<,Folz City Council Staff Report
January 24, 2023
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Tom Sandefur, Assistant City Engineer
tandefur@newportbeachca.gov
PHONE: 949-644-3321
TITLE: Newport Beach Mariners Library, Corona del Mar Lifeguard
Substation, and Ben Carlson Lifeguard Headquarters Heating,
Ventilation, and Air Conditioning Replacement Project — Award of
Contract No. 8760-1 (22F02)
/_1 16"t I:7_T91 6
The City of Newport Beach (City) has received construction bids for the Newport Beach
Mariners Library, Corona del Mar (CdM) Lifeguard Substation, and Ben Carlson Lifeguard
Headquarters Heating Ventilation and Air Conditioning (HVAC) Replacement Project. The
project will replace components of the HVAC systems at the Mariners Branch Library and
the Ben Carlson Lifeguard Headquarters at Newport Pier. In addition, the project will add
an HVAC system to the CdM Lifeguard Substation. Staff requests City Council approval
to award the construction contract to Western Allied Corporation of Santa Fe Springs,
California.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Class 1 Section 15301(d) (maintenance of existing public facilities and
mechanical equipment involving no expansion of existing use) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 8760-1 to Western Allied Corporation for the bid price of $427,497
for the Newport Beach Mariners Library, CdM Lifeguard Substation, and Ben Carlson
Lifeguard Headquarters HVAC Replacement Project, and authorize the Mayor and
City Clerk to execute the contract; and
d) Establish a contingency of $43,000 (approximately 10 percent of total bid) to cover the
cost of unforeseen work not included in the original contract.
5-1
Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard
Headquarters Heating, Ventilation, and Air Conditioning Replacement Project
January 24, 2023
Page 2
DISCUSSION:
A review of the City's facilities and their respective HVAC components found certain
deficiencies. Generally, these deficiencies were due to the age of the components as the
components had reached the end of their expected service life and were ready for
replacement.
In particular, the Mariners Branch Library requires a new evaporative condenser and
replacement of all four water pumps, along with an upgrade to the building's HVAC control
system. At the CdM Lifeguard Substation, the work involves installing an HVAC system
in the facility where none currently exists. In addition, the project will reorient the adjacent
restaurant's exhaust fan to prevent the system from drawing exhaust fumes from the
kitchen hood into the lifeguard facility. The Ben Carlson Lifeguard Headquarters building
at the Newport Pier recently suffered a failure of the HVAC heating and cooling unit on
the roof and requires a replacement.
At 2 p.m. on December 20, 2022, the City Clerk opened and read the following bids for
this project:
BIDDER
TOTAL BID AMOUNT
Low
Western Allied Corporation
$ 427,497.00
2nd
Bon Air, Inc.
$ 565,000.00
The City received two bids for this project. The low bidder, Western Allied Corporation
submitted a bid equaling Engineer's Estimate of $427,000. Western Allied Corporation
submitted all the necessary forms and possesses a Classification "B" and a "C-20"
California State Contractors License as required by the project specifications. A check of
the contractor's references indicates a satisfactory history of similar projects for other
public agencies, including the City.
The limited number of proposers on this project is likely due to current high demand for
skilled contractors, the complexity of the work, and the diverse nature of the individual
components. However, the low bidder has a good history of work with the City and is
capable of delivering the project.
The proposed project includes replacing the existing evaporative condenser and all four
pumps and upgrading the building automation system at Mariners Branch Library;
installing an outdoor heat pump unit, installing three fan coil systems, replacing and
relocating the kitchen exhaust fan at CdM Lifeguard Substation; and installing a one-piece
heating cooling unit at the Ben Carlson Lifeguard Headquarters at Newport Pier.
Pursuant to the contract specifications, the contractor will have 40 consecutive working
days to complete the work. Work is scheduled to begin winter 2023.
The project plans and specifications will be available for review at the January 24, 2023
City Council meeting or upon request.
5-2
Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard
Headquarters Heating, Ventilation, and Air Conditioning Replacement Project
January 24, 2023
Page 3
FISCAL IMPACT:
Sufficient funding is available from the Fiscal Year 2022-23 Capital Improvement Program
(CIP) budget for completion of this contract. The funds are expensed from the Facilities
Maintenance Master Plan Program (FMMP) Account in the Public Works Department,
57101-980000-22F02. The FMMP includes a comprehensive condition assessment of all
City facilities and prioritizes capital repairs and/or major maintenance based on a variety
of factors including current condition and age of facilities. This program funds a variety of
capital repair and maintenance projects in an effort to keep City facilities in good condition.
The FMMP is funded through the General Fund.
The following funds will be expended:
Account Description
FMMP
Account Number
57101-980000-22 F02 $
Total: $
Proposed expenditures are as follows:
Vendor Purpose
Western Allied Corporation Construction Contract
Western Allied Corporation Construction Contingency
Various Printing and Incidentals
Total:
Amount
471,997.00
471,997.00
Amount
427,497.00
43,000.00
$ 1,500.00
$ 471,997.00
Staff recommends establishing $43,000 (approximately 10 percent) for contingency
purposes to cover the cost of unforeseen conditions associated with construction.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this exempt from the California Environmental
Quality Act (CEQA) pursuant to Class 1 Section 15301(d) (maintenance of existing public
facilities and mechanical equipment involving no expansion of existing use) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment;
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Maps
5-3
Attachment A
Location Maps
Newport Lifeguard HQ
Mariners Library
CdM Lifeguard HQ
5-4
ATTACHMENT A
107
4QO�
PACIFIC
OCEAN
LIMITS OF WORK
NEWPORT BEACH LIFEGUARD HQ
0
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP
G8760-1 22F02 1 /24/23
5-5
ATTACHMENT A
LIMITS OF WORK
MARINERS LIBRARY
G
DRIVE
MP��N�RS
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP
C-8760-1' 22F02 1/24/23
5-6
ATTACHMENT A
co
RoTq F� �< M
Fgcyq,Q
PACIFIC
OCEAN
LIMITS OF WORK
CORONA DEL MAR LIFEGUARD HQ
N\1
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP
G8760-1 22F02 1 /24/23
5-7