HomeMy WebLinkAboutH2018-0749 - Misc (2)APOLLO
STRUCTURAL
4650 E. ARROW HWY, STE. A7
MONTCLAIR, CA 917GS
STRUCTURAL OBSERVATION MEANS THE VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM, FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND
SPECIFICATIONS, AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF THE STRUCTURAL SYSTEM. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR
WAIVE THE RESPONSIBILITY FORTH F INSPECTIONS REQUIRED BY THE BUILDING CODE OR LOCAL MUNICIPAL CODE.
ALL CONSTRUCTION WORK THROUGH? DAYOF Nllij2 0-1-2 (�I
THIS REPORT INCLUDES
PROJECTADDRESS
STRUCTURAL OBSERVER OF RECORD(S.O.R)
LICENSE NO. OF S.O.R
CONTACT NUMBER
STEPHENSAM
C84945
(909)851-7717
OWNER 3 I\c. IrI LvU )
JOB NUMBER
OBSERVATION PERFORMED BY
jg - (L L.
STEPHEN SAM
THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH
PORTIONOF BUILDING OBSERVED, IFNOTWHO11LE
DATE
J IFOUNDATION
❑WALL
❑FRAMES
❑FLOOR/ROOF
',-�,G/! '.L/ Y��Y7 �-l-O(�wL�
3 S C
❑FOOTINGS&STEM
WALLS
❑CONCRETE
El STEEL
MOMENT
❑CONCRETE
-
Al '" r' Ai,1
❑CONCRETE SLABS
❑MASONRY
❑STEEL
BRACED
❑STEEL DECK
0c(-'(I ,iJ (, fV,o t-k
❑CAISSONS, PILES,
❑WOOD
❑
❑WOOD
GRADEBEAMS
LA )v S
❑ H I LLSI DE BU I LDI NGS-
❑RETAINING
❑
❑PLYWOOD
SPECIAL FUN ANCHORS
WALL
NAILING
❑
UTL. REINF.
❑
❑
SPECIAL INSPECTION REPORT(S) OBSERVED
OBSERVED DEFICIENCIES:
STRUCTURAL OBSERVATION BY THE STRUCTURAL OBSERVER OF RECORD DOES NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH REQUIREMENTS OF THE
DRAWINGS AND SPECIFICATIONS. THIS OBSERVATION IS ONLY FOR REVIEW FOR GENERAL CONFORMANCE WITH THE DESIGN DOCUMENTS OF THE PROJECTAND
GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR: CONFIRMING THAT ALL CONSTRUCTION 15 PER
PLANS, JOBSITE SAFETY, SELECTING TECHNIQUES OF CONSTRUCTION (INCLUDING SHORING), COORDINATING HIS OR HER WORK WITH THAT OF ALL OTHER TRADES,
AND PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER.
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE:
1) I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL
OBSE_ VATION.
� FESS /
OR ANOTHER ENGINEER WHO I HAVE DESIGNATED ABOVE AND 15 UNDER MY RESPONSIBLE
P----......,.
2) I,
CHARGE, HAS PERFORMEDTHE REQUIRED SITE VISITS ABOVE AT EACH SIGNIFICANT CONSTRUCTION
STAGE TO VERIFY IF THE OBSERVED PORTIONS OF THE STRUCTURE IS IN GENERAL CONFORMANCE
c i A E , V
/(\
WITH THEAPPROVED PLANS AND SPECIFICATIONS;
V
C/U '�^A,
3) DEFICIENCIES DOCUMENTED MUST BE CORRECTED UNLESS OTHERWISE INDICATED ABOVE;
UNDERSTANDS THAT FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE
/! jcl
4) THE CONTRACTOR
DEPARTMENT OF BUILDING AND SAFETY CANNOT OCCUR WITHOUT THE CORRECTION OF ALL
CC j 4 45 m
OBSERVED DEFICIENCIES (NOTED ABOVE);
5) THE CONTRACTOR IS RESPONSIBLE FOR THE SUBMISSION OF THE ORIGINAL OF THIS REPORT TO THE
Xp. 2:Q
DEPARTMENTOF BUILDING AND SAFETY;
6) I HAVE PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE\
Y !
CITY.
s\\ClV1�/�P�
SIGNED S� OF /v_ L - 20aA-T- �jrcoj ll('v7 9rA CA
OF LX
S16AATUREOF RUC( ft LD SE VERFF-RfCGITDjS-OI
u
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY OF THE REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE DEPARTMENT