Loading...
HomeMy WebLinkAboutPA2022-0254_20230113_Civil Responses22021-pWQMP-response-01 1 of 1 1/12/23 MEMORANDUM To: Sergio Gutierrez (City of Newport Building Department) From: Adam Toal  Date: 1/12/2023  Job No.: 22021 – Horton Residence  Subject: Plan Check No. PA2022‐0254  76 Linda Isle  Response to First Review of Preliminary Water Quality Management Plan  We have received the WQMP Comments prepared by the City of Newport Beach and offer the  following responses:    1. Harvest and Use is not feasible for this project as discussed in Section IV.3.3 of the pWQMP  (Worksheet J).  2. Hydrologic Source Controls are not feasible for this project.  HSC‐1 and HSC‐2 are not feasible  because the site does not meet infiltration feasibility criteria.  HSC‐3 (street trees) do not apply to  this project.  HSC‐4 (rain barrels) fall under harvest and use and are therefore not feasible.  HSC‐ 5 (green roof) and HSC‐6 (blue roof) are not generally applied to single‐family construction.  3. Structural source controls S‐3 and S‐4 are already included in the pWQMP.  Source controls S‐6  (loading docks), S‐7 (maintenance bays), and S‐12 (hillside landscaping) do not apply to this  project.  4. An exhibit (Figure B‐1) has been added to the pWQMP in Section IV.3.4 to support the fact that  the construction of biotreatment facilities on the site would restrict the use of the development.   Additional explanation has also been provided.     If you have any questions regarding the foregoing, please call me anytime.    Sincerely,  Toal Engineering, Inc.  By: Adam Toal, P.E.                       CIVIL ENGINEERS & LAND SURVEYORS 139 Avenida Navarro, San Clemente, CA 92672 Tel: (949) 492-8586 www.toalengineering.com