Loading...
HomeMy WebLinkAboutPA2022-0214_20230302_Resolution_ZA2023-009Community Development Department CITY OF NEWPORT BEACH 100 Civic Center Drive Newport Beach, California 92660 949 644-3200 newportbeachca.gov/communitydevelopment VIA EMAIL March 2, 2023 Hayer Architecture Attn: Troy Weiland 445 Marine View Avenue, Suite 280 Del Mar, CA 92014 Subject: Coastal Development Permit (PA2022-0214) 2761 Bay Shore Drive Spanos Residence Dear Mr. Weiland, It was a pleasure working with you on the above referenced application. Please be advised that the subject application was approved by the Zoning Administrator on March 2, 2023 and is now within the required City appeal period until March 17, 2023. If no appeals are filed with the City, a Notice of Final Action will be mailed to the California Coastal Commission. Upon receipt of the notice by the Coastal Commission, the action will be subject to an additional 10-working-day appeal period. You may track status of the Coastal Commission appeal period via the following link: Statewide Appealable Projects PDF At the conclusion of both appeal periods, a building permit may be issued for the project. A copy of the approved resolution with findings and conditions is attached. If you have any questions, please do not hesitate to contact me directly. Thank you and I look forward to working with you again in the future. Sincerely, ____________________________ Jenny Tran, Assistant Planner LAW/jt Tmplt:-05/02/17 cc: Dean Spanos 2761 Bay Shore Drive Newport Beach, CA 92663 Troy Weiland 445 Marine View Avenue, Suite 280 Del Mar, CA 92014 01-10-2023 RESOLUTION NO. ZA2023-009 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING A COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE- FAMILY RESIDENCE AND CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE AND ATTACHED TWO (2)-CAR GARAGE LOCATED AT 2761 BAYSHORE DRIVE (PA2022-0214) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Troy Weiland of Hayer Architecture, with respect to the property located at 2761 Bayshore Drive, requesting approval of a coastal development permit. 2. The lot at 2761 Bayshore Drive is legally described as Lot 22 of Tract No. 1014 Unit One of Bay Shores, in the City of Newport Beach. 3. The applicant requests a coastal development permit (CDP) to allow the demolition of an existing single-family residence and construction of a new 1,977-square-foot two (2)-story single-family residence with a 616-square-foot upper exterior terrace and attached 669- square-foot two (2)-car garage. The project includes a pool and a 2,311-square-foot landscape area, hardscape, walls, and drainage facilities. The project complies with all applicable development standards and no deviations are requested. 4. The subject property is designated RS-D (Single Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-B (Single Unit Residential Detached) – (6.0 – 9.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zoning District. 6. A public hearing was held on March 2, 2023, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. Zoning Administrator Resolution No. ZA2023-009 Page 2 of 9 01-10-2023 2. Class 3 exempts the demolition of up to three (3) single-family residences and construction of up to three (3) single-family residences in urbanized areas. The proposed project consists of the demolition of one (1) single-family residence and the construction of a new 1,977-square-foot two (2)-story single-family residence with a 616- square-foot upper exterior terrace and attached 669-square-foot two (2)-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015 (Coastal Development Permits, Findings, and Decision) of the Newport Beach Municipal Code, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 5,440-square-feet and the proposed floor area is 2,646-square-feet. b. The proposed development provides the minimum required setbacks, which are 10-feet along the front property line abutting Bay Shore Drive, 3-feet along each side property line, and 10-feet along the rear property line abutting the alley. c. The highest guardrail is 17-foot 5-inches, less than the maximum allowed 24-feet, from the established grade (13.34 feet NAVD88) and the highest ridge is 26-foot 9-inches, less than the maximum allowed 29-feet from the established grade, which complies with the maximum height requirements. d. The project includes garage parking for a total of two (2) vehicles and a golf cart, complying with the minimum two (2)-car garage parking requirement for single- family residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with one (1)- and two (2)- story, single- family residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. Zoning Administrator Resolution No. ZA2023-009 Page 3 of 9 01-10-2023 3. The development is approximately 155-feet from the Newport Bay and is separated from the water by Bayshore Drive and a row of existing residential developments. The finished floor elevation of the first floor of the proposed structure is 14.0 feet based on the North American Vertical Datum of 1988 (NAVD88), which complies with the minimum 9.0-foot (NAVD88) elevation standard for new structures. The identified distances from the coastal hazard areas coupled with the 14.0-foot NAVD88 finish floor elevation will help to ensure the project is reasonably safe for the economic life of the structure. 4. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. 5. The property is not located on the shoreline nor is it located within 100 feet of coastal waters. The project design addresses water quality with a construction erosion control plan and a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City’s storm drain system. 6. A priority Water Quality Management Plan (WQMP) has been prepared for the project by Thomas M. Ruiz dated, September 20, 2022. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQMP before building permit issuance. 7. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Prior to the issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline in the private Bayshore community. The community was developed in 1941 as a 258-lot single- family gated community located on the Lido Channel southwest of Coast Highway and Newport Bay Bridge. The project replaces an existing single-family residence located on a standard R-1 lot with a new single-family residence. Therefore, the project does not involve Zoning Administrator Resolution No. ZA2023-009 Page 4 of 9 01-10-2023 a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. No public vertical or lateral access is provided in the Bayshore community. Vertical and lateral access to the bay front is available adjacent to the Bayshore community at the Balboa Bay Club, approximately 1,400 feet west of the property. The project does not include any features that would obstruct access along these routes. 3. The project site is not located adjected to a coastal view road, public viewpoint, public park or beach, or public accessway, as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is in Castaways Park and is not visible from the site. As currently developed, the existing property and other residences along Bay Shore Drive are not located within the view shed of the park. Furthermore, an investigation of the project site and surrounding area did not identify any other public view opportunities. The project site may be located within the viewshed of distant public viewing areas; however, the project is located on an inland lot and will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment and the exceptions to the Class 3 exemption do not apply. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit (PA2022-0214), subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. Zoning Administrator Resolution No. ZA2023-009 Page 5 of 9 01-10-2023 PASSED, APPROVED, AND ADOPTED THIS 2nd DAY OF MARCH, 2023. Zoning Administrator Resolution No. ZA2023-009 Page 6 of 9 01-10-2023 EXHIBIT “A” CONDITIONS OF APPROVAL Planning Division 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 3. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 4. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 5. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 6. The applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 7. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being Zoning Administrator Resolution No. ZA2023-009 Page 7 of 9 01-10-2023 operated or maintained are detrimental to the public health, and welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained to constitute a public nuisance. 8. Prior to issuance of building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 9. Prior to issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive plant species, and water-efficient irrigation design. The plans shall be approved by the Planning Division. 10. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 11. Before the issuance of the building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 12. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 13. This Coastal Development Permit shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 14. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Spanos Residence including but not limited to, Coastal Development Permit (PA2022-0214). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorney’s fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. Zoning Administrator Resolution No. ZA2023-009 Page 8 of 9 01-10-2023 Building Division 15. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 16. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 17. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 18. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 19. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 20. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 21. Prior to the issuance of building permits, the final WQMP shall be reviewed and approved by the Building Division. The implementation shall comply with the approved erosion control plan and WQMP and any changes could require separate review and approval by the Building Division. 22. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays, or Holidays. Zoning Administrator Resolution No. ZA2023-009 Page 9 of 9 01-10-2023 23. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Code. The maximum noise shall be limited to no more than depicted below for the specified periods unless the ambient noise level is higher: Between the hours of 7:00 AM and 10:00 PM Between the hours of 10:00 PM and 7:00 AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 24. The applicant shall provide a minimum of 3-foot-deep door landing on both sides of the entrance door. Public Works Department 25. No encroachments are permitted within the limits of the utility easement located at the rear of the property, including but not limited to, planters, gate swing, first floor eaves, and foundations. Fire Department 26. A fire sprinkler system shall be provided for the single-family residence. 27. A three (3)-foot wide walkway shall be provided on at least one side of the lot from Bayshore Drive to the alley for Fire Department access.