Loading...
HomeMy WebLinkAboutN2018-0325+kT* BeachBea i y of Newportic IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII N2� M325 Permit No: Center rive, NewportBhBeach, CA 92660 Counter Phone Project No : Permit (949)644-3311 �',�ANNF^ v y Online Inspection Request - www newportbeachca.gov / Online r1' Services Inspection Requests Phone (949)644-3255 Job Address : 1 PUBLIC ROW NB Thomas:Guide: „ Description : Install 1,455 LF of 3-inch gas main and 387 LF or 4-inch gas main on Westerly Place between Quail and Dove Streets and at the inte 60r,-, Westerly Place and Quail Street. Concrete and pavement restoration per City Standards. ` Parcel # : Legal Desc : Owner: CITY OF NEWPORT BEACH Contractor : NPL CONSTRUCTION CO Phone: Phone: 623-582-1235 Address : Address : 19820 N 7TH AVE STE 120 PHOENIX, AZ 85027 Contractor State Lic: 732974 Applicant: SOUTHERN CALIFORNIA GAS COMPANY License Expire : 02 28, 2021 Phone: 714-634-3103 [ Address : 1919 S. STATE COLLEGE BLVD ANAHEIM, CA 92806 Business License : BT30013384 Business Expire : 02 28, 2020 Special Cond.: PRE JOB INSPECTION REQUIRED. Workers' Compensation Insurance - - Carrier : AMERICAN ZURICH INSURANCE CO. Policy No : WC6510563 W. C. Expire: 04 01, 2020 Permit Processing Fee : $257.00 Sewer Connection : $0.00 Total Fee $6,943.00 Agreement Fee : $0.00 4TT Box Cover: $0.00 Paid : $6,943.00 Traffic control Plan Check . $526 00 Total Water Meters : $0.00 Balance : $0.00 Inspection Fee : $6,160.00 Water Meter Connection : $0 00 Receipt No. Refundable Deposit: $0.00 Total Water Meter Box $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By : Date : _/_/ Other Department : Date Utilities Approval : Date _/_/ Permit Denied \ Date Date Issued Permit Date Cll_i� Traffic Approval : : _/_/ : General Services Approval : Date _/_/ FEE WORKSHEET FOR ENCROACHMENT PERMIT CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT All Fees Are Non -Refundable Unless Otherwise Stated PROJECT ADDRESS: PERMIT N201 NUMBER: APPLICANT: TO BE COMPLETED BY PUBLIC WORKS DEPARTMENT Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Qt . Inspection Fee: $257.00 Public Works Field Inspection $293.00 Utilities Field Inspection Water Quality/Artificial Turf Inspection $871.00 $20204.00 Refundable Deposit: $535.00 Improvements Street/AlleylWalk Closure: $70.00F7� Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $70.00= Sewer Connection Fee 24" x 36" $152.00 4TT Box & Cover Additional _ _ _ 1 THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE R I REVENUE DIVISION PRIOR TO PAYMENT OF FEES A Qt . $176.00 $129.00 $115.00 TBDBTBD $115.00 $250.00 $64.00 venue Division 1 I (Water Meter: Qty. Qt Installation Charge $563.00F 1 3/4" Meter $50.25 1 1" Meter $121.50 Water Meter Boxes: 1 11 1/2" Meter $285.00 1" DFW Meter Box $96.66 1 11 1/2" Turbine Meter $700.00 2" DFW Meter Box $203.24 1 12" Meter $425.00 1 12" Turbine Meter $845.00 1 13" Meter $3,310.00 14" Meter $4,730.00 16" Meter $7.190.00 1 MISCELLANEOUS FEES Development Services Fee (Plan check hourly) $165.00 5200-5015 Final Tract Map Checking Fee $2,653.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,653.00 5200-5027 Lot Line Adjustment Fee $1,151.00 5200-5028 Park Dedication Fee Zone _ TBD 405-470_ Street Easement/Vacation Fee (+100% of hrly over 4 hrs) $1,089.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBDI 030-2284 Engineering Tech: Total Amount Due: For Finance use only Per ecialist Receipt No. P/users/pbw/shared/encroach/masters/ep front and back masters/ I Rev. 9/13/2018 epfeesheet xls-revised 9113118 I ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR I Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed contractor must provide a Letter of Authorization" to allow another party to pull a permit An approved copy of the permit and construction plan shall be kept at the job site at all times Work, which has been done prior to issuance of a permit is subject to rejection/fine City reserves the right to void permit if work does not commence within 30 days after date of issuance 2 The Permittee agrees to defend indemnify and hold the City its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising oil of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit 3 All work shall be done in accordance with the approved plans. Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director 5 A valid State licensed contractor must perform all construction within the public right-of-way unless waived by the Public Works Director A valid State Contractor License Class A can perform any work in the public right-of-way For construction or connection to water lines a valid State Contractor License Class C-34 is required For construction or connection to sewer lines a valid State Contractor License Class C-42 is required 6 All trenching and/or resurfacing shall conform to City Standard 105-L for parkwav/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected 7 The Public Works Department Inspectors must inspect all work in the Public right-of-way Forms and subgrade must be inspected and approved before concrete is ordered/poured Sewer, pipelines, and subgrade construction must be inspected and approved before backf fling, or applicant may be required to excavate site Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed 8 All trench restoration must be inspected by the Public Works Department No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department Locate and pothole existing City -owned utilities fie water, sewer or street lighting conduits) to verify locations Maintain a one -foot clearance over or under existing City -owned utilities Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser 9 Properly lighted barricades must be provided and maintained around all trenches excavations and obstructions All signs flags, lights and other warning and safety devices shall conform to the requirements of the current Manual of Warning Signs Sights and Other Devices for the Use in Performance of Work Upon Highways" issued by the California Department of Transportation If needed 'barricades can be obtained from the City at a charge of $10 00 per barricade per day, with a minimum charge of $35 00 It is the responsibility of the applicant to place barricades to protect the general public Access to fire hydrants must be maintained at all times 10 Work within or near beach sensitive areas will not be allowed during, City holidays, spring break Memorial Day weekend, summer between June 15 and September 15 and during the holiday season from December 19 to January 1, unless approved by the Public Works Department 1 1 Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department Access for fire police and emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control Handbook 1V'.'A i CH) No nighttime traffic lane closures unless prior approval has been granted Any lanels) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit All vehicles shall be lawfully parked 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials or parking of construction vehicles unless detailed on an attached Temporary Street Closure 13 Applicant must Potify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences 14 Refuse or unused materials shall Le removed within 24 hours after completion of the work If not removed the City may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way a Temporary Street Closure Permit must be obtained from the Public Works Department WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify that I have a Certificate of consent to self -insure, Certificate of Worker's Compensation Insurance, or a Certified Copy t ereof ` Date( (j� �l � ¢ Signature. CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachme t Per spection is required by calling Public Works at 949-644-33 1. 15 Any above ground utility facilities will require documented approval from the adjacent affected property owners) 16 Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws Best Management Practices will be enforced It is against the law to discharge construction debris into the gutter and storm drain Felony violations of Water Quality Laws are punishable by fines up to $25 000 and/or up to three year,, ,n Stale prison plus the full cost to clean up an illegal discharge or spill 17 If a refundable deposit was paid, applicant must submit a Soils Comnachen Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department Monies may be held for six months after final inspection before a refund will be processed 18 No trees In the public right-of-way shall be planted, removed, trimmed, er relocated without approval from the General Services Department 19 All work In the public right-of-way must meet the approval of the P,:blic V,ork> Department or corrections will be required (i e removals exposing connecl etc ) Additional inspection fees may be required 20 Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed 21 Permit is valid for "description" of work noted on front only Additional work performed may require issuance of a separate permit and/or additional fees INo work related to this encroachment permit shall be performed until the Public Works Department has issued this permit. Applicant hereby cknowledges he/she has read and un rstands the terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after issuance. Permit fees are nonrefundable. Dat�: �G�?/ 9 Signature;/^ C din, F FO l 3 qN vt " QFW+? iIN KA': am Imo 01 Rg � ram' m� PP PF GF A \ B Pt, P 1 \\ Q \\ 7 PLOT C _ PLANNING 8_ SKETCHING PLANNED BASE BY R.DUNN -" BY J.ROBWSON WE.VITM] CONSTRUCTION COMPLETION WFM CURRENT OVRER S DATE BV J.RBY. GTE ,roanu ]2=He YES [In0 EI 17I iNS (REQIMRfp WITNL Gb9 CONPMIY RE➢RESE NY>TNE) T OMAS GUIDE PAGE s•]YET T. C:#WA CITYOF NEWPORTBEACH COUl ^ OF: ORANGE �P REGN)NNAMESOUTNEAST DISTR!CT NAME. SANTA ANA ATUS SH'cE'ISl /LEAK $URVEYMEA (Sti =50 ,E fe✓'�",ES PRESSURE DISTRICTNaW 0ST. PRESS. I MAOP W SET/MOP: CUSS LOCATION 111 Lj 2 Ll 9 A ISOMM slI03]-0 SUPPLY LINE PRESS. WA r $.MY$. YIK OR CVER YES NOK PPIIPE PRESSURE TEST REG STAT!ONIO S WA RSPWA MEDIUM_, tIM HIGH) nMIOro NSA PW FReE AREA L -0-SPO"'_ HOT J:STRiC' LOCATION 'F' TO LOCATON ' F • , a 2 TEST PRESSURE: . IPWT UNPTS ON SKETCH R APPLICABLE) YES %0 a z YES [ ':O'✓ 4 MINIMJM 1W _. PSG / MA%IMUN 110 PSG . J CPARE ' n ACTJAL TEST PRESSURE:_ PSG WE P-.ONE• TESTMEDIUM: ._F'-..; - v.S[NOV, MR NITROGEN] OTHER: W LLANY PIPE BE LEA EXPOSED: YES C NO L' DUR .ION 1 HRS ANDNR 1T MIN )E YESRWIE ASMLT NPY IO BP BUPFINISOItI SIGN OA'. NM, RL— YES O NO!E MINT' NAME ISSUED BY. DATE - PRAT Tf'lE. $TORMMATER: WPSONLY9 WGS4PPP❑ APPLICMTSWPPP ❑ SPECIAL ENVIRONMENTAL CONSIDERATIONS. YES [I NOR, - _ (FYEB s6t_REGiON e_NVWfMtl1E_NTAL_AUVm01D M.SCE_LANE. JS PLANNING STARIEGM $TAMING REQUIRED. YES El NO VALVE(S) REQUIRED: YES NO PIPELINE MARKERS REOUIREO YES ❑NO YIB BMR/1Y LOG JOBrtTRENCH' YE$Li NO / PERMZ•!NG PERMR♦ N2c1� -G3.95 ISSUED BY NEWPORT SUCH PERMR• ISSUED BI' 4 I- 38T OF 4" PEM - PUBLIC PROPERTY I- 1.455' OF 3" PEM - PUBLIC PROPERTY A - 285' OF 4" PAM - PUBLIC PROPERTY A- 1,545' OF 3" PAM - PUBLIC PROPERTY AEA NCON IPE, SF .AMPS. ING RE OV RE. (PER GAB SIANDARO tOA.WNi) YES �NO❑ BY DATE ICNANGE LABOR TO Wf/_Y IMMW, PQ)___ 6 •S'.'.. -.E W R PTEfte,A YES VO�-,/NO1:1 NUMBER OF LATERA:S CLI:VtEO. NETIK1g5) VSFD TO VERIFY LOCATIONS) OPEN TRENCH0 GMERAEl POT1 El EXPOSED BY EXCAVATION (GSSTDn540I701 OTHER ❑ METHOD, 00 f APOBOIVE LOCPTX)I COULO NJT BE H OEfEAM•ED BDCATE TEAOORF98ADCATKMN j AM IEABON WHY ON TNS MO�CN LCT DATE- IP 2 FOS/F5. GTE: NERECNANGEOTNE V DESIGNED PIPE qt ORODNCOMPONEHF YESQ NOQ.C. (EYES TEGXNCAL NBNILE•APPAOVALRREQBEEOI W. REG✓JY ENG. WTE. LA INOAlEDTO RERI TBS DATE:_ _AIaA,FPA DA'E. CS_�MELFl.HRNIGA.GOMPp TION YEja No(:], RFAEMED AND PERFORMED AS P:ANNEOPERGASSfD.14M YES ❑NO❑ (E NO PIEILPE PROVl1E EVLANATWN W MQTCHI SIGN DA-- PRINT NANE I T IT_E- '016, CREWFOREMAN INSTAL NUN W'�: AT (FAST ]B" =:REMEM1: .iED '.•J. ,02Kl-ole GUTTERFLOW REASON. 21 WBS0S47.W WORKCENTER #CGD SNA FILE;* I1LWEt#tWT ADJG��7I VnB ....G NBMS#WA SQCalGB$DREAMS 227112 RR WOT PARCEL# # E RIW# WA € a ;�Xvwrs D•IOM DESIGN #TOb2817 DESIGN NAME TERLY ORDEROP# CAD FILE: TICKET#ABCDEFGH ":ION W2040954M TAX ----------------------------------------- --------------------------------------------------------------------------- - - - - ------------------- - ---- - ----------------------------------------- PLANNED WFNCURRENT OWNER RDATE .SHEC 2 OF 2 E� R.DUNN E BY.,M wE:]? 18 7 "=50' Sri v 5F' i E pP' �JP Rd � l4' h4O O ¢P Ji G ` b PLOT INFO: M=2018 i TRAFFIC CONTROL GENERAL NOTES 1, IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRLANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2. ALL TRAFFIC CONTROL DEVICES, STRIPING ,SIGNS, MARKINGS,LEGENDS, AND RAISED PAVEMENT MARKERS ETC. AND THEIR INSTALLATION SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND LATEST EDITION OF WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) 3 THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCO WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER, EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN. 4:1 SLOPE. 6. CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT 150 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL`OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES, 10.THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9:00- 3:00) 11. DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED MATH THE PROPERTY OWNER. ABWD. 2YE MINIMUM RECOMMENDED CHANNEUZING OEWCE AND SIGN SPACING (FROM WATCH HANDBOOK, 2016) slim T IPH oeoaar, • Se21 �>HK maul e rrer oenaarl e IfNPY 9Pir2 2w4P ,it L oen4scH e Inter ceu c e1PFFR SPME waver aww¢ran SPAd10 TN4A weer olrPPimlt lP2OF TwgFRf wear ou2enmP COIFl1Cf IFPOL T2Pu L 9WILR v2m ,/] L e1MIPtl M IPII Iw I= 7 m R b R IN n 2J R w 12 rt mWI mR 1NR mR mR =" mR mR 15R 8 IPX m R 2M R im R m R m R w R M R 17 R 40 WX mR =" IN R 110R WSR 4OR mR mR 4a SPX SO IT w rt = R IN rt 2m R 4a R m R 22 R m IPH m R M 1m R 2m R 4 1 IT m R IN rt 23 R u IPM em R em R = rt m R 4m R w R imp n R m LPN Sm R T1Y R MR 240 IT M R m R IN R m MPH S00 R 1e0 R Jm R 2e0 R eta R w R tm R as R "IF DRIVEWAY ACCESS TO REMAJN J CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR ASND. waa-t 2-PE DRIVEWAY CLOSURES. "�tnsT. C30(W J —j 3 os.o LLJ LLJ _ = E Cw(W (/)< EL 0 TO REMAIN ^ DRIVEWAY ACCESS `-' CONTRACTOR MUST COORDINATE d WITH PROPERTY OWNER FOR DRIVEWAY CLOSURES. I-- x V) o I i 3 I v 3 C30(W iV MATCHUNE A -A " G20-2 A6N0. 1T4 ASN .y'== WEEKDAY WORK DURATION: 32 DAYS ° \ ft DAYS: MONDAY - FRIDAY \ HOURS: 9:OOAM TO 3:OOPM G2XCAXRO \ 2r N/g \ Ire 320' TAPER 2S0'N15 2a01l15 250'N75 IL ST. (40 M.P.H c30(W ♦ ■ ■ wt-KsE (! ...�.. DRIVEWAY ACCESS TO REMAIN w�2A C2W.� c2�2� w»t CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR SPRUCE A\ DRIVEWAY CLOSURES. SE PIPELINE TRAFFIC CONTROL PLAN WESTERLY PL FROM QUAIL ST TO DOVE ST CITY OF NEWPORT BEACH ORANGE COUNTY, CA °5 REVISIONS 638 W. SOUTHERN AVE. TE 15r COMMENTS (O6/13/18) ORANGE, CA 92865 PH: (714) 974-1190 FAX: (714) 974-1753 IEGEtlD OW20-1 G20-2 C30 (CA) FAS. C20(CN(Rh © W1-5L W4-2R LEGM FLASHING ARROW SIGN • CHANNEUZING DEVICE �.� HIGH LEVEL WARNING DEVICE (FLAG TREE) W/ PROPOSED SIGN T PROPOSED SIGN AND POST TYPE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS TYPE III BARRICADE Ain TYPE III BARRICADE W/ PROPOSED SIGNS PROPOSED SIGN TO BE POSTED O SIGNAUZED INTERSECTION ® CONSTRUCTION AREA DIRECTION OF TRAFFIC tr* FLAGGER TNPSDTC TEMPORARY NO PARKING SIGNS W/ DATE k TIME OF CONSTRUCTION DRAWN BY: MM DATE: 04-02-18 SCALE: 1 "=50' QUOTE NUMBER: MCU# 5235950 FILE NAME: PHASE 1 1 R ��� �W\ --\ Y \ pNLY �y TRAFFIC CONTROL GENERAL NOTES 1 IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2. ALL TRAFFIC CONTROL DEVICES, STRIPINGSIGNS. MARKINGS.LEGENDS, AND RAISED PAVEMENT MARKERS, ETC. AND THEIR INSTALLATION SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC WEEKDAY WORK CONTROL DEVICES DURATION: 32 DAYS (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND LATEST EDITION DAYS: MONDAY - FRIDAY OF WORK AREA TRAFFIC CONTROL HANDBOOK(WATCH). HOURS: 9:OOAM TO 3:OOPM 3, THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCD WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES. AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5, ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN. 4:1 SLOPE. 6. CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT 150 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL `OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES. 10.THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9:00 - 3:00) 11. DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH THE PROPERTY OWNER. DRIVEWAY ACCESS TO REMAIN CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR DRIVEWAY CLOSURES. \ 2WNT5 350'I115 250YII5 = TAPER �\ IL ST. SE PIPELINE w� TRAFFIC CONTROL PLAN WESTERLY PL FROM QUAIL ST TO DOVE ST CITY OF NEWPORT BEACH ORANGE COUNTY. CA `5 638 W. SOUTHERN AVE. ORANGE, CA 92865 PH: (714) 974-1190 FAX: (714) 974-1753 O W2G-1 C30 (CA) C20(CA)(RT) 0 G20-2 FAS. O W1-6L R3-5R ONLY REVISIONS COMMENTS (06/13/18) LEGM I I I II FLASHING ARROW SIGN • CHANNEUZING DEVICE �♦� HIGH LEVEL WARNING DEVICE (FLAG TREE) W/ PROPOSED SIGN T PROPOSED SIGN AND POST ^ TYPE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS TYPE III BARRICADE TYPE III BARRICADE W/ PROPOSED SIGNS PROPOSED SIGN TO BE POSTED O SIGNALIZED INTERSECTION ® CONSTRUCTION AREA -+ DIRECTION OF TRAFFIC rr FLAGGER TNPSDTC TEMPORARY NO PARKING SIGNS W/ DATE & TIME OF CONSTRUCTION DRAWN BY: MM DATE: 04-02-18 SCALE: 1 "=50' QUOTE NUMBER: MCU$ 5235950 FILE NAME: PHASE 2 L M DRIVEWAY ACCESS TO REMAIN CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR DRIVEWAY CLOSURES. DRIVEWAY ACCESS TO REMAIN CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR DRIVEWAY CLOSURES. J' 1 alfflo TRAFFIC CONTROL GENERAL NOTES 1, IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN. AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. WEEKDAY WORK DURATION: 32 DAYS 2, ALL TRAFFIC CONTROL DEVICES. STRIPING .SIGNS, MARKINGS.LEGENDS. AND RAISED PAVEMENT MARKERS. ETC. AND THEIR INSTALLATION DAYS: MONDAY - FRIDAY SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES HOURS: 9:OOAM TO 3:001PM (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND LATEST EDITION OF WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 3. THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCD WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN, 4:1 SLOPE. 6. CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT 150 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL 'OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES. 10.THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9:00 - 3:00) 11. DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION, ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH THE PROPERTY OWNER. MINIMUM RECOMMENDED CHANNELQING DEVICE AND SIGN SPACING (FROM WATCH HANDBOOK, 2016) n A DE]f9oH 0.000N DY1B011 0■ENL011 t1Elu•Y wtOI1N Mtu■r '® ,Y ♦ • • ■ E ONII61IDt OVNt]lglt tlWM1IDP !I SDK7<1• 11MY YMYM IM■Y Mgt 9ItlIG QKtli WFILT IP1 IA Ia ?.t2 TIiFA TMAilIf iM[li waw � vEt1e 1n L 9I9 1� 1 �.F DRIVEWAY ACCESS TO REMAIN \ CONTRACTOR MUST COORDINATE �XS WTTH PROPERTY OWNER FOR DRIVEWAY CLOSURES. 25OWTS 250WM 250WM 320' TAPER C WGv QUAIL ST. rj:M�MMOWM-kuP --��_ SE PIPELINE TRAFFIC CONTROL PLAN 638 W. SOUTHERN AVE. WESTERLY PL FROM QUAIL ST TO DOVE ST ORANGE, CA 92865 CITY OF NEWPORT BEACH PH: (714)1 90 ORANGE COUNTY, CA S FAX: (714) 974-74-1753 W20-1 G20-2 �✓ C30 (CA) FAS. w,-6L C2D(CA)(RT) 4 W20-5L R3-SR r W12-1 ox�r 4 W4-2L LEG= FLASHING ARROW SIGN • CHANNELIZING DEVICE �♦� HIGH LEVEL WARNING DEVICE (FLAG TREE) W/ PROPOSED SIGN Z PROPOSED SIGN AND POST TYRE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS TYPE III BARRICADE *04 TYPE III BARRICADE W/ PROPOSED SIGNS PROPOSED SIGN TO BE POSTED O SIGNALIZED INTERSECTION ® CONSTRUCTION AREA DIRECTION OF TRAFFIC rO FLAGGER rnP$DTc TEMPORARYNO PARKING SIGNS W/ DATE k TIME OF CONSTRUCTION REVISIONS DRAWN BY: MM COMMENTS (D6/13/18) DATE 04-02-18 SCALE: 1'=50' QUOTE NUMBER: MCU# 5235950 FILE NAME: PHASE 3 �j le: 2W'NM mWM I I 1 14 (45 M.P.H) TRAFFIC CONTROL GENERAL NOTES 1 IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2. ALL TRAFFIC CONTROL DEVICES, STRIPING ,SIGNS. MARKINGS.LEGENDS. AND RAISED PAVEMENT MARKERS. ETC. AND THEIR INSTALLATION SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS. AND LATEST EDITION OF WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 3. THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCD WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES. AND SHALL BE REPAIRED. REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN. 4:1 SLOPE. 6. CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT 150 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL -OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES. 10 THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9'00 - 3:00) 11. DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH THE PROPERTY OWNER. LEGEND 'a• FLASHING ARROW SIGN CHANNEUZ14G DEVICE �.� HIGH LEVEL WARNING DEVICE (FLAG TREE) W/ PROPOSED SIGN T PROPOSED SIGN AND POST TYPE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS TYPE III BARRICADE TYPE M BARRICADE W/ PROPOSED SIGNS PROPOSED SIGN TO BE POSTED O SIGNALIZED INTERSECTION ® CONSTRUCTION AREA DIRECTION OF TRAFFIC re FLAGGER TNPSDTC TEMPORARY NO PARKING SIGNS W/ DATE & TIME OF CONSTRUCTION WEEKDAY WORK DURATION: 32 DAYS DAYS: MONDAY - FRIDAY HOURS: 9:OOAM TO 3:OOPM I QUAIL ST. WNIMUY RECOMMENDED CHANNEUZIMO DEVICE AND SIGN SPACING (FROM WATCH HANDBOOK. 2016) oEa161oN meoN oAFnsloN maul o�[xsoN N11�Y LL\t�M W011M �'S- >al Am�oo riAr riAr Irir-M aFrtn �svc��w � 1/2 L 1EA1N9tlufER �� TMO1 LYI{Dlt !/LIY 1ME1 nwx ,/x rssv, ,n � 250'NTS 2S0'NTS 020-2 O W20-1 C30 (CA) iC20(CA)(LT) O WI-6R SE PIPELINE REVISIONS DRAWN BY: MM TIC SSTCTfY COMMOfTS (08/13/18) DATE: 04-02-18 TRAFFIC CONTROL PLAN 638 W. SOUTHERN AVE. WESTERLY PL FROM QUAIL ST TO DOVE ST ORANGE, CA 92865 SCALE: 1 "=50' CITY OF NEWPORT BEACH PH: (714) 974-1190 QUOTE NUMBER: ORANGE COUNTY, CA 1#s FAX: (714) 974-1753 MCU# 5235950 FILE NAME: PHASE 4 ■! SPRUCE AVE. 020-2 KEEP R4-7A (RT) RIGN E FAS. W4-2L Le. 15• BIRCH ST. �A � ld � BIRCH (45 M.P.H) DRIVEWAY ACCESS TO REMAIN CONTRACTOR MUST COORDINATE WITH PROPERTY OWNER FOR DRIVEWAY CLOSURES. TRAFFIC CONTROL GENERAL NOTES 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN. AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE NARK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2, ALL TRAFFIC CONTROL DEVICES, STRIPING ,SIGNS. MARKINGS.LEGENDS. AND RAISED PAVEMENT MARKERS. ETC. AND THEIR INSTALLATION SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND LATEST EDITION OF WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 3. THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCD WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES. AND SHALL BE REPAIRED. REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN. 4:1 SLOPE. 6. CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT ISO FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL -OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES. 10.THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9:00 - 3:00) 11. DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH THE PROPERTY OWNER. SE PIPELINE TRAFFIC CONTROL PLAN WESTERLY PL FROM QUAIL ST TO DOVE ST CITY OF NEWPORT BEACH ORANGE COUNTY. CA netiA\� \ Irmlim01 Ms. EXIST. ABWD. {'PA MINIMUM RECOMMENDED CHANNELRING DEVICE AND SIGN SPACING (FROM WATCH HANDBOOK. 2016) s•® �- Mw mmn A INK swat aro®x B I■rr o■■1mnl ■ rtrM aWN1maI B Isrr uomol E NItK !/CE wo■r CKNIQIDR swan IIVDi MAWM CK■■fl@A SPNtlIO IMtMM CHY■E10A WI■11e1 lATY 1■ DI L 1rm 9i1■IS 1N4A 1/0 L 8qU /A 1 lsve ,n l 1YB1001I 25 BIM Im R I75 R w R N5 R IN R T5 R 50 R 12 IT 55 I+n NO IN R NR ■0R mFT 50R aR 15 FT Y IMI mR mR 10]R mR mR 55R 70R 17R 40 IIN1 T50 R m R IN R I IS IT 305 R Q FT b R 00 R 46 InI NO IT SN0 R TAR I■0 IT no R N5 R w R n rt w Mil No R m0 R No R 000 R 4]S R w R ,OD R w R 55 W1 soo rt AN IT m R W R 4■S R w R IN R n R b KM SW R TAR MO R ]A R SO R t00 R n b 1/M yq rt ]Sp R ]■5 R !p AN R W R 95 R ,CS R TS R u WEEKDAY WORK DURATION: 32 DAYS DAYS: MONDAY - FRIDAY HOURS: 9:OOAM TO 3:OOPM UAIL ST. Geaz RB ilA(Ln rrrMn S . 638 W. SOUTHERN AVE. ORANGE, CA 92865 PH: (714) 974-1190 F FAX: (714) 974-1753 I///I • �♦� * FLASHING ARROW SIGN CHANNELIZING DEVICE HIGH LEVEL WARNING DEVICE (FLAG TREE W/ PROPOSED SIGN PROPOSED SIGN AND POST TYPE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS LEDEtlO O O G20-2 W20-1 TYPE III BARRICADE C30 (CA) ® FAS. 0� m STYPEE IGNS IIIBARRICADE W/ PROPOSED W,-6 PROPOSED SIGN TO BE POSTED C20(CA)(Rr) S O SIGNALIZED INTERSECTION W4-2R SIDEWALK ttOSED T 20 ® CONSTRUCTION AREA —� DIRECTION OF TRAFFIC O R9-IIA(LT) t�L W12-, r♦ FLAGGER ® R3-4 K� Rh7A(LT) LEFT TNPSDTC TEMPORARY NO PARKING SIGNS W/ DATE k TIME OF CONSTRUCTION Q REVISIONS DRAWN BY: MM COMMENTS (06/13/18) DATE: 04-02-18 5 SCALE: 1 "=50' QUOTE NUMBER: MCUJ 5235950 6 FILE NAME: PHASE 5 TRAFFIC CONTROL GENERAL NOTES 1, IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICE AS MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2. ALL TRAFFIC CONTROL DEVICES. STRIPING.SIGNS, MARKINGS,LEGENDS, AND RAISED PAVEMENT MARKERS. ETC. AND THEIR INSTALLATION SHALL CONFORM TO LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) 2010 EDITION OF CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS, AND LATEST EDITION OF WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 3. THE CITY OF NEWPORT BEACH RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TOMAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND BE DONE PER CA MUTCD WITH THE APPROVAL OF THE ENGINEER. REVISED TRAFFIC CONTROL PLANS MAY BE REUIRED BY THE ENGINEER. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY ENGINEER. 4. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 5. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. OPEN TRENCH WITH LESS THAN 5 FEET OF CLEARANCE SHALL BE RAMPED WITH A MIN. 4.1 SLOPE. 6, CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 7. CONTRACTOR SHALL PROVIDE FAGGERS AS DEEMED NECESSARY BY ENGINEER. 8. PLACE ADDITIONAL LANE CLOSED (C30) SIGNS AT 150 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL `OPEN TRENCH- (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 9. CONTRACTOR SHALL PROVIDE FOR SAFE PEDESTRIAN ACCESS AT ALL TIMES. I O.THE ROADWAY SHALL BE OPENED BY END OF THE WORKDAY. NORMAL ROADWAY OPEATIONS SHALL BE RESTORED OUTSIDE NORMAL WORK HOURS (9:DO - 3:00) it DRIVEWAY ACCESS SHALL REMAIN DURING CONSTRUCTION. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED MATH THE PROPERTY OWNER. SE PIPELINE TRAFFIC CONTROL PLAN WESTERLY PL FROM QUAIL ST TO DOVE ST CITY OF NEWPORT BEACH ORANGE COUNTY, CA DRTVEWAY ACCESS TO REMAIN CONTRACTOR MUST COORDINATE / wrt PRnPERrY nImwm EnR MINIMUM RECOMMENDED CHANNEL17ING DEVICE AND SIGN SPACING (FROM WATCH HANDBOOK, 2016) N� DIMNSDII A nol meow DNErmI 5 DMENswN N Nwir SNi1NG TM In L 0MEN5wN N DNENson E aETm 942 NA ow4mmx mwvw tAFp! NAuw PNMnrml draw TN NwNr a1Nw0mN onsu+ SPICllO NNrlr IFAiw Di.FR L NNN,r SWAILFH TM4n � L m n51 Im R Ia R m IT b R 1m R a R m R 12 R m NPN 250 R Im R m R m R Sm R m R m R 15 R 15 M11 mR m Im mR 4.A• R ]SR AR RR b 1 P N a 0 R S 0 R I m R I I O R ] m R b rt m R a R bIi D50IT w ZAR Im R ]mIT bR mR aR m YPN 5m R m0 R m0 R SLID R Ia R m R Im R m R YWI mDrt !mR STR IT KDR mR 100 aR m NPN SmR ZR ]EDIT 2bR 5m" on ImR aR mimN m0R ]mR 3mR SlOR l,6R mR ImR art WEEKDAY WORK DURATION: 32 DAYS DAYS: MONDAY - FRIDAY HOURS: 9:00AM TO 3:OOPM LEG= OW20-1 O G20-2 C30 (CA) FAS. WI-6L C20(CA)(Rn W4-2R W20-SL 638 W. SOUTHERN AVE. ORANGE, CA 92865 PH: (714) 974-1190 FAX: (714) 974-1753 REVISIONS COMMENTS (06/13/18) I LOM t' FLASHING ARROW SIGN • CHANNEUZING DEVICE �♦� HIGH LEVEL WARNING DEVICE (FLAG TREE) W/ PROPOSED SIGN T PROPOSED SIGN AND POST TYPE I BARRICADE TYPE I BARRICADE W/ PROPOSED SIGNS TYPE III BARRICADE TYPE III BARRICADE W/ PROPOSED SIGNS PROPOSED SIGN TO BE POSTED O SIGNALIZED INTERSECTION ® CONSTRUCTION AREA DIRECTION OF TRAFFIC >re FLAGGER TNPSDTC TEMPORARY NO PARKING SIGNS W/ DATE & TIME OF CONSTRUCTION DRAWN BY: TC DATE: 04-30-18 SCALE: 1 "=50' QUOTE NUMBER: MCU# 5235950 FILE NAME: PHASE 6 Lei .817/2019 City of Newport Beach Page 3 of 5 t ' 4:30.35PM INSP150 - Daily Inspection Request Report Requested Inspection Date : 08/08/2019 Inspection Type: ENCROACH Inspection Area : PW Site Address: 1 PUBLIC ROW AMID Information: Activity : N2018-0325 SubType : Status : APPROVED OWNER: CITY OF NEWPORT BEACH Phone: APPLICANT: SOUTHERN CALIFORNIA GAS COMPANY Phone : 714-634-3103 Description : Install 1,455 LF of 3-inch gas main and 387 LF or 4-inch gas main on Westerly Place between Quail and Dove Streets and at the intersection of Westerly Place and Quail Street. Concrete and pavement restoration per City Standards. Requested Inspection(s) Item: 10200 PRE JOB - PW Requested Time: 8/8/2019 12:00:OOAM Entered By: WEBUSER Comments: AM-10am-Noon, Call On Way Assigned to : zzzzzzzzzzz* �� Requestor: WEBUSER 9098160627 OOP 6;ty 440-ef r Refill► 8/19/50)19 City of Newport Beach Page 12 of 14 6: j. 56AM INSP150 - Daily Inspection Request Report y Requested Inspection Date : 08/19/2019 Inspection Type: ENCROACH Inspection Area: PW Site Address: 1 PUBLIC ROW A/P/D Information: Activity : N2018-0325 SubType : Status : APPROVED OWNER: CITY OF NEWPORT BEACH Phone: APPLICANT: SOUTHERN CALIFORNIA GAS COMPANY Phone : 714-634-3103 Description : Install 1,455 LF of 3-inch gas main and 387 LF or 4-inch gas main on Westerly Place between Quail and Dove Streets and at the intersection of Westerly Place and Quail Street. Concrete and pavement restoration per City Standards. Requested Inspections) Item: 10210 PUBLIC WORKS Requested Time: 8/19/2019 12:00:OOAM Requestor: WEBUSER 909-276-8475 Entered By: WEBUSER Comments: AM - Assigned to: 77777777777* . 1` ..,�2� /✓ ��— �o���rc.? �.� y L{ j�; 1, �y l�� 7%�-��