HomeMy WebLinkAboutPA2022-0295_20230316_Resolution_ZA2023-015Community Development Department
CITY OF NEWPORT BEACH
100 Civic Center Drive
Newport Beach, California 92660
949 644-3200
newportbeachca.gov/communitydevelopment
VIA EMAIL
March 16, 2023
Oscar Almendarez
31234 West Nine Drive
Laguna Niguel, CA 92677
oz.almendarez@gmail.com
Subject: Coastal Development Permit No. (PA2022-0295)
Sanderson Residence CDP
6104 W. Ocean Front
Dear Mr. Almendarez,
It was a pleasure working with you on the above referenced application. Please be
advised that the subject application was approved by the Zoning Administrator on
March 16, 2023 and is now within the required City appeal period until March 30,
2023. If no appeals are filed with the City, a Notice of Final Action will be mailed to
the California Coastal Commission. Upon receipt of the notice by the Coastal
Commission, the action will be subject to an additional 10-working-day appeal period.
You may track status of the Coastal Commission appeal period via the following link:
Statewide Appealable Projects PDF
At the conclusion of both appeal periods, a building permit may be issued for the
project.
A copy of the approved resolution with findings and conditions is attached. If you
have any questions, please do not hesitate to contact me directly. Thank you and I
look forward to working with you again in the future.
Sincerely,
RESOLUTION NO. ZA2023-015
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING A
COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW THREE (3)-STORY SINGLE-FAMILY RESIDENCE AND
ATTACHED TWO (2)-CAR GARAGE INCLUDING A ONE (1)-CAR
COVERED CARPORT LOCATED AT 6104 WEST OCEAN FRONT
(PA2022-0295)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Oscar Almendarez on behalf of the owner with respect to
property located at 6104 West Ocean Front, and legally described as Lot 3 and a portion
of Lot 4, of Block A, of the Seashore Colony Tract addition to Newport Beach, requesting
approval of a Coastal Development Permit.
2. The applicant requests a coastal development permit to allow the demolition of an existing
single-family residence and the construction of a new 3,675-square-foot, three (3)-story,
single-family residence with an attached 525-square-foot, two (2)-car garage and a 196-
square-foot, one (1)-car covered carport. The proposed development also includes
additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and
landscaping. The project complies with all development standards and no deviations are
requested. All proposed improvements are located within the confines of private property.
No development is proposed within the existing 15-foot-deep west ocean front
encroachment area on the beach.
3. The subject property is located within the Two-Unit Residential (R-2) Zoning District and
the General Plan Land Use Element category is Two-Unit Residential (RT).
4. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Two-Unit Residential (RT-E) (30.0 – 39.9 DU/AC) and the Coastal Zoning
District is Two-Unit Residential (R-2).
5. A public hearing was held on March 16, 2023, online via Zoom. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal Code
(NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Zoning Administrator Resolution No. ZA2023-015
Page 2 of 10
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
2. Class 3 exempts the demolition and construction of up to three (3) single-family
residences in urbanized areas. The proposed project consists of the demolition of an
existing single-family residence and the construction of a new 3,675-square-foot, three
(3)-story, single-family residence with an attached 525-square-foot, two (2)-car garage
and a 196-square-foot, one (1)-car covered carport.
3. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would
invalidate the use of these exemption. The project location does not impact an
environmental resource of hazardous or critical concern, does not result in cumulative
impacts, does not have a significant effect on the environment due to unusual
circumstances, does not damage scenic resources within a state scenic highway, is not
a hazardous waste site, and is not identified as a historical resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015(F) (Coastal Development Permits, Findings and
Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in
support of such findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 4,420 square feet and the proposed floor area
is 4,200 square feet.
b. The proposed development complies with the required setbacks, which are five
feet along the front property line abutting West Ocean Front, five feet along the rear
property line abutting the alley, and three feet along each side property line.
c. The highest guardrail/parapet is below 24 feet from established grade and the
highest ridge is no more than 29 feet from established grade. The proposed
development complies with all height requirements.
d. The proposed development provides a two (2)-car garage, meeting the minimum
garage requirement for a single-family residence with less than 4,000 square feet
of habitable floor area. The proposed development also includes a one (1)-car
covered carport.
Zoning Administrator Resolution No. ZA2023-015
Page 3 of 10
e. The proposed development complies with the minimum 9.0-foot North American
Vertical Datum of 1988 (NAVD 88) top of slab elevation requirement for interior
living areas of new structures.
2. The neighborhood is predominantly developed with two (2)- and three (3)-story single
and multi-family residences. The proposed three-story design, bulk, and scale of the
development is consistent with the existing neighborhood pattern of development.
3. The existing 15-foot encroachment of the patio is allowed pursuant to Title 21 Appendix
C (Oceanfront Encroachment Policy Guidelines). The project has been conditioned to
remove all encroachments within the 15-foot Ocean Front encroachment area that are
inconsistent with the existing Ocean Front encroachment permit. No other work is
proposed within the encroachment area.
4. A Coastal Hazards Report was prepared by PMA Consulting, Inc. dated November 7,
2022. The project site is separated from the water by a wide sandy beach. The report
concludes that the proposed project is reasonably safe from the shoreline erosion due
to lack of wave or wakes that can erode sand from the beach. The site is approximately
350 feet from the mean high tide line. The report also concludes that the project will be
reasonably safe from future sea level rise assuming an increase up to 10.9 feet NAVD
88 (the likely range for sea level rise over 75-year design life of the structure based on
low risk aversion estimates for sea level rise provided by the State of California, Sea
Level Rise Guidance: 2018 Update).
5. The report also assesses risks from sea level rise using the Medium-High Risk Aversion
scenario, which assumes an increase in 6 feet (13.7 feet NAVD 88) over the next 75
years. The site has not historically been subject to any wave overtopping, nor is
overtopping waters over the next 75 years expected to reach the subject site, even under
extreme conditions. The finish floor elevation of the proposed dwelling is 14.37 feet
NAVD88 which complies with the minimum 9.0-foot (NAVD 88) elevation standard for
new structures and exceeds the minimum requirements for sea level rise under both
scenarios (10.9 and 13.7 feet NAVD 88). The project should be designed for adaptability
up to an elevation of 14.4 feet (NAVD 88). Flood shields (sandbags and other barriers)
can be deployed across the openings to protect and prevent flooding to the structure.
Based on the data provided, the study provides no recommendations for shoreline
protection devices and concludes that coastal hazards will not impact the property over
the next 75 years, as the proposed project has minimal risk from flooding.
6. The property owner will also be required to acknowledge any hazards present at the site
and unconditionally waive any claim to damage or liability against the decision authority,
consistent with NBMC Section 21.30.015(D)(3)(c) – (Waterfront - Development
Standards). The Acknowledgement of Coastal Hazards is included as a condition of
approval that will need to be recorded prior to the issuance of building permits.
7. Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) -
(Natural Landform and Shoreline Protection), the property owner will be required to enter
into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or
Zoning Administrator Resolution No. ZA2023-015
Page 4 of 10
destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The Waiver of
Future Protection is included as a condition of approval that will need to be recorded
prior to final building inspection.
8. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
a building permit. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and the CBC prior to building permit issuance.
9. The property is located approximately 350 feet east of coastal waters. Pursuant to Section
21.35.030 (Construction Pollution Prevention Plan) of the Municipal Code, a Construction
Pollution Prevention Plan (CPPP) is required to implement temporary Best Management
Practices (BMPs) during construction to minimize erosion and sedimentation and to
minimize pollution of runoff and coastal waters derived from construction chemicals and
materials. A CPPP has been provided and construction plans and activities will be required
to adhere to the CPPP.
10. The project design addresses water quality with a construction erosion control plan and a
post-construction drainage system that includes drainage and percolation features
designed to retain dry weather runoff and minor rain event runoff on-site. Any water not
retained on-site is directed to the City’s storm drain system.
11. The project site is not located adjacent to a coastal view road or public viewpoint, as
identified in the Coastal Land Use Plan. The nearest public view road occurs along West
Coast Highway crossing over the bridge to and from Huntington Beach. The project site is
adjacent to a public beach. However, the project will replace an existing single-family
residence with a new single-family residence that complies with all applicable Local
Coastal Program (LCP) development standards and maintains a building envelope
consistent with the existing and anticipated neighborhood pattern of development.
Therefore, the project does not include any unique features, does not have the potential to
degrade the visual quality of the Coastal Zone, or result in significant adverse impacts to
public views.
12. The front of the proposed residence, which is visible from the public boardwalk and bay,
contains substantial architectural treatment and visual interest, in keeping with the design
guidelines of the Zoning Code. The design includes modulation of volume throughout the
structure, an increased front setback along the public boardwalk beyond what is required
by code, and low walls that prevent the appearance of the site from being walled off from
the boardwalk and bay. Therefore, the project does not have the potential to degrade the
visual quality of the Coastal Zone or result in significant adverse impacts on existing public
views.
Zoning Administrator Resolution No. ZA2023-015
Page 5 of 10
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal
Act if the project is located between the nearest public road and the sea or shoreline of any
body of water located within the coastal zone.
Facts in Support of Finding:
1. The site is located between the nearest public road and the sea or shoreline; however, the
project will not affect the public’s ability to gain access to, use, and/or view the coast and
nearby recreational facilities. The existing residential development neither provides nor
inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of
Public Access/Recreation Impacts) requires that the provision of public access bear a
reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing single-family
residence with a new single-family residence. Therefore, the project does not involve a
change in land use, density or intensity that will result in increased demand on public
access and recreation opportunities.
2. The project is designed and sited so as not to block or impede existing public access
opportunities and all development will occur within the confines of private property. Coastal
access is currently provided and will continue to be provided by street ends throughout the
Balboa Peninsula with access to the beach and water. The nearest vertical access points
are at the 62nd and 61st Street ends, each located less than 100 feet from the subject
property. The project does not include any features that would obstruct access along these
routes.
3. The existing 15-foot encroachment of the patio is allowed pursuant to Title 21 Appendix
C (Oceanfront Encroachment Policy Guidelines). The project has been conditioned to
remove all inconsistent encroachments within the 15-foot Ocean Front encroachment
area. The existing patio does not affect public views or access to the public beach.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby finds this project is
categorically exempt from the California Environmental Quality Act pursuant to Section
15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA
Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has
no potential to have a significant effect on the environment.
2. The Zoning Administrator of the City of Newport Beach hereby approves the Coastal
Development Permit (PA2022-0295), subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
3. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Zoning Administrator Resolution No. ZA2023-015
Page 6 of 10
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code (NBMC). Final
action taken by the City may be appealed to the Coastal Commission in compliance with
Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and
Title 14 California Code of Regulations, Sections 13111 through 13120, and Section
30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 16TH DAY OF MARCH, 2023.
Zoning Administrator Resolution No. ZA2023-015
Page 7 of 10
EXHIBIT “A”
CONDITIONS OF APPROVAL
Planning Division
1. The development shall be in substantial conformance with the approved site plan, floor
plans, and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new Coastal Development Permit.
3. Coastal Development Permit No. PA2022-0295 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code (NBMC), unless an extension is
otherwise granted.
4. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council,
its boards and commissions, officials, officers, employees, and agents from and against
any and all claims, demands, obligations, damages, actions, causes of action, suits,
losses, judgments, fines, penalties, liabilities, costs and expenses (including without
limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of development. The letter shall be scanned into the plan set prior to building
permit issuance.
5. Prior to final building permit inspection, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices to address the
threat of damage or destruction from waves, erosion, storm conditions, landslides,
seismic activity, bluff retreat, sea level rise, or other natural hazards that may affect the
property, or development of the property, today or in the future. The agreement shall be
binding against the property owners and successors and assigns.
6. Prior to the issuance of building permits, a Certificate of Compliance shall be submitted
and recorded by the applicant.
7. Prior to the issuance of a building permit, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
8. Prior to the issuance of a building permit, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
Zoning Administrator Resolution No. ZA2023-015
Page 8 of 10
9. Prior to the issuance of a building permit, a copy of the Resolution, including conditions
of approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
10. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
11. This Coastal Development Permit does not authorize any development seaward of the
private property, including the West Ocean Front Encroachment Area.
12. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right-of-way.
13. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers.
14. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
15. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock-piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
16. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
17. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
18. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
19. Construction activities shall comply with Section 10.28.040 of the Newport Beach
Municipal Code, which restricts hours of noise-generating construction activities that
Zoning Administrator Resolution No. ZA2023-015
Page 9 of 10
produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday,
and 8:00 a.m. and 6:00 p.m. on Saturday. Noise-generating construction activities are
not allowed on Saturdays, Sundays or holidays.
20. All noise generated by the proposed use shall comply with the provisions of Chapter
10.26 and other applicable noise control requirements of the Newport Beach Municipal
Code. The maximum noise shall be limited to no more than depicted below for the
specified time periods unless the ambient noise level is higher:
Between the hours of 7:00AM
and 10:00PM
Between the hours of
10:00PM and 7:00AM
Location Interior Exterior Interior Exterior
Residential Property 45dBA 55dBA 40dBA 50dBA
Residential Property located within
100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA
Mixed Use Property 45dBA 60dBA 45dBA 50dBA
Commercial Property N/A 65dBA N/A 60dBA
21. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In
compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and
similar construction activities shall occur between August 16 and January 31, outside of
the peak nesting period. If such activities must occur inside the peak nesting season from
February 1 to August 15, compliance with the following is required to prevent the taking of
Native Birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest
and determine when the nest is no longer active.
22. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
23. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
24. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
Zoning Administrator Resolution No. ZA2023-015
Page 10 of 10
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
25. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the
current business owner, property owner, or the leasing agent.
26. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Sanderson Residence including, but not limited to, Coastal Development
Permit (PA2022-0295). This indemnification shall include, but not be limited to, damages
awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred
in connection with such claim, action, causes of action, suit or proceeding whether incurred
by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant
shall indemnify the City for all of City's costs, attorneys' fees, and damages which City
incurs in enforcing the indemnification provisions set forth in this condition. The applicant
shall pay to the City upon demand any amount owed to the City pursuant to the
indemnification requirements prescribed in this condition.
Public Works Department
27. Prior to the issuance of a building permit, the applicant shall submit a construction
management plan for review and approval by the Public Works Department. The
construction management plan shall demonstrate that the applicant/owner will have
sufficient and guaranteed access to the site through private property and will not impact
public access including the public right-of-way and alley. Said plan shall also indicate
areas for the storage of construction equipment and materials.
28. Prior to issuance of final building permits, all encroachments within the Ocean Front
Encroachment area that are inconsistent with the existing Ocean Front Encroachment
Permit shall be removed. The existing gate shall be modified to open inward of (i.e.
towards) the subject property.
29. A new sewer clean out shall be installed on the existing sewer lateral per City Standard
406.
30. All improvements shall be constructed as required by Ordinance and the Public Works
Department.