Loading...
HomeMy WebLinkAboutH2018-0749 - Misc (2)APOLLO STRUCTURAL 4650 E. ARROW HWY, STE. A7 MONTCLAIR, CA 917GS STRUCTURAL OBSERVATION MEANS THE VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM, FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS, AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF THE STRUCTURAL SYSTEM. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FORTH F INSPECTIONS REQUIRED BY THE BUILDING CODE OR LOCAL MUNICIPAL CODE. ALL CONSTRUCTION WORK THROUGH? DAYOF Nllij2 0-1-2 (�I THIS REPORT INCLUDES PROJECTADDRESS STRUCTURAL OBSERVER OF RECORD(S.O.R) LICENSE NO. OF S.O.R CONTACT NUMBER STEPHENSAM C84945 (909)851-7717 OWNER 3 I\c. IrI LvU ) JOB NUMBER OBSERVATION PERFORMED BY jg - (L L. STEPHEN SAM THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH PORTIONOF BUILDING OBSERVED, IFNOTWHO11LE DATE J IFOUNDATION ❑WALL ❑FRAMES ❑FLOOR/ROOF ',-�,G/! '.L/ Y��Y7 �-l-O(�wL� 3 S C ❑FOOTINGS&STEM WALLS ❑CONCRETE El STEEL MOMENT ❑CONCRETE - Al '" r' Ai,1 ❑CONCRETE SLABS ❑MASONRY ❑STEEL BRACED ❑STEEL DECK 0c(-'(I ,iJ (, fV,o t-k ❑CAISSONS, PILES, ❑WOOD ❑ ❑WOOD GRADEBEAMS LA )v S ❑ H I LLSI DE BU I LDI NGS- ❑RETAINING ❑ ❑PLYWOOD SPECIAL FUN ANCHORS WALL NAILING ❑ UTL. REINF. ❑ ❑ SPECIAL INSPECTION REPORT(S) OBSERVED OBSERVED DEFICIENCIES: STRUCTURAL OBSERVATION BY THE STRUCTURAL OBSERVER OF RECORD DOES NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS. THIS OBSERVATION IS ONLY FOR REVIEW FOR GENERAL CONFORMANCE WITH THE DESIGN DOCUMENTS OF THE PROJECTAND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR: CONFIRMING THAT ALL CONSTRUCTION 15 PER PLANS, JOBSITE SAFETY, SELECTING TECHNIQUES OF CONSTRUCTION (INCLUDING SHORING), COORDINATING HIS OR HER WORK WITH THAT OF ALL OTHER TRADES, AND PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER. I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE: 1) I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSE_ VATION. � FESS / OR ANOTHER ENGINEER WHO I HAVE DESIGNATED ABOVE AND 15 UNDER MY RESPONSIBLE P----......,. 2) I, CHARGE, HAS PERFORMEDTHE REQUIRED SITE VISITS ABOVE AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE OBSERVED PORTIONS OF THE STRUCTURE IS IN GENERAL CONFORMANCE c i A E , V /(\ WITH THEAPPROVED PLANS AND SPECIFICATIONS; V C/U '�^A, 3) DEFICIENCIES DOCUMENTED MUST BE CORRECTED UNLESS OTHERWISE INDICATED ABOVE; UNDERSTANDS THAT FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE /! jcl 4) THE CONTRACTOR DEPARTMENT OF BUILDING AND SAFETY CANNOT OCCUR WITHOUT THE CORRECTION OF ALL CC j 4 45 m OBSERVED DEFICIENCIES (NOTED ABOVE); 5) THE CONTRACTOR IS RESPONSIBLE FOR THE SUBMISSION OF THE ORIGINAL OF THIS REPORT TO THE Xp. 2:Q DEPARTMENTOF BUILDING AND SAFETY; 6) I HAVE PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE\ Y ! CITY. s\\ClV1�/�P� SIGNED S� OF /v_ L - 20aA-T- �jrcoj ll('v7 9rA CA OF LX S16AATUREOF RUC( ft LD SE VERFF-RfCGITDjS-OI u STRUCTURAL OBSERVATION DOES NOT WAIVE ANY OF THE REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE DEPARTMENT