HomeMy WebLinkAboutX2021-0164 - Misc (3)XU)'k --0t 6 �t
Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscappe pproject for the property located at 1819 PORT STIRLINO PL.
NEWPO1zT BEACH (provide
address or parcel number(s)) was installed by me or under my supervision.
street
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
X Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
X Yes _ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
Effective irrigation system design, installation and maintenance are important. Sprinklers should
serve only the required turf areas and not spray on buildings, fences or non -landscaped areas.
Excess water on sidewalks, pavement and block walls causes damage, increases liability and
wastes water. Watering should be done before sunrise to reduce evaporation losses. Turf
areas, planters, trees and shrubs should be watered separately to meet varying water needs.
Always irrigate the entire depth and width of the root zone regardless of the time of year.
Automatic times and moisture sensors make it easier to manage irrigations. Once or twice a
year, water twice as long to leach out salts and buildup in our soils.
Landscape Watering Guidelines
Seasonal Frequency - Days Between Waterings
Spring
Mar - May
Summer
May - Oct
Fall
Oct - Dec
Winter
Dec - Mar
Water
This
Deeply
Trees
Desert Adapted
14 - 30 days
7 - 21 days
14 - 30 days
30 - 60 days
24" - 36"
High Water Use
7 -12 days
7 -10 days
7 -12 days
14 - 30 days
24" - 36"
Shrubs
Desert Adapted
14 - 30 days
7 - 21 days;
14 - 30 days
30 - 45 days
18" - 24"
High Water Use
7 - 10 days
5 - 7 days
7 - 10 days
10 - 14 days
18" - 24"
Groundcovers
and Vines
Desert Adapted
14 - 30 days
7 - 21 days
14 - 30 days
21 - 45 days
8" -12"
High Water Use
7 - 10 days
2 - 5 days
7 - 10 days
10 - 14 days
8" - 12"
Cacti and Succulents
21 - 45 days
14 - 30 days
21 - 45 days
If needed
8" - 12"
Annuals
3 - 7 days
2 - 5 days
3 - 7 days
5 -10 days
8" -12"
Warm Season Grass
Bermuda, etc
4 - 14 days
3 - 6 days
6 - 21 days
15 - 30 days
6"-10"
Cool Season Grass
(Rye, Fescue
3 - 7 days
None
3 -10 days
7 - 14 days
6" - 10"
These guidelines are for established plants (1 year for shrubs, 3 years for trees). Additional water is needed
for new plantings or unusually hot or dry weather. Less water is needed during cool or rainy weather. Drip run
times are typically 2 hours or more for each watering.
Watering Schedule for Newly planted Desert Adapted Plants
How much and
How Often
Spring
Summer
Fall
Winter
Mar - May
May - Oct
Oct - Dec
Dec - Mar
Weeks 1 and 2
every 3 - 4 days
every 1 - 2 days
every 3 - 4 days
every 3 - 4 days
Weeks 3 and 4
every 6 - 7 days
every 3 - 4 days
every 6 - 7 days
every 6 - 7 days
Weeks 5 and 6
every7 -10 days
every 4 - 6 days
every 7 -10 days
every 7 - 10 days
Weeks 7 and 8
every 10 -14 days
every 7 days
every 10 -14 days
every 10 -14 days
After Week 8
Gradually extend the time between irrigations until plants are established.
NOTE: After the eighth week, move the drip emitters to the outer edge of the root ball. High water -use plants
may require more frequent irrigations. Water deeply to 24 - 36 inches for trees, 18 - 24 inches for shrubs, 8 -
1 2 inches for ground cover, vines, cactus, succulents and annuals, and 6 - 10 inches for warm and cool
eason_grasses.
DAVID A. PEDERSEN
Print Name
.6. � 01�
Signature
Date
3605
License Number
20271 AGAGIA ST. NEWPORT BEACH GA. SUITE 120
;,,
949-251-8999
`telephone
Landscape Design Professional's Stamp
(If Appropriate)
f'r
34
DAVE@DPLANDSGAPE.GOM
E-mail Address
LANDSCAPE IRRIGATION AUDIT REPORT 5/31/2022
Project Name: Rucker Residence
Address: 1819 Port Stirling, Newport Beach CA
Design / Installation: Dave Pedersen
20271 Acacia St., Ste 120 Newport Beach, CA 92660 949.251.8999
Certified Landscape Irrigation Auditor (CLIA): BIG PICTURE LANDSCAPE
Michael McMillen / 714.394.6126 / Bigpicturelandscape(o)gmaii.com CLIA #014256
All of the zones / hydrozones on the irrigation systems were evaluated with a visual inspection. As per your
request, we evaluated the irrigation systems in accordance with the California Model Water Efficient
Landscape Ordinance (MWELO).
SUMMARY
This audit was inspect the overall site irrigation systems within the limits of construction. The irrigation
systems are new systems utilizing POTABLE water.
IRRIGATION PLANS:
Each hydrozone identified on the plans were executed in the field, (Total valve qty. 5). Each system layout,
components and functionality have met all the requirements of the Irrigation Plans.
MWELO:
The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for
new construction and irrigation installations based on A131881.
UNIFORMITY:
Since the dripline is subterranean and the planting material is already installed and would be damaged if the
dripline was unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard
90% efficiency for pressure compensating drip & low -flow irrigation per the Irrigation Association's Landscape
Irrigation Auditor, 3rd edition book was used for the report.
Shrub ZONES / STATION Al-A5
• Irrigated Area: Zones separated based on Full sun South/ West side of project
• Plant Material: Shrubs - Low water
• Plant Condition: Traditional
• Microclimate: Full Sun
• Soil Category: Silty Clay Loam
• Root Depth: Approximately 2-10"
• Slope: Overall site 2% to 2:1 at back of property.
• Compaction: yes
• Runoff: No runoff observed
• Standing Water: None
• Hydrozone Separation: Yes
• Mulch in Beds: Yes
• Pressure Regulation: Not required / Isolation valve installed per plan
• Controller: Hunter Pro-C controller w/ Solar Sync.
• Valves: Install per plans ( 2 west front / 3 west rear)
• Emitter Type: Netafim TLHCVXR5-12 w/ Techline fittings (.53 gph @ 12" o.c row spacing @ 12" o.c.)
• Max Flow: 9.0 GPM
• Distribution Uniformity:.90
• Precipitation Rate: 0.6
Punch list Items: 05/13/2022 (Compliance based on the following corrects during the maintenance period)
• Waterproof connections required to al wire connections.
• Contractor to provide owner with controller charts and Record Drawings.
Zone Audit Conclusion: PASS , project IS within compliance to begin maintenance.
The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and
MWELO requirements.
The MWELO is a calculation noted on your landscape construction documents. This state required calculation
defines landscape irrigation estimated and maximum water used for the landscape. The state of California is
currently in a government declared drought and water use restrictions are being enforced statewide.
It is the responsibility of the Homeowner (Person maintaining the landscape), to determine when a plant
material is established, and the irrigation schedule should be adjusted as needed to sustain the plant while
being water efficient.
Please refer to https://water.ca.gov/ and local agencies for the UpToDate guidelines.
Respectfully, (1�} � r' r„ �Pf��-R• IHC�
Michael McMillen �� 2
Certified Irrigation Auditor #014256 . •.
Big Picture Landscapes C CLIA
•,• Plea AW•`•,,
Irrigation Inspection Affidavit
Irrigation Plan No: Rucker Residence
Project Name: 1819 Port Stirling. Newport Beach CA
Irrigation Plan Designer: Dave Pedersen 949.251.8999
Field Inspector CILIA : Big Picture Landscape - Michael McMillen 714.394.6126
Date (s) of Inspection: 0511312022 and 0513112022
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection: 0511312022
A. Inspections during construction to check mainline in open trench: Yes No
1. Location of mainline conforms to as -built plan X _
2. Size of main line conforms to plan X _
3. Depth of mainline conforms to plan X _
4. Main line conditions is undamaged X _
5. Main line pressure tested with water and meter to check for visible leaks X _
6. Specific observations attached if needed X
Date Inspection: 0513112022
B. Inspections after completion of system installation prior to sodding:
Yes No
1.
Irrigation POC has isolation valve
X _
2.
System components (i.e., controller, backflow, rain sensor, etc.)
X
3.
Drip line GPH and spacing as specified
X
4.
System activated for observation of compliance
X _
5.
Each station complies installed per plan
X
6.
Matched precipitation rates provided by zone
X
7.
As -built plan provided to owner
X _
8.
Specific observations attached as needed
X
Summary of irrigation review: Pass. This project In Compliance as all Items listed on
punch list have been addressed.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on
the qualification indicated below:
Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA
California #014256 IA. 703.536.7080
BIG PICTURE LANDSCAPE
r r ,
Michael McMillen