HomeMy WebLinkAboutPA2022-0253 - AIC PlansGENERAL REQUIREMENTS
_ 1. CONSTRUCTION SHALL BE IN CONFORMITY WITH THE 2019 EDITION OF THE
CALIFORNIA BUILDING CODE (CBC) AND ALL APPLICABLE LOCAL AND STATE
CODES AND ORDINANCES.
2. SITE INSPECTION: THE CONTRACTOR SHALL EXAMINE THE PROJECT SITE & SHALL
VERIFY ALL DIMENSIONS, LOCATIONS & ELEVATIONS OF THE EXISTING
CONSTRUCTION.THE CONTRACTOR SHALL ALSO DILIGENTLY INVESTIGATE THE SITE
FOR THE POSSIBLE EXISTENCE & LOCATION OF UNDERGROUND UTILITIES,
PRIOR TO ORDERING ANY MATERIAL AND/OR COMMENCING WORK AND SHALL
REPORT ANY DISCREPANCIES TO "PMA CONSULTING, INC." HEREINAFTER CALLED
THE ENGINEER".
3. CONTRACTOR SHALL PROVIDE BARRICADES AND PEDESTRIAN PROTECTION AS
REQUIRED BY STATE AND LOCAL CODES.
4. CONTRACTOR SHALL CONSULT WITH REPRESENTATIVES OF CITY AND UTILITY
COMPANIES CONCERNING AVAILABLE FACILITIES BEFORE COMMENCING WORK OR
CONNECTING TO SEWER, PIPING OR WIRING, ETC., AND REPORT ANY PROBLEMS
TO THE ENGINEER.
5. CONTRACTOR SHALL FULLY PROTECT ALL ADJACENT PROPERTIES BEFORE
COMMENCING ANY WORK.
6. OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS,
NOTES, AND DETAILS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
AND RESOLVED BEFORE PROCEEDING WITH THE WORK.
7. CONTRACTOR SHALL INSTALL TEMPORARY TOILETS BEFORE START OF JOB.
8. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER THESE
GENERAL NOTES.
9. TYPICAL DETAILS SHOWN SHALL APPLY WHERE NO SPECIAL DETAIL IS SHOWN.
WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION, OR A NOTE IS
SHOWN FOR ONE CONDITION, IT SHALL. ALSO APPLY FOR ALL LIKE OR SIMILAR
CONDITIONS UNLESS NOTED OTHERWISE.
10. DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS. DETAILED DRAWINGS AND
SPECIFICATIONS TAKE PRECEDENCE OVER GENERAL DRAWINGS AND
SPECIFICATIONS.
11. WRITTEN DIMENSIONS ( NOT SCALED DIMENSIONS SHALL BE USED.
12. TEMPORARY ERECTIONBRACING AND SHORING SHALL BE PROVIDED AS REQUIRED
ON ALL STRUCTURES, ADEQUATE TO PROVIDE FULL STRUCTURAL STABILITY AND
SAFETY. BRACING SHALL NOT BE REMOVED UNTIL THE ELEMENTS ARE FULLY
CONNECTED AND ARE CAPABLE OF SUPPORTING THE DESIGN LOADING.
13. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM
ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING
FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
14. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION NOT TO UNDERMINE ANY
ADJACENT STRUCTURE DURING THE COURSE OF CONSTRUCTION.
15. CLEAN UP: NO PAINT, PLASTER, CEMENT, SOIL, MORTAR OR OTHER RESIDUE
SHALL BE ALLOWED TO ENTER THE BAY, STREETS, GUTTERS OR STORM DRAINS.
ALL MATERIALS & WASTE SHALL BE REMOVED FROM THE SITE, NBMC 17.32.020.
16. DEMOLITION: ALL MATERIAL FROM THE EXISTING BULKHEAD THAT IS NOT USED
AS FILL SHALL BE REMOVED FROM THE SITE & DISPOSED OF IN AN OFFICIAL
.DUMP SITE.
17. SEE THE LATEST "GENERAL GRADING SPECIFICATIONS" OF THE BUILDING
DEPARTMENT FOR THE CITY'S: GENERAL NOTES, EROSION CONTROLS, REQUIRED
INSPECTIONS, GRADING FILLS/CUTS & ALL NECESSARY DOCUMENTATION.
18. POOLS, SPAS, FENCES, PATIO COVERS AND OTHER FREESTANDING STRUCTURES
REQUIRE SEPARATE REVIEWS AND PERMITS.
19. ALL A.S.T.M. SPECIFICATIONS NOTED ON THE DRAWINGS SHALL BE IN
ACCORDANCE WITH THE LATEST ISSUE OF THE A.S.T.M.
20. OBSERVATION VISITS TO THE PROJECT SITE BY THE ENGINEER SHALL NOT BE
CONSTRUED AS ANY INSPECTION AS REQUIRED BY CODE.
FOUNDATIONS
1. THE CONTRACTOR SHALL ESTABLISH ALL CONSTRUCTION LINES AND PROCEED WITH
THE EXCAVATION OF ALL FOOTINGS AS CALLED FOR ON THE DRAWINGS.
q 2. FOOTINGS SHALL BEAR ON NATURAL UNDISTURBED UNIFORM EARTH OR ENGINEERED
COMPACTED FILL.
3. NO REINFORCING STEEL AND NO CONCRETE SHALL BE PLACED IN ANY EXCAVATION
PRIOR TO APPROVAL BY THE BUILDING DEPARTMENT.
4. THE TOP OF ALL EXCAVATIONS SHALL BE PROTECTED AGAINST HEAVY SURCHARGE
LOADS AND FROM EROSION DUE TO RAINFALL OR SURFACE RUN-OFF DURING THE
ENTIRE CONSTRUCTION PERIOD.
5. THE SOILS REPORT DESCRIBED UNDER ITEMS No.7 BELOW SHALL BE A PART OF
THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN THE SOILS
REPORT AND COMPLY WITH ALL RECOMMENDATIONS THEREIN.
6. PAD PREPARATION SHALL BE IN ACCORDANCE WITH THE SOILS REPORT. THE
PAD SHALL BE INSPECTED AND APPROVED BY THE SOILS ENGINEER PRIOR TO
PLACING ANY CONCRETE. THE PAD SHALL BE KEPT MOIST PRIOR TO THE
PLACING OF CONCRETE.
7. FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS CONTAINED IN THE SOILS
REPORT ON FILE WITH THE BUILDING DEPARTMENT.
GRADING NOTES
1. THE ANTICIPATED TOTAL VOLUME OF CUT AND FILL FOR SEAWALL CONSTRUCTION ON
THIS PROJECT WILL BE GREATER 50 CUBIC YARDS. THUS, GRADING PERMIT IS
REQUIRED. WHEN A GRADING PERMIT & PLANS ARE REQUIRED, IF NO GRADING IS
ADDRESSED ON THE PLANS - SEE THE CIVIL & ARCHITECTURAL PLANS FOR THE
FINISH GRADING ON THE SHORE SIDE OF THE BULKHEAD.
2. A PRE -GRADING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF
GRADING WITH THE FOLLOWING PEOPLE PRESENT:OWNER, GRADING CONTRACTOR,
DESIGN CIVIL ENGINEER, SOILS ENGINEER, GEOLOGIST, CITY GRADING ENGINEER OR
THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED AT THE
MEETING.
3. A PRE -PAVING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF
TRACTOR
RESENT:OWNER GRADING CON
GRADING WITH THE FOLLOWING PEOPLE P ,
DESIGN CIVIL ENGINEER, SOILS ENGINEER, GEOLOGIST, CITY GRADING ENGINEER OR
OUTLINED AT THE
I FIELD INSPECTIONS WILL BE 0
THEIR REPRESENTATIVES. REQUIRED
THE U Q
MEETING.
4. THE PROJECT GEOTECHNICAL ENGINEER SHALL INSPECT & APPROVE ALL AREAS
PRIOR THE THE PLACEMENT OF ANY FILL.
5. ALL FILLS SHALL BE INSPECTED, TESTED & APPROVED BY THE GEOTECHNICAL
ENGINEER VERIFYING MINIMUM OF 90% REQUIRED RELATIVE COMPACTION AS WELL AS
STABILITY.
6. ALL EXCAVATIONS FOR ANCHORS SHALL BE INSPECTED & APPROVED BY THE
GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE.
7. TEMPORARY EROSION CONTROL PLANS ARE REQUIRED FROM OCTOBER 15 TO MAY 15.
8. EROSION CONTROL DEVICES SHALL BE AVAILABLE ON -SITE BETWEEN OCTOBER 15 AND
MAY 15.
9. BETWEEN OCTOBER 15 AND MAY 15, EROSION CONTROL MEASURES SHALL BE IN
PLACE AT THE END OF EACH WORKING DAY WHENEVER THE FIVE-DAY PROBABILITY
OF RAIN EXCEEDS 30 PERCENT. DURING THE REMAINDER OF THE YEAR, THEY SHALL
BE IN PLACE AT THE END OF THE WORKING DAY, WHENEVER THE DAILY RAINFALL
PROBABILITY EXCEEDS 50 PERCENT. SEE DETAILS L & R ON SHEET SW-2.
10. LANDSCAPING PLANS SHALL BE SUBMITTED FOR APPROVAL, WORK COMPLETED AND A
CERTIFICATE OF CONFORMANCE RECEIVED BY THE CITY GRADING ENGINEE
R PRIOR TO
CLOSURE OF PERMIT, UNLESS WAIVED BY THE CITY GRADING ENGINEER.
11. TEMPORARY DESILTING BASINS, WHEN REQUIRED, SHALL BE INSTALLED AND
MAINTAINED FOR THE DURATION OF THE PROJECT.
12. DATUM: ALL ELEVATIONS ARE BASED ON MLLW AND/OR NAVS88 DATUM.
STRUCTURAL GENERAL
BACKFILLING & COMPACTION NOTES
1. ALL BACKFILL SHALL CONFORM TO THE SOILS ENGINEER'S REPORT AND
RECOMMENDATIONS.
2. UTILITY TRENCH BACKFILL AND ANY OTHER BACKFILL MUST BE MECHANICALLY
COMPACTED. JETTING AND FLOODING SHALL NOT BE PERMITTED.
3. WHERE WALLS ARE BACKFILLED ON ONE SIDE ONLY, PROVIDE SHORING OR OTHER
APPROVED MEANS OF LATERAL SUPPORT UNTIL RESISTING ELEMENTS ARE ALL IN
PLACE AND HAVE ATTAINED THEIR REQUIRED STRENGTHS. RESISTING ELEMENTS SHALL
BE CONCRETE SLABS OR OTHER PERMANENT BUILDING COMPONENTS.
4. UNLESS NOTED OTHERWISE IN THE SOILS REPORT, ALL FILLS SHALL BE COMPACTED TO
A MINIMUM OF 90% OF MAXIMUM DENSITY IN ACCORDANCE WITH THE REQUIREMENTS OF
THE CBC APPENDIX SECTION 3313.
5. FILTER CLOTH SHALL BE MIRAFI 14ON-SERIES NONWOVEN POLYPROPYLENE GEOTEXTILE
AS MANUFACTURED BY "TC MtRAFI COMPANY" AND SHALL BE MINIMUM 2.0' WIDE AND
BE PLACED ON THE INSIDE FACE OF THE BULKHEAD EXTENDED EQUALLY FROM THE
JOINT TO (2.0') BELOW THE FINAL MUDLINE FOR THE ENTIRE HEIGHT OF THE
BULKHEAD.
6. COMPACTION REPORT MUST BE SUBMITTED TO AND BE APPROVED BY THE BUILDING
DEPARTMENT BEFORE FOUNDATION INSPECTION.
7. A FINAL SOIL REPORT OF COMPACTION & APPROVAL SHALL BE PREPARED BY THE
PROJECT GEOTECHNICAL ENGINEER & SUBMITTED FOR BUILDING DEPARTMENT REVIEW AT
THE COMPLETION OF THE PROJECT.
8. COMPACT SOIL TO THE REQUIRED RELATIVE DENSITIES PER ASTM 155-91. DO NOT USE
HEAVY COMPA
CTION EQUIPMENT WITHIN 20 FEET OF THE BULKHEAD.
9. ON SITE BROKEN. CONCRETE & AC PAVING MAY BE USED AS FILL PROVIDED IT DOES
NOT EXCEED 6 E S 0 INCHES IN SIZE & I NOT STACKED LAYERED OR PLACED ABOVE
ELEVATION +7.0' & IS APPROVED BY THE GEOTECHNICAL ENGINEER.
1.
STEEL
1. STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO A.S.T.M. A572 GRADE
50 OR A992 WITH Fy = 50 KSI.
2. STEEL PIPE COLUMNS AND OTHER STEEL PIPE STRUCTURAL MEMBERS SHALL
CONFORM TO A.S.T.M. A53, GRADE B.
3. STRUCTURAL STEEL TUBING SHALL CONFORM TO A.S.T.M. A500, GRADE B, Fy =
46 KSI.
4. BOLTS SHALL CONFORM TO A.S.T.M. A307 UNLESS NOTED OTHERWISE. WHERE
HIGH STRENGTH (H.S.) BOLTS ARE SPECIFIED, THEY SHALL BE MINIMUM 3/4"
DIAMETER AND CONFORM TO A.S.T.M. A325 SC CLASS A UNLESS NOTED
OTHERWISE ON THE PLANS. THE INSTALLATION OF H.S. BOLTS SHALL BE
INSPECTED BY A REGISTERED DEPUTY INSPECTOR APPROVED BY THE BUILDING
DEPARTMENT.
5. ALL BOLTS HOLES IN STEEL MEMBERS SHALL BE STANDARD HOLES, U.N.O.
6. STRUCTURAL STEEL "NELSON" STUDS SHALL BE MANUFACTURED FROM C1015,
C1017 AND C1020 COLD DRAWN STEEL CONFORMING TO A.S.T.M. A108-58T.
7. LIGHT GAUGE STEEL MEMBERS SHALL CONFORM TO A.S.T.M. STANDARDS AS
FOLLOWS:
A) FOR 18 GA. THICK AND LIGHTER STEEL : A446, GRADE A (GALVANIZED)
OR A570, GRADE 33 OR A611, GRADE C - ALL HAVING MINIMUM OF 33 KSI
YIELD STRENGTH.
B) FOR 16 GA. THICK AND HEAVIER STEEL : A446, GRADE D (GALVANIZED)
OR A570, GRADE 50 OR A607, GRADE 50 - ALL HAVING MINIMUM OF 50 KSI
YIELD STRENGTH.
8. FABRICATION AND ERECTION SHALL CONFORM TO THE 14th EDITION OF A.I.S.C.
SPECIFICATIONS.
9. ALL HOLES FOR BOLTS IN STRUCTURAL STEEL SHALL BE DRILLED OR PUNCHED.
BURNING OF HOLES SHALL NOT BE PERMITTED.
10. ALL STEEL SHALL BE STAINLESS, HOT DIP GALVANIZED OR EPDXY COATED.
REINFORCING STEEL
1. FOR STRUCTURES EXPOSED TO SALT WATER SPLASH OR IMMERSION, REBAR
REINFORCEMENT SHALL CONFORM TO ASTM A 706, UNLESS NOTED OTHERWISE ON
DETAILS, AND SHALL BE EPDXY COATED PER ASTM A 934 OR ASTM A 772. WELDED
WIRE MESH SHALL CONFORM TO ASTM A 185 AND SHALL, BE EPDXY COATED
CONFORMING TO ASTM A 884, WITH ALL VISIBLE DEFECTS AND CUT ENDS REPAIR
COATED. WIRES USED TO TIE REINFORCING STEEL SHALL BE EITHER EPDXY COATED
STEEL, OR A 316, STAINLESS STEEL.
2.- REINFORCEMENT MARKED CONTINUOUS MAY BE SPLICED BY LAPPING 42 BAR DIAMETERS
IN CONCRETE_ AND 48 BAR DIAMETERS IN MASONRY WITH 24 INCH MINIMUM LAP IN
EACH CASE, UNLESS NOTED OTHERWISE ON PLANS. ALL SPLICES WHEN DETAILED
SHALL BE LOCATED WHERE SHOWN ON PLANS.
3. REINFORCING STEEL SHALL BE ACCURATELY PLACED AND SECURED IN POSITION WITH
METAL OR CONCRETE BLOCKS, CHAIRS, SPACERS, ETC., AND WIRE TIES BEFORE PLACING
ANY CONCRETE.
4. ADDITIONAL REINFORCING REQUIRED FOR ERECTION OF PRECAST CONCRETE PANELS
SHALL BE ADDED PER THE CONTRACTOR'S DETAILS.
5. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS, UNLESS
NOTED OTHERWISE.
A) CONCRETE BELOW GRADE OR IN CONTACT WITH SOIL: WHEN CAST AGAINST EARTH 3",
WHEN FORMED 2".
B) WALLS ABOVE GRADE: EXTERIOR FACE 1Y21, INTERIOR FACE 1".
C) PRECAST CONCRETE ELEMENTS: AS DETAILED.
D) CONCRETE SLAB ON GRADE: REINFORCING STEEL AT CENTER OF SLAB, UNLESS NOTED
OTHERWISE.
6. REINFORCEMENT DETAILING SHALL BE IN ACCORDANCE WITH CBC SECTION 1907.
7. ALL TIE WIRES SHALL BE MINIMUM 16 GAUGE, BLACK ANNEALED, CONFORMING TO
A.S.T.M. A82.
8. ALL REINFORCING BARS SHALL BE FREE OF RUST, GREASE OR OTHER MATERIAL LIKELY
TO IMPAIR BONDING.
9. ALL BENDS IN REINFORCING SHALL BE COLD BENDS.
GENERAL SPECIAL INSPECTIONS
1. PERIODIC (NON -CONTINUOUS) OR CONTINUOUS SPECIAL INSPECTION BY A CITY
CERTIFIED DEPUTY INSPECTOR IS REQUIRED FOR THE FOLLOWING:
A) SITE CONCRETE WORK (COPING & ANCHOR BEAM) :...........CONTINUOUS.
B) INSPECT SHEET PILE FOR LENGTH & DAMAGE : .................NON -CONTINUOUS.
C T & G LOCKING OF PANELS :................................................ NON -CONTINUOUS.
D) ANCHOR ROD TENSIONING :.................................................... NON -CONTINUOUS.
E) GROUTING OF PVC SLEEVES :................................................ NON -CONTINUOUS.
F) PILING INSTALLATION:............................................................. NON -CONTINUOUS.
G) HELICAL ANCHORS INSTALLATION IN ACCORDANCE WITH
ICC ER-2794:...........................................NON-CONTINUOUS.
SECTION 2.4.2 OF
SPECIAL INSPECTION IS REQUIRED FOR SEAWALL PANEL CONCRETE IF NOT CAST
IN A CERTIFIED YARD.
2. CONTINUOUS SPECIAL INSPECTIONS IS REQUIRED FOR THE INSTALLATION OF
TS , DHESIVE ANCHOR BOLTS ADHESIVE DOWELS AND
ANCHOR BOL A
MECHANICAL ANCHORS IN ALL CONCRETE AND MASONRY WORKS.
3. SPECIAL INSPECTIONS SHALL BE DONE BY ONE OR MORE REGISTERED DEPUTY
SPECIAL INSPECTORS, APPROVED BY THE BUILDING DEPARTMENT ONLY,
HIRED AND PAID FOR BY THE OWNER.
4. SITE VISITS CONDUCTED BY THE ENGINEER ARE MERELY FOR OBSERVATION
PURPOSE ONLY AND DO NOT CONSTITUTE AN INSPECTION.
5. TWO (2) PROPERLY COMPLETED AND SIGNED COPIES OF THE SPECIAL
INSPECTION AGREEMENT MUST BE SUBMITTED TO THE PERMIT SERVICES
DIVISION PRIOR TO ISSUANCE OF THE PERMIT.
6. AS A MINIMUM, THE DEPTH OF THE SEAWALL EMBEDMENT INTO THE GROUND
SHALL BE AS SHOWN ON ELEVATIONS ON (S-1) AND MUST BE ACCURATELY
MEASURED BY THE DEPUTY INSPECTOR. A COPY OF THE MEASUREMENT MUST BE
SUBMITTED TO THE CITY & THE ENGINEER OF RECORD.
7. SPECIAL INSPECTION IS REQUIRED FOR ALL NEW CONCRETE AND MASONRY
CONSTRUCTION, INCLUDING REINFORCING STEEL.
VaCEIV&D QY
COMMUNITy
✓DEVELOPMENT
(CIO V 2 3 :ZO22
CHY,toj:
4 ' lr Iqa
CONCRETE
1. ALL CONCRETE MIX DESIGNS, CONFORMING TO CHAPTER 19 OF ACI 318-14, TABLE
19.3.2.1, CATEGORY (C) & CLASS C2 PER TABLE 19.3.1.1 OF ACI 318-14, SHALL BE
SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL BEFORE ANY CONCRETE IS
PLACED. ALL CONCRETE MIXES SHALL HAVE A MINIMUM CEMENT CONTENT OF 6.0
SACKS OF CEMENT PER CUBIC YARD OF MIX. ALL CONCRETE MIXES SHALL BE
CERTIFIED BY A CONCRETE TESTING LABORATORY AND SIGNED BY A CALIFORNIA
REGISTERED CIVIL ENGINEER.
2. CONCRETE SHALL HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 5000 PSI AND
A 0.40 WATER -TO -CEMENT RATIO.
3. CONCRETE GROUT SHALL HAVE THE SAME COMPRESSIVE STRENGTH AS THE OTHER
CONCRETE AND SHALL BE A SUITABLE MIX CONSISTING OF PEA GRAVEL, SAND,
CEMENT AND WATER. MAXIMUM SLUMP SHALL BE 5 INCHES. AN APPROVED
SUPERPLASTICIZING ADMIXTURE MAY BE ADDED TO INCREASE THE SLUMP TO MAXIMUM
7.5 INCHES. GROUT UNDER STEEL COLUMN BASE PLATES SHALL BE "RAPID -SET" OR
"FIVE STAR GROUT" OR APPROVED EQUAL.
4. CONCRETE SHALL BE DESIGNED FOR PERMEABILITY, STRENGTH, CHEMICAL STABILITY
AND ABRASION RESISTANCE, APPROPRIATE FOR ITS APPLICATION. PORTLAND CEMENT
SHALL CONFORM TO ASTM C 150 TYPE I OR TYPE II MODIFIED, AND LOW ALKALI.
CHEMICAL ADMIXTURES SHALL CONFORM TO ASTM C 494. CHEMICALS DESIGNED TO
LIMIT CORROSION OF INTERNAL REINFORCING MAY BE USED. AIR ENTRAINMENT
ADMIXTURES SHALL CONFORM TO ASTM C 260. COARSE AND FINE AGGREGATE SHALL
CONFORM TO ASTM C 33, AND ASTM C 330 WHERE LIGHTWEIGHT AGGREGATES ARE
USED. LIGHTWEIGHT AGGREGATE, IF USED, SHALL CONSIST OF EXPANDED AND COATED
SHALE OR EQUIVALENT MATERIAL OF SUFFICIENT STRENGTH AND DURABILITY TO
PROVIDE CONCRETE 0 REQUIRED STRENGTH.
FTHE
5. CONCRETE TEST SAMPLES SHALL BE TAKEN IN ACCORDANCE WITH A.S.T.M. AND CBC
STANDARDS. RESULTS OF THE 7 & 28 DAY TESTS SHALL BE SUBMITTED TO THE
ENGINEER FOR HIS RECORDS. SLUMP TESTS ARE REQUIRED FOR ALL TEST SAMPLES
AND MUST ALSO BE REPORTED. ADDITIONALLY, ALL LIGHT WEIGHT CONCRETE SAMPLES
MUST HAVE THEIR IN -PLACE DENSITIES DETERMINED AND REPORTED,
6. SIDES OF FOOTING PADS MAY BE POURED AGAINST STABLE EARTH.
7. SLURRY CONCRETE, WHERE SPECIFIED OR USED, SHALL HAVE A MINIMUM CEMENT
CONTENT OF 1.5 SACKS OF CEMENT PER CUBIC YARD OF MIX.
8. SEE ARCHITECTURAL NOTES FOR COLORED OR TEXTUR
ED CONCRETE.
9. CONCRETE FORM WORK TOLERANCES SHALL BE IN ACCORDANCE WITH CBC AND A.C.I.
STANDARDS.
10. ALL STEEL REINFORCING, ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE
SECURED IN POSITION AND INSPECTED BY THE LOCAL BUILDING DEPARTMENT
INSPECTOR, PRIOR TO THE PLACING OF ANY CONCRETE.
11. ALL NECESSARY BRACES STRONGBACKS PICK-UP INSERTS BOLTS,�
ETC. FOR
PRECAST CONCRETE PANELS SHALL BE DESIGNED BY OTHERS FOR SAFEERECTION OF
THE PANELS.
12. NO CALCIUM CHLORIDE SHALL NOT BE USED IN ANY CONCRETE.
13. ALL CONCRETE TO BE CURED FOR A MINIMUM OF 3 DAYS BY A METHOD ACCEPTABLE
TO THE ENGINEER. FORMS MAY BE STRIPPED ONLY AFTER THE CONCRETE HAS
ATTAINED MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI.
14. CHAMFER EXPOSED CORNERS %" U.N.O.
TRULINE PILE WALL INSTALLATION
PROCEDURES & NOTES
I. INSTALLATION PROCEDURE
1. INSTALL TRULINE PILES TO THE REQUIRED DEPTH IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS UTILIZING MANUAL LABOR DIGGING AND PUSH
DOWN BY BACKHOE OR SIMILAR EQUIPMENT.
NO NAIIMMO ALLOWW FOR THE MTALLATION OF TRULM
PLEB.
2. PUMP OUT AND REMOVE ALL SAND THAT MAY HAVE ENTERED INTO THE PILES
DURING THE INSTALLATION. PLACE REINFORCEMENT AS SHOWN ON DRAWINGS.
3. PLACE 5000 PSI CONCRETE FROM BOTTOM UP USING TREMIE ALL THE WAY TO TOP
OF TRULINE PILES. CONCRETE COPING CAN BE POURED AT THE SAME TIME WITH
PILES.
4. WHERE CALLED OUT ON THE DRAWINGS, TRULINE PILES SHALL BE MANUFACTURED IN
THE MANUFACTURING PLANT OF FORMTECH ENTERPRISES, INC. LOCATED AT 126 BEN
BURTON CIRCLE IN BOGART, GEORGIA, 30622 U.S.A., AND SHALL BE INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND. SPECIFICATIONS &
DETAIL V/SW-2.
-ZONING APPROVAL. IN CONCEPT ON
LY LY -
T IIESE PLAINS HAVE NOT BEEN
REVIEWED FOR COMPLIANCE
WITH THE BUILDING COD
OR PUBLIC WORKS DEPA MENT
R U Q IRE�tiEN"
APPUCANT'S ACKNOWLEDGEMENT:
(SiGNA
CITY OF NEWPORT BEACH ?A 2t)22 -- o 2 53
APPROVAL IN CONCEPT NO.
This project conforms to all applicable planning regulations
and policies in effect on this date. -. _ .. . _. . .
.
for constru ctron
No
These plans are not to be used purposes.
building permit will be issued until approval is received from the
California Coastal Commission.
PLANNI G DIVIe��SION
b
2 Z
2
Z
-• 3
D ate:'
1
B�1
ZONE: 9-2-
.
SETBACKS:
I FRONT 3
2d
REAR
. RIGHTSIDE
3
LEFT SIDE ' 3
HEIG
HT 2H � 1ak 2� a
pad
DISCRETIONARY APPROVALS: 'PA 2o1Z - o 2 53
FA 262z, - 02.7 8
NOTES
ABBREVIATIONS
A.B. ............
ANCHOR BOLT
DN ..............
DOWN
HT ...............
HEIGHT
OFF .............
OFFICE
T.F.
............. TOP OF FOOTING
A.C. ...........
ASPHALT CONCRETE
DP ................
DEEP
H.S. .............
HIGH STRENGTH
OPNG ...........OPENING
T.B.
TOP OF BEAM
A/C ............
AIR CONDITIONING
D.S. ............
DOWNSPOUT
HVAC ...........
HEATING/VENTILATING &
OPP HD ......•
OPPOSITE HAND
TG ...............
.............
TAPERED GIRDER
A.C.P. .........
ASPHALT CONCRETE PAVING
DWGS ..........
DRAWINGS
AIR CONDITIONING
O.S.F. ..........
OUTSIDE FACE
T.G.
TOP OF GIRDER
ADDL ..........
ADDITIONAL
(E) ...............
EXISTING
...............
IN .
INCH
P.C. ............
PIPE COLUMN
THK
THICK
A.F.F.
ABOVE FININSH FLOOR
EA
EACH
INFO
""""""
INFORMATION
PEN •••••••••••••
PENETRATION
THRU
.••""'.""
THROUGH
ALUM ..........
ALUMINUM
E.F. ............
EACH FACE
INT ..............
INTERIOR
PL .................
PLATE OR PROPERTY LINE
T.L.
...........
••.•..•.••
TOP OF LEDGER
ALT ............
ALTERNATE
ELEC ............
ELECTRICAL
J.B. .............
JOIST BEARING
PILAS ..........
PILASTER
T.N.
..............
OF NAILER
ANOD
ANODIZED
ELEV
ELEVATION
J.G. .
JOIST GIRDER
PLYWD
PLYWOOD
T.O.
.TOP
OF
ARCHT ••••••••
ARCHITECTURAL
EMBED ••••••••
EMBEDMENT, EMBEDDED
JST •••••••••••••
JOIST
PSF .............
POUNDS PER SQUARE FOOT T.O.P.
....•........
...........TOP
TOP OF PARAPET/PANEL
•"".....
B.B. •••.••......
BOTTOM OF BEAM
E.N. .............
EDGE NAILING
JT .............
JOINT
PSI .............
.POUNDS PER .SQUARE INCH
T.O.S.
TOP OF STEEL.
BET ..............
BETWEEN
EQ ...............
EQUAL
K.O. ..............
KNOCK OUT
P.T. .............
PRESERVATIVE TREATED
TOT
..........
BLDG ............
BUILDING
E.S. .............
EACH SIDE
L .................
ANGLE
R.D. .............
ROOF DRAIN
..............TOTAL
TRANSF TRANSFER
BLKG ...........
BLOCKING
E.W. .............
EACH WAY
LAT .............
LATERAL
"
REBAR .........
REINFORCING BAR
.......
TRANSV TRANSVERSE
BM .............
BEAM
EXIST ...........
EXISTING
LDR .............
LEDGER
R.B. .............
ROOF BEAM
.......
TS TUBE STEEL
B.N. ............
BOUNDARY NAILING
EXP .............
EXPANSION
LG ...............
LONG
REQD ...........
REQUIRED
...............
T.S.
TOP OF SLAB
BOT .............
BOTTOM
EXT .............
EXTERIOR
LLH ..............
LONG LEG HORIZONTAL
REINF ..........
REINFORCING
T.W.
.............
TOP OF WALL
B.W. ............
BOTTOM OF WALL
F.D. ............
FLOOR DRAIN
LLV ..............
LONG LEG VERTICAL
REF .............
REFERENCE
TYP
.............
TYPICAL
C .................
CANT ..........
CHANNEL
CANTILEVER
FDN .............
F.F. ..............
FOUNDATION
FINISH FLOOR
LONGIT ........
L.P.
LONGITUDINAL
LOW POINT
REV .............
R.J.
REVISION
ROOF JOIST
U.N.O.
.............
.......... UNLESS NOTED OTHERWISE
C.G. ...............
CENTER OF GRAVITY
F.G. ............FINISH
GRADE
.............
LT ...............
LIGHT
.............
RM ..............
ROOM
VERT
V.I.F.
........... VERTICAL
VERIFY IN FIELD
C.J. ...............
CONSTRUCTION JOINT OR
FIN ...............
FINISH
MAIL ..........
MATERIAL
.....
R.O. .ROUGH
OPENING
...........
...............
W/ WITH
CL
CEILING JOIST
CENTER LINE
F.J. ..............
FLOOR JOISTMAX
...........
MAXIMUM
SCH .............
SCHEDULE
..............
WD WOOD
......•••••••••
FLG
FLANGE
M.B. ............
MACHINE BOLT
SECT ...........
SECTION
W
WIDE FLANGE
CLG ..............
CEILINGCLR
FLR ..............
FLOOR
MATL ..........
MATERIAL
SHTG ...........
SHEATHING
............•••
W 0
/
............ WITHOUT
.............
C.M.U.
CONCRETE MASONRY UNIT
F. Q.C. ..........
FACE OF 0
CONCRETE
MAX ............
MAXIMUM
SHT .............
SHEET
W.P. ............... WORK POINT
.........
COL
COLUMN
F.O.M.
FACE OF MASONRY
M.B. ............
MACHINE BOLT
SIM '••'•"•••••..
SIMILAR
W.R.
......•••••• WATER RESISTANT
,,,,,,,,
COMPO ........
COMPOSITION
F.O•S. ..........
FACE OF STUD
MECH ••••••••••
MECHANICAL
S.J. ...............
SAWCUT JOINT
WT
WEIGHT
CONC ••••'••'
CONCRETE
F.N.
FIELD NAILING
MEZZ ..........
MEZZANINE
S.P. ...............
SPLICE POINT
W.W.F.
..........WELDED WIRE FABRIC
CONN
"""""
CONNECTION
F.S. .............
FAR SIDE
MFD
MANUFACTURED
SPA ...............
SPACING
X
.. EXTRA STRONG
CONS ........
CONTINUOUS
FT
FEET OR FOOT
MFR •••••••••••••
MANUFACTURER
SPECS •••••••••
SPECIFICATIONS
XX •••••••••••••
.. DOUBLE EXTRA STRONG
CONST
CONSTRUCTION
FTG •••••••••••••
FOOTING
MIN
"""""""
MINIMUM .
SQ
"""""""'
SQUARE
........
CORR """""
CORRIDOR
GALV ...........
GALVANIZED
MISC ............
MISCELLANEOUS
STAGG ...........
STAGGERED
CTR
CENTER
GA
GAUGE
M.F.O. ..........
METAL FRAMED OPENING
STD ...............
STANDARD
............
DBL .............
DOUBLE
G.I. ..............
GALVANIZED IRON
MLB ••• •••••••••
MICROLLAM BEAM
STIFF
STIFFENER
DET .............
DETAIL
GLB .............
GLU-LAM BEAM
M.P.H. ..........MILES
PER HOUR
STL .............
STEEL
DF ..............
DOUGLAS FIR
GLP .............
GLU-LAM PURLIN
MTL .............
METAL •
S.S. .............
SELECT STRUCTURAL
SYMBOLS
D.F. ............
DRINKING FOUNTAIN
GYP BD .........
GYPSUM BOARD
(N) .............
NEW
STRUCT .......
STRUCTURAL
DIAG
DIAGONAL
NAL
HDR ............
HEAD ER
N.I.C. ...........
NOT IN CONTRACT
SYM .............
SYMETRICAL
@ ..............
AT
...........
DIAPH
DIAPHRAGM
HGR .............HAG
HANGER
NO. .............
NUMBER
T & B .........
TOP & BOTTOM
CENTER LINE
DIA
DIAMETER
HK. ..............
HOOK
N.S. .............
NELSON STUD OR NEAR SIDE
T & G
TONGUE &GROVE
..............
DIAMETER
...............
DIM
DIMENSION
HORIZ ..........
HORIZONTAL
N.T.S. ..........
NOT TO SCALE
TEMP ...........
TEMPERED
It ..............
PLATE OR PROPERTY LINE
""""""'
H.P. .............
HIGH POINT
O.C. .............
ON CENTER
� ...........
... STEP IN FOOTING
Notes must to shown A. war#AA on the title street of the plan
THE MAXIMUM TIME TO COMPLETE CONSTRUCTION
ON A PROJECT IS LIMITED TO THREE YEARS
FROM THE DATE OF THE PERMIT FOR ALL
PERMITS ISSUED AFTER AUGUST 21, 2019 AS
REQUIRED BY NBMC SECTION 15.02.95.
ISSUANCE OF A BUILDING PERMIT BY THE CITY
OF NEWPORT BEACH DOES NOT RELIEVE
APPLICANTS OF THE LEGAL REQUIREMENTS TO
OBSERVE COVENANTS, CONDITIONS AND
RESTRICTIONS WHICH MAY BE RECORDED AGAINST
THE PROPERTY OR TO OBTAIN PLANS. YOU
SHOULD CONTACT YOUR COMMUNITY ASSOCIATION
PRIOR TO COMMENCEMENT OF ANY
CONSTRUCTION AUTHORIZED BY THIS PERMIT.
PRIOR TO PERFORMING ANY WORK IN THE CITY
RIGHT-OF-WAY AN ENCROACHMENT PERMIT MUST
BE OBTAINED FROM THE PUBLIC WORKS
DEPARTMENT.
s ranr£r nce up-mer -'
1 I_111.1-° 3� hrten�+�ri!1111 11
.`
u� E lay italrstslrit a E
61,11
.. P 141
U
``
Ld
Q
o
gi
RI
I
11
Wl��
z
ob�z
in
o P
z
O
11
o v=i
a€sz
V)
0
11
> LLJ
w <
rr
30I°
0.
Z
- ESS/
O IS
0�R SAGA FL-,
C �
9No.0 66947 -;oA
J C rTl
0�_ O- .0 ,-u
* *
sX CIV\\-
F OF CA1-\F
11/22/2022
•
V
N
0 Z
Cq
b � _~
�Q 8
4 - J C,Vq d
iI4FF
1-1
o •? U o a
V-gI �a
o U
III U "
00
P N
00
LL
LL
O
J
9
m
Q
U
Z
LU
0
Z
a_
rl
¢
xI .
0
ru
06
0_1
�'
w
(
I-P
Z
J
3:Q
`d
O
� 1�1,
0
O o)
� U
W Z
0 W W
Q
Q
I` Q
O Im-Q
Tm- t1
y , Aa11D Tl1 r UUiSlne ; rs
I.Sediment,
3
from areas dlsturl l . constRict � shall . retained on e r _ e � ,� � � �, r.� . � � �.r .. a by n I tJ site using structural controls to the maximum rr,�..
,Clus'Mntvre ter. ,rw x (� ,
e?�#errt pr t a let ,I �'A_r � r -°, ¢fl,;i€ � xfi
= ` , ., LL,,
Z Stockpiles of sail shall ice propeO/ contained to minimize sediment transport from the site to streets, drainage , , .; „ ..- � �
14
- __ - -
faoilities � adjacent properties via urx�ff vehicle lacking, or wind. ., "a 1,, �k
l . _ P ort r r to . ky - n8 alb �;
' . '' J Crag ,-. ,�
.^'f
_.--_ - _. - - . .
-,
3,A� riateBMP'sf � r f r" ww l• al l .. ,. �:,. � ;::;. ,...: ,.,< ,
l� P Bi rant 4}Gtirl re.ated iCL Q�1)
sle,, `i . l _ sh...t be Inl ..errtlk+<d tt? rrlinlrn+ze #ran ark -
from the site try streets, drainage fao►Ieties, or adjr�inir3g properties txl wind or raarroif, .:.: ' �1` < V)
,,
'
i r
4. Runoff from equipment and vehicle "sling st1= I t contained at construction sites unl+�r's treated to reduce ~ P , � „ , .
or rent ove sediment and other pollutants. "" J i-
tij ";,� r -
1
11
4 M t
��
1 G3
5. All construction contractor and subcontractor personnel are to be made aware or the required best mama .. anent her„ y l ;� .11
2 � - /�'j
ti n h ii.�;� rca� . rL/
ac. S and . _Quest ra f r n c n r1- I rs n#ral ;lam i<ra€ •_
practices } g rn asures .v tine p feat site and arayr associated construction staging areas. , r I ; . _
�,
,,;. .
6. At the end of each day of construction v l Materials -
h y r #r ct r� activity rty al construction debris and waste rnateraals shad be +�akiectecl .r . =,r, sN <;r, ' ... .
>, SQ4,S6tn Sr New ut#
;z
t ,
and property disposed in trash or recycle bins. ;,` .hrlrell�tlC S Ijo"salc9�
t IY Y , : `'.4 Beat �GA 92i3 ; Lido hrlarira Vitl
:_
. _ ,_
_. - _ _. ,
tl
'�J, .. ,, , - 1 I ,.
I, Construction sites shad be maintained. I suc a n _, Shopping mall,, rt h coridtkla ilia# an anticipated storm does not �r wastes or . _._ _ _ n ` v
NI
-t r
tl off the i har s €yE I r t fern ae 01' _;.
utants o de. D rraa raa he han # rrttwa er rsl w e n for perform, nd � :, ,
Po ge to of s o t o y h . n teary . r rrsarace a ., , I.
g :.
, . __
a
jy� s., i.-tas1 , P�rfi , ., . W C V
completion sit construction practices a where the n®t, caul scr cc2rrtnitte k �r I a r t
P Y o a a . n _ .any wakeus.a_°4T -. ,, .,, , ", .:
.: W
standard cause o ;
r threaten to cam pollution, contamination, or nuisance; or C4nt21il a hazardous substance in ; :k
,' r
a a ,. re11 If"
ilia reportable under Federal Regulations Cf r_ -:
Po f1' Parts i 17 and 3i12- n ; _' 'f fir.., . C7
-, ,
� . a O
_ ,. x
t _ :. .
e1
&. Potential I , , F ... �.. o l� t ial pollutants t include e but , ...
r1t uk tti s no iict tare not iirn►tesi to. solid or liquid terrlrcdl ills else o , .. :
Po {} wastes from iris stains, r , 4. .
"4 spills; k .. N.... .... i .., .max,. ,+ .l•� Y. ., 9., `�v`■■
paints, F �a -
sealatats glues, limes, pesticides, # rtt cirf v,+oad preservatives and sralvents asl etc fibers paint flakes ,'4, ,.., .,;, .� , . ,, (N
or stucco fragments, fuels, oils, lubricants, hydraulic.$,.. ;.� Ca u i J
9 , f I , bncu�rits i�t>cf radiator or flub fertilizers, vef~iloleiep��I�y{(ynt _ : , ... rn tom _a V#1Ea.
;.::, ..
. .
.-
_, p,® _ v Q
_ f
sell wale and concrete wash wit r .,,.., �:9 8 Q e concrete, detergent or fls�atable wastes; ,Wastes from and Il lri4?fe jUlprllet►k r .. , ,. � ,' .,,.,..., �ar ri g I;I �h: � lr€par l
I� .., x Q
@g.... .. ,.
teem cleaning or chemical degreasing and sty rchlonnate to le t a . �.
e9 d po b water line flushing, G ,, 7 3.
U
5,.
_. Thff t�Eir_ hth W
,
During construction, ee shall f
r nett I die se of such materials Irt a ified and
d controlled temporary area on , i
ry ,.tra��_r�19 Z
-site, II r Pirate rior � : , LIJ _
i sica separated from potential story water runoff, with ult:irmte disposal in accordance with local. I-
. Icy` , t , • ', W
.. ,. P ra.,Or:hii't , U
state and federal requirements. i n n l� W W
' . . _ it ' :`,- (--
-.,;
::r . _ ,,
, ,. s .. <<. .. ,- ,. Llcir Hratrse
9. Dewatenng of contaminated roundwater, or discharging contaminated salts via surface erosion is rohiLted. � _ .. , , 41 , `� , � ,'..', :.-, roo�c�a gn�p W g :µ. :', 0Q� J
I catering of non -contaminated groundwater requires a National Pollutant Di nay Elimination � �m Perrr�t from '_ -� W (-- Co �(
the respective $we Regions i Water quality Control Board. VICINITY MAP UJ C) (/' � °C
10. Graded areas can the permitted area perimeter must drain away from the- face of slow at the conclusion of each W = W
working day, Drainage is to be directed toward desilting facilities, � � P O 1--
1 1. The p�err-nittee and contractor dull i responsitle and shall take necessary precautions to prevent public trespass SCOPE O F WORK: CY)00 ^
onto areas where impounded water creates a hazardous condition. O U "t > x I..L� '
-- - _. _ W
12. The rr`nittee and contractor ll i the ero ` control work t - ` •- ` - 1. TO REPLACE IN THE SAME .ALIGNMENT. THE EXISTING LOW/NON-COMPLIANT O O I. -
with sue. Inspect _ _src+n c _ tro . o k and r`�aire that the work Is Ir1 accordance � J Z 0
SEAWALL COASTAL HAZARDS PROTECTIVE DEVICE BY UTILIZING TRULINE PILES S U)
+with theafapronred plans, /
WITH CAST -IN -PLACE CONCRETE COPING ATOP, TIED TO A NEW CONCRETE
U
13, The pef>nitt shall notify all neral contractors, sub0ntractor!, Material suppliers, Dees, argil property DEADMAN WITH DYWIDAG TIE -BACKS. N cal > >
cwftrs: that dumping of chemicals Into the storm drain system or the watershed is p(ohlibited. 2. TO CONSTRUCT A NEW CONCRETE STEM WALL OVER THE COPING WITH TOP OF N N O O W�/
14. Equipment and workers fur emergency work shall be matte aavaiilable at all tirr duringthe rat season. Necessary N o0 Iz Iz L.L.
�Y _ rY WALL ELEVATION OF +10.90 NAVD88, WITH ADAPTABILITY TO BE RAISED TO N � w w
materials shall be available on site and stockpiled at convenient locations to facilitate rapid cunsttuction of +14.40 NAVD88 IN THE FUTURE. � � O
temporary davices when rain is irriminent- � 11- 11U_
3. THE CONSTRUCTION LISTED IN ITEMS 1 & 2 ABOVE WILL BE DONE WITHOUT ANY � o � Lw o
15. All removable erosion prciteot a devices shall be in place at the end of �ea-ch workim. day wre n the 5-Day Rain MECHANIZED EQUIPMENT BEYOND THE FACE OF BULKHEAD/SEAWALL. � z z Y
Probability Forecast exceeds 40%. a o o bi
16.8edirr ntsfrom areas disturbers by construction shall t retained on site using an efrective our ination of NOTE TO THE BIDDERS 11 f
erosion and sediment controls to the maximum extent practicable, and stockpiles of sail shall be properly �containt� SHEET OF Q
to minimize sediment tra port from the site to streets, drainage facilities of adjacent properties aria runoff, AFTER THOROUGHLY EXAMINING THE CONSTRUCTION DOCUMENTS AND THE SITE:
vehicle tracking, or wind- 1. NOTIFY THE ARCHITECT AND/OR THE ENGINEER IN WRITING, REGARDING ALL _
17.Approprlate IBMPs for nstrvction=related materials, wastes, spills or residues shall be ill lerruented and retained DISCREPANCIES REQUIRING CLARIFICATION, PRIOR TO THE "BID SUBMITTAL". 2
on site, to rninifnize transport from the site to streets, drainage facilities, or adjQirli.N property bin wirw or 2. IF THE ARCHITECT AND/OR THE ENGINEER IS NOT NOTIFIED, AS REQUIRED PER _
rum- ITEM #1 ABOVE, IT SHALL MEAN THAT THE CONTRACTOR HAS CONSIDERED SW_0 J
ADEQUATE CONTINGENCY IN HIS BID TO COVER ALL COSTS TO COMPLY WITH
THE MOST STRINGENT CONDITIONS. W
3. THE CONTRACTOR SHALL NOT BE ENTITLED TO ANY ADDITIONAL COMPENSATION N
FOR ANY DISCREPANCY DISCOVERED AFTER THE "CLOSE OF THE BID". 0-
PRELIMINARY FOR CDP
(E) STRUCTURE
AT NEIGHBORING
PROPERTY
/I
/I
/I
1111�/ j
(N) CONT CONIC
DEADMEN
(N) 1"0 THREADED
TIE -ROD TYP
(TOTAL OF 3)
P
TYP W_
(E) SEAWALL AT \
NEIGHBORING y
PROPERTY TYP �
I
SITE PLAN/TIE-RODS LAYOUT
(E) SEAWALL TO REMAIN
AND BE PROTECTED
T.O. (N)
TRULINE
PILES
MUDLINE
t
PARTIAL FOOTPRINT OF THE
1ST FLOOR OF THE PROPOSED �I
STRUCTURE ON THE LOT �I
(UNDER SEPARATE PERMI
III
T.O.S.= +9.00'NAVD88
IIII
15'-0')
2'-611 5'-0"
1 IIII I /
13' I
W W W Y W W W Y W W
W W W W W Y W W W W W W W
i
4'-0"
OUTSIDE FACE OF (N)
CONIC COPING TO
ALIGN WITH OUTSIDE -
FACE OF THE (E)
REMOVED LOW CONIC
SEAWALL
7'-16�'
5-0" 2'
=!- -z--J
I.13'
(N) WD V
STEPS PER
Y W W W W W W Y JW
Y .V W .l• W i• W W W W
N 53°36'38"E 30.00'
TYP I (N) GANGWAY
K UNDER
\\Sw-v SEPARATE
PERMIT
II II-0" 11'-0"
30' -0"
T
(N) SEAWALL, SEE SITE
PLAN FOR LENGTH
4'-0"
I�
VI/
r
/ (E) STRUCTURE
AT NEIGHBORING
V/ PROPERTY
V
Y
PROPERTY
r LINE TYP
I
I
pia
— (N) LANDSCAPE +�
Q
AREA TYP
3:
ozz
L__
PLAN
NORTH
(E) SEAWALL AT
NEIGHBORING
PROPERTY TYP
(N) TRULINE PILES
SEE V TYP
SW-
- IH
0
in
N
R
APPLY DETAIL W- AT THE ENTIRE PERIMETER OF ANY
EXCAVATED MATERIAL PILED UP AT THE PROJECT SITE IN
COMPLIAQNCE WITH ITEM 6 UNDER "EROSION CONTROL
NOTES" ON SHEET SW-0.
& BE PROTECTED
PROPERTY LINE TYP
T.O. (N) _CONC STEM WALL ELEV=
+10.90' NAVD88=+11.10' M.L.L.W.
T.O. (N) CONIC COPING ELEV= +7.90' NAVD88=+8.10' M.L.L.W_
MUDLINE
(N) TRULINE PILE TYP
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT I BUILDING DIVISION
STRUCTURAL OBSERVATION GENERAL NOTES
1. STRUCTURAL OBSERVATION IS REQUIRED FOR THIS PROJECT IN
7. IF THE CITY'S FORM IS NOT USED, REPORTS SHALL BE ON STRUCTURAL
ACCORDANCE WITH CBC 1710. STRUCTURAL OBSERVATION IS THE VISUAL
OBSERVER'S LETTERHEAD, STATE SITE ADDRESS, PLAN CHECK & PERMIT
OBSERVATION OF THE STRUCTURAL SYSTEM BY A LICENSED DESIGN
NUMBERS, STAGES & ELEMENTS OBSERVED, DATE OBSERVED, & COMPLETE
PROFESSIONAL FOR GENERAL CONFORMANCE TO THE APPROVED
CONTACT INFORMATION FOR STRUCTURAL OBSERVER.
CONSTRUCTION DOCUMENTS.
8. ALL STRUCTURAL OBSERVATION REPORTS, REGARDLESS OF FORM USED,
2. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE
SHALL INCLUDE THE LICENSE STAMP & SIGNATURE OF THE STRUCTURAL
REQUIRED INSPECTIONS BY THE CITY OF NEWPORT BEACH.
OBSERVER RESPONSIBLE FOR THE PROJECT.
3. THE OWNER SHALL EMPLOY A LICENSED DESIGN PROFESSIONAL TO PERFORM
9. EACH STRUCTURAL OBSERVATION REPORT SHALL BE GIVEN TO THE OWNER
STRUCTURAL OBSERVATION SITE VISITS, AND TO ISSUE ALL STRUCTURAL
OR OWNER'S REPRESENTATIVE, PROJECT CONTRACTOR, AND THE BUILDING
OBSERVATION REPORTS.
INSPECTOR.
4. THE DESIGN ENGINEER SHALL IDENTIFY THE REQUIRED STRUCTURAL
10. THE CONTRACTOR SHALL RESOLVE ALL DEFICIENCIES & THE FINAL
OBSERVATION SITE VISITS ON THE STRUCTURAL OBSERVATION SCHEDULE.
STRUCTURAL OBSERVATION REPORT ISSUED PRIOR TO FINAL INSPECTION OR
5. THE REQUIRED SITE VISITS SHALL AT A MINIMUM INCLUDE THE FOLLOWING:
ACCEPTANCE OF STRUCTURAL WORK BY THE BUILDING INSPECTOR.
A. OBSERVATION OF THE FOUNDATION SYSTEM PRIOR TO FINAL CONCRETE
11. THE FINAL STRUCTURAL OBSERVATION REPORT SHALL STATE THAT THE
POUR;
STRUCTURAL SYSTEM CONFORMS TO THE APPROVED CONSTRUCTION
B. OBSERVATION OF BUILDING FRAMING PRIOR TO CALLING FOR THE CITY
DOCUMENTS & THAT ALL PREVIOUSLY OBSERVED DEFICIENCIES HAVE BEEN
OF NEWPORT BEACH "COMPLETE FRAMING INSPECTION"; AND,
CORRECTED.
C. FINAL OBSERVATION OF THE COMPLETED STRUCTURE.
12. FINAL INSPECTION OR OTHER ACCEPTANCE OF THE STRUCTURAL SYS• TEM
ADDITIONAL SITE VISITS MAY BE NEEDED AS DETERMINED BY THE DESIGN
BY THE CHIEF BUILDING OFFICIAL, OR DESIGNEE, WILL NOT OCCUR UNTIL THE
ENGINEER OR STRUCTURAL OBSERVER.
FINAL STRUCTURAL OBSERVATION REPORT IS RECEIVED.
6, THE STRUCTURAL OBSERVER SHALL PREPARE A STRUCTURAL OBSERVATION
13. THE LICENSED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL
REPORT FOR EACH STAGE OF CONSTRUCTION OBSERVED. THE CITY OF
PREPARE ALL CONSTRUCTION DOCUMENT CHANGES RELATING TO THE
NEWPORT BEACH "STRUCTURAL OBSERVATION REPORT" FORM, OR A
STRUCTURAL SYSTEMS. REVIEW & APPROVAL OF SUCH CHANGES BY THE
SIMILARLY FORMATTED REPORT, SHALL BE USED FOR ALL STRUCTURAL
CHIEF BUILDING OFFICIAL, OR DESIGNEE, SHALL BE OBTAIN BY THE RESIGN
OBSERVATION REPORT.
PROFESSIONAL AND/OR CONTRACTOR PRIOR TO INSTALLATION ANDIOR
CONSTRUCTION OF SAID CHANGES.
STRUCTURAL OBSERVATION SCHEDULE
SITE ADDRESS: 504 38TH STREET
PC #:
TO BE COMPLETED BY THE DESIGN ENGINEER, AND INCLUDED ON THE CONSTRUCTION DRAWINGS.
BASED ON THE PROJECT SCOPE, PLEASE IDENTIFY THE ELEMENTS AND/OR CONNECTIONS THAT REQUIRE STRUCTURAL OBSERVATION. SPECIFY THE INTERVAL
OR STAGE OF CONSTRUCTION WHEN THE STRUCTURAL OBSERVATION WILL BE
PERFORMED.
TYPE
STRUCTURAL ELEMENTS AND/OR
SCHEDULED INTERVAL OR STAGE OF CONSTRUCTION
CONNECTIONS TO BE OBSERVED
❑ FOOTINGS, SLAB FOUNDATION, ANCHORS
1n
Z
a
❑ MAT FOUNDATION, PRESTRESSED CONC. SLAB
O
o
❑ CAISSON, PILE, GRADE BEAM
LL
■ OTHER: CONCRETE FOR TRULINE
PRIOR TO
POURING CONCRETE
PILES COPING & DEADMAN
❑ CONCRETE
❑ MASONRY
❑ WOOD OR MANUFACTURED SHEAR PANELS
y
❑ OTHER:
❑ STEEL MOMENT OR BRACED FRAME
uj
❑ CONCRETE MOMENT FRAME
14-
❑ MASONRY WALL FRAME
❑ OTHER:
❑ CONCRETE
U
m
❑ STEEL DECK
x
IL
❑ WOOD
❑ OTHER:
FINAL
■ FINAL OBSERVATION & REPORT
FORMSISTRUCTURAL OBSERVATION GENERAL NOTES & SCHEDULE M2011
,K,\ nAK,n,A,A„ (N) 1x4 S4S RAILING
N
�
>I�
U SR
0 6� z
o
�
z0
6
z
a
cn
0
N1'
CL
�
3�ga
C)
Ee$
z
aaa
81
Q�OFESS/�,I
IS FAG'
CD No.0 66947 rr l
Ld -� O m
p, ` �7
9TF OF CAI-�F
11/22/2022
•
Cq
Cn
Cq
Lo
b [
0
Cq
U � W
Cq
ti
a
LL
H
O
J
O
U
Q
O
<
Q
U
U�
a_
Q
\
z
Q
0
z
p
W
Q
z
W
z
O
0
J
Q
r-
Q
Q
0-
M
J
z
O
S.
Q
U
H
Q
W
I-
=
w
W
Q
W
0
Q
m
06
(n
LU
F-
z
0
~
~
Do
O
�CL
U
co
�
0
LL,
IW—
a.
J
Lo
Z
U)
N
N
>
>
N
N
O
O
O
NF—
00
0
\
d
W
W
o CL
Ld \
z
z
Y
0
O0
�
U
SHEET OF
0-
0
U
1..
O
LL
z
w
SEAWALL ELEVATION
T SECTION AT WOOD STEPS
N.T.S.
V
PRELIMINARY FOR CDP
FUTURE T.O.W_ELEV�-=+14.40'
NAVD88 _ _ _ _
1'-6"
=+14.60' MLLW
FUTURE FLOOD PROTECTED
-I- - -
Lli
cw
�� ��
11 7 A
T.O. (N) GUARDRAIL- ELEV_+12.50'
- _
=+12.80' MLLW
CONC STEM WALL IF DEEMED
NAVD88 _ _ -
I I S NECESSARY TO ACCOMMODATE
SEA LEVEL RISE A
o
��
N
�(3)
EPDXY COATED
CORRUGATED PVC 3" CLR ALL 1
SHEATHING SHOP AROUND TYP
(
PROPERTY LINE AT FACE -� -�I 3'-O"-I-(N) BLDG WALL,
gCONT
#6 EA FACE
6) EPDXY COATED
GROUTED FULL LENGTH)
Tc
OF STEM WALL & COPING I I PLANTER WIDTH ICONC SLAB &FTG
I I I SEPARATE
cn
Z�
#4 EPDXY COATED TIE TYP
ONT #6
T.O. CN)TEM WALL ELEV_
_ _ _ _ _ _ I UNDER
F_
z
w z
:lz"
-I, ,
ROD COUPLER - 1 -
+10.90 NAVD88
(N) F.S. BY (N) HARDSCAPE PERMIT
�,
o h�
G - - -
(OPTIONAL), SEE
=+11.10 MLLW
I I OTHERS BY OTHERS I
#4@18 O.C. I
�
z
o
J
j
_
-' •
J
a
J N FLOOD PROTECTED I
z Q O I BENT AS SHOWN
o
_
U
o V,
Z
a o
0
oz 9 CONC STEM WALL I ; I I I T.O. (N) SLAB ELEV=+9.00'
A C°
u_
Q
a
_ `�'
0
I
I I NAVD88=+9.20'f MLLW
zw _I SLOPE PER CIVIL --_ -- ----
------
w
z mm
3
�--L
I M I
o
O
ESTABLISHED GRADE= I I-rrr=r_rr art �_r1=rr1=nrLNJ
I -I r=irl=,
+I -III-III-III-III=III-III=III-III ''Lu
' (
10
Al-
I
• �r
T.O. N COPING ELEV=
C) _
+7.90 NAVD88 �
+7.40' NAVD88=+7.60' MLL� I 1 I =HII-III=III= -III-III=III=L=L-III=III-
_ _ _ _ _ N _I n_I 11_ III—III-1 I I-1 I I=1 I I-111
THICKENED EDGE
U CL OF CONN � _ OF SLAB „ I I
z
�� .
I I
=+8.10 MLLW -'
- -
- o (N) #4 x 1 -0 LG
o z =.: I II lnl I I I I= 1 I
w
,,,
7Q
2 EPDXY COATED 5 BOTH o
O I I- w
I
U a L - @ 18 O.C. N
Lip -
WAYS @ ANCHOR RODS -
ICI-
o
�o I - - - - - - - -
ADHESIVE DOWELS J I`
• I—
I
N
zU o „
�- I 4 EMBED
oz
g
ANCHOR PLATE %"x9"x9"
I I ^
a
a
a
W/ANCHOR NUT BEHIND - -
_ _
FOR TYP
- (N) 2'-0" WIDE
(2) EPDXY COATED #5 EA
WAY x V-6" LONG @ EACH
(2) EPDXY COATED #5 1'
VERT & HORIZ BARS #4 EPDXY COATED
COUPLER,
6 w z CONC FTG WHERE G
OUTSIDE(N) J o
TYP W 2 4 CONT
)#
QRpFESS/
ANCHOR ROD
TIES @ 16 O.C.
a m o /( READ, SEE -
�� IS
OR SO F`
NOTE ;
NOTE;
CDCOPING TO ALIGN - w
LA
FOR INFORMATION NOT SHOWN, SEE DETAIL B
-
—s A K
FOR INFORMATION NOT SHOWN, SEE DETAILS &
- -
WITH OUTSIDE FACE OF V N z
THE (E) REMOVED LOW (N) TIE -BACK -
CONC SEAWALL - PER PLAN TYP
�� z
C� No.0 66947 � m
n
X CIV\�-
9�F
DEADMEN ELEVATION
N.T.S.
A
SECTION AT DEADMEN
N.T.S.
B
CORRUGATED PVC SHEATHING
OF CA1
SHOP GROUTED FULL LENGTH
WITH THE FOLLOWING GROUT MIX:
11 /22/2022
EQ EQ
COUPLER PER ICC ESR-3367
1 BAG (94 LBS.) TYPE III
PORTLAND CEMENT
•
1
SPECIAL INSPECTION IS REQUIRED.
E4.5-5 GAL WATER
I
LINE/MUD NE �I I 0.75 LBS. INTFUSION AID LS FOR (N) CONT
III- CONC DEADMAN
- --- - - - - -
_N.G. ELEV= _ - -
- El
- - - - - -
I I (I I TYP SEE g
o
'
(* )
+0.10' NAVD88 44
=+0.30' MLLW o
_ _ _- _
-,_ -I I I -I I I -I I
HEAT SHRINK SLEEVE GROUT SLEEVE
' 1 I 1=I � I=I I � I=I I
- " III El I
•� W�
z
CENTERED OVER COUPLER
-�
'-8
2 LAYERS OF MOLDABLE DENSO TAPE
a
(*) DELETE GROUT SLEEVE ON OVER BARE BAR AND COUPLER
I=
I�I
o
FIELD CUT TENDONS
c�
Z
�' a
SPACE BETWEEN COUPLER AND BAR
TO BE COMPLETELY FILLED WITH
(N) 8 THICK TRULINE PILES
o
°
w PER PLAN, FILLEDO
WITH
CORROSION INHIBITING GREASE
U z
� o CONC AS SHOWN TYP
a
�
o _
T
m Zuj
COUPLER INSTALLATION PROCEDURE: PREPARATION FOR FIELD CUT BARS
o -I 25'-0" U.N.O. ON PLAN
III
0
o m
1. APPLY CORROSION INHIBITING GREASE TO THE BARE ENDS OF
1
THE BARS AND THE INSIDE OF THE COUPLER. 1. CUT CORROSION PROTECTION AND THREAD BAR WITH AN
z 00 w II II
a
2. CONNECT THE TWO BAR ENDS WITH THE COUPLER. EACH END ABRASIVE SAW (DO NOT USE A TORCH).
w _
-I
SHALL BE SCREWED INTO THE COUPLER HALF THE LENGTH OF 2. CAREFULLY REMOVE 6" (t Y4") CORRUGATED AND CEMENT
_j
III
THE COUPLER. GROUT FROM THE END OF THE NEW CUT.
z 7.
3. TORQUE BAR ENDS TOGETHER (200 FT. LBS).
4. ADD ANOTHER COAT OF GREASE TO BARE BAR AND COUPLER
w
AND WRAP WITH TWO LAYERS OF DENSO TAPE,
LL
5. CENTER HEAT SHRINK SLEEVE OVER COUPLER AND APPLY
LL
HEAT UNTIL SLEEVE IS FULLY RECOVERED.
Q
J
DCP COUPLER DETAIL
N.T.S.
G
TYPICAL SECTION AT SEAWALL
N.T.S.
K
0
m 0_0
v
o�
1 MIN TYP I RAPID SET NON-
Lf�)±
Q LLI
U
AFTER STRESSING I SHRINK GROUT TYP
(N) CONC I TYP SEAL AROUND HOLE
#4 CLOSED CONC COPING
J Q W
0
Z
COPING BEFORE GROUTING
TIES TYP �,P
Q Q
W
ANCHOR NUT. I.: _: TYP
Q
TORQUE AS CORRUGATED PVC
#5 CONT @
06 ~
Q
3/4" CHAMFER TYP
READ BEFORE } :. SHEATHING (SHOP
EA FACE
� J �
<
Q
GROUTING TYP GROUTED FULL
o Q
2 BAGS MIN. SANDBAGS (TYP)
GROUT LENGTH) TYP
I:. ..
• I
TUBES �....:.
#5 CONT @ EA FACE
Y2" "V" REVEAL @
EE3
MAX 8'-0" O.C. ( I
BEARING PLATE
EA FACE 3" I • • 3"
1Y2"x10"SQ
CLR I I CLR
W/HOLES FOR
I EPDXY
GROUT TUBES I (DAG
TYP EADBAR
TYPICAL SECTION TYPICAL ELEVATION
• • I CO
COATED VERT
TYP PER PLAN
) " @ 12" O.C.
(N) EPDXY COATED
5" I.D. STD PIPE
14/ SLEEVE WELDED TO
MW LL
#4 CONT ©MAX
SANDBAG VELOCITY REDUCER DETAIL
ISE
12" 0 C. •
BEARING PLATE TYP
1 " MIN
I 1'-8"
COVER TYP GROUT SLEEVE TYP
COLD JOINT I I COPING
OPTIONAL I • • I
BLOCKOUT (N) COPING FOR
(N) 8" THICK TRULINE ANCHOR CONN. AFTER
s 2'-0" TYP
/4" CHAMFER K
PILES PER PLAN, STRESSING, TREAT SURFACE
- TYP
FILLED WITH CONC WITH BONDING AGENT AND
Y2" "V" REVEAL AT
FILL WITH RAPID SET
M
TOP OF COPING
I
NON -SHRINK GROUT TYP
ELEVATION • • CORRUGATED PVC
cfl
VELOCITY REDUCER DETAIL
1 "=1"
L
q. SHEATHING SHJ
FOR BLOCKOUT AT I,` ; CLR
TIE —BACK TO COPING CONN
N.T.S.
N
CORNER OF COPING
N.T.S.
P
Q
C
, . GROUTED FULLOP
ANCHOR PLATE SEE i` ;:: <a`:` TYP LENGTH TYP
U
D ETAI Lr N TYP •
.......::..:::.....
- - - - - - - ----------------- ---
-- ------------------------------------------------------------------------
.
6"
W W Q
TWO ROWS OF SANDBAGS
(N) 20" WIDE I • TYP
0 Q w m
THREE BAGS HIGH
ONE ROW OF SANDBA S
CAST I N PLAC E
CONC COPING
U) W ~
TWO BAGS HIGH
W/(6)#6 EPDXY
(N) TRULINE PILE 800 SERIES
f II_- O
�— TOE OF SLOPE
COATED CONT DYWIDAG
W/(2)#6 VERT REBARS
Q 00 0-
Q
----------------------------- - ----- - ------ -- - - -------------- - ------ ------- ---------- -- -- ---
REBARS IN #4 TH READ B AR
" " CENTERED AT PILE & #4
O (.) M
SLOPE
CLOSED TIES @ PER PLAN TYP
36HORIZ @ 12 O.C. EXTEND
d-
O W
W
12" O.C.
TYP TYP
1 1 VERT REBARS 19 ABOVE TOP
J Lo Z
0
(N) 8" THICK
OF PILE FOR 21" TOTAL
CV
N
O
N
N
r-
>
O
>
O
TRULINE PILES PER
PLAN, FILLED WITH
CONC AS SHOWNCN
EMBED INTO CONC COPING
TYP U.N.O. ,�"� [`�
I I AI AP D
CURB FACE, 100' MAX. NE ROW OF
WHERE OCCURS SANDBAGS
TWO BAGS
TYP
--
w
w
HIGH
o
Or
w
z
F-
z
y
TOE OF SLOPE PROTECTION DETAIL
w
°° -
0
Or
w
NOTES
SHEET OF
NOTE:
.
1. FOR INFO NOT SHOWN, SEE
THIS DETAIL SHALL APPLY AT THE ENTIRE PERIMETER OF ANY EXCAVATED
MATERIAL PILED UP AT THE PROJECT SITE IN COMPLIANCE WITH ITEM 6
DETAILS &
K V
UNDER "EROSION CONTROL NOTES" ON SHEET S-0.
- -
SW-2
TOE OF SLOPE PROTECTION
1"=1"
R
SECTION AT COPING
N.T.S.
S
SECTION AT NEW TRULINE PILES
N.T.S.
V
PRELIMINARY FOR CDP