Loading...
HomeMy WebLinkAboutPA2022-033_20230316_Resolution_ZA2023-011Community Development Department CITY OF NEWPORT BEACH 100 Civic Center Drive Newport Beach, California 92660 949 644-3200 newportbeachca.gov/communitydevelopment VIA EMAIL March 16, 2023 Jacquelyn Gentes 11150 West Olympic Boulevard Los Angeles, CA 90064 Subject: Coastal Development Permit (PA2022-033) 408 Via Lido Nord Boone Residence Dear Ms. Gentes, It was a pleasure working with you on the above referenced application. Please be advised that the subject application was approved by the Zoning Administrator on March 16, 2023 and is now within the required City appeal period until March 30, 2023. If no appeals are filed with the City, a Notice of Final Action will be mailed to the California Coastal Commission. Upon receipt of the notice by the Coastal Commission, the action will be subject to an additional 10-working-day appeal period. You may track status of the Coastal Commission appeal period via the following link: Statewide Appealable Projects PDF At the conclusion of both appeal periods, a building permit may be issued for the project. A copy of the approved resolution with findings and conditions is attached. If you have any questions, please do not hesitate to contact me directly. Thank you and I look forward to working with you again in the future. Sincerely, David Lee, Senior Planner BMZ/dl 01-10-2023 RESOLUTION NO. ZA2023-011 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING A COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE AND ATTACHED TWO (2)-CAR GARAGE LOCATED AT 408 VIA LIDO NORD (PA2022-033) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Jacquelyn Gentes (Applicant) concerning property located at 408 Via Lido Nord requesting approval of a coastal development permit. The property is legally described as Lot 477 and the northwesterly 15 feet of Lot 478 of Tract 907, excepting therefrom the northwesterly 10 feet of Lot 477 (Property). 2. The Applicant requests a coastal development permit to demolish an existing single-family residence and construct a new 3,422-square-foot, two (2)-story, single-family residence with a 500-square-foot two (2)-car garage. The project also includes additional appurtenances such as site walls, fences, patios, drainage devices, and landscaping. A modification to the existing seawall is proposed. The design complies with all applicable development standards, including height, setbacks, and floor area limit; no deviations are requested (Project). 3. The Property is designated Multiple Residential (RM) by the General Plan Land Use Element and is located within the Multiple Residential (RM) Zoning District. 4. The Property is located within the coastal zone. The Coastal Land Use Plan category is Multiple Unit Residential (RM-E) – (30.0 – 39.9 DU/AC) and it is located within the RM (Multiple Residential) Coastal Zoning District. 5. The proposed project is located within the City of Newport Beach Permit Jurisdiction pursuant to the Post LCP Certification Permit and Appeal Jurisdiction Map (“Map”) and is within the Appeal Area of the California Coastal Commission. Pursuant to the Map, the California Coastal Commission retains jurisdiction within tidelands, submerged lands, and lands that are subject to the public trust or were subject to the public trust at any time. The existing seawall is adjacent to a public walkway, but not located within tidelands or lands that are subject to the public trust or were subject to the public trust at any time. The existing seawall is contained entirely within private property and all alterations would be conducted without the use of mechanized equipment on the water or sand. Additionally, the project is located outside of submerged lands, which is defined as the lands that lie below the line of mean low tide (from California Code of Regulations Section 13577). Therefore, the project is under the permit jurisdiction of the City of Newport Beach. Zoning Administrator Resolution No. ZA2023-011 Page 2 of 10 01-10-2023 6. A public hearing was held on March 16, 2023, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This Project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition of up to three (3) single-family residences and additions of up to 10,000 square feet to existing structures. The Project consists of the demolition of one (1) single-family residence and the construction of a new 3,501-square-foot single-family dwelling and an attached 500-square-foot two (2)-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 of the CEQA Guidelines are not applicable. The Project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015 (Coastal Development Permits, Findings, and Decision) of the NBMC, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 4,363 square feet. The Project includes 3,422 square feet of livable area and an attached 500-square-foot two (2)-car garage. The Multiple Residential (RM) zoning category excludes 200 square feet from the total gross floor area per required parking space devoted to enclosed parking. Therefore, the gross floor area is 3,522 square feet and complies with the maximum floor area limitation. b. The proposed development provides the minimum required setbacks, which are 4 feet along the front property line abutting Via Lido Nord and 3 feet along each side Zoning Administrator Resolution No. ZA2023-011 Page 3 of 10 01-10-2023 property line. There is no required setback along the front property line abutting the shore. c. The highest two (2)-story roofline is no more than 24 feet from the established grade level of 11.45 feet based on the North American Vertical Datum of 1988 (NAVD 88), which complies with the maximum height limitation. d. The Project includes enclosed garage parking for two (2) vehicles, which complies with the minimum two (2)-car parking requirement for single-family residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two (2)-story, single- and multi- family residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. 3. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by PMA Consulting, Inc. dated January 27, 2022, for the Project. The current maximum bay water elevation is 7.7 NAVD 88. The report analyzes future sea level rise scenarios assuming a 3.05-foot increase in the maximum water level over the next 75 years (i.e., the life of the structure). Therefore, the sea level is estimated to reach approximately 10.75 feet NAVD 88 (the likely range for sea level rise over the 75-year design life of the structure based on low-risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). 4. On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any bulkhead structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet NAVD 88 with a design for adaptability elevation of 14.4 feet NAVD 88. The existing seawall elevation is 12.8 feet NAVD 88 and is adaptable to 14.4 feet NAVD 88. The Project includes the alteration of the existing seawall, which includes removing a portion of the seawall to provide a private walkway that leads to the shore. The stairs of the walkway are located on private property and the top of concrete deck is 11.04 feet NAVD 88. Both the existing retaining wall and new concrete deck are above the minimum 10.9 feet NAVD 88 required. The Coastal Hazard Report concludes that the seawall, as altered, will not require additional shoreline protective devices as the existing wall is adequate and can be raised to 14.4 feet NAVD 88, making the Project safe from flooding hazards for the next 75 years. 5. The finish floor elevation of the proposed single-family residence is 11.4 feet NAVD 88, which complies with the minimum 9.0-foot NAVD 88 elevation standard. 6. Under NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to agree with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). This requirement is included as a condition of approval that will need to be satisfied before the final building permit inspection. 7. The property owner will be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, Zoning Administrator Resolution No. ZA2023-011 Page 4 of 10 01-10-2023 consistent with NBMC Section 21.30.015(D)(3)(c) – (General Site Planning and Development Standards). This requirement is included as a condition of approval that will need to be satisfied before the issuance of building permits. 8. The Property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. 9. The Property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The Project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 10. Under Section 21.35.050 (Water Quality and Hydrology Plan) of the NBMC, due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Management Plan (WQMP) is required. A preliminary WQMP has been prepared for the Project by Forkert Engineering and Surveying, Inc., dated December 10, 2021. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQMP before building permit issuance. 11. The Project design addresses water quality with a construction erosion control plan and a post-construction drainage system that includes drainage and percolation features designed to retain dry weather runoff and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 12. The Property is not located adjacent to a coastal view road, public access way, or coastal viewpoint as identified in the Coastal Land Use Plan (CLUP). The nearest coastal viewpoint identified by the CLUP is a small park on the street end of Via Genoa, which is approximately 110 feet east of the Property. As currently developed, the Property and other residences along Via Lido Nord are visible from the channel and within the view shed of the park. However, the proposed single-family residence complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Additionally, the Project does not contain any unique features that could degrade the visual quality of the coastal zone. Finding: Zoning Administrator Resolution No. ZA2023-011 Page 5 of 10 01-10-2023 B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The Property is located between the nearest public road and the sea or shoreline. Section 21.30A.040 (Determination of Public Access/Recreation Impacts) of the NBMC requires that the provision of public access bear a reasonable relationship between the requirement and the Project’s impact and be proportional to the impact. As identified in the CLUP, a small park on the street end of Via Genoa is a public beach access point and is located approximately 110 feet east of the Property. In this case, the Project replaces an existing single-family residence located on an RM lot with a new single-family residence. Therefore, the Project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the Project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical access to the bay exists throughout Lido Isle, with the closest vertical access point located at the street end of Via Genoa. Additionally, lateral access is available on the walkway and small beach in front of the site. The Project only involves work on private property and does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment and the exceptions to the Class 3 exemption do not apply. 2. The Zoning Administrator of the City of Newport Beach hereby approves the Coastal Development Permit, subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. Zoning Administrator Resolution No. ZA2023-011 Page 6 of 10 01-10-2023 PASSED, APPROVED, AND ADOPTED THIS 16TH DAY OF MARCH, 2023. Zoning Administrator Resolution No. ZA2023-011 Page 7 of 10 01-10-2023 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Before the final building permit inspection, the alteration of the existing seawall shall be constructed to a minimum elevation of 12.8 feet NAVD 88 with the capability to be raised up to 14.4 feet NAVD 88, in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. 3. Before the final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 4. Before issuance of building permits, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the development. This letter shall be scanned into the plan set before building permit issuance. 5. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 6. This Coastal Development Permit does not authorize any development seaward of the private property. 7. All construction activities shall occur within private property and the use of mechanized equipment is prohibited within the Bay and public property. 8. This approval does not authorize any new or existing improvements (including landscaping) on California Coastal Permit Jurisdiction, State tidelands, public beaches, Zoning Administrator Resolution No. ZA2023-011 Page 8 of 10 01-10-2023 or the public right-of-way. Any improvements located on tidelands, submerged lands, and/or lands that may be subject to the public trust shall require a coastal development permit (CDP) approved by the California Coastal Commission (Coastal Commission). 9. The Applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 10. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 11. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 12. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 13. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 14. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 15. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. Zoning Administrator Resolution No. ZA2023-011 Page 9 of 10 01-10-2023 16. The Applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 17. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained are detrimental to the public health, and welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained to constitute a public nuisance. 18. Before issuance of building permits, the Applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 19. Before issuance of building permits, the Applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 20. Before issuance of building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 21. Before issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. The implementation shall comply with the approved WQHP/WQMP and any changes could require separate review and approval by the Building Division. 22. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 23. Construction activities shall comply with Section 10.28.040 (Construction Activity— Noise Regulations) of the NBMC, which restricts hours of noise-generating construction activities that produce noise between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays, or Holidays. 24. Before the issuance of building permits, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 25. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 26. This Coastal Development Permit shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the NBMC unless an extension is otherwise granted. Zoning Administrator Resolution No. ZA2023-011 Page 10 of 10 01-10-2023 27. To the fullest extent permitted by law, the Applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Boone Residence, including, but not limited to the Coastal Development Permit (PA2022-033). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the Applicant, City, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The Applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition.