Loading...
HomeMy WebLinkAboutPA2022-0254_20221101_Bulkhead Conditions Report dated 10-24-22 WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 ORCHARD, SUITE 250 PH. (949) 206-9929 LAKE FOREST, CA 92630 FAX (949) 206-9955 www.wsase.com e-mail: Tmail@wsase.comT Page | 1 October 24, 2022 76 Linda Isle Newport Beach, CA 92660 RE: BULKHEAD CONDITIONS REPORT Applicant: MARCUS HERNANDEZ WSA Job #7738 Mr. Hernandez, William Simpson & Associates, Inc., (WSA) is pleased to provide this report in accordance with Section 21.30.15.E.3 of City of Newport Beach Municipal Code. STATEMENT OF THE PREPARER’S QUALIFICATIONS Masoud Jafari, S.E., the preparer of this report, holding a Bachelor of Science Degree in Structural Engineering from Tehran, Iran, is a Licensed Civil Engineer - Certificate No. C43673 - and Structural Engineer - Certificate No. S3812 - by the State of California. He joined the company in 1987 and is now partly the owner, serving as the principal in charge of the company. He has been actively involved in the design and entitlement of waterfront developments such as custom homes, seawalls, piers, platforms, floating docks and marinas for over 30 years. All the above being said, Masoud Jafari, S.E. shall be considered a qualified preparer for the Coastal Hazard Analysis Report on this project. OBSERVATION A cursory observation of the existing seawall/bulkhead and cantilever concrete deck was conducted by a representative of our office on March 15, 2022. Observed was the visible portion of the waterfront faces of the seawall and the cantilevered deck. Due to the site conditions, tie-backs were not accessible, thus not observed. FINDINGS The jetted-in pre-cast concrete panels and the cast-in-place coping of the seawall along with the cantilevered concrete deck were found generally in good condition with minor repairable cracks which is typical for a concrete structure of this vintage. WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 ORCHARD, SUITE 250 PH. (949) 206-9929 LAKE FOREST, CA 92630 FAX (949) 206-9955 www.wsase.com e-mail: Tmail@wsase.comT Page | 2 CONCLUSION & DESCRIPTION OF PROPOSED WORK Based on our site observation, we conclude that the existing seawall is required to protect the proposed principal structure on the lot. To be able to do so, the seawall shall be repaired/reinforced as reflected on the enclosed Drawing S-2. The proposed work on the seawall and the concrete deck consist of the following: 1. Demolition of the existing cantilevered concrete deck. 2. Installation of deadman and tiebacks while the lot is vacant, after demolition of the existing house is completed and prior to the beginning of the construction of the new house. 3. Form and pour new cantilevered concrete deck with concrete wall along the entire bayward edge of the deck with top of wall elevation of +10.90’NAVD88. The above listed construction work shall not require use of mechanized equipment or a barge on the water, and consist of the following: Once the seawall is reinforced in accordance with the enclosed drawings, no repair or replacement of the seawall shall be anticipated in the next 75. If during this period though, the seawall displays any sign of distress that requires immediate attention, it should be repaired or replaced at that time accordingly, without seaward encroachment from its current location. The above conclusion and description of proposed work were prepared based on the existing conditions, proposed drawings, and within the inherent limitations of this study, in accordance with generally acceptable engineering principles and practices. We make no further warranty, either expressed or implied. William Simpson & Associates, Inc. appreciates the opportunity to work with you towards the successful completion of your project. Should you have any questions regarding this report, please give us a call. Respectfully submitted, Masoud Jafari, S.E. Principal Enclosures: Seawall Drawing S-2 SECTION PLAN * *