Loading...
HomeMy WebLinkAboutPA2022-0306_200230119_Bulkhead Conditions report dated 10-31-22 WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 ORCHARD, SUITE 250 PH. (949) 206-9929 LAKE FOREST, CA 92630 FAX (949) 206-9955 www.wsase.com e-mail: Tmail@wsase.comT 1 October 31st, 2022 KPI Architect & Planning 17752 Mitchell N. Suite ‘C’ Irvine, CA 92614 RE: BULKHEAD CONDITIONS REPORT FOR COASTAL DEVELOPMENT PERMIT Mr. Jeff Logan; Applicant 2286 Channel Road City of Newport Beach, County of Orange WSA Job #7543 Dear Mr. Logan, William Simpson & Associates, Inc., (WSA) is pleased to provide this report in accordance with Section 21.30.15.E.3 of City of Newport Beach Municipal Code. STATEMENT OF THE PREPARER’S QUALIFICATIONS Masoud Jafari, S.E., the preparer of this report, holding a Bachelor of Science Degree in Structural Engineering from Tehran, Iran, is a Licensed Civil Engineer - Certificate No. C43673 - and Structural Engineer - Certificate No. S3812 - by the State of California. He joined the company in 1987 and is now partly the owner, serving as the principal in charge of the company. He has been actively involved in the design and entitlement of waterfront developments such as custom homes, seawalls, piers, platforms, floating docks and marinas for over 30 years. All the above being said, Masoud Jafari, S.E. shall be considered a qualified preparer for the Bulkhead Conditions Report on this project. OBSERVATION A cursory observation of the existing seawall/bulkhead was conducted by a representative of our office on October 8, 2020. Observed was the visible/exposed portion of the waterfront face of the seawall. Due to the site conditions, tie-backs were not accessible, thus not observed. FINDINGS The cast-in-place concrete seawall was found in generally good condition, without noticeable evidence of distress. Some minor horizontal and diagonal cracks were observed, which is a typical condition all seawalls of this vintage in the area. PA2022-0306 WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 ORCHARD, SUITE 250 PH. (949) 206-9929 LAKE FOREST, CA 92630 FAX (949) 206-9955 www.wsase.com e-mail: Tmail@wsase.comT 2 CONCLUSION Based on our site observation, we conclude that the existing seawall is required to protect the proposed principal structure on the lot. To be able to do so, the seawall shall be repaired/reinforced as reflected on the enclosed Drawings SW-1 and SW-2. Once the seawall is reinforced in accordance with the enclosed drawings, no repair or replacement of the seawall shall be anticipated in the next 75. If during this period though, the seawall displays any sign of distress that requires immediate attention, it should be repaired or replaced at that time accordingly, without seaward encroachment from its current location. The above conclusion was prepared based on the existing conditions, proposed drawings, and within the inherent limitations of this study, in accordance with generally acceptable engineering principles and practices. We make no further warranty, either expressed or implied. William Simpson & Associates, Inc. appreciates the opportunity to work with you towards the successful completion of your project. Should you have any questions regarding this report, please give us a call. Respectfully submitted, Masoud Jafari, S.E. Principal PA2022-0306 PA2022-0306 PA2022-0306