HomeMy WebLinkAboutRS171875-RS171876,SW170293_Correction ListCounty of Orange
OC Public Works
OC Planning
Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
Residential Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday
from 8:00 a.m. to 4:00 p.m. except holidays.
Project Number:RS171875-RS171876,SW170293,EL171704,PB172172
Submittal Date:Jan 30, 2018
CBC Edition: 2013
Plan Check Date: 2/14/2018 4:21 PM
Description:New pool (940 sq.ft.)
with attached spa
(100 sq.ft.). New
freestanding trellis.
New detached cabana.
Job Address
9 TIDE WATCH
NEWPORT COAST, CA
Owner Address
Yucan Cui
9 Tide Watch
Newport Coast CA92657
1st Plan Check 1/8/18 Current - 1st Recheck
Plan Checked By Contact Address
Matthew Kaplan
5000 BIRCH ST WEST WING
STE 3000
Newport Beach CA92660
949-506-9655
theauroagroupinc@gmail.com
Page 1 of 7
RS171875-RS171876,SW170293,EL171704,PB172172
GENERAL INFORMATION
Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee.
Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building
permits.
Major corrections shall be made on the original tracing resubmitted with three (3) sets of new prints. Return the
previous check print with revised plans.
The correction list is available on line at http://ocplanning.net (Click on the plan check status).
The Structural Engineer or Civil Engineer or Architect responsible for the project shall sign three final approved
sets of plans. The third set is for the assessor´s Office.
Note on the correction sheet the location of the completed corrections on your plans. Plans will not be rechecked
at the counter, allow ten (10) working days for recheck.
Page 2 of 7 2/14/2018 4:21 PM
RS171875-RS171876,SW170293,EL171704,PB172172
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES
Notes must be shown as worded, on the title sheet of the plan
1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________
__________.
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum
extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage
facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport
from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce
or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management
practices and good housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or
pollutants off the site. Discharges of material other than stormwater only when necessary for performance and
completion of construction practices and where they do not: cause or contribute to a violation of any water quality
standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in
a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains,
sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes
or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment
steam cleaning or chemical degreasing and superchlorinated potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary area on
-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited.
Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from
the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each
working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass
onto areas where impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance
with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary
materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of
temporary devices when rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain
Probability Forecast exceeds 40%.
Page 3 of 7 2/14/2018 4:21 PM
RS171875-RS171876,SW170293,EL171704,PB172172
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of
erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted
to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff,
vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained
on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or
runoff.
Page 4 of 7 2/14/2018 4:21 PM
RS171875-RS171876,SW170293,EL171704,PB172172
Residential Plan Check Corrections
Sheet Comments By
RS 2016
D. Leever1 In your responses, please refer to the alpha-numeric reference numbers that are
shown at the start of each of the following correction items.
Pending D. Leever2 RS CRC 2016
Pending D. Leever2.1 PLAN REQUIREMENTS
Pending D. Leever2.1.1 Revise treills and cabana plans to show compliance with OCFA approval
letter requirements (such as non-combustible materials or fire-retardant
treated wood per CBC 710A).
Pending D. Leever2.1.2 Revise cover sheet of the plans to include a summary of the scope
of work, and include area of the proposed trellis, cabana, pool, and spa.
Permit description and valuation will be verified at time of recheck.
Revise cover sheet of plans to indicte correct dimensions and floor area
of the proposed cabana. Structural plans show 26' X 16' (416sf). Also
indicate correct size of the proposed spa as shown on site plan. See
red amrks on sheet TS-1.
Pending D. Leever2.1.3 Revise cabana foundation plan and footing detail to provide deepened
footing to meet minimum slope setback requirements per CBC 1808.7.2 and
soils report recommendation of 14´ from bottom of footing to slope face
(soils report by PA & Associates, dated 9-30-17, page 11).
Pending D. Leever2.1.4 Revise cabana foundation plan to provide 18"deep grade beams inter
-connecting the pad footings, as recommended by soils report page 11.
Revise cabana footing detail 2/S5 to show grade beam and grade beam connection
to pad footing
Pending D. Leever2.2 GENERAL CONSTRUCTION REQUIREMENTS
Pending D. Leever2.2.1 Provide a cross sectional drawing through the side yard lattice patio
cover and adjacent ascending slope at the adjacent property to the south
(10' higher, 2:1 slope with 6' high retaining wall per soils report page
1) . Indicate the total vertical height (H) of the slope, slope gradient
(i.e. 2:1, or 1.5:1) and the required setback from the lattice patio cover
to toe of slope per CBC 1808.7.1 and CBC Figure 1808.7.1. Minimum setback
required is the smaller of H/2 or 15´. Alternate setback may be considered
through setback waiver process, see attached example and instructions.
Setback waiver requires separate permit number with associated fees, usually
requires $500 deposit.
Revise the cross sectional drawing of the trellis on sheet LS-2 to indicate
the dimension from the trellis post to the back of the retaining wall.
Provide minimum required slope setback H/2 (5'/2 = 2'6") or apply for
a setback waiver.
Page 5 of 7 2/14/2018 4:21 PM = Indicates line item not Cleared.
RS171875-RS171876,SW170293,EL171704,PB172172
Residential Plan Check Corrections
Sheet Comments By
Pending D. Leever2.2.2 Provide a cross sectional drawings through the cabana and the adjacent
descending slope at the rear and at the side. Indicate the total vertical
height (H = 40´ per soils report page 1) of the slope, slope gradient
(2:1 per soils report) and the required setback from the bottom of the
proposed pool to the slope face (daylight) per CBC 1808.7.2 and CBC Figure
1808.7.1. Revise cabana foundation plan to provide deepened footings,
as needed, to meet slope setback requirements
Remove pool from cabana cross sectional drawing. Revise cabana cross sectional
drawing to show footings. Indicate footing depth and distance from bottom
of footing to slope face. See red marks on sheet LS-2.
Pending D. Leever2.3 STRUCTURAL
Pending D. Leever2.3.1 Provide design and details for the roof trusses at the cabana, or
provide roof truss shop drawings reviewed and approved by Engineer of
Record. If trusses are to be a deferred submital, provide a note on the
cover sheet to indicate this. See red marks on sheet S6.
SWIMMING POOL STANDARD PLANS
Pending D. Leever3 1.Upon final approval and prior to permit issuance, the applicant shall be required
to submit one hard copy set of plans AND one USB drive containing separate .pdf
files for the following as applicable:
construction plans (including all trades),
structural calculations,
soils report(s),
2. File naming convention examples:
SW170293.RS171875-6.plans.pdf
SW170293.RS171875-6.structuralcalculations.pdf
SW170293.RS171875-6.soils.pdf
3. It is the contractor or owner/builder's responsibility to provide one hard copy
set of plans with county approval stamp in the field for inspector to view.
Pending D. Leever4 Minimum setback from any footing shall not be less than height of pool wall unless
calculations are submitted to show pool wall is designed to take surcharge from
the cabana. Indicate depth of pool at side adjacent to the cabana and indicate
the distance from the pool wall to edge of cabana footings.
Pending D. Leever5 Note on plans that all gates shall be self closing and self latching with a latch
a minimum of 5´ high and must be swinging outward away from pool area.
Revise all site plans to show the side gate swinging outward, away from pool area.
See red marks on sheet TS-1 (typical all site plans).
Pending D. Leever6 The attached Structural Observation form is to be completed, checkmarked for caissons, and
signed by the homeowner at the bottom. This form is to be included on the plans.
Page 6 of 7 2/14/2018 4:21 PM = Indicates line item not Cleared.
RS171875-RS171876,SW170293,EL171704,PB172172
Residential Plan Check Corrections
Sheet Comments By
Pending D. Leever7 Provide a cross sectional drawing through the pool and the adjacent descending
slope. Indicate the total vertical height (H = 40´ per soils report page 1) of
the slope, slope gradient (2:1 per soils report) and the required setback from the
bottom of the proposed pool to the slope face (daylight) per CBC 1808.7.2 and CBC
Figure 1808.7.1. (14' minimum per soils report page 11).
Provide a separate cross section showing the pool only. Include pool caissons.
Pending D. Leever8 If applicable - Revise plans to show vertical height dimension from water surface
to the overhead electrical conductor cable. Minimum clearance shall be per CEC
Section 680.8 and Figure 680.8 (see attached). If not applicable, provide note
on the plans "No overhead electric lines".
Pending D. Leever9 At the time of issuance, contractor shall provide proof of California Contractor
License C53.
Pending D. Leever10 That portion of the pool wall within a horizontal distance of 7 feet from the
top of the slope shall be capable of supporting the water in the pool without soil
support. [CBC1808.7.3].
Pending D. Leever11 Revise swimming pool plan to show correct rebar spacing at deep end at the pool
slab, per calculations page 52 (#5 @8" o.c. top and bot).
Pending D. Leever12 Revise pool wall calculations to use equivalent fluid pressure of 125pcf for highly
expansive soils as indicated in the soils report by PA & Associates, dated 9-30
-17, page 13. Revise pool structural plans and details accordingly. Or provide
an addendum to the soils report to provide alternate design equivalent fluid pressure
for low expansive soils as indicated in soils report page 7.
Calculations pages 53-56 have been revised to include 125pcf equivalent fluid pressure,
however, the required rebar in these calculations does not match the rebar per calculations
pages 50-52. Revise calculations to be consistant. Also revise pool structural
plans and details accordingly.
Pending D. Leever13 Provide addendum to soils report to provide recommendation for minimum and maximum
caisson spacing. Maximum caisson spacing 10´ per calculations page 58. Revise plans
to show caisson spacing that complies with both soils report recommendations and
caisson design calculations page 58.
Pending D. Leever14 Revise caisson design to include lateral pressure of 1000psf at the top 5 feet
as recommended by soils report page 12. Revise structural plans and details accordingly.
Pending D. Leever15 Revise the structural plan sheet S-2.0 to include the proposed spa and spa caissons.
Provide details and calculations accordingly.
Page 7 of 7 2/14/2018 4:21 PM = Indicates line item not Cleared.