actual Substantial Construction Completion Date November 28, 2022 FISCAL IMPACT: The City Bridge Deck Maintenance Project was included within the FY 2021-22 CIP Budget. Funds for the construction contract were expended from the following account: Account Description Account Number Amount Gas Tax 12101-980000-21 R13 $ 242,053.29 Total: $ 242,053.29 ENVIRONMENTAL REVIEW: On September 13, 2022, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (c) (repair and maintenance of existing street with no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Maps 6-2 ATTACHMENT A a BAYSIDE DR ki eq yS�oF � O,Q i EL D Z M=11= LEGEND BRIDGE N07 i0 SCALE CITY BRIDGE DECK MAINTENANCE PROJECT BALBOA ISLAND BRIDGE LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7679-2 1 09/13/22 6-3 1 9J� o �L? r Q g�gON Pv c� a a LEGEND l 0 BRIDGE NOT TO SCALE CITY BRIDGE DECK MAINTENANCE PROJECT BISON AVE BRIDGE LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7679-2 1 09/13/22 c �0 O o B b a E o o 0 P 0 O ® a 0 / O a� '7 "OAII 113 a �NyO��R a FORD RD 4 LEGEND d BRIDGE NOT TO SCALE CITY BRIDGE DECK MAINTENANCE PROJECT BONITA CANYON BRIDGE LOCATION MAP CITY OF NEWPORT BEACHI PUBLIC WORKS DEPARTMENT C-7679-2 1 09/13/22 6-5 0 -BAYV/EW WAY SAN DIEGO CREEK o m I o LEGEND BRIDGE NOT TO SCALE CITY BRIDGE DECK MAINTENANCE PROJECT JAMBOREE ROAD BRIDGE LOCATION MAP CITY OF NEWPORT BEACHI PUBLIC WORKS DEPARTMENT C-7679-2 1 09/13/22 • • CITY BRIDGE DECK MAINTENANCE PROJECT 38TH STREET BRIDGE LOCATION MAP CITY OF NEWPORT BEACHI PUBLIC WORKS DEPARTMENT C-7679-2 1 09/13/22 6-7 Planning Commission - September 8, 2022 Item No. 4b - Additional Materials provided by Staff RM 25 du g .0 r f 3 Sk �s .{ , r ° ,. poi �r1$ 32 CA2022-005 (PA2022-087) 00,0NNBG�S Code Amendment City of Newport Beach Bay Island EXHIBIT D gus Division August 16, 2022 13-77 Planning Commission - September 8, 2022 Item No. 4b - Additional Materials provided by Staff Bay Island Amendments (PA2022-087) 13-78