Loading...
HomeMy WebLinkAboutPA2022-0165_20230302_CDD Action Letter COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 www.newportbeachca.gov COMMUNITY DEVELOPMENT DIRECTOR ACTION LETTER Subject: Starbucks Jamboree Road (PA2022-0165)  Staff Approval for Substantial Conformance Site Location 4501 Jamboree Road Applicant Starbucks Coffee Company Legal Description Parcel 2 of Resubdivision No. 0557 in Book 108, Page 27 of Parcel Maps On March 2, 2023, the Community Development Director found substantial conformance and approved Staff Approval (PA2022-0165) to allow the conversion of a Wienerschnitzel drive-thru restaurant into a Starbucks drive-thru café located at 4501 Jamboree Road. The proposed changes do not intensify the existing use and are in substantial conformance with Use Permit No. UP1797C. This approval is based on the following analysis. LAND USE AND ZONING • General Plan Land Use Plan Category: Mixed Use Horizontal 2 (MU-H2) • Zoning District: PC-15 (Koll Center Office Site G) I. PREVIOUS APPROVALS FOR EXISTING USE On July 15,1976, the Planning Commission approved Use Permit No. UP1797 to construct and operate a Wienerschnitzel drive-thru and restaurant within Office Site G of the Koll Center Planned Community (PC-15). The restaurant proposed a drive-thru aisle with a take- out window, a 630 square foot dining room, a kitchen, service counter, restroom facilities, office, and back-of-house storage for an approximate total of 2,100-square-feet of gross floor area. The original proposed hours of operation were from 10:30 a.m. to 11 p.m. While the Newport Beach Municipal Code (NBMC) required 42 parking spaces, the applicant proposed 32-onsite parking spaces with the potential for up to 8 additional cars queued in the drive-thru aisle. The Planning Commission approved the reduced number. On February 10, 1983, the Planning Commission approved an amendment to UP1797 to add 850 square feet of outdoor dining space. As a part of the amendment, the applicant submitted a parking study demonstrating the provided on-site parking was adequate. The number of required onsite parking spaces was further reduced by one space to 31 and capacity for 8 additional cars queued in the drive-thru aisle. Starbucks Jamboree Road (PA2022-0165) March 2, 2023 Page 2 Tmplt: 01/18/23 On September 6, 1984, the Planning Commission approved a second amendment to UP1797 to allow the service of on-sale beer and wine. No further changes to parking the requirements were made. On June 20, 1985, the Planning Commission approved a third amendment to UP1797 to allow the enclosure of a portion of the outdoor dining area. The newly enclosed floor area would be used as an ice cream sales area and resulted in an approximate gross floor area of 2,300 square feet. No changes to the parking requirements were made. II. CURRENT OPERATIONAL CHARACTERISTICS The restaurant currently operates in accordance with UP1797 and its amendments. Current hours of operation are from 9 a.m. to 10 p.m., daily. The restaurant provides 47 indoor seats and 32 outdoor seats. In 2016, the operator received a building permit to add a storage room at the rear of the building bringing the total gross floor area of the restaurant to approximately 2,668 square feet. The accessibility upgrades required by the California Building Code as part of the storage room addition reduced the total number of onsite parking spaces to 30. A reduction in required onsite parking spaces provided to accommodate an accessibility upgrade associated with tenant improvements is allowed by the Director pursuant to NBMC 20.40.110 (Adjustments to Off-Street Parking Requirements). The drive-thru continues to provide stacking for 8 cars. III. PROPOSED CHANGES The applicant requests a staff approval for substantial conformance with UP1797 and its amendments to convert the existing restaurant into a Starbucks. Table 1 below summarizes the proposed changes to the existing restaurant: Table 1 – Existing Condition versus Proposed Condition Existing Proposed Gross Floor Area 2,668 square feet 2,117 square feet Number of Indoor Seats 47 seats 25 seats Number of Outdoor Seats 32 seats 16 seats Number of Parking Spaces 30 parking spaces 30 parking spaces Drive-thru Capacity 9 cars 13 cars Hours of Operation 9 a.m. to 10 p.m., daily 5 a.m. to 11 p.m., daily Other building improvements include a refinish of the exterior façade to be consistent with Starbucks branded paint colors, materials, and signage. A new 144.5 square foot trash enclosure is proposed along the rear property line and new landscape will be installed along the front property line, interior property lines, and adjacent to the drive-thru lane. The project plans are available as Attachment No. CD 4. Starbucks Jamboree Road (PA2022-0165) March 2, 2023 Page 3 Tmplt: 01/18/23 The project will also update the site to improve circulation and queuing capacity. At the direction of the City Traffic Engineer, a Drive-Thru Queuing, Site Access, and Parking Evaluation was prepared by Linscott Law & Greenspan, Engineers, dated February 16, 2023, and is available as Attachment No. CD 3. The findings of this professional evaluation support the adequacy of the proposed design and configuration of the drive-thru facility and site access points in serving drive-thru queues as well as inbound and outbound traffic generated by the project. IV. FINDINGS Pursuant to Section 20.54.070 (Changes to an Approved Project) of the NBMC, the Community Development Director may authorize minor changes to an approved site plan, architecture, or the nature of the approved use without a public hearing where the Director first finds that the changes: Finding: A. The changes are consistent with all applicable provisions of this Zoning Code. Facts in Support of Finding: 1. The project site is located within the PC-15 (Koll Center Office Site G) Zoning District. Restaurants are an allowed use within the designated commercial areas of PC-15. Specifically, Office Site G is allowed three (3) restaurant, bar, or theater/nightclub sites. 2. Part II (Commercial), Section I (Site Area and Building Area) of PC-15 provides allowable building area for sites located within Office Site G. The project results in a reduction to gross floor area. 3. Part II (Commercia), Section III (General Development Standards for Commercial Land), subsection C (Setbacks) requires a 30-foot front setback and no side or rear setback. The remodeled building is set back approximately 80 feet from the front property line. 4. Part II (Commercial), Group V (Restaurants), subsection E (Building Height) of PC-15 suggests a maximum height limit of thirty-five (35) feet. The remodeled building will measure only 16 feet, 5 inches from the existing grade to the highest parapet and is within the suggested height limit. Finding: B. The changes do not involve a feature of the project that was a basis for or subject of finding or exemptions in a negative declaration or Environmental Impact Report for the project. Facts in Support of Finding: Starbucks Jamboree Road (PA2022-0165) March 2, 2023 Page 4 Tmplt: 01/18/23 1. The project was originally found to be categorically exempt from the requirements of CEQA under Section 15301, Class 1 (Existing Facilities). Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. 2. The proposed changes will alter an existing fast-food restaurant and will ultimately result in a reduction to both gross floor area of the restaurant and total onsite seating. Operational changes to the existing restaurant, such as the hours, will not result in an intensification of use or an expansion of use beyond the existing drive- thru use. The prosed changes are categorically exempt under Section 15301 (Existing Facilities). Finding: C. The changes do not involve a feature of the project that was specifically addressed or was the subject of a condition(s) of approval for the project or that was a specific consideration by the applicable review authority in the project approval. Facts in Support of Finding: 1. The property is within a developed neighborhood and the existing use of the building as a drive-thru restaurant will remain. 2. The proposed project was reviewed by relevant City departments including the Building Division, Public Works Department, and Fire/Life Safety Services. It was determined that adequate public and emergency vehicle access, public services, and utilities are provided to the subject property. 3. The proposed changes do not involve a feature that was specifically addressed in the approval for Use Permit No. UP1797 and its amendments. 4. In no past approvals were any limitations placed on the hours of operation for the restaurant nor were the hours used to make any required findings. 5. The project will not result in a reduction to the number of provided on-site parking spaces. 6. Project assumptions have been included as a part of this Staff Approval to provide zoning clearance for the use. For example, Assumption No. 5 assumes the hours of operation for drive-thru service and dining areas to be from 5 a.m. to 11 p.m., daily, and that all customers shall vacate the specified premises after these designated closing times. 7. Given the operational characteristics of the restaurant, noise from music or voices is unlikely to be generated at a level loud enough to impact surrounding uses. The largest stationary source of noise will be the speaker from the ordering system. Starbucks Jamboree Road (PA2022-0165) March 2, 2023 Page 5 Tmplt: 01/18/23 Assumption No. 7 assumes the ordering system will be equipped with automatic volume control (AVC) that allows for adjustments if noise is found to be problematic. Finding: D. The changes do not result in an expansion or change in operational characteristics of the use. Facts in Support of Finding: 1. The project consists of a minor alteration to an existing fast-food restaurant and a modification to hours of operation that do not constitute late hours or beyond 11 p.m. The project does not incorporate a new use or intensify the existing use. 2. All Facts in Support of Finding C incorporated by reference. V. CONDITIONS AND ASSUMPTIONS 1. All previous conditions of approval for Conditional Use Permit No. UP1979C shall remain in force and effect, as stated in Attachment No. CD 2. 2. Prior to the Issuance of a Building Permit, a copy of the Staff Approval shall be incorporated into the Building Division and field sets of plans. 3. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Starbucks Jamboree Road including, but not limited to, Staff Approval (PA2022-0165). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages that which City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. The following assumptions are specific to providing zoning clearance through this Staff Approval and do not serve to modify or amend those conditions of the original permit. If any of these assumptions change, the project may no longer be in substantial conformance and may require the processing of a new use permit. In particular, this determination of substantial conformance is based on the following: Starbucks Jamboree Road (PA2022-0165) March 2, 2023 Page 6 Tmplt: 01/18/23 4. The project shall be substantially similar to the approved site plan and floor plan (Attachment No. CD 4). 5. The hours of operation for drive-thru service and dining areas shall be limited to 5 a.m. to 11 p.m., daily. All customers shall vacate the specified premises after these designated closing times. 6. The gross floor area shall be limited to 2,117 square feet with a maximum of 25 seats. The outdoor dining area shall be limited to 322 square feet with a maximum of 16 seats. 7. The drive-thru order speaker shall be equipped with automatic volume control (AVC) and the drive-thru menu board shall be equipped with automatic brightness control to automatically adjust to the brightness level in connection with the brightness of the sun. The menu board shall turn off during closing hours. APPEAL PERIOD: An appeal or call for review may be filed with the Director of Community Development or City Clerk, as applicable, within fourteen (14) days following the date the action or decision was rendered unless a different period is specified by the NBMC. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: Joselyn Perez Associate Planner BMZ/jp Approved by: Attachments: CD 1 Vicinity Map CD 2 Use Permit No. UP1797C CD 3 Drive-Thru Queuing, Site Access, and Parking Evaluation CD 4 Project Plans Attachment No. CD 1 Vicinity Map Tmplt: 01/18/23 VICINITY MAP Staff Approval (PA2022-0165) 4501 Jamboree Road Subject Property Attachment No. CD 2 Use Permit No. UP1797C Tmplt: 01/18/23 Attachment No. CD 3 Drive-Thru Queuing, Site Access, and Parking Evaluation N:\4600\2224625 - Starbucks at Birch & Jamboree, Newport Beach\4625-ltr 2-16-23.docx February 16, 2023 Mr. Kareem Ali Starbucks 555 Anton Boulevard, Suite 300 Costa Mesa, CA 92626 LLG Reference: 2.22.4625.1 Subject: Drive-Thru Queuing Evaluation for Starbucks at Birch & Jamboree Newport Beach, California Dear Mr. Ali: Linscott, Law & Greenspan, Engineers (LLG) is pleased to present the findings of a drive-thru queuing evaluation for the proposed conversion of an existing Weinerschnitzel restaurant to a Starbucks at 4501 Jamboree Road, Newport Beach. This updates our prior letter report dated February 6, 2023 to address City staff comments. The Project site located at the southwest corner of the Jamboree Road and Birch Street intersection. The existing building currently operated by Weinerschnitzel is 2,668 square feet (SF) in size, which will be reduced to approximately 2,117 SF (a reduction of approximately 551 SF) for the proposed Starbucks. The existing 1,242- SF Starbucks (with 10 interior and 10 outdoor dining seats) located at 4551 Jamboree Road and north of the Weinerschnitzel building will not be maintained for future operation by Starbucks. Based on the findings of our analysis, the proposed design and configuration of the drive-thru facility will be adequate in serving drive-thru queues generated by the Project. The following pages describe our study methodology and findings. PROJECT DESCRIPTION Figure 1 presents a vicinity map for the Project. Figure 2 illustrates the proposed site plan and drive-thru design. Mr. Kareem Ali February 16, 2023 Page 2 N:\4600\2224625 - Starbucks at Birch & Jamboree, Newport Beach\4625-ltr 2-16-23.docx The Project consists of 2,117 SF of gross floor area with a 25-seat interior café and approximately 322 SF with 16 seats of patio/outdoor seating (the existing patio/outdoor seating is approximately 515 SF with 36 seats). Vehicular access is provided via a two-way (entry and exit) driveway located off southbound Jamboree Road. A drive-thru lane that could accommodate 13 vehicles will be provided. The parking supply of 30 spaces (the same number of spaces as the existing Weinerschnitzel) will be provided. As shown on Figure 2, approximately 13 vehicles can be accommodated within the drive-thru lane, consisting of 7 vehicles before reaching the order/menu board, and 6 vehicles between the order/menu board and the pick-up window. DRIVE-THRU QUEUING ANALYSIS Attached at the end of this letter report is LLG’s prior queuing and site access study dated January 27, 2022 that was prepared for the Starbucks at Bristol & Birch, and approved by the City of Newport Beach. As part of that study, and to estimate drive- thru queue storage length requirements for Starbucks, queue observations were conducted at the existing Starbucks located at:  Harbor & 91 Fwy Store# 23316 (1224 N. Harbor Boulevard, Anaheim) The proposed Starbucks at Birch & Jamboree would be similar to the existing Starbucks Anaheim in terms of size (Project: 2,400 SF, Anaheim: 2,100 SF), total number of employees (Project: 30, Anaheim: 35), and hours of operation (Project: 4:30am to 12:00am, Anaheim 4:30am to 11:00pm), and would provide a greater number of staff during the peak work shift (Project: 8 to 9 employees, Anaheim: 6 to 8 employees), and more parking spaces (Project: 30, Anaheim 22). Table 1 presents the drive-thru queue observation results for each of the three survey dates at the existing Starbucks Anaheim, indicating the number of vehicles in queue, and the number of occurrences each queue length was observed. As Table 1 indicates, the average queue observed was 6 vehicles, the 85th percentile queue was 10 vehicles, the 95th percentile queue was 11 vehicles, and the 100th percentile or maximum queue was 14 vehicles. The site plan for the Anaheim café shows that approximately 8 vehicles can be accommodated within the drive-thru facility. When the queue exceeded this queue storage length, the vehicles were observed to use the drive aisle, but the queue dissipated quickly without any special/peak period management measures being implemented. According to Starbucks, drive-thru transactions that were generated during the surveys are comparable to pre-COVID conditions, and likely to be greater than before the COVID pandemic since more customers are now choosing to use the drive-thru instead of going inside the café. Mr. Kareem Ali February 16, 2023 Page 3 N:\4600\2224625 - Starbucks at Birch & Jamboree, Newport Beach\4625-ltr 2-16-23.docx The observed queue lengths at the existing Starbucks Anaheim are anticipated to be greater than what the proposed Starbucks at Birch & Jamboree could generate. This is because the proposed Starbucks at Birch & Jamboree is projected to have approximately 25% less sales than the existing Starbucks Anaheim based on the fact that there are more Starbucks locations that exist near the Project (see the attached map at the end of this letter), and customers will clearly have more options to choose from, thereby reducing the demand on the Project’s drive-thru facility by the estimated 25%. In addition, the proposed Project will primarily be serving commuters (who do not linger like in a sit-down café without a drive-thru) and more local (and directional) traffic along the Jamboree Road corridor. Based on the characteristics of the proposed project site, it is not envisioned that patrons will linger within the café given the more inviting options presented in other nearby locations. It should further be noted that the proposed Starbucks at Birch & Jamboree will have newer equipment that operate quicker, and the initial order point located one to two vehicles further than the existing Starbucks Anaheim. This is expected to result in greater efficiency of the Project’s drive-thru operations, allowing the Starbucks team to receive the customer’s order sooner and have it be ready when they arrive at the window, which in turn, will help facilitate processing orders and serve drive-thru customers more expediently, and move vehicles in the drive-thru quicker through the queue. A drive-thru lane is self-regulating. That is, customers will approach the property and evaluate whether it would be faster to enter the drive-thru lane, or park their vehicle and walk in. This shows why expediting drive-thru operations and increasing parking space accessibility (by increasing parking turnover, shortening parking duration, and minimizing internal circulation “friction” or conflicts) go hand-in-hand in equalizing peak traffic demand on site, enhancing the Project’s ability to fully address parking, site access and on-site circulation needs during periods of peak activity. Table 2 summarizes the findings of the drive-thru queuing analysis for the Project that presumes the 25% reduced demand on the drive-thru. Figure 3 illustrates where the average queue of 5 vehicles, the 85th percentile queue of 8 vehicles, the 95th percentile queue of 9 vehicles, and the 100th percentile or maximum queue of 11 vehicles would be located within the proposed drive-thru lane for the Project. As shown, there would be adequate queue storage provided in the proposed design of the drive-thru lane to fully accommodate all estimates of queue lengths. Based on the drive-thru design, operations, and service characteristics of the proposed Starbucks described above, we conclude that potential drive-thru queues could be accommodated within the proposed drive-thru lane without the implementation of any on-site traffic control or additional management measures. Mr. Kareem Ali February 16, 2023 Page 4 N:\4600\2224625 - Starbucks at Birch & Jamboree, Newport Beach\4625-ltr 2-16-23.docx Because the Project will maintain the same number of parking spaces as the existing Weinerschnitzel and provide a total supply of 30 spaces, the Project’s parking supply is adequate. ● ● ● ● ● We appreciate the opportunity to work on this study. If you have any questions regarding this analysis, please call us at 949.825.6175. Sincerely, Linscott, Law & Greenspan, Engineers Trissa (de Jesus) Allen, P.E. Senior Transportation Engineer Attachments STARBUCKS ±2,117 SF 12 9 7 2 J A M B O R E E R O A D PL 1 5 0 . 0 ' EXIT ONLY TABLE 1 SEPTEMBER/OCTOBER 2021 DRIVE-THROUGH QUEUE OBSERVATIONS AT STARBUCKS ANAHEIM1 STARBUCKS AT BIRCH & JAMBOREE, NEWPORT BEACH Number of Vehicles Observed in Queue (N) Number of Occurrences (N) Was Observed Day #1 Wednesday September 29, 2021 Day #2 Thursday September 30, 2021 Day #3 Friday October 1, 2021 0 5 8 6 1 23 23 34 2 44 44 67 3 38 65 56 4 41 76 57 5 51 79 38 6 45 53 30 7 49 20 19 8 49 15 21 9 38 26 18 10 21 6 28 11 10 5 25 12 5 0 10 13 1 0 6 14 0 0 5 Total 420 420 420 Average 6 5 5 85th Percentile 9 7 10 95th Percentile 10 9 11 100th Percentile (Max) 13 11 14 Note: [1] Drive-thru queue observations were conducted at Starbucks located at 1224 N. Harbor Boulevard, Anaheim from 7:00AM to 9:00AM, 11:00AM to 1:00PM, and 4:00PM to 7:00PM on each of the three survey dates, by AimTD, LLC. TABLE 2 PROJECT QUEUEING FORECAST STARBUCKS AT BIRCH & JAMBOREE, NEWPORT BEACH Queue Proposed Project (Starbucks at Birch & Jamboree) Peak Queue Observed from Starbucks Anaheim per Table 1 (veh) Adjusted Queue for the Project with 25% Reduction (veh) Proposed Drive-Thru Queue Storage (veh) Adequate Drive-Thru Storage? (Yes/No) Average Queue 6 5 13 Yes 85th Percentile Queue 10 8 13 Yes 95th Percentile Queue 11 9 13 Yes 100th Percentile Queue (Max) 14 11 13 Yes N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx January 27, 2022 Mr. Kareem Ali Starbucks 555 Anton Boulevard, Suite 300 Costa Mesa, CA 92626 LLG Reference: 2.21.4466.1 Subject: Revised Drive-Thru Queuing, Site Access, and Parking Evaluation for Starbucks at Bristol & Birch Newport Beach, California Dear Mr. Ali: Linscott, Law & Greenspan, Engineers (LLG) is pleased to present the findings of a drive-thru queuing, site access, and parking evaluation for the proposed Starbucks located at the southeast corner of the Bristol Street and Birch Street intersection (presuming Bristol Street runs in the east-west direction) in the City of Newport Beach. This letter report updates the prior study dated January 25, 2022 to address City staff comments on that previous study. Based on the findings of our analysis, the proposed design and configuration of the drive-thru facility and site access points will be adequate in serving drive-thru queues, and inbound and outbound traffic generated by the Project. In addition, the proposed on-site supply of 20 spaces will be adequate in meeting the Project’s total parking needs. The following pages describe our study methodology and findings. PROJECT DESCRIPTION Figure 1 presents a vicinity map for the Project. Figure 2 illustrates the proposed site plan and drive-thru design. The Project consists of 2,565 square feet (SF) of gross floor area, plus 300 SF of patio seating. Vehicular access is provided via two-way (entry and exit) driveways located off eastbound Bristol Street and Birch Street. A drive-thru lane and 20 on-site parking spaces will be provided. Mr. Kareem Ali January 27, 2022 Page 2 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx As shown on Figure 2, approximately 11 vehicles can be accommodated within the drive-thru lane, consisting of 5 vehicles before reaching the order/menu board, and 6 vehicles between the order/menu board and the pick-up window. The scope for this study was developed in close coordination with City staff, and included a thorough review of existing Starbucks locations in order to select sites that are comparable to the Project for the purposes of conducting drive-thru queuing observations and parking demand counts. Appendix A contains maps showing existing Starbucks cafes that were considered. The first map in Appendix A shows that there are four Starbucks cafes that exist within a radius of one mile from the Project, as follows:  Bristol & Redhill Store# 22637, which has a drive-thru, and located in the Bristol Village shopping center approximately 0.8 miles northwest of the Project  Jamboree & Bristol Store# 14018, without a drive-thru, and located in the Back Bay Court shopping center approximately 0.8 miles southeast of the Project  MacArthur & Campus Store# 5216, without a drive-thru, and located in the MacArthur/Campus shopping center  Jamboree & Birch Store# 5661, without a drive-thru, and located in the Jamboree Plaza shopping center Because the four existing cafes listed above are located within a shopping center, their development setting would differ from the Project, which is a standalone site. Two standalone Starbucks cafes located in Anaheim were identified to be more representative of the Project (i.e., not part of a shopping center or mixed-use development, freeway accessible, located along a major arterial, a parking supply of around 20 spaces). The second and third maps contained in Appendix A illustrate the locations of the two cafes selected as survey locations for this study, as follows:  Harbor & 91 Fwy Store# 23316 (1224 N. Harbor Boulevard, Anaheim), which is a standalone café, approximately 0.2 miles south of the SR-91 Freeway, with full access (unsignalized driveway) off Harbor Boulevard, a drive-thru facility that can accommodate approximately 8 vehicles in queue, and provides 22 spaces on site. Appendix A includes the site plan for this café. The City of Anaheim does not require the implementation of peak period traffic control or parking management measures for this site.  Lincoln & Magnolia Store# 59228 (2595 W. Lincoln Avenue, Anaheim), which is a standalone café, approximately 1.2 miles southwest of the I-5 Freeway, with right-turn in and out access (unsignalized driveways) off Magnolia Avenue and Lincoln Avenue, a drive-thru facility that can accommodate approximately 8 vehicles in queue, and provides 16 spaces on Mr. Kareem Ali January 27, 2022 Page 3 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx site. Appendix A includes the site plan for this café. The City of Anaheim does not require the implementation of peak period traffic control or parking management measures for this site. Appendix B contains the Project’s prior site plan approved by the County of Orange (PA 95-109 Changed Plan), which shows a total of 24 spaces on site. The Project will result in a net reduction of 4 spaces due to parking lot and site access design improvements required by the City for the Project, as follows:  Improvement to the accessible path from the Bristol Street right-of-way to the store entrance.  Modification to the existing accessible parking space and sidewalk ramp for compliance with current accessible code requirements.  Relocation of the trash enclosure to place it on an accessible path of travel from the building for compliance with accessible code requirements. Relocation of the trash enclosure affected the existing non-conforming tandem parking spaces. Removal of tandem parking spaces resulted in the loss of three stalls.  One stall was removed to provide for a compliant turn around space. DRIVE-THRU QUEUING ANALYSIS Queuing Survey Methodology To estimate drive-thru queue storage length requirements for Starbucks, queue observations were conducted at the existing Starbucks located at:  Harbor & 91 Fwy Store# 23316 (1224 N. Harbor Boulevard, Anaheim) Figure 3 presents the hourly transaction profile for the above site for each day of the week (September 27, 2021 through October 3, 2021). It shows that the peak number of transactions occurred on Wednesday, Thursday, and Friday, coinciding with the drive-thru queuing observations that were conducted during these peak operating days of the week (September 29, 2021, September 30, 2021, and October 1, 2021). The time periods selected for each survey date were 7:00 AM to 9:00 AM, 11:00 AM to 1:00 PM, and 4:00 PM to 7:00 PM. Table 1 provides a comparison between drive-thru and indoor transactions (comprised of mobile orders and other transactions made inside the cafe) during the survey week. For Site #1 (1224 N. Harbor) evaluated for queuing purposes, Table 1 indicates that the greatest number of total transactions occurred on Thursday, with approximately 66% of sales generated from drive-thru operations, 20% from mobile orders from inside the café (representing customers who parked in a space and walked into the café), and 14% from other indoor orders. These are important aspects Mr. Kareem Ali January 27, 2022 Page 4 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx to note because they indicate that the majority of Starbucks orders were made from the drive-thru lane, as opposed to walk-in traffic occupying a parking space, and that there was a high percentage of mobile orders generated. Survey Results and Data Interpretation Table 2 presents the drive-thru queue observation results for each of the three survey dates, indicating the number of vehicles in queue, and the number of occurrences each queue length was observed. As Table 2 indicates, the average queue observed was 6 vehicles, the 85th percentile queue was 10 vehicles, the 95th percentile queue was 11 vehicles, and the 100th percentile or maximum queue was 14 vehicles. The site plan for this café shows that approximately 8 vehicles can be accommodated within the drive-thru facility. When the queue exceeded this queue storage length, the vehicles were observed to use the drive aisle, but the queue dissipated quickly without any special/peak period management measures being implemented. According to Starbucks, drive-thru transactions that were generated during the surveys are comparable to pre-Covid conditions, and likely to be greater than before since more customers are now choosing to use the drive-thru instead of going inside the café. The observed queue lengths at the existing Starbucks Anaheim are anticipated to be greater than what the proposed Starbucks at Bristol & Birch could generate. This is because the proposed Starbucks at Bristol & Birch is projected to have approximately 25% less sales than the existing Starbucks Anaheim based on the fact that there are more Starbucks locations that exist within one mile of the Project (as discussed in the Project Description section of this study). With four Starbucks cafes that exist near the Project, customers clearly have more options to choose from, thereby reducing the demand on the Project’s drive-thru facility by the estimated 25%. In addition, the Anaheim Starbucks evaluated for drive-thru queuing purposes serves a larger, more regional market that includes traffic from the SR-91 Freeway, Harbor Boulevard corridor, Downtown Fullerton to the north, and Downtown Anaheim to the south. There is only one other café that exists within a one-mile radius. In contrast, the proposed Project will primarily be serving commuters (who do not linger like in a sit-down café without a drive-thru) and more local (and directional) traffic along the Bristol Street one-way couplet, and SR-73 Freeway further disperses because of high proliferation of Starbucks cafes (a total of four cafes within a one-mile radius) in the Newport Beach area. Based on the characteristics of the proposed project site, it is not envisioned that patrons will linger within the café given the more inviting options presented in the other nearby locations. It should further be noted that the proposed Starbucks at Bristol & Birch will have newer equipment that operate quicker, and the initial order point located one to two vehicles further than the existing Starbucks Anaheim. This is expected to result in Mr. Kareem Ali January 27, 2022 Page 5 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx greater efficiency of the Project’s drive-thru operations, allowing the Starbucks team to receive the customer’s order sooner and have it be ready when they arrive at the window, which in turn, will help facilitate processing orders and serve drive-thru customers more expediently, and move vehicles in the drive-thru quicker through the queue. A drive-thru lane is self-regulating. That is, customers will approach the property and evaluate whether it would be faster to enter the drive-thru lane, or park their vehicle and walk in. This shows why expediting drive-thru operations and increasing parking space accessibility (by increasing parking turnover, shortening parking duration, and minimizing internal circulation “friction” or conflicts) go hand-in-hand in equalizing peak traffic demand on site, enhancing the Project’s ability to fully address parking, site access and on-site circulation needs during periods of peak activity. The next sections of this letter report discuss our findings from detailed site access and parking analyses that indicate the Project will be able to adequately address site access and parking needs. As described previously, the Project is anticipated to have a reduced demand of 25% based on the fact that there are four more Starbucks locations that exist within one mile of the Project (compared to only one other café that exists within the same one- mile radius of the Starbucks Anaheim observed for queuing purposes). The projected 25% reduced demand on the Project’s drive-thru operations also accounts for the potential benefits of two operational strategies, which are not currently implemented at the existing Starbucks Anaheim, and are described below. As presented previously on Table 1 (which provides a comparison between drive-thru and indoor transactions during the survey week), the majority of Starbucks orders were made from the drive-thru lane, as opposed to walk-in traffic occupying a parking space, and that there was a high percentage of mobile orders generated. Based on this, and as a conservative measure to better facilitate drive-thru queuing during peak periods for the Project, it is recommended for the Project to position an order taker outside to expedite service from the drive-thru and help vehicle queues to dissipate quicker. In addition, the Project should designate 1 or 2 spaces (farthest away from Bristol Street) for mobile pick-up orders to help reduce drive-thru queuing and shorten parking duration. The potential benefit of allocating spaces to mobile pick-up orders will be discussed further in the parking section of this letter report. Table 3 summarizes the findings of the drive-thru queuing analysis for the Project that presumes the 25% reduced demand on the drive-thru. Figure 4 illustrates where the average queue of 5 vehicles, the 85th percentile queue of 8 vehicles, the 95th percentile queue of 9 vehicles, and the 100th percentile or maximum queue of 11 vehicles would be located within the proposed drive-thru lane for the Project. As shown, there would be adequate queue storage provided in the proposed design of the drive-thru lane to fully accommodate all estimates of queue lengths; however, it should be noted that the 85th percentile queue length is considered to be the industry’s Mr. Kareem Ali January 27, 2022 Page 6 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx most appropriate and solid basis for planning and designing a drive-thru facility. As described previously, drive-thru queues are expected to be shorter and would dissipate quicker due to projections of 25% less sales for the Project compared to the existing Starbucks Anaheim, and greater efficiency of processing drive-thru orders because of the proposed order/menu board and pickup window configuration, positioning an order taker outside to expedite drive-thru service during peak periods, and designating 1 or 2 spaces for mobile order pick-up. Based on the drive-thru design, operations, and service characteristics of the proposed Starbucks described above, we conclude that potential drive-thru queues could be accommodated within the proposed drive-thru lane without the implementation of any on-site traffic control or additional management measures (going beyond what has previously been described). SITE ACCESS ANALYSIS Table 4 presents the ITE trip rates (per the 11th Edition of ITE’s Trip Generation manual) and the resulting ITE trip generation estimates for the Starbucks Project and for the existing Burger King to be replaced by the Project. As indicated in Table 4, compared to the existing Burger King, the Project would generate an increase of 170 weekday daily trips, 106 AM peak hour trips, and 15 PM peak hour trips. These ITE-based incremental peak hour trips for the Project were assigned to each project driveway intersection, and provide the basis for detailed peak hour level of service and queuing analyses at each of the two project driveway intersections under Existing Plus Project conditions. It should be noted that the LOS analysis conducted for existing conditions account for actual trips generated by the existing Burger King currently operating on the project site based on the AM and PM peak hour traffic counts collected at the two project driveway intersections on Tuesday, October 12, 2021. Figure 5 illustrates the general directional traffic distribution pattern for the proposed Project. Project traffic volumes both entering and exiting the Project site have been distributed and assigned to the adjacent street system based on the following considerations:  directional flows on the freeways in the immediate vicinity of the project site (i.e., SR-73 Freeway)  the site's proximity to major traffic carriers (i.e., Bristol Street, Birch Street, etc.)  expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals  ingress/egress restrictions and availability at the project site Mr. Kareem Ali January 27, 2022 Page 7 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx The HCM level of service methodology was applied to evaluate project driveway intersection operations and queues for specific movements. Table 5 indicates that the two intersections currently operate at acceptable levels of service (i.e., LOS D or better), and would continue to operate at the same acceptable levels with the Project. Furthermore, the proposed Starbucks would not increase the queue lengths for specific movements at each project driveway intersection, as indicated in Table 6. PARKING ANALYSIS Based upon the proposed site plan for the project, a total of 20 surface parking spaces will be provided on site. For “Food Service-Fast Food” restaurants, Chapter 21.40 Off-Street Parking of the City’s Municipal Code requires 1 space per 50 SF of gross floor area, and 1 space per 100 SF of outdoor dining areas. The application of this City Code ratio to the proposed Starbucks (2,565 SF GFA, plus 300 SF of outdoor seating) yields a Code- based parking requirement of 55 spaces. The parking requirement for this Project is based on the existing Conditional Use Permit, which was approved by the County of Orange in 1995. The Conditional Use Permit requires 24 parking spaces. As such, the City requires 24 parking spaces in order to determine compliance with the parking requirement. A 4-space parking waiver is being sought to address the shortfall between the 24 required parking spaces, and the 20 parking spaces proposed. In order to determine the parking demand for a Starbucks with a drive-thru, field studies were conducted at two separate Starbucks locations. Those locations include the same Anaheim location observed for drive-thru queuing purposes detailed herein, and second Starbucks, located at:  Lincoln & Magnolia Store# 59228 (2595 W. Lincoln Avenue, Anaheim) As required by the City, the following summarizes operational information for the Project and each of the two existing Starbucks locations:  Project o Lot Size: 21,954 SF o Building Size: 2,565 SF (plus 300 SF of outdoor seating) o Number of Staff on Peak Shift: 6-8 (this varies depending on the day) o Total Number of Employees: 30 o Hours of Operation: 4:00 AM to 12:00 AM daily o Parking Supply: 20 spaces Mr. Kareem Ali January 27, 2022 Page 8 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx  1224 N. Harbor Boulevard, Anaheim o Lot Size: 32,626 SF o Building Size: 1,700 SF (plus 400 SF of outdoor seating) o Number of Staff on Peak Shift: 6-8 (this varies depending on the day) o Total Number of Employees: 35 o Hours of Operation: 4:30 AM to 11:00 PM daily o Parking Supply: 22 spaces  2595 W. Lincoln Avenue, Anaheim o Lot Size: 22,499 SF o Building Size: 2,000 SF (plus 400 SF of outdoor seating) o Number of Staff on Peak Shift: 6-8 (this varies depending on the day) o Total Number of Employees: 40 o Hours of Operation: 5:00 AM to 10:00 PM daily o Parking Supply: 16 spaces As discussed previously, Table 1 provides a comparison between drive-thru and indoor transactions (comprised of mobile orders and other transactions made inside the cafe) during the survey week. For Site #1 (1224 N. Harbor) evaluated for queuing and parking purposes, Table 1 indicates that the greatest number of total transactions occurred on Thursday, with approximately 66% of sales generated from drive-thru operations, 20% from mobile orders from inside the café (representing customers who parked in a space and walked into the café), and 14% from other indoor orders. These are important aspects to note because they indicate that the majority of Starbucks orders were made from the drive-thru lane, as opposed to walk-in traffic occupying a parking space, and that there was a high percentage of mobile orders generated. For Site #2 (2595 W. Lincoln) evaluated for parking purposes, Table 1 indicates that the greatest number of total transactions occurred on the same Thursday as Site #1, with approximately 65% of sales generated from drive-thru operations, 15% from mobile orders from inside the café, and 20% from other indoor orders. Table 7 presents a summary of the parking supply and demand counts for the two existing Starbucks Anaheim locations. The hourly demand counts were performed between 6:00 AM and 8:00 PM on Friday, October 8, 2021 and Saturday, October 9, 2021. All employees park on site, and were accounted for in the parking demand counts conducted. According to Starbucks, mobile order and other indoor transactions that were generated during the surveys are comparable to pre-Covid conditions, and likely to be significantly less than before since more customers are now choosing to use the drive- Mr. Kareem Ali January 27, 2022 Page 9 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx thru instead of going inside the café. Mobile orders significantly reduce the amount of time that patrons spend parked within a parking space because they are able to quickly park, pick up their pre-ordered items, and proceed to their destination. As discussed previously, the observed parking demand at the existing Starbucks Anaheim locations are anticipated to be greater than what the proposed Starbucks at Bristol & Birch could generate. This is because the proposed Starbucks at Bristol & Birch is projected to have approximately 25% less sales than the existing Starbucks Anaheim cafes based on the fact that there are more Starbucks locations that exist within one mile of the Project (as discussed in the Project Description section of this study). With four Starbucks cafes that exist near the Project (compared to only one other café that exists within the same one-mile radius of each of the two Anaheim cafes observed for parking demand purposes), customers clearly have more options to choose from, thereby reducing the Project’s parking demand by the estimated 25%. In addition, the two Anaheim Starbucks cafes evaluated for parking demand purposes serve a larger, more regional market that includes traffic from the SR-91 Freeway, Harbor Boulevard corridor, Beach Boulevard corridor, Downtown Fullerton to the north, and Downtown Anaheim to the south. There is only one other café that exists within a one-mile radius of each Anaheim café surveyed. In contrast, the proposed Project will primarily be serving commuters (who do not linger like in a sit-down café without a drive-thru) and more local (and directional) traffic along the Bristol Street one-way couplet, and SR-73 Freeway already dispersed because of high proliferation of Starbucks cafes (a total of four cafes within a one-mile radius) in the Newport Beach area. It should further be noted that the proposed Starbucks at Bristol & Birch will have newer equipment that operate quicker. This is expected to result in greater efficiency of mobile order and other indoor cafe operations. The projected 25% reduced parking demand also accounts for the potential benefits of two operational strategies, which are not currently implemented at the existing Starbucks Anaheim. As described previously, these include positioning an order taker outside to expedite drive-thru service during peak periods, and designating 1 or 2 spaces for mobile order pick-up. The implementation of these measures will not only help expedite drive-thru operations but also increase parking space accessibility. The allocation of parking spaces for mobile order pick-up nearest the doorways and farthest away from Bristol Street will maximize parking efficiency on site by increasing parking turnover, shortening parking duration, and will help minimize internal circulation “friction” or conflicts (due to customers parking and backing out of the space) along the drive aisle and the Bristol access (reducing the potential for back-ups onto Bristol Street). As discussed in the prior sections of this study regarding the “self-regulating” aspect of the Project’s tripmaking characteristics, drive-thru operations go hand-in-hand with on-site parking in equalizing peak traffic Mr. Kareem Ali January 27, 2022 Page 10 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx demand on site; one serves as a “relief valve” for the other. In other words, customers will approach the property and evaluate whether it would be faster to enter the drive-thru lane, or park their vehicle and walk in. The Project anticipates having 6 to 8 employees, and, consistent with the two Anaheim cafes surveyed for parking demand evaluation purposes, will be parked on site. Because employees have a longer parking duration compared to customers, they will be parking away from the front doors, in the southern portion of the parking lot nearest the drive-thru lane. This would ensure that more conveniently located spaces are preserved for customer use, and would help minimize vehicular and pedestrian conflicts near the drive-thru entrance (by lessening the frequency of vehicles accessing and departing a parking space during peak periods because the spaces would primarily serve employees parked for the majority of the day). Based on the above considerations, having 1 or 2 spaces for the exclusive use by mobile order customers, positioning an order taker outside to expedite drive-thru service during peak times, and parking employees in a strategic portion of the lot, will enhance the Project’s ability to fully meet peak parking demand, in addition to addressing drive-thru, site access, and on-site circulation needs during periods of peak activity. As Table 7 indicates, peak parking demand observed was 14 spaces for Site #1 and 16 spaces for Site #2. The bottom portion shows the total size (GFA plus outdoor seating) for each site, and the resulting empirical parking ratio derived (peak demand divided by the total SF) for each survey date. The greatest ratio derived is 6.7 spaces per 1,000 SF. This is consistent with empirical ratios from LLG’s older parking studies completed for Starbucks, and is therefore considered to be a solid demand factor for application in estimating the Project’s parking needs. Applying a 25% reduction to the empirical ratio of 6.7 spaces per 1,000 SF (to further calibrate the empirical results to account for the unique aspects and setting for the Project) to the proposed Starbucks (2,565 SF GFA, plus 300 SF of outdoor seating) results in a parking ratio of 5.0 spaces per 1,000 SF and a parking demand of 14 spaces. Adding a 10% contingency to the 14-space demand yields in an adjusted demand of 15 spaces. Compared against the proposed on-site supply of 20 spaces, the 15-space demand results in a surplus of 5 spaces. Even without applying the 25% reduction, the proposed 20-space on-site supply would be adequate in meeting an empirical-based demand of 19 spaces (6.7 spaces per 1,000 SF applied to 2,865 SF). Appendix B contains the prior site plan approved by the County of Orange (PA 95- 109 Changed Plan), which shows a total of 24 spaces on site. The Project will result in a net reduction of 4 spaces due to parking lot and site access design improvements Mr. Kareem Ali January 27, 2022 Page 11 N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Letter\4466-ltr revised 1-27-22.docx required by the City for the Project to meet accessible code requirements and design standards. Based on the above, we conclude that the on-site supply of 20 spaces will be adequate in meeting the Project’s parking demand. We appreciate the opportunity to work on this study. If you have any questions regarding this analysis, please call us at 949.825.6175. Sincerely, Linscott, Law & Greenspan, Engineers Trissa (de Jesus) Allen, P.E. Senior Transportation Engineer Attachments TABLE 1 DRIVE-THRU VS. INDOOR TRANSACTIONS STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Day of Week Total Transactions Drive- Thru Drive- Thru % Mobile Order Mobile % Other Indoor Other Indoor % Total Transactions Drive- Thru Drive- Thru % Mobile Order Mobile % Other Indoor Other Indoor % Monday 811 539 66% 152 19% 120 15% 790 561 71% 103 13% 126 16% Tuesday 869 543 62% 180 21% 146 17% 902 613 68% 118 13% 171 19% Wednesday 956 582 61%184 19% 190 20%932 624 67%140 15% 168 18% Thursday 962 631 66% 197 20% 134 14% 938 610 65% 140 15% 188 20% Friday 952 617 65% 175 18% 160 17% 894 572 64% 143 16% 179 20% Saturday 885 519 59% 169 19% 197 22% 902 595 66% 127 14% 180 20% Sunday 855 535 63% 141 16% 179 21% 885 593 67% 142 16% 150 17% Note: [a] Source: Starbucks. Site #1: 1224 N. Harbor Blvd, Anaheim (9/27/2021 to 10/3/2021) Site #2: 2595 W. Lincoln Ave, Anaheim (9/27/2021 to 10/3/2021) Drive-Thru Transactions Mobile Order Indoor Other Indoor Transactions Drive-Thru Transactions Mobile Order Indoor Other Indoor Transactions TABLE 2 DRIVE-THROUGH QUEUE OBSERVATIONS1 STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Number of Vehicles Observed in Queue (N) Number of Occurrences (N) Was Observed Day #1 Wednesday September 29, 2021 Day #2 Thursday September 30, 2021 Day #3 Friday October 1, 2021 0 5 8 6 1 23 23 34 2 44 44 67 3 38 65 56 4 41 76 57 5 51 79 38 6 45 53 30 7 49 20 19 8 49 15 21 9 38 26 18 10 21 6 28 11 10 5 25 12 5 0 10 13 1 0 6 14 0 0 5 Total 420 420 420 Average 6 5 5 85th Percentile 9 7 10 95th Percentile 10 9 11 100th Percentile (Max) 13 11 14 Note: [1] Drive-thru queue observations were conducted at Starbucks located at 1224 N. Harbor Boulevard, Anaheim from 7:00AM to 9:00AM, 11:00AM to 1:00PM, and 4:00PM to 7:00PM on each of the three survey dates, by AimTD, LLC. TABLE 3 PROJECT QUEUEING SUMMARY STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Queue Proposed Project Peak Queue Observed from Survey Sites from Table 2 (veh) Adjusted Queue for the Project with 25% Reduction (veh) Drive-Thru Queue Storage (veh) Adequate Drive-Thru Storage? (Yes/No) Average Queue 6 5 11 Yes 85th Percentile Queue 10 8 11 Yes 95th Percentile Queue 11 9 11 Yes 100th Percentile Queue (Max) 14 11 11 Yes TABLE 4 PROJECT TRIP GENERATION RATES AND ESTIMATES1 STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH ITE Land Use Code / Project Description Daily 2-Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Trip Rates: 937: Coffee Shop with Drive-Thru (TE/1,000 SF) 533.57 51% 49% 85.88 50% 50% 38.99 934: Fast-Food Restaurant with Drive-Thru (TE/1,000 SF) 467.48 51% 49% 44.61 52% 48% 33.03 Trip Estimates: Proposed Project Starbucks (2,565 SF) Trips [A] 1,369 112 108 220 50 50 100 Existing Land Use Burger King (2,565 SF) Trips [B] 1,199 58 56 114 44 41 85 Project Trip Increase Starbucks minus Burger King [A] – [B] 170 54 52 106 6 9 15 Notes: [1] Source: Trip Generation, 11th Edition, Institute of Transportation Engineers, (ITE) [Washington, D.C. (2021)].  TE/1,000 SF = Trip End per Thousand Square Feet TABLE 5 PROJECT DRIVEWAY INTERSECTION LOS SUMMARY STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Minimum Acceptable LOS Jurisdiction (1) (2) (3) Project Driveway Time Period Existing Traffic Conditions Future Project Traffic Conditions Poor LOS? HCM LOS HCM LOS Increase Yes/No 1. Project Dwy No. 1 at D Newport Beach AM 15.9 s/v C 17.2 s/v C 1.3 s/v No Bristol Street PM 18.2 s/v C 18.2 s/v C 0.0 s/v No 2. Birch Street at D Newport Beach AM 10.1 s/v B 11.1 s/v B 1.0 s/v No Project Dwy No. 2 PM 10.5 s/v B 10.7 s/v B 0.2 s/v No Notes:  s/v = seconds per vehicle  Bold HCM/LOS values indicate adverse service levels based on City of Newport Beach LOS standards. TABLE 6 PROJECT DRIVEWAY INTERSECTION QUEUE SUMMARY STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Project Driveway Estimated Storage Provided (feet) (1) Existing Traffic Conditions (2) Future Project Traffic Conditions AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Max. Queue/ Min. Storage Required1 Adequate Storage (Yes/No) Max. Queue/ Min. Storage Required1 Adequate Storage (Yes/No) Max. Queue/ Min. Storage Required1 Adequate Storage (Yes/No) Max. Queue/ Min. Storage Required1 Adequate Storage (Yes/No) 1. Project Driveway No. 1 at Bristol Street Northbound Right-Turn Lane 22’ 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes Eastbound Shared Through/Right-Turn Lane 22’ 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 2. Birch Street at Project Driveway No. 2 Northbound Shared Through/Right-Turn Lane 100’ 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes Southbound Left-Turn Lane 170’ 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes Westbound Shared Left/Right-Turn Lane 22’ 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes 22’ [2] Yes Notes: [1] Per HCM 6 methodology, queue is based on the 95th percentile queues and is reported in total queue length (feet) per lane for unsignalized intersections. [2] A minimum queue of 22 feet per vehicle is assumed for all reported queues less than 22 feet. TABLE 7 PARKING SUMMARY STARBUCKS BRISTOL & BIRCH, NEWPORT BEACH Supply = 22 Supply = 22 Supply = 16 Supply = 16 Start Spaces Parking Percent Spaces Parking Percent Spaces Parking Percent Spaces Parking Percent Time Occupied Surplus Occupancy Occupied Surplus Occupancy Occupied Surplus Occupancy Occupied Surplus Occupancy 6:00 AM 7 15 32% 3 19 14% 5 11 31% 3 13 19% 7:00 AM 10 12 45% 4 18 18% 8 8 50% 4 12 25% 8:00 AM 13 9 59% 5 17 23% 16 0 100% 7 9 44% 9:00 AM 11 11 50% 11 11 50% 13 3 81% 15 1 94% 10:00 AM 13 9 59% 10 12 45%16 0 100%15 1 94% 11:00 AM 11 11 50%14 8 64%11 5 69% 14 2 88% 12:00 PM 14 8 64%10 12 45% 13 3 81%16 0 100% 1:00 PM 13 9 59% 13 9 59% 11 5 69% 12 4 75% 2:00 PM 10 12 45%14 8 64%9 7 56% 11 5 69% 3:00 PM 11 11 50%14 8 64%14 2 88% 12 4 75% 4:00 PM 14 8 64% 14 8 64%10 6 63% 10 6 63% 5:00 PM 14 8 64% 14 8 64%10 6 63% 8 8 50% 6:00 PM 14 8 64%10 12 45% 7 9 44% 9 7 56% 7:00 PM 14 8 64%6 16 27% 10 6 63% 5 11 31% 8:00 PM 10 12 45% 5 17 23% 8 8 50% 5 11 31% Size (SF) 2,100 -- --2,100 -- --2,400 -- --2,400 -- -- Empirical 6.7 -- --6.7 -- --6.7 -- --6.7 -- -- Ratio sp/KSF sp/KSF sp/KSF sp/KSF Adjusted Empirical Ratio (with 25% Reduction): 5.0 sp/KSF Project Size: 2,865 (2,565 SF GFA + 300 SF outdoor seating) Project Peak Parking Demand: 14 spaces Project Peak Demand w/ 10% Contingency: 15 spaces Proposed Supply: 20 spaces Parking Surplus: 5 spaces Note: [a] Source: Parking counts conducted by AimTD, LLC. Site #1: 1224 N. Harbor Blvd Anaheim, CA Friday, October 8, 2021 Site #1: 1224 N. Harbor Blvd Anaheim, CA Saturday, October 9, 2021 Site #2: 2595 W. Lincoln Ave Anaheim, CA Friday, October 8, 2021 Site #2: 2595 W. Lincoln Ave Anaheim, CA Saturday, October 9, 2021 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-21-4466-1 Starbucks Bristol & Birch, Newport Beach N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Dividers.doc APPENDIX A EXISTING STARBUCKS LOCATIONS A-1 A-2 A-3 1 2 3 4 5 6 7 8 9 10 13141516171819202122 11 12 NO PARKING LOADING ZONE N89°25'42"W 198.22' N0 0 ° 3 4 ' 1 8 " E 1 2 7 . 0 0 ' S89°25'42"E 51.86' S08°12'53"W 30.27' N89°25'42"W 246.05' N0 0 ° 3 4 ' 1 8 " E 1 5 7 . 0 0 ' REFER TO ARCHITECTURALPLANS FOR PARAPET HEIGHT. ECONOMIZER HOOD. ECONOMIZER HOOD. HP-2 HP-1 R 10'-0" R 10'-0" R 10'-0" 1 2 3 4 56 7 EF-1 A B C D 1 2 3 5 6 B.2 B.7 4 1 2 3 4 5 6 7 8 9 10 13141516171819202122 11 12 NO PARKING LOADING ZONE N89°25'42"W 198.22' N00°34'18"E 127.00' S89°25'42"E 51.86' S08°12'53"W 30.27' N89°25'42"W 246.05' N00°34'18"E 157.00' ARCHITECTURAL SITE PLAN NOTES A. REFER TO EXTERIOR ELEVATIONS FOR BUILDING SIGNAGE LOCATION AND DESIGN ID. REFER TO ELECTRICAL PLANS FOR ELECTRICAL REQUIREMENTS. B. LANDSCAPING TO BE PROVIDED PER ZONING CODE AND LEED REQUIREMENTS. C. DRIVE-THRU EQUIPMENT INCLUDING VEHICLE DETECTION LOOP, WIRELESS COMMUNICATION, AND MONITORS COORDINATED BY CONSTRUCTION MANAGER. REFER TO ELECTRICAL SPECIFICATIONS FOR ELECTRICAL REQUIREMENTS. D. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SITE WORK, INCLUDING NEW BOLLARDS, FOOTING AND CONDUIT FOR DRIVE-THRU SIGNAGE. COORDINATE WITH CONSTRUCTION MANAGER. E. ALL PARKING AND DRIVE-THRU STRIPING TO BE PROVIDED. F. TRASH ENCLOSURE TO BE LOCKABLE USING STEEL GATES OR CHAIN. G. PROVIDE 6" (150MM) THICK CONCRETE PAVING THE LENGTH OF THE DRIVE-THRU LANE, EXTENT TO INCLUDE DRIVE-THRU WINDOW STANDING PAD. H. GENERAL CONTRACTOR TO APPLY CONCRETE SEALER TO ALL EXTERIOR CONCRETE PATIO AND WALKWAY SURFACES. J. CONSTRUCTION IN THE PUBLIC RIGHT OF WAY AND PROJECTION BEYOND THE PROPERTY LINES OR INTO THE ALLEYS SHALL COMPLY WITH COUNTY OF LOS ANGELES BUILDING CODE CHAPTER 32. K. PEDESTRIANS SHALL BE PROTECTED DURING CONSTRUCTION, REMODELING AND DEMOLITION ACTIVITIES AS REQUIRED BY COUNTY OF LOS ANGELES BUILDING CODE CHAPTER 33. (3306) SHEET NOTES 1. DISTRIBUTE ALL UNDER SLAB UTILITIES (ELECTRICAL, WATER, GAS AND SANITARY WASTE, DRAINS AND VENTING) TO THE FINAL POINT OF CONNECTION. 2. FURNISH AND INSTALL AN APPROVED, TESTED AND CERTIFIED BACKFLOW PREVENTION ASSEMBLY, IF REQUIRED BY APPLICABLE CODES. 3. PROVIDE ADEQUATE LIGHTING FOR EXTERIOR PATIO. 4. PROVIDE KEYED, FROST-FREE RECESSED HOSE BIB ACCESSIBLE TO TRASH ENCLOSURE. SEE CIVIL DRAWINGS 5. INSTALL BIKE RACK. SEE DETAIL 7/G-0007. 2 RACK = 4 BICYCLE SPACES. 6. PROVIDE FLASHED ROOF PENETRATIONS FOR ALL TENANT'S VENTS INCLUDING TENANT SUPPLIED WATER HEATER AND RTU. 7. PROVIDE SLEEPERS, CURBS AND PADS TO SUPPORT TENANT SUPPLIED ROOF TOP EQUIPMENT. 8. PERMIT, FURNISH AND INSTALL BUILDING MONITORING AND FIRE PROTECTION ALARM SYSTEM. 9. FURNISH AND INSTALL ALL PLUMBING VENTS FROM THE ROOF THROUGH FLASHING TO A LOCATION ABOVE THE PROPOSED TENANT CEILING IN THE PREMISES. 10. PROVIDE SIDEWALKS AND PATIO. 11. FURNISH AND INSTALL HVAC ROOF TOP UNITS OR SPLIT SYSTEMS INCLUDING ALL ELECTRICAL, PLUMBING CONNECTIONS AND THERMOSTAT/HVAC CONTROLS. 12. PROVIDE DUCTED FRESH AIR INTAKE INTEGRATED WITH AIR HANDLING SYSTEM. 13. FURNISH AND INSTALL ALL RIGID "HARD" DUCTWORK. 14. FURNISH AND INSTALL ELECTRICAL PANEL, SEE ELECTRICAL DRAWINGS. 15. FURNISH AND INSTALL PARKING LOT POLE LIGHTS IN ACCORDANCE WITH FINAL APPROVED SITE PLAN, AT A MINIMUM OF 1.5 FTC AROUND THE BUILDING AND SITE PERIMETER. EXTERIOR BUILDING LIGHTING TO INCLUDE INGRESS AND EGRESS LIGHTS. 16. FURNISH AND INSTALL ALL UNDERGROUND ELECTRICAL CONDUITS, LABELED WITH PULL STRINGS FROM THE ELECTRICAL PANELS TO THE FOLLOWING EXTERIOR DRIVE-THRU EQUIPMENT: ONE (1) 1" CONDUIT TO MONUMENT ONE (1) 1" CONDUIT TO PRE-ORDER MENU BOARD TO ELECTRICAL PANELS; ONE (1) 1" CONDUIT TO PRE-MENU/MENU BOARD FOR FUTURE; ONE (1) 1" CONDUIT FROM THE MENU BOARD TO ELECTRICAL PANELS; TWO (2) 1" CONDUITS FROM OCS/SPEAKER POST TO DRIVE THRU WINDOW; ONE (1) 1" CONDUIT FROM ALL DIRECTIONAL SIGNS TO ELECTRICAL PANELS; ONE (1) CONDUIT FROM GREEN/LIVING WALL FEATURE CONTROL BOX TO ELECTRICAL PANELS. ONE (1) SPARE 1" CONDUIT TO BE RUN THROUGH FOUNDATION WALL OUT REAR OF BUILDING, CAPPED AND TERMINATED ABOVE CEILING. VERIFY LOCATIONS FOR STUB UP WITH TENANT'S REPRESENTATIVE. 17. FURNISH AND INSTALL CONCRETE FOOTINGS AND ANCHOR BOLTS FOR THE FOLLOWING ITEMS: PREVIEW MENU BOARD ORDER MENU BOARD SPEAKER POST/ORDER CONFIRMATION SYSTEM (OCS) DIRECTIONAL SIGNAGE HEIGHT RESTRICTION BAR MONUMENT SIGN 18. FURNISH AND INSTALL 6" DIAMETER STEEL PIPE BOLLARDS, FILLED WITH CONCRETE. PAINT TO MATCH COLOR OF DARK BRONZE POWDER COATED RAILING. 19. FURNISH AND INSTALL DARK BRONZE POWDER COATED RAILING, SEE DETAILS 8 & 9/G-0005 20. 2 FEET OVERHANG 21. ACCESSIBLE PARKING SPACE IDENTIFICATION SIGN. 22. RECYCLING COLLECTION AREA. 23. TRASH COLLECTION AREA 24. ACCESSIBLE ROUTE 25. INSTALL "UNAUTHORIZED VEHICLE..." SIGN, SEE CIVIL DRAWINGS. 26. INSTALL ADA DIRECTION SIGN LEADING TO AN ACCESSIBLE ROUTE OF TRAVEL FROM PUBLIC WAY 27. FURNISH AND INSTALL TRANSFORMER. SEE CIVIL AND ELECTRICAL DRAWINGS. 28. INSTALL NON ILLUMINATED SQUARE BOLLARD. # USER RATIO REQUIRED SPACES REQUIRED DRIVE-THRU OUTDOOR SEATING ACCESSIBLE 10 SP/1,000 S.F. 10 SP/1,000 S.F. 19 1 22TOTAL 20 STANDARD 21 1 SPACES PROVIDED 6' - 2 1 / 4 " 5' - 0 " G-0005 7 G-0005 10 G-0005 2 G-0008 1 1 5 2 6 7 8 9 10 11 12 13 14 16 18 24 26 21 25 22 23 17 21 G-0006 3 G-0006 2 TYP. 24 19 20 VAN 25 HA R B O R B L V D . 27 G-0007 8 16 17 16 17 Y ADL1 Y ADL4 Y ADL3 Y ADL2 Y 14103 (3) (3) G-0007 9 28 Y 1410328 Y ADL50 15' - 0" 2401 UTAH AVENUE SOUTH SEATTLE, WASHINGTON 98134 (206) 318-1575 SHEET NUMBER: SHEET TITLE: SCALE: STORE #: CONCEPT: PROJECT #: PALETTE: ISSUE DATE: DESIGN MANAGER: PRODUCTION DESIGNER: CHECKED BY: PROJECT NAME: PROJECT ADDRESS: STARBUCKS COFFEE COMPANY RLEED AP: C 2011 STARBUCKS COFFEE COMPANY R THESE DRAWINGS AND SPECIFICATIONS ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. 19000 MacArthur Blvd. Suite 250 Irvine, CA 92612 949-296-0450 COPYRIGHT NOTICECOPYRIGHT NOTICECOPYRIGHT NOTICECOPYRIGHT NOTICE This drawing is the property of the above referenced Professional and is not to be used for any purpose other than the specific project and site named herein, and cannot be reproduced in any manner without the express written permission from the Professional. PROFESIONAL SEALPROFESIONAL SEALPROFESIONAL SEALPROFESIONAL SEAL As indicated 12/11/2014 4:37:06 PM I:\STARBUCKS\Harbor & 91 Fwy - Anaheim\Starbucks-Fwy 91 & Harbors_Anaheim_Central_New-01.rvt G-0004 ARCHITECTURAL SITE PLAN 60124-001 AS NOTED IN REVISION SCHEDULE HARBOR & 91 1224 N. HARBOR BLVD ANAHEIM, CA 92801 ORANGE COUNTY NCS RUSTIC CONTEMPO 23316 SLADE BLANCHARD GREENBERGFARROW DOUGLAS S. COUPER JOHN HARRISON SITE SCHEDULE - "S" DESIGN ID COUNT DESCRIPTION RESP. BULB COMMENTS 14163 1 DT ORDER POINT CANOPY FREESTANDING - FLAT BLACK MT0028 VD ADL1 1 DT WAYFINDING GRAPHIC EXIT ARROW - WHITE GC MFR: ENNIS FLINT ADL2 1 DT WAYFINDING GRAPHIC ENTRY ARROW - GREEN GC MFR: ENNIS FLINT ADL3 3 DT WAYFINDING GRAPHIC DIRECTIONAL DOUBLE ARROW - GREEN GC MFR: PAVEMENT STENCIL (RE-USABLE), REFERENCE PAINT P936 ADL4 3 DT WAYFINDING GRAPHIC DIRECTIONAL DOUBLE ARROW - WHITE GC MFR: PAVEMENT STENCIL (RE-USABLE), REFERENCE PAINT P935 UMBRELLA 10065 6 UMBRELLA - 72IN 1805MM - LOGO 3PL 12139 6 UMBRELLA - BASE FOR CANOPY - SILVER MT0021 3PL SITE SCHEDULE - "S" DESIGN ID COUNT DESCRIPTION RESP.BULB COMMENTS ADL50 1 BOLLARD GC EXTERIOR MENU 14116 1 MENU BOARD - DT DIGITAL ORDER SCREEN - FLAT BLACK MT0028 VD 14119 1 MENU BOARD - DT 5 PANEL FREESTANDING - 108X65IN 2745X1650MM - FLAT BLACK MT0028 VD 14120 1 MENU BOARD - DT PRE MENU FREESTANDING - 36X65IN 915X1650MM - FLAT BLACK MT0028 VD OTHER 10020 1 DT WINDOW SHELF - 48IN 1205MM - SST GC MFR: READY ACCESS 10042 2 BIKE RACK HOOP VD 14093 1 DT WAYFINDING GRAPHIC ORDER POINT STAR PATTERN - WHITE GC MFR: ENNIS FLINT 14103 2 BOLLARD NONILLUMINATED SQUARE - FLAT BLACK MT0028 VD PARKING SUMMARY N 0 8' 16' 24' Scale: 3/32" = 1'-0"Scale: 3/32" = 1'-0"1 ARCHITECTURAL SITE PLAN 2 Revision Schedule Rev Date By Description P 9/22/14 CHECK SET Q 9/29/14 CITY SUBMITTAL 2 11/20/14 PLAN CHECK CORR. 2 A-4 A. REFER TO EXTERIOR ELEVATIONS ON SHEET A201 FOR BUILDING SIGNAGE LOCATION AND DESIGN ID. REFER TO ELECTRICAL PLANS FOR ELECTRICAL REQUIREMENTS. B.LANDSCAPING TO BE PROVIDED PER ZONING CODE AND SUSTAINABILITY REQUIREMENTS. C.DRIVE-THRU EQUIPMENT INCLUDING VEHICLE DETECTION LOOP, WIRELESS COMMUNICATION AND MONITORS SHALL BE COORDINATED BY STARBUCKS CONSTRUCTION MANAGER. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. D. PROVIDE 6" (150MM) THICK CONCRETE PAVING THE LENGTH OF THE DRIVE-THRU LANE, EXTENT TO INCLUDE DRIVE-THRU ENTRY POINT THROUGH WINDOW STANDING PAD. E.GENERAL CONTRACTOR TO APPLY CONCRETE SEALER TO ALL EXTERIOR CONCRETE PATIO AND WALKWAY SURFACES. F. GENERAL CONTRACTOR TO VERIFY ALL EXISTING ELEVATIONS AND BUILDING CONDITIONS IN FIELD PRIOR TO START OF CONSTRUCTION. G. PROVIDE DETECTABLE WARNING (IF APPLICABLE PER LOCAL CODE) AT TRANSITION FROM SIDEWALK TO DRIVE AISLE. H. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL HAVE SURFACE SLOPE NOT TO EXCEED 2% IN ALL DIRECTIONS. I. REFER TO ELECTRICAL DRAWINGS FOR SITE RELATED ELECTRICAL WORK. J. SCRAPE AND REPAINT ALL EXISTING PAINTED SITE FEATURES, INCLUDING, BUT NOT LIMITED TO CURBS, BOLLARDS, RAILINGS AND SITE LIGHTING BASES. K. SEE SHEET A002 FOR ARCHITECTURAL SITE DETAILS. KEYNOTES GENERAL NOTES 2 (E) LANDSCAPING AREA TO REMAIN. (UNDER SHELL PERMIT#BLD2020-02247) 3 (N) ACCESSIBLE PATH OF TRAVEL FOR PUBLIC WRIGHT OF WAY. (UNDER SHELL PERMIT#BLD2020-02247) 4 (E) ACCESSIBLE PARKING STALL TO REMAIN. (UNDER SHELL PERMIT#BLD2020-02247) 5 (E) PARKING STALL, TYP. TO REMAIN (UNDER SHELL PERMIT#BLD2020-02247) 6 (E) ACCESSIBLE STRIPING TO REMAIN (UNDER SHELL PERMIT#BLD2020-02247) 7 (E) CURB CUT TO REMAIN (UNDER SHELL PERMIT#BLD2020-02247) 8 (E) DETECTABLE WARNING, SEE 12/G011 (UNDER SHELL PERMIT#BLD2020-02247) 9 (E) BUILDING TO REMAIN N.I.C. 10 (N)PROPOSED 2,000 SQ. F.T STARBUCKS TENANT IMPROVEMENT 1 (E) PUBLIC RIGHT OF WAY TO REMAIN 11 ALL PROPERTY LINES ARE SHOWN ON THIS SITE PLAN AND ARE EXISTING TO REMAIN. NO CHANGE 12 EXISTING DRIVE THRU LANE TO REMAIN. (UNDER SHELL PERMIT#BLD2020-02247) 13 EXISTING TRASH ENCLOSURE TO REMAIN. (UNDER SHELL PERMIT#BLD2020-02247) 14 EXISTING SHADED PARKING TO REMAIN. 15 HATCHED REGION REPRESENTS UNOBSTRUCTED LINE OF SIGHT AT DRIVEWAYS PER CITY OF ANAHEIM PUBLIC WORKS STANDARD #115-B. ANY OBSTRUCTING OBJECTS NOT TO EXCEED 24" MAX HEIGHT. (UNDER SHELL PERMIT #BLD2020-02247) OVERALL SITE PLAN LEGEND SCOPE OF WORK NIC LANDSCAPE TRASH ENCLOSURELINCOLN AVE. A001A 01 STARBUCKS 10 LINCOLN AVE. N M A G N O L I A A V E . N M A G N O L I A A V E . 11 1 1 1 3 3 3 2 2 2 2 2 2 2 4 5 5 6 8 8 7 7 7 8 8 EXISTING BUILDING N.I.C 9 EXISTING PARKING N.I.C 14 1111 11 11 11 11 11 1111 12 12 12 13 13 7 EV 6 6 50' - 0"50' - 0" 7' - 0" 2 2 50 ' - 0 " 50 ' - 0 " 7' - 0" 2 15 15 15 15 7' - 0" 7' - 0" C-36004 S T ATEOF CA L I F O RNIA LICE N S E D A RCHIT E C T REN. 08/31/21 M AIK E L M.FAR A GA LL A SHEET NUMBER: SHEET TITLE: SCALE: AS SHOWN STORE #: PROJECT #: PR O J E C T N A M E : PR O J E C T A D D R E S S : C 2020 STARBUCKS COFFEE COMPANY R Pe r m i t t e d S e t 1 1 - 6 - 2 0 2 0 ISSUE DATE: 2401 UTAH AVENUE SOUTH SEATTLE, WASHINGTON 98134 (206)318-1575 THESE DRAWINGS AND THE PROJECT MANUAL ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. STARBUCKS TEMPLATE VERSION: i2020-01-31.1 STARBUCKS R DESIGN MANAGER: PRODUCTION DESIGNER: CHECKED BY: 43180 BUSINEES PARK DR. SUITE: 203 TEMECULA, CA92590 (714)331-6114 info@urbandwellarchitects.com ADDRESS: PHONE: EMAIL: 11 / 6 / 2 0 2 0 1 1 : 1 6 : 2 7 A M \\ T E M E C U L A \ P u b l i c \ T e m e c u l l a O f f i ce \ S t a r b u c k s A c c o u n t \ P r o je c t s \ F Y 2 1 \ 0 1 3 - L i n c o l n & M a g n o l i a - 8 4 8 4 3 - 0 0 1 \ 9 - Su b m i t t a l s \ 8 4 8 4 3 - 0 0 1 L in c o l n & M a g n o l i a - P e r m i t t e d S e t 1 1 - 6 - 2 0 2 0 \ 8 4 8 4 3 - 0 0 1 L i n c o l n & M a g n o l i a - P e r m i t t e d S e t 11 - 6 - 2 0 2 0 . r v t A001 84843-001 06.18.2020 LI N C O L N & M A G N O L I A 25 9 5 W L i n c o l n A v e n u e An a h e i m , C A 9 2 8 0 1 U S A 59228 GIANCARLO RENELLA ROGINA KHALED MAIKEL FARAGALLA ARCHITECTURAL OVERALL SITE PLAN Scale: 1/16" = 1'-0" 011ST FLOOR - ARCHITECTURAL OVERALL SITE PLAN N 0 8' 16'32' Scale: 1/16" = 1'-0" Revision Schedule Rev Date By Description A-5 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-21-4466-1 Starbucks Bristol & Birch, Newport Beach N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Dividers.doc APPENDIX B COUNTY OF ORANGE – APPROVED SITE PLAN (PA95-109 CHANGED PLAN) B-1 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-21-4466-1 Starbucks Bristol & Birch, Newport Beach N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Dividers.doc APPENDIX C DRIVE-THROUGH QUEUING STUDY DATA 9/29/2021 Wednesday AM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 7:00 AM 202 7:30 AM 336 8:00 AM 426 8:30 AM 279 7:01 AM 202 7:31 AM 235 8:01 AM 213 8:31 AM 3710 7:02 AM 112 7:32 AM 235 8:02 AM 112 8:32 AM 279 7:03 AM 101 7:33 AM 224 8:03 AM 134 8:33 AM 268 7:04 AM 101 7:34 AM 112 8:04 AM 145 8:34 AM 257 7:05 AM 101 7:35 AM 134 8:05 AM 156 8:35 AM 235 7:06 AM 011 7:36 AM 156 8:06 AM 3710 8:36 AM 145 7:07 AM 022 7:37 AM 167 8:07 AM 4610 8:37 AM 145 7:08 AM 123 7:38 AM 268 8:08 AM 4711 8:38 AM 347 7:09 AM 224 7:39 AM 347 8:09 AM 4711 8:39 AM 325 7:10 AM 314 7:40 AM 145 8:10 AM 3811 8:40 AM 325 7:11 AM 213 7:41 AM 156 8:11 AM 3912 8:41 AM 134 7:12 AM 112 7:42 AM 156 8:12 AM 1910 8:42 AM 235 7:13 AM 134 7:43 AM 156 8:13 AM 21012 8:43 AM 145 7:14 AM 134 7:44 AM 369 8:14 AM 21012 8:44 AM 235 7:15 AM 134 7:45 AM 279 8:15 AM 11011 8:45 AM 246 7:16 AM 224 7:46 AM 3710 8:16 AM 11011 8:46 AM 167 7:17 AM 112 7:47 AM 178 8:17 AM 21012 8:47 AM 358 7:18 AM 123 7:48 AM 3811 8:18 AM 31013 8:48 AM 4610 7:19 AM 123 7:49 AM 3710 8:19 AM 3912 8:49 AM 448 7:20 AM 325 7:50 AM 178 8:20 AM 3811 8:50 AM 437 7:21 AM 314 7:51 AM 268 8:21 AM 3710 8:51 AM 437 7:22 AM 145 7:52 AM 257 8:22 AM 369 8:52 AM 448 7:23 AM 246 7:53 AM 246 8:23 AM 4610 8:53 AM 448 7:24 AM 246 7:54 AM 235 8:24 AM 268 8:54 AM 347 7:25 AM 257 7:55 AM 145 8:25 AM 167 8:55 AM 257 7:26 AM 358 7:56 AM 156 8:26 AM 257 8:56 AM 066 7:27 AM 246 7:57 AM 246 8:27 AM 437 8:57 AM 178 7:28 AM 235 7:58 AM 437 8:28 AM 347 8:58 AM 178 7:29 AM 224 7:59 AM 426 8:29 AM 246 8:59 AM 077 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-1 9/29/2021 Wednesday MD Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 11:00 AM 426 11:30 AM 213 12:00 PM 459 12:30 PM 426 11:01 AM 437 11:31 AM 123 12:01 PM 437 12:31 PM 404 11:02 AM 437 11:32 AM 224 12:02 PM 437 12:32 PM 303 11:03 AM 437 11:33 AM 213 12:03 PM 448 12:33 PM 202 11:04 AM 336 11:34 AM 202 12:04 PM 459 12:34 PM 202 11:05 AM 325 11:35 AM 213 12:05 PM 459 12:35 PM 011 11:06 AM 336 11:36 AM 112 12:06 PM 358 12:36 PM 112 11:07 AM 347 11:37 AM 112 12:07 PM 268 12:37 PM 101 11:08 AM 347 11:38 AM 101 12:08 PM 268 12:38 PM 101 11:09 AM 336 11:39 AM 101 12:09 PM 369 12:39 PM 112 11:10 AM 336 11:40 AM 123 12:10 PM 459 12:40 PM 224 11:11 AM 336 11:41 AM 134 12:11 PM 459 12:41 PM 213 11:12 AM 314 11:42 AM 224 12:12 PM 459 12:42 PM 303 11:13 AM 314 11:43 AM 314 12:13 PM 459 12:43 PM 314 11:14 AM 303 11:44 AM 404 12:14 PM 448 12:44 PM 314 11:15 AM 213 11:45 AM 303 12:15 PM 459 12:45 PM 224 11:16 AM 213 11:46 AM 202 12:16 PM 459 12:46 PM 246 11:17 AM 202 11:47 AM 000 12:17 PM 459 12:47 PM 347 11:18 AM 112 11:48 AM 000 12:18 PM 459 12:48 PM 347 11:19 AM 011 11:49 AM 022 12:19 PM 369 12:49 PM 358 11:20 AM 112 11:50 AM 112 12:20 PM 369 12:50 PM 358 11:21 AM 112 11:51 AM 123 12:21 PM 358 12:51 PM 448 11:22 AM 213 11:52 AM 246 12:22 PM 358 12:52 PM 448 11:23 AM 101 11:53 AM 145 12:23 PM 358 12:53 PM 448 11:24 AM 011 11:54 AM 347 12:24 PM 448 12:54 PM 448 11:25 AM 112 11:55 AM 358 12:25 PM 437 12:55 PM 437 11:26 AM 101 11:56 AM 358 12:26 PM 437 12:56 PM 437 11:27 AM 112 11:57 AM 459 12:27 PM 437 12:57 PM 448 11:28 AM 123 11:58 AM 459 12:28 PM 437 12:58 PM 448 11:29 AM 213 11:59 AM 358 12:29 PM 437 12:59 PM 448 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-2 9/29/2021 Wednesday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 4:00 PM 011 4:30 PM 4711 5:00 PM 426 5:30 PM 325 4:01 PM 101 4:31 PM 4610 5:01 PM 415 5:31 PM 325 4:02 PM 000 4:32 PM 4610 5:02 PM 314 5:32 PM 314 4:03 PM 022 4:33 PM 4610 5:03 PM 415 5:33 PM 303 4:04 PM 112 4:34 PM 459 5:04 PM 314 5:34 PM 213 4:05 PM 213 4:35 PM 448 5:05 PM 415 5:35 PM 314 4:06 PM 224 4:36 PM 459 5:06 PM 303 5:36 PM 202 4:07 PM 314 4:37 PM 448 5:07 PM 202 5:37 PM 022 4:08 PM 325 4:38 PM 448 5:08 PM 202 5:38 PM 134 4:09 PM 426 4:39 PM 448 5:09 PM 202 5:39 PM 235 4:10 PM 415 4:40 PM 437 5:10 PM 202 5:40 PM 325 4:11 PM 415 4:41 PM 426 5:11 PM 112 5:41 PM 325 4:12 PM 303 4:42 PM 415 5:12 PM 033 5:42 PM 325 4:13 PM 336 4:43 PM 415 5:13 PM 134 5:43 PM 437 4:14 PM 437 4:44 PM 415 5:14 PM 235 5:44 PM 426 4:15 PM 437 4:45 PM 437 5:15 PM 246 5:45 PM 415 4:16 PM 437 4:46 PM 448 5:16 PM 336 5:46 PM 415 4:17 PM 448 4:47 PM 4610 5:17 PM 426 5:47 PM 426 4:18 PM 437 4:48 PM 4610 5:18 PM 426 5:48 PM 415 4:19 PM 448 4:49 PM 4610 5:19 PM 415 5:49 PM 415 4:20 PM 437 4:50 PM 459 5:20 PM 415 5:50 PM 404 4:21 PM 448 4:51 PM 459 5:21 PM 415 5:51 PM 415 4:22 PM 448 4:52 PM 459 5:22 PM 314 5:52 PM 415 4:23 PM 459 4:53 PM 459 5:23 PM 426 5:53 PM 415 4:24 PM 358 4:54 PM 459 5:24 PM 437 5:54 PM 415 4:25 PM 459 4:55 PM 448 5:25 PM 437 5:55 PM 415 4:26 PM 4610 4:56 PM 437 5:26 PM 336 5:56 PM 314 4:27 PM 459 4:57 PM 437 5:27 PM 235 5:57 PM 314 4:28 PM 4610 4:58 PM 437 5:28 PM 336 5:58 PM 314 4:29 PM 4711 4:59 PM 437 5:29 PM 336 5:59 PM 213 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-3 9/29/2021 Wednesday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 6:00 PM 213 6:30 PM 4610 6:01 PM 202 6:31 PM 4711 6:02 PM 213 6:32 PM 4610 6:03 PM 202 6:33 PM 4610 6:04 PM 202 6:34 PM 459 6:05 PM 101 6:35 PM 459 6:06 PM 112 6:36 PM 347 6:07 PM 112 6:37 PM 448 6:08 PM 011 6:38 PM 426 6:09 PM 112 6:39 PM 426 6:10 PM 101 6:40 PM 426 6:11 PM 101 6:41 PM 426 6:12 PM 000 6:42 PM 426 6:13 PM 011 6:43 PM 325 6:14 PM 112 6:44 PM 325 6:15 PM 112 6:45 PM 213 6:16 PM 213 6:46 PM 314 6:17 PM 101 6:47 PM 314 6:18 PM 123 6:48 PM 314 6:19 PM 123 6:49 PM 213 6:20 PM 235 6:50 PM 213 6:21 PM 3710 6:51 PM 011 6:22 PM 369 6:52 PM 112 6:23 PM 358 6:53 PM 112 6:24 PM 459 6:54 PM 213 6:25 PM 448 6:55 PM 202 6:26 PM 459 6:56 PM 000 6:27 PM 459 6:57 PM 011 6:28 PM 459 6:58 PM 123 6:29 PM 448 6:59 PM 224 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-4 9/30/2021 Thursday AM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 7:00 AM 426 7:30 AM 101 8:00 AM 224 8:30 AM 246 7:01 AM 426 7:31 AM 022 8:01 AM 314 8:31 AM 246 7:02 AM 347 7:32 AM 055 8:02 AM 314 8:32 AM 224 7:03 AM 246 7:33 AM 066 8:03 AM 224 8:33 AM 112 7:04 AM 145 7:34 AM 279 8:04 AM 123 8:34 AM 123 7:05 AM 145 7:35 AM 3710 8:05 AM 123 8:35 AM 123 7:06 AM 325 7:36 AM 2810 8:06 AM 022 8:36 AM 235 7:07 AM 224 7:37 AM 3811 8:07 AM 224 8:37 AM 426 7:08 AM 325 7:38 AM 3811 8:08 AM 325 8:38 AM 325 7:09 AM 336 7:39 AM 3710 8:09 AM 213 8:39 AM 123 7:10 AM 336 7:40 AM 279 8:10 AM 112 8:40 AM 134 7:11 AM 325 7:41 AM 369 8:11 AM 213 8:41 AM 268 7:12 AM 314 7:42 AM 3811 8:12 AM 246 8:42 AM 369 7:13 AM 314 7:43 AM 189 8:13 AM 167 8:43 AM 459 7:14 AM 325 7:44 AM 279 8:14 AM 268 8:44 AM 459 7:15 AM 145 7:45 AM 369 8:15 AM 347 8:45 AM 279 7:16 AM 336 7:46 AM 268 8:16 AM 246 8:46 AM 369 7:17 AM 314 7:47 AM 369 8:17 AM 235 8:47 AM 257 7:18 AM 235 7:48 AM 459 8:18 AM 235 8:48 AM 246 7:19 AM 134 7:49 AM 358 8:19 AM 235 8:49 AM 145 7:20 AM 224 7:50 AM 257 8:20 AM 347 8:50 AM 235 7:21 AM 224 7:51 AM 347 8:21 AM 235 8:51 AM 246 7:22 AM 426 7:52 AM 437 8:22 AM 235 8:52 AM 459 7:23 AM 325 7:53 AM 426 8:23 AM 314 8:53 AM 336 7:24 AM 213 7:54 AM 415 8:24 AM 213 8:54 AM 246 7:25 AM 112 7:55 AM 314 8:25 AM 112 8:55 AM 246 7:26 AM 213 7:56 AM 314 8:26 AM 022 8:56 AM 235 7:27 AM 123 7:57 AM 303 8:27 AM 235 8:57 AM 224 7:28 AM 213 7:58 AM 224 8:28 AM 235 8:58 AM 224 7:29 AM 202 7:59 AM 145 8:29 AM 134 8:59 AM 156 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-5 9/30/2021 Thursday MD Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 11:00 AM 101 11:30 AM 213 12:00 PM 314 12:30 PM 145 11:01 AM 101 11:31 AM 213 12:01 PM 314 12:31 PM 134 11:02 AM 011 11:32 AM 224 12:02 PM 123 12:32 PM 325 11:03 AM 123 11:33 AM 246 12:03 PM 112 12:33 PM 303 11:04 AM 213 11:34 AM 246 12:04 PM 213 12:34 PM 303 11:05 AM 213 11:35 AM 246 12:05 PM 213 12:35 PM 112 11:06 AM 202 11:36 AM 268 12:06 PM 235 12:36 PM 112 11:07 AM 202 11:37 AM 358 12:07 PM 235 12:37 PM 123 11:08 AM 224 11:38 AM 257 12:08 PM 235 12:38 PM 123 11:09 AM 224 11:39 AM 257 12:09 PM 213 12:39 PM 213 11:10 AM 224 11:40 AM 257 12:10 PM 213 12:40 PM 336 11:11 AM 325 11:41 AM 279 12:11 PM 123 12:41 PM 336 11:12 AM 202 11:42 AM 3811 12:12 PM 235 12:42 PM 336 11:13 AM 202 11:43 AM 3710 12:13 PM 325 12:43 PM 426 11:14 AM 101 11:44 AM 369 12:14 PM 314 12:44 PM 314 11:15 AM 000 11:45 AM 3811 12:15 PM 213 12:45 PM 314 11:16 AM 000 11:46 AM 369 12:16 PM 213 12:46 PM 303 11:17 AM 011 11:47 AM 369 12:17 PM 101 12:47 PM 202 11:18 AM 112 11:48 AM 279 12:18 PM 000 12:48 PM 101 11:19 AM 213 11:49 AM 3710 12:19 PM 000 12:49 PM 101 11:20 AM 202 11:50 AM 4610 12:20 PM 000 12:50 PM 022 11:21 AM 202 11:51 AM 459 12:21 PM 000 12:51 PM 224 11:22 AM 112 11:52 AM 459 12:22 PM 123 12:52 PM 202 11:23 AM 112 11:53 AM 459 12:23 PM 246 12:53 PM 112 11:24 AM 123 11:54 AM 358 12:24 PM 235 12:54 PM 123 11:25 AM 213 11:55 AM 336 12:25 PM 235 12:55 PM 224 11:26 AM 202 11:56 AM 336 12:26 PM 325 12:56 PM 235 11:27 AM 213 11:57 AM 426 12:27 PM 303 12:57 PM 314 11:28 AM 112 11:58 AM 314 12:28 PM 325 12:58 PM 415 11:29 AM 123 11:59 AM 202 12:29 PM 235 12:59 PM 415 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-6 9/30/2021 Thursday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 4:00 PM 101 4:30 PM 235 5:00 PM 404 5:30 PM 448 4:01 PM 000 4:31 PM 325 5:01 PM 303 5:31 PM 448 4:02 PM 022 4:32 PM 426 5:02 PM 202 5:32 PM 448 4:03 PM 134 4:33 PM 426 5:03 PM 314 5:33 PM 459 4:04 PM 224 4:34 PM 336 5:04 PM 314 5:34 PM 448 4:05 PM 213 4:35 PM 336 5:05 PM 325 5:35 PM 437 4:06 PM 202 4:36 PM 325 5:06 PM 224 5:36 PM 437 4:07 PM 101 4:37 PM 325 5:07 PM 213 5:37 PM 437 4:08 PM 112 4:38 PM 404 5:08 PM 224 5:38 PM 437 4:09 PM 101 4:39 PM 303 5:09 PM 235 5:39 PM 325 4:10 PM 011 4:40 PM 415 5:10 PM 336 5:40 PM 325 4:11 PM 022 4:41 PM 314 5:11 PM 336 5:41 PM 325 4:12 PM 224 4:42 PM 415 5:12 PM 437 5:42 PM 325 4:13 PM 224 4:43 PM 426 5:13 PM 426 5:43 PM 314 4:14 PM 224 4:44 PM 415 5:14 PM 415 5:44 PM 314 4:15 PM 224 4:45 PM 314 5:15 PM 325 5:45 PM 213 4:16 PM 325 4:46 PM 303 5:16 PM 325 5:46 PM 213 4:17 PM 415 4:47 PM 314 5:17 PM 325 5:47 PM 224 4:18 PM 415 4:48 PM 325 5:18 PM 336 5:48 PM 325 4:19 PM 415 4:49 PM 235 5:19 PM 448 5:49 PM 314 4:20 PM 202 4:50 PM 235 5:20 PM 437 5:50 PM 303 4:21 PM 202 4:51 PM 314 5:21 PM 437 5:51 PM 303 4:22 PM 101 4:52 PM 303 5:22 PM 336 5:52 PM 314 4:23 PM 000 4:53 PM 314 5:23 PM 336 5:53 PM 314 4:24 PM 011 4:54 PM 426 5:24 PM 448 5:54 PM 404 4:25 PM 112 4:55 PM 426 5:25 PM 459 5:55 PM 112 4:26 PM 213 4:56 PM 426 5:26 PM 459 5:56 PM 134 4:27 PM 224 4:57 PM 415 5:27 PM 448 5:57 PM 134 4:28 PM 235 4:58 PM 415 5:28 PM 448 5:58 PM 235 4:29 PM 336 4:59 PM 404 5:29 PM 459 5:59 PM 336 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-7 9/30/2021 Thursday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 6:00 PM 336 6:30 PM 202 6:01 PM 437 6:31 PM 101 6:02 PM 426 6:32 PM 011 6:03 PM 426 6:33 PM 112 6:04 PM 426 6:34 PM 101 6:05 PM 437 6:35 PM 101 6:06 PM 426 6:36 PM 123 6:07 PM 426 6:37 PM 123 6:08 PM 415 6:38 PM 123 6:09 PM 415 6:39 PM 224 6:10 PM 415 6:40 PM 224 6:11 PM 415 6:41 PM 224 6:12 PM 202 6:42 PM 325 6:13 PM 202 6:43 PM 314 6:14 PM 101 6:44 PM 303 6:15 PM 011 6:45 PM 303 6:16 PM 112 6:46 PM 303 6:17 PM 101 6:47 PM 303 6:18 PM 101 6:48 PM 303 6:19 PM 123 6:49 PM 303 6:20 PM 134 6:50 PM 112 6:21 PM 235 6:51 PM 123 6:22 PM 314 6:52 PM 224 6:23 PM 325 6:53 PM 224 6:24 PM 325 6:54 PM 224 6:25 PM 314 6:55 PM 213 6:26 PM 314 6:56 PM 202 6:27 PM 314 6:57 PM 123 6:28 PM 303 6:58 PM 224 6:29 PM 202 6:59 PM 325 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-8 10/1/2021 Friday AM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 7:00 AM 4610 7:30 AM 347 8:00 AM 3710 8:30 AM 21012 7:01 AM 4711 7:31 AM 347 8:01 AM 3710 8:31 AM 11011 7:02 AM 4711 7:32 AM 358 8:02 AM 3710 8:32 AM 21012 7:03 AM 4610 7:33 AM 3710 8:03 AM 3710 8:33 AM 21012 7:04 AM 4610 7:34 AM 369 8:04 AM 4711 8:34 AM 21012 7:05 AM 459 7:35 AM 369 8:05 AM 3710 8:35 AM 41014 7:06 AM 448 7:36 AM 369 8:06 AM 4711 8:36 AM 4913 7:07 AM 459 7:37 AM 369 8:07 AM 3912 8:37 AM 31013 7:08 AM 4610 7:38 AM 4610 8:08 AM 3912 8:38 AM 3912 7:09 AM 4610 7:39 AM 4610 8:09 AM 4812 8:39 AM 3811 7:10 AM 358 7:40 AM 4711 8:10 AM 3811 8:40 AM 4812 7:11 AM 347 7:41 AM 4711 8:11 AM 3811 8:41 AM 4913 7:12 AM 437 7:42 AM 3710 8:12 AM 41014 8:42 AM 31013 7:13 AM 437 7:43 AM 3811 8:13 AM 3811 8:43 AM 3912 7:14 AM 437 7:44 AM 279 8:14 AM 2911 8:44 AM 4711 7:15 AM 437 7:45 AM 279 8:15 AM 2911 8:45 AM 4610 7:16 AM 437 7:46 AM 369 8:16 AM 2911 8:46 AM 358 7:17 AM 336 7:47 AM 4610 8:17 AM 3710 8:47 AM 459 7:18 AM 358 7:48 AM 4610 8:18 AM 4711 8:48 AM 448 7:19 AM 347 7:49 AM 268 8:19 AM 4711 8:49 AM 448 7:20 AM 358 7:50 AM 088 8:20 AM 279 8:50 AM 437 7:21 AM 459 7:51 AM 2911 8:21 AM 314 8:51 AM 426 7:22 AM 448 7:52 AM 2911 8:22 AM 4711 8:52 AM 426 7:23 AM 3710 7:53 AM 4913 8:23 AM 4711 8:53 AM 426 7:24 AM 2911 7:54 AM 3710 8:24 AM 3811 8:54 AM 336 7:25 AM 2810 7:55 AM 4610 8:25 AM 4711 8:55 AM 246 7:26 AM 3710 7:56 AM 4610 8:26 AM 4913 8:56 AM 448 7:27 AM 3710 7:57 AM 3710 8:27 AM 41014 8:57 AM 459 7:28 AM 279 7:58 AM 459 8:28 AM 41014 8:58 AM 4610 7:29 AM 369 7:59 AM 459 8:29 AM 41014 8:59 AM 4610 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-9 10/1/2021 Friday MD Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 11:00 AM 336 11:30 AM 415 12:00 PM 112 12:30 PM 224 11:01 AM 336 11:31 AM 303 12:01 PM 112 12:31 PM 213 11:02 AM 325 11:32 AM 213 12:02 PM 022 12:32 PM 213 11:03 AM 246 11:33 AM 112 12:03 PM 123 12:33 PM 112 11:04 AM 246 11:34 AM 011 12:04 PM 213 12:34 PM 134 11:05 AM 257 11:35 AM 112 12:05 PM 224 12:35 PM 325 11:06 AM 358 11:36 AM 112 12:06 PM 123 12:36 PM 303 11:07 AM 358 11:37 AM 112 12:07 PM 123 12:37 PM 303 11:08 AM 459 11:38 AM 112 12:08 PM 123 12:38 PM 112 11:09 AM 448 11:39 AM 213 12:09 PM 224 12:39 PM 112 11:10 AM 448 11:40 AM 202 12:10 PM 235 12:40 PM 213 11:11 AM 437 11:41 AM 011 12:11 PM 336 12:41 PM 202 11:12 AM 448 11:42 AM 112 12:12 PM 426 12:42 PM 202 11:13 AM 437 11:43 AM 101 12:13 PM 426 12:43 PM 112 11:14 AM 235 11:44 AM 000 12:14 PM 426 12:44 PM 112 11:15 AM 336 11:45 AM 011 12:15 PM 415 12:45 PM 112 11:16 AM 325 11:46 AM 112 12:16 PM 404 12:46 PM 213 11:17 AM 415 11:47 AM 213 12:17 PM 213 12:47 PM 112 11:18 AM 404 11:48 AM 314 12:18 PM 112 12:48 PM 112 11:19 AM 404 11:49 AM 213 12:19 PM 134 12:49 PM 101 11:20 AM 404 11:50 AM 325 12:20 PM 145 12:50 PM 101 11:21 AM 314 11:51 AM 303 12:21 PM 235 12:51 PM 112 11:22 AM 224 11:52 AM 202 12:22 PM 325 12:52 PM 224 11:23 AM 224 11:53 AM 101 12:23 PM 314 12:53 PM 213 11:24 AM 213 11:54 AM 112 12:24 PM 336 12:54 PM 202 11:25 AM 213 11:55 AM 101 12:25 PM 426 12:55 PM 101 11:26 AM 123 11:56 AM 112 12:26 PM 224 12:56 PM 101 11:27 AM 123 11:57 AM 213 12:27 PM 213 12:57 PM 000 11:28 AM 213 11:58 AM 202 12:28 PM 202 12:58 PM 011 11:29 AM 325 11:59 AM 112 12:29 PM 022 12:59 PM 112 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-10 10/1/2021 Friday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 4:00 PM 224 4:30 PM 314 5:00 PM 101 5:30 PM 213 4:01 PM 235 4:31 PM 303 5:01 PM 101 5:31 PM 213 4:02 PM 134 4:32 PM 314 5:02 PM 101 5:32 PM 202 4:03 PM 235 4:33 PM 325 5:03 PM 112 5:33 PM 112 4:04 PM 325 4:34 PM 314 5:04 PM 213 5:34 PM 112 4:05 PM 426 4:35 PM 314 5:05 PM 213 5:35 PM 101 4:06 PM 404 4:36 PM 415 5:06 PM 202 5:36 PM 134 4:07 PM 202 4:37 PM 437 5:07 PM 101 5:37 PM 257 4:08 PM 101 4:38 PM 336 5:08 PM 112 5:38 PM 235 4:09 PM 000 4:39 PM 336 5:09 PM 112 5:39 PM 224 4:10 PM 011 4:40 PM 336 5:10 PM 112 5:40 PM 314 4:11 PM 101 4:41 PM 437 5:11 PM 145 5:41 PM 426 4:12 PM 101 4:42 PM 426 5:12 PM 044 5:42 PM 314 4:13 PM 112 4:43 PM 437 5:13 PM 055 5:43 PM 314 4:14 PM 123 4:44 PM 426 5:14 PM 156 5:44 PM 202 4:15 PM 112 4:45 PM 415 5:15 PM 257 5:45 PM 000 4:16 PM 213 4:46 PM 415 5:16 PM 246 5:46 PM 000 4:17 PM 314 4:47 PM 303 5:17 PM 246 5:47 PM 011 4:18 PM 314 4:48 PM 213 5:18 PM 336 5:48 PM 101 4:19 PM 224 4:49 PM 112 5:19 PM 325 5:49 PM 101 4:20 PM 325 4:50 PM 213 5:20 PM 314 5:50 PM 101 4:21 PM 314 4:51 PM 202 5:21 PM 303 5:51 PM 000 4:22 PM 314 4:52 PM 314 5:22 PM 303 5:52 PM 022 4:23 PM 202 4:53 PM 426 5:23 PM 303 5:53 PM 123 4:24 PM 213 4:54 PM 325 5:24 PM 202 5:54 PM 235 4:25 PM 213 4:55 PM 202 5:25 PM 202 5:55 PM 336 4:26 PM 213 4:56 PM 202 5:26 PM 011 5:56 PM 358 4:27 PM 235 4:57 PM 202 5:27 PM 123 5:57 PM 358 4:28 PM 235 4:58 PM 011 5:28 PM 224 5:58 PM 358 4:29 PM 224 4:59 PM 112 5:29 PM 224 5:59 PM 358 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-11 10/1/2021 Friday PM Pk Hr Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue Time Queue Pick‐ up to Order  Board Queue Order  Board Back Total Queue 6:00 PM 347 6:30 PM 112 6:01 PM 145 6:31 PM 213 6:02 PM 145 6:32 PM 202 6:03 PM 235 6:33 PM 224 6:04 PM 325 6:34 PM 224 6:05 PM 325 6:35 PM 123 6:06 PM 415 6:36 PM 224 6:07 PM 314 6:37 PM 314 6:08 PM 303 6:38 PM 314 6:09 PM 303 6:39 PM 314 6:10 PM 314 6:40 PM 404 6:11 PM 415 6:41 PM 415 6:12 PM 314 6:42 PM 213 6:13 PM 314 6:43 PM 112 6:14 PM 314 6:44 PM 011 6:15 PM 213 6:45 PM 112 6:16 PM 213 6:46 PM 101 6:17 PM 213 6:47 PM 112 6:18 PM 314 6:48 PM 112 6:19 PM 314 6:49 PM 101 6:20 PM 235 6:50 PM 112 6:21 PM 224 6:51 PM 101 6:22 PM 314 6:52 PM 022 6:23 PM 303 6:53 PM 022 6:24 PM 314 6:54 PM 123 6:25 PM 303 6:55 PM 112 6:26 PM 202 6:56 PM 112 6:27 PM 213 6:57 PM 101 6:28 PM 101 6:58 PM 101 6:29 PM 112 6:59 PM 011 Starbucks 1224 N Harbor Blvd Anaheim, CA 92801 C-12 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-21-4466-1 Starbucks Bristol & Birch, Newport Beach N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Dividers.doc APPENDIX D EXISTING TRAFFIC COUNT DATA T218 DATE:LOCATION:PROJECT #:SC Tue, Oct 12, 21 NORTH & SOUTH: LOCATION #:1 EAST & WEST: CONTROL:NO CONTROL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:XX0 X XXX40XX X 0000 7:00 AM 001 0 000177100 0 179 00000 317:15 AM 003 0 000212100 0 216 00000 407:30 AM 000 0 000259000 0 259 00000 457:45 AM 004 0 000282100 0 287 00000 318:00 AM 003 0 000309000 0 312 00000 498:15 AM 003 0 000321200 0 326 00000 498:30 AM 000 0 000340100 0 341 00000 408:45 AM 002 0 000305300 0 310 00000 36 VOLUMES 0 0 16 0 0 0 0 2,205 9 0 0 0 2,230 0 0 0 0 0 APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 0% 0% 0% APP/DEPART 16 /00 /9 2,214 /2,221 0 /00 BEGIN PEAK HR VOLUMES 008 0 0001,275600 01,289 APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 0% 0% 0%PEAK HR FACTOR 0.667 0.000 0.939 0.000 0.945APP/DEPART 8 /00 /6 1,281 /1,283 0 /004:00 PM 001 0 000337000 0 338 00000 474:15 PM 002 0 000303200 0 307 00000 374:30 PM 002 0 000311300 0 316 00000 414:45 PM 004 0 000371100 0 376 00000 53 5:00 PM 004 0 000387300 0 394 00000 53 5:15 PM 002 0 000353500 0 360 00000 42 5:30 PM 007 0 000368500 0 380 00000 51 5:45 PM 003 0 000312300 0 318 00000 41 VOLUMES 0 0 25 0 0 0 0 2,742 22 0 0 0 2,789 0 0 0 0 0 APPROACH % 0% 0% 100% 0% 0% 0% 0% 99% 1% 0% 0% 0%APP/DEPART 25 /00 /22 2,764 /2,767 0 /00BEGIN PEAK HRVOLUMES 0 0 17 0 0 0 0 1,479 14 0 0 0 1,510APPROACH % 0% 0% 100% 0% 0% 0% 0% 99% 1% 0% 0% 0%PEAK HR FACTOR 0.607 0.000 0.957 0.000 0.958APP/DEPART 17 /00 /14 1,493 /1,496 0 /00 Burger King Dwy NORTH SIDE Bristol WEST SIDE EAST SIDE Bristol SOUTH SIDE Burger King Dwy EB through/ right turn lane INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach Burger King Dwy Bristol U-TURNS Burger King Dwy No queue EB to Burger King. EB through/right turn lane (BD17) Burger King Dwy Bristol Bristol AM 8:00 AM PM 4:45 PM Add U-Turns to Left Turns D-1 0000TOTAL 0 0 000PM 0 0 000AM 0 0 0 0 0 0 0 0 0 0 0 0 0 TO T A L PM AM 0 0 0 0 0 0 AM PM TO T A L 4, 9 4 7 2, 7 4 2 2, 2 0 5 31 22 9 2, 2 2 1 2, 7 6 7 4, 9 8 8 4, 9 7 8 2, 7 6 4 2, 2 1 4 9 AM 001616 22 PM 002525 31 TOTAL 0 0 41 41 0000TOTAL 0 0 000PM 0 0 000AM 0 0 0 0 0 0 0 0 0 0 0 0 0 TO T A L PM AM AM 8:00 AM 8:45 AM 0 0 0 0 0 0 #N/A AM PM TO T A L 2, 7 5 4 1, 4 7 9 1, 2 7 5 PM 4:45 PM 5:45 PM 20 14 6 1, 2 8 3 1, 4 9 6 2, 7 7 9 2, 7 7 4 1, 4 9 3 1, 2 8 1 6 AM 0088 14 PM 001717 20 Total 0 0 25 25 AimTD LLC TURNING MOVEMENT COUNTS Burger King Dwy Br i s t o l Br i s t o l SC ALL HOURS Newport Beach Burger King Dwy Burger King Dwy Burger King Dwy Br i s t o l Br i s t o l PEAK HOUR D-2 T218 DATE:LOCATION:PROJECT #:SCTue, Oct 12, 21 NORTH & SOUTH:LOCATION #:2 EAST & WEST:CONTROL:NO CONTROL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:X40 0 2XXXX0X 0 0000 7:00 AM 0320 2 34000010 1 70 000007:15 AM 0311 2 40000000 0 74 00000 7:30 AM 0581 3 62000020 1 127 010017:45 AM 0792 3 78000000 1 163 00000 8:00 AM 0791 4125000020 1 212 000008:15 AM 0850 4102000000 3 194 000008:30 AM 01021 3135000010 2 244 00000 8:45 AM 01050 4112000000 4 225 01001VOLUMES 05716 25688000060131,30902002 APPROACH % 0% 99% 1% 4% 96% 0% 0% 0% 0% 32% 0% 68%APP/DEPART 577 /586 713 /694 0 /29 19 /00BEGIN PEAK HR VOLUMES 03712 1547400003010875APPROACH % 0% 99% 1% 3% 97% 0% 0% 0% 0% 23% 0% 77% PEAK HR FACTOR 0.888 0.886 0.000 0.813 0.897APP/DEPART 373 /382 489 /477 0 /16 13 /004:00 PM 0970 3 92000010 2 195 00000 4:15 PM 01030 3102000000 1 209 000004:30 PM 01013 3107000000 3 217 00000 4:45 PM 0980 5119000000 2 224 010015:00 PM 01230 4107000020 2 238 010015:15 PM 01201 4120000010 0 246 03003 5:30 PM 0961 3115000010 0 216 010015:45 PM 0640 3107000000 6 180 00000 VOLUMES 08025 28869000050161,72506006APPROACH % 0% 99% 1% 3% 97% 0% 0% 0% 0% 24% 0% 76%APP/DEPART 807 /824 897 /874 0 /27 21 /00 BEGIN PEAK HRVOLUMES 04424 16453000030 7 925 APPROACH % 0% 99% 1% 3% 97% 0% 0% 0% 0% 30% 0% 70%PEAK HR FACTOR 0.907 0.946 0.000 0.625 0.940APP/DEPART 446 /454 469 /456 0 /15 10 /00 Birch NORTH SIDE Burger King Dwy WEST SIDE EAST SIDE Burger King Dwy SOUTH SIDE Birch INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach Birch Burger King Dwy U-TURNS Birch Queue NB till Burger King Dwy: 16:16:10, 16:17:22, 16:26:11, 16:36:22, 17:02:16, 17:56:58 Birch Burger King Dwy Burger King Dwy AM 8:00 AM PM 4:30 PM Add U-Turns to Left Turns D-3 1,610 0 1,557 53 TOTAL 1,410 897 0 869 28 PM 824 713 0 688 25 AM 586 19 21 40 0 0 0 13 16 29 0 0 0 TO T A L PM AM 6 5 11 0 0 0 AM PM TO T A L 0 0 0 0 0 0 29 27 56 0 0 0 694 AM 0 571 6 577 874 PM 0 802 5 807 1,568 TOTAL 0 1,373 11 1,384 958 0 927 31 TOTAL 836 469 0 453 16 PM 454 489 0 474 15 AM 382 13 10 23 0 0 0 10 7 17 0 0 0 TO T A L PM AM AM 8:00 AM 8:45 AM 3 3 6 0 0 0 #N/A AM PM TO T A L 0 0 0 PM 4:30 PM 5:45 PM 0 0 0 16 15 31 0 0 0 477 AM 0 371 2 373 456 PM 0 442 4 446 933 Total 0 813 6 819 AimTD LLC TURNING MOVEMENT COUNTS Birch Bu r g e r K i n g D w y Bu r g e r K i n g D w y SC ALL HOURS Newport Beach Birch Birch Birch Bu r g e r K i n g D w y Bu r g e r K i n g D w y PEAK HOUR D-4 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-21-4466-1 Starbucks Bristol & Birch, Newport Beach N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Dividers.doc APPENDIX E LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Sub-Dividers.doc APPENDIX E-I EXISTING TRAFFIC CONDITIONS E-1 0.024Volume to Capacity (v/c): CLevel Of Service: 15.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Project Driveway No. 1 at Bristol Street Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Bristol StreetBristol StreetProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 006134980Total Analysis Volume [veh/h] 00233720Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.94500.94500.94500.9500Peak Hour Factor 006127580Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 006127580Base Volume Input [veh/h] Bristol StreetBristol StreetProject Driveway No. 1Name Volumes Scenario 1: 1 AM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-2 CIntersection LOS 0.09d_I, Intersection Delay [s/veh] AACApproach LOS 0.000.0015.89d_A, Approach Delay [s/veh] 0.000.000.000.001.810.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.070.0095th-Percentile Queue Length [veh/ln] AACMovement LOS 0.000.000.000.0015.890.00d_M, Delay for Movement [s/veh] 0.000.000.000.010.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 1: 1 AM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-3 0.006Volume to Capacity (v/c): BLevel Of Service: 11.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Birch Street at Project Driveway No. 2 Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0045.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Birch StreetBirch StreetName Intersection Setup 000Pedestrian Volume [ped/h] 113528172414Total Analysis Volume [veh/h] 3113241103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89700.89700.89700.89700.89700.8970Peak Hour Factor 103474152371Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 103474152371Base Volume Input [veh/h] Project Driveway No. 2Birch StreetBirch StreetName Volumes Scenario 1: 1 AM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-4 BIntersection LOS 0.29d_I, Intersection Delay [s/veh] BAAApproach LOS 10.080.260.00d_A, Approach Delay [s/veh] 1.481.480.001.140.000.0095th-Percentile Queue Length [ft/ln] 0.060.060.000.050.000.0095th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.6111.800.008.210.000.00d_M, Delay for Movement [s/veh] 0.010.010.010.010.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 1: 1 AM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-5 0.062Volume to Capacity (v/c): CLevel Of Service: 18.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Project Driveway No. 1 at Bristol Street Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Bristol StreetBristol StreetProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 00151544180Total Analysis Volume [veh/h] 00438640Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95800.95800.95800.9500Peak Hour Factor 00141479170Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00141479170Base Volume Input [veh/h] Bristol StreetBristol StreetProject Driveway No. 1Name Volumes Scenario 2: 2 PM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-6 CIntersection LOS 0.21d_I, Intersection Delay [s/veh] AACApproach LOS 0.000.0018.22d_A, Approach Delay [s/veh] 0.000.000.000.004.930.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.200.0095th-Percentile Queue Length [veh/ln] AACMovement LOS 0.000.000.000.0018.220.00d_M, Delay for Movement [s/veh] 0.000.000.000.020.060.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 2: 2 PM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-7 0.006Volume to Capacity (v/c): BLevel Of Service: 12.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Birch Street at Project Driveway No. 2 Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0045.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Birch StreetBirch StreetName Intersection Setup 000Pedestrian Volume [ped/h] 73482174470Total Analysis Volume [veh/h] 2112041118Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94000.94000.94000.94000.94000.9400Peak Hour Factor 73453164442Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 73453164442Base Volume Input [veh/h] Project Driveway No. 2Birch StreetBirch StreetName Volumes Scenario 2: 2 PM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-8 BIntersection LOS 0.25d_I, Intersection Delay [s/veh] BAAApproach LOS 10.470.290.00d_A, Approach Delay [s/veh] 1.141.140.001.190.000.0095th-Percentile Queue Length [ft/ln] 0.050.050.000.050.000.0095th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.7912.060.008.370.000.00d_M, Delay for Movement [s/veh] 0.010.010.000.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 2: 2 PM Existing STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-9 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\4400\2214466 - Starbucks Bristol & Birch, Newport Beach\Misc\4466 Sub-Dividers.doc APPENDIX E-II EXISTING (WITH STARBUCKS) TRAFFIC CONDITIONS E-10 0.104Volume to Capacity (v/c): CLevel Of Service: 17.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Project Driveway No. 1 at Bristol Street Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Bristol StreetBristol StreetProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 00481349340Total Analysis Volume [veh/h] 001233780Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.94500.94500.94500.9500Peak Hour Factor 00451275320Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00451275320Base Volume Input [veh/h] Bristol StreetBristol StreetProject Driveway No. 1Name Volumes Scenario 3: 3 AM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-11 CIntersection LOS 0.41d_I, Intersection Delay [s/veh] AACApproach LOS 0.000.0017.23d_A, Approach Delay [s/veh] 0.000.000.000.008.590.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.340.0095th-Percentile Queue Length [veh/ln] AACMovement LOS 0.000.000.000.0017.230.00d_M, Delay for Movement [s/veh] 0.000.000.000.010.100.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 3: 3 AM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-12 0.050Volume to Capacity (v/c): BLevel Of Service: 13.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Birch Street at Project Driveway No. 2 Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0045.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Birch StreetBirch StreetName Intersection Setup 000Pedestrian Volume [ped/h] 60255285025414Total Analysis Volume [veh/h] 156132136103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.89700.89700.89700.89700.89700.8970Peak Hour Factor 54224744522371Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 54224744522371Base Volume Input [veh/h] Project Driveway No. 2Birch StreetBirch StreetName Volumes Scenario 3: 3 AM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-13 BIntersection LOS 1.24d_I, Intersection Delay [s/veh] BAAApproach LOS 11.130.720.00d_A, Approach Delay [s/veh] 10.7910.790.003.510.000.0095th-Percentile Queue Length [ft/ln] 0.430.430.000.140.000.0095th-Percentile Queue Length [veh/ln] BBAAAAMovement LOS 10.3612.970.008.370.000.00d_M, Delay for Movement [s/veh] 0.080.050.010.040.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 3: 3 AM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-14 0.055Volume to Capacity (v/c): CLevel Of Service: 18.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Project Driveway No. 1 at Bristol Street Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Bristol StreetBristol StreetProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 00211544160Total Analysis Volume [veh/h] 00538640Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95800.95800.95800.9500Peak Hour Factor 00201479150Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00201479150Base Volume Input [veh/h] Bristol StreetBristol StreetProject Driveway No. 1Name Volumes Scenario 4: 4 PM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-15 CIntersection LOS 0.18d_I, Intersection Delay [s/veh] AACApproach LOS 0.000.0018.18d_A, Approach Delay [s/veh] 0.000.000.000.004.370.0095th-Percentile Queue Length [ft/ln] 0.000.000.000.000.170.0095th-Percentile Queue Length [veh/ln] AACMovement LOS 0.000.000.000.0018.180.00d_M, Delay for Movement [s/veh] 0.000.000.000.020.060.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 4: 4 PM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-16 0.022Volume to Capacity (v/c): BLevel Of Service: 12.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Birch Street at Project Driveway No. 2 Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0045.0045.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Birch StreetBirch StreetName Intersection Setup 000Pedestrian Volume [ped/h] 27114822111470Total Analysis Volume [veh/h] 7312053118Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.94000.94000.94000.94000.94000.9400Peak Hour Factor 25104532010442Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25104532010442Base Volume Input [veh/h] Project Driveway No. 2Birch StreetBirch StreetName Volumes Scenario 4: 4 PM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-17 BIntersection LOS 0.57d_I, Intersection Delay [s/veh] BAAApproach LOS 10.730.350.00d_A, Approach Delay [s/veh] 4.524.520.001.490.000.0095th-Percentile Queue Length [ft/ln] 0.180.180.000.060.000.0095th-Percentile Queue Length [veh/ln] BBAAAAMovement LOS 10.0612.370.008.410.000.00d_M, Delay for Movement [s/veh] 0.040.020.000.020.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 4: 4 PM Existing + Project STarbucks Bristol & Birch, Newport Beach Version 2021 (SP 0-6) Generated with E-18 Tmplt: 01/18/23 Attachment No. CD 4 Project Plans