Loading...
HomeMy WebLinkAboutAIC2020003 - PlansGENERAL REQUIREMENTS 1. CONSTRUCTION SHALL BE IN CONFORMITY WITH THE 2019 EDITION OF THE CALIFORNIA BUILDING CODE (CBC) AND ALL APPLICABLE LOCAL AND STATE CODES AND ORDINANCES. 2. SITE INSPECTION: THE CONTRACTOR SHALL EXAMINE THE PROJECT SITE & SHALL VERIFY ALL DIMENSIONS, LOCATIONS & ELEVATIONS OF THE EXISTING CONSTRUCTION. THE CONTRACTOR SHALL ALSO DILIGENTLY INVESTIGATE THE SITE FOR THE POSSIBLE EXISTENCE &LOCATION OF UNDERGROUND UTILITIES, PRIOR TO ORDERING ANY MATERIAL AND/OR COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO "PMA CONSULTING, INC." HEREINAFTER CALLED "THE ENGINEER". 3. CONTRACTOR SHALL PROVIDE BARRICADES AND PEDESTRIAN PROTECTION AS REQUIRED BY STATE AND LOCAL CODES. 4. CONTRACTOR SHALL CONSULT WITH REPRESENTATIVES OF CITY AND UTILITY COMPANIES CONCERNING AVAILABLE FACILITIES BEFORE COMMENCING WORK OR CONNECTING TO SEWER, PIPING OR WIRING, ETC., AND REPORT ANY PROBLEMS TO THE ENGINEER. 5. CONTRACTOR SHALL FULLY PROTECT ALL ADJACENT PROPERTIES BEFORE COMMENCING ANY WORK. 6. OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, NOTES AND DETAILS SHALL BE ENGINEER BROUGHT TO THE ATTENTION OF THE ENG G I AND RESOLVED BEFORE PROCEEDING WITH THE WORK. 7. CONTRACTOR SHALL INSTALL TEMPORARY TOILETS BEFORE START OF JOB. 8, NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES. 9. TYPICAL DETAILS SHOWN SHALL APPLY WHERE NO SPECIAL DETAIL IS SHOWN. WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION, OR A NOTE IS SHOWN FOR ONE CONDITION, IT SHALL ALSO APPLY FOR ALL LIKE OR SIMILAR CONDITIONS UNLESS NOTED OTHERWISE. 10. DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS. DETAILED DRAWINGS AND SPECIFICATIONS TAKE PRECEDENCE OVER GENERAL DRAWINGS AND SPECIFICATIONS. 11. WRITTEN DIMENSIONS (NOT SCALED DIMENSIONS) SHALL BE USED. 12. TEMPORARY ERECTION BRACING AND SHORING SHALL BE PROVIDED AS REQUIRED ON ALL STRUCTURES, ADEQUATE TO PROVIDE FULL STRUCTURAL STABILITY AND SAFETY. BRACING SHALL NOT BE REMOVED UNTIL THE ELEMENTS ARE FULLY CONNECTED AND ARE CAPABLE OF SUPPORTING THE DESIGN LOADING. 13. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 14. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION NOT TO UNDERMINE ANY ADJACENT STRUCTURE N. DURING THE COURSE OF CONSTRUCTION. I R 0 15. CLEAN UP: NO PAINT PLASTER CEMENT, SOIL MORTAR OR OTHER RESIDUE E SHALL BE ALLOWED TO ENTER THE BAY, STREETS, GUTTERS OR STORM DRAINS. ALL MATERIALS & WASTE SHALL BE REMOVED FROM THE SITE, NBMC 17.32.020. 16. DEMOLITION: AL T L MATERIAL FROM THE EXISTING BULKHEAD THAT IS NOT USED AS FILL SHALL BE REMOVED FROM THE SITE & DISPOSED OF IN AN OFFICIAL DUMP SITE. 17. SEE THE LATEST "GENERAL GRADING SPECIFICATIONS" OF THE BUILDING DEPARTMENT FOR THE CITY'S: GENERAL NOTES, EROSION CONTROLS, REQUIRED INSPECTIONS, GRADING FILLS/CUTS & ALL NECESSARY DOCUMENTATION. 18. POOLS, SPAS, FENCES, PATIO COVERS AND OTHER FREESTANDING STRUCTURES REQUIRE SEPARATE REVIEWS AND PERMITS. 19. ALL A.S.T.M. SPECIFICATIONS NOTED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH THE LATEST ISSUE OF THE A.S.T.M. 20. OBSERVATION VISITS TO THE PROJECT SITE BY THE ENGINEER SHALL NOT BE CONSTRUED AS ANY INSPECTION AS REQUIRED BY CODE. FOUNDATIONS 1. THE CONTRACTOR SHALL ESTABLISH ALL CONSTRUCTION LINES AND PROCEED WITH THE EXCAVATION OF ALL FOOTINGS AS CALLED FOR ON THE DRAWINGS. 2. FOOTINGS SHALL BEAR ON NATURAL UNDISTURBED UNIFORM EARTH OR ENGINEERED COMPACTED FILL. 3 NO REINFORCING STEEL AND NO CONCRETE SHALL BE PLACED IN ANY EXCAVATION PRIOR TO APPROVAL BY THE BUILDING DEPARTMENT. 4. THE TOP OF ALL EXCAVATIONS SHALL BE PROTECTED AGAINST HEAVY SURCHARGE LOADS AND FROM EROSION DUE TO RAINFALL OR SURFACE RUN-OFF DURING THE ENTIRE CONSTRUCTION PERIOD. 5. THE SOILS REPORT DESCRIBED UNDER ITEM No.7 BELOW SHALL BE A PART OF THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN THE SOILS REPORT AND COMPLY WITH ALL RECOMMENDATIONS THEREIN. 6. PAD PREPARATION SHALL BE IN ACCORDANCE WITH THE SOILS REPORT. THE PAD SHALL BE INSPECTED AND APPROVED BY THE SOILS ENGINEER PRIOR TO PLACING ANY CONCRETE. THE PAD SHALL BE KEPT MOIST PRIOR TO THE PLACING OF CONCRETE. 7. FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS CONTAINED IN THE SOILS REPORT ON FILE WITH THE BUILDING DEPARTMENT. SOILS REPORT PREPARED BY EGA CONSULTANTS LLC 375-C MONTE VISTA AVENUE ADDRESS COSTA MESA, CA 92627 PHONE NUMBER.................................................................................. (949) 642-9309 SOILS REPORT DATE................................................................................... 04/23/2019 SOILS REPORT PROJECT NUMBER............................................................... BS173.1 GRADING NOTES 1. THE ANTICIPATED TOTAL VOLUME OF CUT AND FILL FOR SEAWALL CONSTRUCTION ON THIS PROJECT WILL BE LASS THAN 50 CUBIC YARDS. THUS, GRADING PERMIT IS NOT REQUIRED. 2. WHEN A GRADING PERMIT & PLANS ARE REQUIRED, IF NO GRADING IS ADDRESSED ON THE PLANS - SEE THE CIVIL & ARCHITECTURAL PLANS FOR THE FINISH GRADING ON THE SHORE SIDE OF THE BULKHEAD. 3. A PRE -GRADING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF GRADING WITH THE FOLLOWING PEOPLE PRESENT:OWNER, GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, SOILS ENGINEER, GEOLOGIST, CITY GRADING ENGINEER OR THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED AT THE MEETING. 4. A PRE -PAVING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF GRADING WITH THE FOLLOWING PEOPLE PRESENT:OWNER, GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, SOILS ENGINEER, GEOLOGIST, CITY GRADING ENGINEER OR THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED AT THE MEETING. 5. THE PROJECT GEOTECHNICAL ENGINEER SHALL INSPECT & APPROVE ALL AREAS PRIOR THE THE PLACEMENT OF ANY FILL. 6. ALL FILLS SHALL BE INSPECTED, TESTED & APPROVED BY THE GEOTECHNICAL ENGINEER VERIFYING MINIMUM OF 90% REQUIRED RELATIVE COMPACTION AS WELL AS STABILITY. 7. ALL EXCAVATIONS FOR ANCHORS SHALL BE INSPECTED & APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE, 8. TEMPORARY EROSION CONTROL PLANS ARE REQUIRED FROM OCTOBER 15 TO MAY 15. 9. EROSION CONTROL DEVICES SHALL BE AVAILABLE ON -SITE BETWEEN OCTOBER 15 AND MAY 15. 10. BETWEEN OCTOBER 15 AND MAY 15, EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE FIVE-DAY PROBABILITY OF RAIN EXCEEDS 30 PERCENT, DURING THE REMAINDER OF THE YEAR, THEY SHALL BE IN PLACE AT THE END OF THE WORKING DAY, WHENEVER THE DAILY RAINFALL PROBABILITY EXCEEDS 50 PERCENT. SEE DETAILS N & T ON SHEET SW-2. 11. LANDSCAPING PLANS SHALL BE SUBMITTED FOR APPROVAL, WORK COMPLETED AND A CERTIFICATE OF CONFORMANCE RECEIVED BY THE CITY GRADING ENGINEER PRIOR TO CLOSURE OF PERMIT, UNLESS WAIVED BY THE CITY GRADING ENGINEER. 12. TEMPORARY DESILTING BASINS, WHEN REQUIRED, SHALL BE INSTALLED AND MAINTAINED FOR THE DURATION OF THE PROJECT. 13. DATUM: ALL ELEVATIONS ARE BASED ON MLLW OR NAVD88 DATUM. STRUCTURAL GENERAL NOTES BACKFILLING & COMPACTION NOTES 1. ALL BACKFILL SHALL CONFORM TO THE SOILS ENGINEER'S REPORT AND RECOMMENDATIONS. 2. UTILITY TRENCH BACKFILL AND ANY OTHER BACKFILL MUST BE MECHANICALLY COMPACTED. JETTING AND FLOODING SHALL NOT BE PERMITTED. 3, WHERE WALLS ARE BACKFILLED ON ONE SIDE ONLY PROVIDE SHORING OR OTHER APPROVED MEANS OF LATERAL SUPPORT UNTIL RESISTING ELEMENTS ARE ALL IN PLACE AND HAVE ATTAINED THEIR REQUIRED STRENGTHS. RESISTING ELEMENTS SHALL BE CONCRETE SLABS OR OTHER PERMANENT BUILDING COMPONENTS. 4. UNLESS NOTED OTHERWISE IN THE SOILS REPORT, ALL FILLS SHALL BE COMPACTED TO A MINIMUM OF 90% OF MAXIMUM DENSITY IN ACCORDANCE WITH THE REQUIREMENTS OF THE CBC APPENDIX SECTION 3313. 5. FILTER CLOTH SHALL BE MIRAFI 14ON-SERIES NONWOVEN POLYPROPYLENE GEOTEXTILE AS MANUFACTURED BY " TC MIRAFI COMPANY" AND SHALL BE MINIMUM 2.0' WIDE AND BE PLACED ON THE INSIDE FACE OF THE BULKHEAD EXTENDED FROM EQUALLY THE Q M JOINT TO (2.0') BELOW THE FINAL MUDLINE FOR THE ENTIRE HEIGHT OF THE BULKHEAD. 6. COMPACTION REPORT MUST BE SUBMITTED TO AND BE APPROVED BY THE BUILDING DEPARTMENT BEFORE FOUNDATION INSPECTION. 7. A FINAL SOIL REPORT OF COMPACTION & APPROVAL SHALL BE PREPARED BY THE PROJECT GEOTECHNICAL ENGINEER & SUBMITTED FOR BUILDING DEPARTMENT REVIEW AT THE COMPLETION OF THE PROJECT. 8. COMPACT SOIL TO THE REQUIRED RELATIVE DENSITIES PER ASTM 155-91. DO NOT USE HEAVY COMPACTION EQUIPMENT WITHIN 20 FEET OF THE BULKHEAD. 9. ON SITE BROKEN CONCRETE & AC PAVING MAY BE USED AS FILL PROVIDED IT DOES NOT EXCEED 6 INCHES IN SIZE & I STACKED, LAYERED OR B N IS KED PLACED ABOVE ELEVATION +7,0' & IS APPROVED BY THE GEOTECHNICAL ENGINEER. CONCLUSIONS AND REOMMENDATIONS - PER SOILS REPORTi FROM A SOILS ENGINEERING AND ENGINEERING GEOLOGIC POINT OF VIEW, THE SUBJECT PROPERTY IS CONSIDERED SUITABLE FOR THE PROPOSED CONSTRUCTION PROVIDED THE CONCLUSIONS AND RECOMMENDATIONS IN THE SUPPLEMENTAL GEOTECHNICAL REPORT ARE INCORPORATED INTO THE DESIGN AND PROJECT SPECIFICATIONS. SOLID SAWN MEMBERS AND GLU-LAM BEAMS 1. ALL WOOD -CONSTRUCTION FINGERS SHALL HAVE FRAMING THAT INCLUDES CROSS -MEMBERS THAT PROVIDE RIGID CONNECTION TO THE FULL-LENGTH STRINGERS. ALL CONNECTIONS SHALL BE MADE USING THRU-BOLTS. A) COMMERCIAL DOCK FRAMING: FOR INDEPENDENT LONG DOCKS THAT FLOAT FREELY AND DO NOT HAVE DOCKS AND/OR FINGERS ATTACHED FOR STABILITY, ALL PRIMARY LOAD CARRYING FRAMING MEMBERS SHALL BE FABRICATED FROM GLUED -LAMINATED BEAM CONSTRUCTION, TO PREVENT WARPAGE OF THE MAJOR MEMBERS, CONTRIBUTING TO DOCK INSTABILITY. 2. ALLOWABLE STRESSES FOR HARBOR STRUCTURES SHALL NOT EXCEED THOSE STATED IN THE "CALIFORNIA BUILDING CODE". 3. TIMBER USED FOR WALKING DECKS SHALL HAVE A MINIMUM NET THICKNESS OF 1x INCHES. 4. TIMBER FOR WALKING SURFACES SHALL BE DOUGLAS FIR, SELECT STRUCTURAL. SAWN TIMBER FOR OTHER FRAMING MEMBERS SHALL BE DOUGLASS FIR, No.1 MINIMUM. 5. GLUED -LAMINATED TIMBER SHALL BE DOUGLASS FIR 24F-V8, INDUSTRIAL GRADE FOR APPLICATION IN WET ENVIRONMENT. FABRICATION SHALL COMPLY WITH PRODUCT STANDARD PS 56-73, "STRUCTURAL GLUED LAMINATED TIMBER". 6. WALKING SURFACES SHALL HAVE A NON-SKID FINISH AND BE MAINTAINED PERIODICALLY OR WHEN WORN AND UNSAFE. TREATED TIMBER DECKING REQUIRES NO FURTHER NON-SKID FINISH. 7. DIMENSIONAL LUMBER IS NOT REQUIRED TO BE PAINTED. HOWEVER, IF THE APPLICANT CHOOSES TO PAINT, SUCH PAINT SHALL BE MAINTAINED TO GOOD CONDITION AND APPEARANCE. 8. PLYWOOD UTILIZED WITHIN DOCK FRAMING SYSTEM SHALL BE EXTERIOR GRADE MATERIAL. PLYWOOD SHALL NOT BE USED AS THE WALKING SURFACE FOR A DOCK SYSTEM, UNLESS THE PRODUCT CAN BE DEMONSTRATED TO THE CITY OF NEWPORT BEACH BUILDING DEPARTMENT THAT IS PROVIDED WITH A FACTORY -APPLIED PROTECTIVE, NON-SKID WALKING SURFACE THAT WILL BE DURABLE AND HAS A PROVEN PROCESS FOR PATCHING AND TOUCH-UP. INTERNAL PLYWOOD MEMBERS SHALL BE PROVIDED IN SUCH A MANNER THAT WATER CAN BE EASILY CONVEYED OFF THE TOP SURFACE OF THE PLYWOOD AND NOT POND OR GET TRAPPED, LEADING TO EARLY DETERIORATION AND DRY ROT. 9. WEIGHT OF TREATED DOUGLAS FIR SHALL BE ASSUMED TO BE 35 POUNDS PER CUBIC FOOT.. 10. ALL TIMBER SHALL BE MARKED WITH THE APPROPRIATE GRADE OF MATERIAL AND PRESERVATIVE TREATMENT, OR MAY BE SUBJECT TO REJECTION BY THE CITY INSPECTOR. 11. WOOD PRESERVATIVE FOR TIMBER: A) ALL TIMBER PRODUCTS SHALL BE COATED WITH PRESERVATIVE TREATMENT TO RETENTION LIMITS RECOMMENDED BY THE AMERICAN WOOD PRESERVERS ASSOCIATION STANDARD M4 "STANDARD FOR THE CARE OF PRESERVATIVE -TREATED WOOD PRODUCTS" AND AWPA STANDARD C2 "LUMBER, TIMBER, BRIDGE TIES & MINE TIES - PRESERVATIVE TREATMENT BY PRESSURE PROCESSES". B) CURRENT STATE AND FEDERAL ENVIRONMENTAL REQUIREMENTS AND GUIDELINES FOR THE TYPE AND APPLICATION OF PRESERVATIVE TREATMENTS WILL BE STRICTLY ENFORCED. C) ALL LUMBER MUST BEAR A STAMP BY THE AMERICAN LUMBER STANDARDS COMMITTEE FOR CONFORMANCE TO THE AMERICAN PRESERVERS ASSOCIATION STANDARDS. D FIELD CUTS AND BORED SHALL RECEIVE FIELD -APPLIED PRESERVATIVE TREATMENT IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. PRESERVATIVE TREATMENT CHEMICALS SHALL NOT BE ALLOWED TO ENTER HARBOR WATERS. 12. ALL BOLT HOLES IN WOOD MEMBERS SHALL BE A MINIMUM OF TO A MAXIMUM �32II OF Y16" LARGER THAN THE BOLT DIAMETER. WOOD MEMBERS WITH HOLES NOT MEETING THE ABOVE CRITERIA SHALL BE REMOVED AND REPLACED. STEEL 1. STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO A.S.T.M. A572 GRADE 50 OR A992 WITH Fy = 50 KSI. 2. STEEL PIPE COLUMNS AND OTHER STEEL PIPE STRUCTURAL MEMBERS SHALL CONFORM TO A.S.T.M. A53, GRADE B. 3. STRUCTURAL STEEL TUBING SHALL CONFORM TO A.S.T.M. A500, GRADE B, Fy = 46 KSI. 4. BOLTS SHALL CONFORM TO A.S.T.M. A307, UNLESS NOTED OTHERWISE. WHERE HIGH STRENGTH (H.S.) BOLTS ARE SPECIFIED, THEY SHALL BE MINIMUM -%" DIAMETER AND CONFORM TO A.S.T.M. A325 SC CLASS A UNLESS NOTED OTHERWISE ON THE PLANS. THE INSTALLATION OF H.S. BOLTS SHALL BE INSPECTED BY A REGISTERED DEPUTY INSPECTOR APPROVED BY THE BUILDING DEPARTMENT. 5. ALL BOLTS HOLES IN STEEL MEMBERS SHALL BE STANDARD HOLES, U.N.O. 6. STRUCTURAL STEEL "NELSON" STUDS SHALL BE MANUFACTURED FROM C1015, C1017 AND C1020 COLD DRAWN STEEL CONFORMING TO A.S.T.M. A108-58T. 7. LIGHT GAUGE STEEL MEMBERS SHALL CONFORM TO A.S.T.M. STANDARDS AS FOLLOWS: A) FOR 18 GA. THICK AND LIGHTER STEEL : A446, GRADE A (GALVANIZED) OR A570, GRADE 33 OR A611, GRADE C - ALL HAVING MINIMUM OF 33 KSI YIELD STRENGTH. B) FOR 16 GA. THICK AND HEAVIER STEEL : A446, GRADE D (GALVANIZED) OR A570, GRADE 50 OR A607, GRADE 50 - ALL HAVING MINIMUM OF 50 KSI YIELD STRENGTH. 8. FABRICATION AND ERECTION SHALL CONFORM TO THE 14th EDITION OF A.I.S.C. SPECIFICATIONS, 9. ALL HOLES FOR BOLTS IN STRUCTURAL STEEL SHALL BE DRILLED OR PUNCHED. BURNING OF HOLES SHALL NOT BE PERMITTED. 10, ALL STEEL SHALL BE STAINLESS, HOT DIP GALVANIZED OR EPDXY COATED. WELDING 1. ALL WELDING SHALL BE DONE USING THE SHIELDED ELECTRIC ARC PROCESS BY CERTIFIED WELDERS, USING E70XX ELECTRODES. 2. WELDING OF STEEL REINFORCING BARS SHALL BE DONE WITH LOW HYDROGEN ELECTRODES, A233, CLASS E70XX SERIES. 3. WELDS REQUIRING CONTINUOUS OR PERIODIC SPECIAL INSPECTION NEED NOT HAVE SPECIAL INSPECTION WHEN WELDING IS DONE IN AN APPROVED FABRICATOR'S SHOP, HOWEVER, THE APPROVED FABRICATOR MUST SUBMIT A CERTIFICATE OF COMPLIANCE IN ACCORDANCE WITH THE SECTION 1704.2.2 OF THE CBC. 4. SPECIAL INSPECTION IS REQUIRED FOR ALL FIELD WELDINGS. CONCRETE 1. ALL CONCRETE MIX DESIGNS, CONFORMING TO CBC CHAPTER 19, SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL BEFORE ANY CONCRETE IS PLACED. ALL CONCRETE MIXES SHALL HAVE A MINIMUM CEMENT CONTENT OF 6.0 SACKS OF CEMENT PER CUBIC YARD OF MIX. ALL CONCRETE MIXES SHALL BE CERTIFIED BY A CONCRETE TESTING LABORATORY AND SIGNED BY A CALIFORNIA REGISTERED CIVIL ENGINEER. 2. CONCRETE SHALL HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 5000 PSI AND A 0.40 WATER -TO -CEMENT RATIO. 3. CONCRETE GROUT SHALL HAVE THE SAME COMPRESSIVE STRENGTH AS THE OTHER CONCRETE AND SHALL BE A SUITABLE MIX CONSISTING OF PEA GRAVEL, SAND, CEMENT AND WATER. MAXIMUM SLUMP SHALL BE 5 INCHES. AN APPROVED SUPERPLASTICIZING ADMIXTURE MAY BE ADDED TO INCREASE THE SLUMP TO MAXIMUM 7.5 INCHES. GROUT UNDER STEEL COLUMN BASE PLATES SHALL BE "RAPID -SET" OR "FIVE STAR GROUT" OR APPROVED EQUAL. 4. CONCRETE SHALL BE DESIGNED FOR PERMEABILITY, STRENGTH, CHEMICAL STABILITY AND ABRASION RESISTANCE, APPROPRIATE FOR ITS APPLICATION. PORTLAND CEMENT SHALL CONFORM TO ASTM C 150 TYPE I OR TYPE II MODIFIED, AND LOW ALKALI. CHEMICAL ADMIXTURES SHALL CONFORM TO ASTM C 494. CHEMICALS DESIGNED TO LIMIT CORROSION OF INTERNAL REINFORCING MAY BE USED. AIR ENTRAINMENT ADMIXTURES SHALL CONFORM TO ASTM C 260. COARSE AND FINE AGGREGATE SHALL CONFORM TO ASTM C 33, AND ASTM C 330 WHERE LIGHTWEIGHT AGGREGATES ARE USED. LIGHTWEIGHT AGGREGATE, IF USED, SHALL CONSIST OF EXPANDED AND COATED SHALE OR EQUIVALENT MATERIAL OF SUFFICIENT STRENGTH AND DURABILITY TO PROVIDE CONCRETE OF THE REQUIRED STRENGTH. 5. CONCRETE TEST SAMPLES SHALL BE TAKEN IN ACCORDANCE WITH A.S.T.M. AND CBC STANDARDS. RESULTS OF THE 7 & 28 DAY TESTS SHALL BE SUBMITTED TO THE ENGINEER FOR HIS RECORDS. SLUMP TESTS ARE REQUIRED FOR ALL TEST SAMPLES AND MUST ALSO BE REPORTED. ADDITIONALLY, ALL LIGHT WEIGHT CONCRETE SAMPLES MUST HAVE THEIR IN -PLACE DENSITIES DETERMINED AND REPORTED. 6. SIDES OF FOOTING PADS MAY BE POURED AGAINST STABLE EARTH. 7. SLURRY CONCRETE, WHERE SPECIFIED OR USED, SHALL HAVE A MINIMUM CEMENT CONTENT OF 1.5 SACKS OF CEMENT PER CUBIC YARD OF MIX. 8. SEE ARCHITECTURAL NOTES FOR COLORED OR TEXTURED CONCRETE. 9. CONCRETE FORM WORK TOLERANCES SHALL BE IN ACCORDANCE WITH CBC AND A.C.I. STANDARDS. 10. ALL STEEL REINFORCING, ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE SECURED IN POSITION AND INSPECTED BY THE LOCAL BUILDING DEPARTMENT INSPECTOR, PRIOR TO THE PLACING OF ANY CONCRETE. 11. ALL NECESSARY BRACES, STRONGBACKS, PICK-UP INSERTS, BOLTS, ETC., FOR PRECAST CONCRETE PANELS SHALL BE DESIGNED BY OTHERS FOR SAFE ERECTION OF THE PANELS. 12. NO CALCIUM CHLORIDE SHALL NOT BE USED IN ANY CONCRETE. 13. ALL CONCRETE TO BE CURED FOR A MINIMUM OF 3 DAYS BY A METHOD ACCEPTABLE TO THE ENGINEER. FORMS MAY BE STRIPPED ONLY AFTER THE CONCRETE HAS ATTAINED MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI. 14. CHAMFER EXPOSED CORNERS -'a" U.N.O. ABBREVIATIONS A.B. ............ ANCHOR BOLT DN .............. DOWN HT ............... HEIGHT OFF .............OFFICE T.F. TOP OF FOOTING A.C. ........... ASPHALT CONCRETE DP ................ DEEP H.S. ............. HIGH STRENGTH H H OPNG ...........OPENING T.B. ............. TOP OF BEAM ........... A/C ............ AIR CONDITIONING D.S. ............ DOWNSPOUT HVAC ........... HEATING/VENTILATING & OPP HD .......OPPOSITE HAND TG ............... TAPERED GIRDER A.C.P. ......... ASPHALT CONCRETE PAVING DWGS .......... DRAWINGS AIR CONDITIONING O.S.F. .......... OUTSIDE FACE T.G TOP OF GIRDER ADDL .......... ADDITIONAL E ............... EXISTING IN ................ INCH P.C. ............ PIPE COLUMN . THK ............. ......... .. THICK A.F.F. ......... ABOVE FININSH FLOOR EA ............... EACH INFO ..,......... INFORMATION PEN ............ PENETRATION THRU THROUGH ALUM .......... ALUMINUM E,F. ............. EACH FACE INT .............. INTERIOR PL ................ PLATE OR PROPERTY LINE T.L. ........... TOP OF LEDGER ALT """""" ALTERNATE ELEC ELECTRICAL J.B. """"""' JOIST BEARING PILAS .......... PILASTER T.N. ......... .. TOP OF NAILER ANOD ........ ANODIZED ELEV ............ ELEVATION J.G. ............. JOIST GIRDER PLYWD ......... PLYWOOD OF ARCHT ....... ARCHITECTURAL EMBED ........ EMBEDMENT, EMBEDDED JST ............. JOIST PSF ............. .0. POUNDS PER SQUARE FOOT T.O.P. ..............TOP .......... TOP OF PARAPET/PANEL B.B. ............ BOTTOM OF BEAM E.N. ............. EDGE NAILING JT ............. JOINT PSI ............. POUNDS PER SQUARE INCH T.O.S. TOP OF STEEL BET .............. BETWEEN EQ ............... EQUAL K.O. .............. KNOCK OUT P.T. ............. PRESERVATIVE TREATED ......... BLDG ............ BUILDING E.S. ............. EACH SIDE L ................. ANGLE R.D. ............. ROOF DRAIN TRANSF TRANSFER BLKG ........... BLOCKING E.W. ............. EACH WAY LAT ............. LATERAL REBAR ......... REINFORCING BAR ....... TRANSV ....... TRANSVERSE BM ............. BEAM EXIST ........... EXISTING LDR ............. LEDGER R.B. ............. ROOF BEAM TS TUBE STEEL B.N. ............ BOUNDARY NAILING EXP ............. EXPANSION LG ............... LONG REQD ........... REQUIRED ............... T.S. ............. TOP OF SLAB BOT ............. BOTTOM EXT ............. EXTERIOR LLH .............. LONG LEG HORIZONTAL REINF .......... REINFORCING T.W. TOP OF WALL B.W. ............ BOTTOM OF WALL F.D. ............ FLOOR DRAIN LLV .............. LONG LEG VERTICAL REF ............. REFERENCE TYP ............. ............. TYPICAL C ................. CHANNEL FDN ............. FOUNDATION LONGIT ........ LONGITUDINAL REV ............. REVISION U.N.O. .......... UNLESS NOTED OTHERWISE CANT .......... CANTILEVER F.F. .............. FINISH FLOOR L.P. ............. LOW POINT R.J. ............. ROOF JOIST VERT ........... VERTICAL C.G. ............... CENTER OF GRAVITY F.G. ............FINISH GRADE LT ............... LIGHT RM .............. ROOM V.I.F. ........... VERIFY IN FIELD C.J. ............... CONSTRUCTION JOINT OR FIN MATL .,........ MATERIAL R.O. ............. ROUGH OPENING W/ ,,,,,,,,,,,,,,,WITH CEILING JOIST ...............FINISH F.J. FLOOR JOIST MAX ............ MAXIMUM SCH ............. SCHEDULE WD ............. .WOOD CL ................. CENTER LINE .............. FLG M.B. ............ MACHINE BOLT SECT ........... SECTION W ..............., WIDE FLANGE CLG .............. CLR CEILING CLEAR ..............FLANGE FLR ..............FLOOR MATL .......... MATERIAL SHTG ........... SHEATHING W/0 •••••••• WITHOUT ............. C.M.U. ......... CONCRETE MASONRY UNIT F.O.C. .......... FACE OF CONCRETE MAX ............ MAXIMUM SHT ............. SIM SHEET SIMILAR W.P. ............... WORK POINT COL ....... COLUMN F.O.M. .......... FACE OF MASONRY M.B. MACHINE BOLT S.J. SAWCUT JOINT W,R. ............ WATER RESISTANT COMPO COMPOSITION F.O.S. •••••••••• FACE OF STUD MECH .......... MECHANICAL """""""' ••••••••••••••• WT WEIGHT ........ CONC CONCRETE F.N. ............. FIELD NAILING MEZZ .......... MEZZANINE S.P. ............... SPLICE POINT W.W.F. ..........WELDED WIRE FABRIC .......... CONN CONNECTION .......... F.S. ... FAR SIDE MFD ............. MANUFACTURED SPA ............... SPACING X ................. EXTRA STRONG .......... CONT CONTINUOUS FT FEET OR FOOT MFR ............. MANUFACTURER SPECS ......... SPECIFICATIONS XX ............... DOUBLE EXTRA STRONG .......... CONTT ,,,,,•„ CONSTRUCTION FTG ............. FOOTING MIN MISC .............. MINIMUM MISCELLANEOUS SQ ............... STAGG SQUARE STAGGERED CORR .......... CORRIDOR GALV ........... GA GALVANIZED GAUGE M.F.O. ............ .......... METAL FRAMED OPENING ........... STD ............... STANDARD CTR ............ DBL CENTER DOUBLE G.I. .............. GALVANIZED IRON MLB •• ••••••••• MICROLLAM BEAM STIFF '•""""' STIFFENER ............. DET DETAIL GLB ............. GLU-LAM BEAM M.P.H. .......... MILES PER HOUR STL ............. STEEL ............. DF DOUGLAS FIR GLP ............. GLU-LAM PURLIN MTL ............. METAL S.S. ............. SELECT STRUCTURAL SYMBOLS .............. D.F. """""" DRINKING FOUNTAIN GYP BD ......... GYPSUM BOARD (N) ............. NEW STRUCT ....... STRUCTURAL @ AT DIAG ........... DIAGONAL HDR .............HEADER N.I.C. ........... NOT IN CONTRACT SYM ............. T B SYMETRICAL TOP & BOTTOM .............. t CENTER LINE DIAPH DIAPHRAGM H ............. HANGER NO . ............. NUMBER & ......... .............. ......... DIA ............... DIAMETER HK. .............. HOOK N.S. ............. NELSON STUD OR NEAR SIDE T & G ......... TONGUE &GROVE 0 ............. DIAMETER DIM DIMENSION HORIZ .......... HORIZONTAL N.T.S. ...•...... NOT TO SCALE TEMP ........... TEMPERED It .............. PLATE OR PROPERTY LINE H.P. ............ . HIGH POINT O.C. ••••••••••••• ON CENTER .............. STEP IN FOOTING REINFORCING STEEL 1. FOR STRUCTURES EXPOSED TO SALT WATER SPLASH OR IMMERSION, REBAR REINFORCEMENT SHALL CONFORM TO AST MA 706 UNLESS NOTED OTHER WISE ON DETAILS, AND SHALL BE EPDXY COATED PER ASTM A 934, AFTER BENDING OF THE REBARS. WELDED WIRE MESH SHALL CONFORM TO ASTM A 185 AND SHALL BE EPDXY COATED CONFORMING TO ASTM A 884, WITH ALL VISIBLE DEFECTS AND CUT ENDS REPAIR COATED. WIR ES USED TO TIE REINFORCING STEEL SHALL BE EITHER EPDXY COATED STEEL OR A 316 STAINLESS L SS STEEL. 2. REINFORCEMENT MARKED CONTINUOUS MAY BE SPLICED B M Y LAPPING 42 BAR DIAMETERS IN CONCRETE AND 48 BAR DIAMETERS IN MASONRY WITH 24 N S INCH MINIMUM LAP IN EACH CASE, UNLESS NOTED OTHERWISE ON PLANS. ALL SPLICES WHEN DETAILED SHALL BE LOCATED WHERE SHOWN ON PLANS. 3. REINFORCING STEEL SHALL BE ACCURATELY PLACED AND SECURED IN POSITION WITH METAL OR CONCRETE BLOCKS, CHAIRS, SPACERS, ETC., AND WIRE TIES BEFORE PLACING ANY CONCRETE. 4. ADDITIONAL REINFORCING REQUIRED FOR ERECTION OF PRECAST CONCRETE PANELS SHALL BE ADDED PER THE CONTRACTOR'S DETAILS. 5. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE. A) CONCRETE BELOW GRADE OR IN CONTACT WITH SOIL: WHEN CAST AGAINST EARTH 3", WHEN FORMED 2". B) WALLS ABOVE GRADE: EXTERIOR FACE %", INTERIOR FACE 1". C) PRECAST CONCRETE ELEMENTS: AS DETAILED. D) CONCRETE SLAB ON GRADE: REINFORCING STEEL AT CENTER OF SLAB, UNLESS NOTED OTHERWISE. 6. REINFORCEMENT DETAILING SHALL BE IN ACCORDANCE WITH CBC SECTION 1907. 7. ALL TIE WIRES SHALL BE MINIMUM 16 GAUGE BLACK , ANNEALED, CONFORMING TO A.S.T.M. A82. 8. ALL REINFORCING BARS SHALL BE FREE OF RUST, GREASE OR OTHER MATERIAL LIKELY TO IMPAIR BONDING. 9. ALL BENDS IN REINFORCING SHALL BE COLD BENDS. NAILING AND FASTENERS ALL NAILS AND FASTENERS SHALL BE CORROSION RESISTANT MEETING ASTM A153 CLASS D HOT DIP GALVANIZED AND BE ACRYLIC ADHESIVE 0 THERMAL R MA PLASTIC RESIN LATEX ADHESIVE COATED. 1. ALL NAILS SHALL BE 16d (0.148" DIAMETER) HELICAL THREAD NAILS, WITH MINIMUM BENDING YIELD STRENGTH OF FYB = 90,000 PSI U.N.O. 2. NAILING OTHER THAN ROOF OR FLOOR DIAPHRAGM SHOWN ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH TABLE 2304.9.1 OF THE CBC. 3. NAILS FOR ROOF AND FLOOR SHEATHING SHALL HAVE A MIN OF %" PENETRATION INTO THE FRAMING MEMBERS. 4. ALL HARDWARE SHALL BE CORROSION -RESISTANT 0 C MPLYING WITH HDG G185 FINISH AND BE MANUFACTURED BY "SIMPSON STRONG -TIE CO., INC." (OR APPROVED EQUAL), AND SHALL HAVE A VALID ICC NUMBER ON THE PRODUCT. ANY DEVIATION FROM THE APPROVED PRODUCTS MUST BE APPROVED BY THE BUILDING DEPARTMENT, NOT BY THE FIELD INSPECTOR. 5. ALL HARDWARE SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. BLIND NAILING SHALL NOT BE ACCEPTABLE AND WILL BE REJECTED. 6. WHERE MECHANICAL OR ADHESIVE ANCHORS/DOWELS ARE INDICATED ON DRAWINGS: A MECHANICAL ANCHORS SHALL BE STAINLESS STEEL HILTI KWIK BOLT KB- TZ AND BE INSTALLED IN ACCORDANCE WITH ICC ESR-1917 B) ADHESIVE ANCHORS SHALL BE STAINLESS STEEL HILTI II HIT-HY 200 MAX-SD" ADHESIVE INSTALLED IN ACCORDANCE WITH ICC ESR-3187 OR STAINLESS STEEL SIMPSON STRONG -TIE '(SET-XP EPDXY" ADHESIVE INSTALLED IN ACCORDANCE WITH ICC ESR-2508. C) HOLES SHALL BE DRILLED WITH NON-REBAR-CUTTING DRILL BITS. D) CONTINUOUS INSPECTION IS REQUIRED FOR THE INSTALLATION OF THE ALL ANCHORS/DOWELS BY A REGISTERED SPECIAL INSPECTOR APPROVED BY THE BUILDING DEPARTMENT. THE INSPECTOR SHALL VERIFY THE INSTALLATION OF ANCHORS/DOWELS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS INCLUDING CLEANLINESS OF DRILL HOLES AND PROPER EMBEDMENT. E) UNLESS NOTED OTHERWISE ON THE DRAWINGS, USE MINIMUM %" DIAMETER AT 24" ON CENTER WITH A MINIMUM OF 5" EMBEDMENT. CITY OF NEWPORT BEACH �� APPROVAL IN CONCEPT NO. This project conforms to all applicable planning regulations and policies in effect on this date. These plans are not to be used for construction purposes. No building permit Wit be issued until approval is received from the California Coastal Commission. PLANNING DIVISION L Pla. 3/tk 2_o �►.1 a�,Q 6, A�sE.- �ate�---- -- - ZONING APPROVAL IN CONCEPT ONLY - THESE PLANS KAVEATOT BEEN O. I . i APPLICANT' GENERAL SPECIAL INSPECTIONS 1. PERIODIC (NON -CONTINUOUS) OR CONTINUOUS SPECIAL INSPECTION BY A CITY CERTIFIED DEPUTY INSPECTOR IS REQUIRED FOR THE FOLLOWING: A) SITE CONCRETE WORK (COPING & ANCHOR BEAM) :........... NON -CONTINUOUS. B) INSPECT SHEET PILE FOR LENGTH & DAMAGE : .................NON -CONTINUOUS. C) T & G LOCKING OF PANELS :................................................ NON -CONTINUOUS. D) ANCHOR ROD TENSIONING:.................................................... NON -CONTINUOUS. E) GROUTING OF PVC SLEEVES :................................................ NON -CONTINUOUS. F) PILING INSTALLATION:............................................................ NON -CONTINUOUS. G) HELICAL ANCHORS INSTALLATION IN ACCORDANCE WITH SECTION 2.4.2. OF ICC ER-2794:...........................................NON-CONTINUOUS. SPECIAL INSPECTION IS REQUIRED FOR SEAWALL PANEL CONCRETE IF NOT CAST IN A CERTIFIED YARD. 2. CONTINUOUS SPECIAL INSPECTIONS IS REQUIRED FOR THE INSTALLATION OF ANCHOR BOLTS, ADHESIVE ANCHOR BOLTS, ADHESIVE DOWELS AND MECHANICAL ANCHORS IN ALL CONCRETE AND MASONRY WORKS. 3. SPECIAL INSPECTIONS SHALL BE DONE BY ONE OR MORE REGISTERED DEPUTY (SPECIAL) INSPECTORS, APPROVED BY THE BUILDING DEPARTMENT ONLY, HIRED AND PAID FOR BY THE OWNER. 4. SITE VISITS CONDUCTED BY THE ENGINEER ARE MERELY FOR OBSERVATION PURPOSE ONLY AND DO NOT CONSTITUTE AN INSPECTION. 5. TWO (2) PROPERLY COMPLETED AND SIGNED COPIES OF THE SPECIAL INSPECTION AGREEMENT MUST BE SUBMITTED TO THE PERMIT SERVICES DIVISION PRIOR TO ISSUANCE OF THE PE RMIT. 6. AS A MINIMUM THE DEPTH OF THE SEAWALL EMBEDMENT I U N INTO THE GROUND SHALL BE AS SHOWN ON ELEVATIONS ON (S-1) AND MUST BE ACCURATELY MEASURED BY THE DEPUTY INSPECTOR, A COPY OF THE MEASUREMENT MUST BE SUBMITTED TO THE CITY & THE ENGINEER OF RECORD. 7. SPECIAL INSPECTION IS REQUIRED FOR ALL NEW CONCRETE AND MASONRY CONSTRUCTION, INCLUDING REINFORCING STEEL. CONCRETE REPAIR AFTER THE REINFORCING OF THE EXISTING SEAWALL IS COMPLETED IN COMPLIANCE WITH THE REQUIREMENTS AS Q SHOWN ON THIS SET OF DRAWINGS IT IS RECOMMENDED THAT THE OWNER SHALL HIRE A COMPANY SPECIALIZING IN STRUCTURAL PRESERVATION TO FIX THE CURRENT CRACKS, WHERE OCCUR, AT THE EXISTING CONCRETE WALL. ZONE: - I SETBACKS: n� FRONT GS` _�.l�ew vPIE (jd, ) R � (,�.CS f Qa�" --.- ___ ( _ RIGHTSIDE � 4 ' -,� :: LEFT SIDE 4 ' HEIGHT LIMIT: D- °_r_� �` --'x. DISCRETIONARY APPROVALS: j q ®®y, -.1. , - _ - ,\�,,. 1. _ r .- - r­ 11 AIC APPROVED LIAR 19 2020 ISSUANCE OF A BUILDING PERMIT BY THE CITY OF NEWPORT BEACH DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTY OR TO OBTAIN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY ASSOCIATION PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT. PRIOR TO PERFORMING ANY WORK IN THE CITY RIGHT-OF-WAY AN ENCROACHMENT PERMIT MUST BE OBTAINED FROM THE PUBLIC WORKS DEPARTMENT. - �­ � - '' il� � ` " I - I '11%111A - � f' S $f '4 3ig�r' ''Lido Isle '"wq 1' % ' R1 S/ .? Orr s a �; .w x f: ..' - 5 C a `g l� CD (=> Q 0 Iis n Ii tt1gg 1WW yy�F P! " 12 wI (3 Z cn O bR Z 0 ?_ J z o 10Z 0 L > w T z II a 0:� o 15 I Ix br m 1.1 10 Pe . R <<<1n z Q U J o- n Q QL w z O OFESS/ R O IS S 0 0 co I�� LA <" �-A Z CE-3 No.0 66947 � m . w � o -- * * �Px CIV\\- �Q 9TF OF CAS \Fp�� 03/06/2020 • 4 0 t- oo N n C � w V o •evt6 wiz I.�� P, '�P, a cd � O 1 � N 19 b i � p a a O 5.�a V�� � 0 W P Cq 00 CD C0 dD W Q J W U W > 2 � U Q t� CO W N F- Co 2 W a' 06 �: a. 0�O It 2rW T- Z q ( - x Y o- h �t o -� ;"- a37 `�' -� y5 •/� � 'ab ham: "f to FSt Lt r,FR;� r W.._ r1 v< ,� V! b a t/rq Savd �� ' t _ �� r" �l FiaY+t r� #sx; ,, 6 -.. V ��" �1�i0=1h �f� B Afettu �.. _ L'X ><� r �.. ._ r Wiz.., n "� >. :. w _ "� u S. 7 _. I r �. V y�1 40.3 �1,,-, r� -,� _ y.�Y� 8gac1� _`"`�_ , $v - __ m" s -" ",,, ,f,, , .: IVQ04fld Oki 11 - 4 .. w_ VICINITY MAP }x i- � 111- .. � y f I Z f I; # , - J .� .._ , U �= __ ­11 �.: n.: z m� .x. " Q M4a € _. x _ c.-. P� r him ' 1 Q 06 L,LI to W ,. F-- ,a ,1 r- vra 0 O O a ri e z t0 Z - � J Ls, l3(ob'Da alvd ' ~ Q Q _..� - W U w �,. X > _ Z W Q = W i, W >- U 0 ft r = Q Q W J fi x� CrWA. �t �(D II 1- �zF-W0Q�:2 U ()UO�: D g 0 V V z C/) SCOPE OF WORK: ADD ACAST-IN-PLACE CONCRETE CAP TO THE EXISTING SEAWALL. NOTE TO THE BIDDERSi AFTER THOROUGHLY EXAMINING THE CONSTRUCTION DOCUMENTS AND THE SITE: 1. NOTIFY THE ARCHITECT AND/OR THE ENGINEER IN WRITING, REGARDING ALL DISCREPANCIES REQUIRING CLARIFICATION, PRIOR TO THE "BID SUBMITTAL". . 2. IF THE ARCHITECT AND/OR THE ENGINEER IS NOT NOTIFIED, AS REQUIRED PER ITEM #1 ABOVE, IT SHALL MEAN THAT THE CONTRACTOR HAS CONSIDERED ADEQUATE CONTINGENCY IN HIS BID TO COVER ALL COSTS TO COMPLY WITH THE MOST STRINGENT CONDITIONS. 3. THE CONTRACTOR SHALL NOT BE ENTITLED TO ANY ADDITIONAL COMPENSATION FOR ANY DISCREPANCY DISCOVERED AFTER THE "CLOSE OF THE BID". O O-) N O O-) N i.r) \ N O o z Q r1r) o 00 � SHEET o D- Ek� I- I-- W a- n wa- Q� w 0 U OF Sw_0 SITE PLAN WEST BAY AVENUE V_ Z (E) WOOD DECK & PIER V FOR SEAWALL - ELEVATION NEWPORT BAY (E) PL WALL PROPERTY LINE �j (E) SEAWALL AT NEIGHBORING (E) SEAWALL, SEE SITE PLAN FOR LENGTH PROPERTY TO REMAIN & BE PROTECTED TYP IPROPERTY LINE TYP /T.II nnr,In r-TrLA u1A1 1 — (E) PRE -CAST CONC SEAWALL NO T.O. (E) BLOCK WALL ELEV=+12.20' NAVD88 (N) STEM WALL_ ELEV=_+_10.60' N_AVD88 =+10.78'f MLLW T.O._(E) SEAWALL ELEV=+9.24' NAVD88 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT I BUILDING DIVISION STRUCTURAL OBSERVATION GENERAL NOTES 1. STRUCTURAL OBSERVATION IS REQUIRED FOR THIS PROJECT IN 7. IF THE CITY FORM IS NOT USED, REPORTS SHALL BE ON STRUCTURAL ACCORDANCE WITH CBC 1710. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVERS LETTERHEAD, STATE SITE ADDRESS, PLAN CHECK & PERMIT OBSERVATION OF THE STRUCTURAL SYSTEM BY A LICENSED DESIGN NUMBERS, STAGES & ELEMENTS OBSERVED, DATE OBSERVED, & COMPLETE PROFESSIONAL FOR GENERAL CONFORMANCE TO THE APPROVED CONTACT INFORMATION FOR STRUCTURAL OBSERVER. CONSTRUCTION DOCUMENTS. 8. ALL STRUCTURAL OBSERVATION REPORTS, REGARDLESS OF FORM USED, 2. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE SHALL INCLUDE THE LICENSE STAMP & SIGNATURE OF THE STRUCTURAL REQUIRED INSPECTIONS BY THE CITY OF NEWPORT BEACH. OBSERVER RESPONSIBLE FORTHE PROJECT. 3. THE OWNER SHALL EMPLOY A LICENSED DESIGN PROFESSIONALTO PERFORM 9. EACH STRUCTURAL OBSERVATION REPORT SHALL BE GIVEN TO THE OWNER STRUCTURAL OBSERVATION SITE VISITS, AND TO ISSUE ALL STRUCTURAL OR OWNERS REPRESENTATIVE, PROJECT CONTRACTOR, AND THE BUILDING OBSERVATION REPORTS. INSPECTOR. 4. THE DESIGN ENGINEER SHALL IDENTIFY THE REQUIRED STRUCTURAL 10. THE CONTRACTOR SHALL RESOLVE ALL DEFICIENCIES & THE FINAL OBSERVATION SITE VISITS ON THE STRUCTURAL OBSERVATION SCHEDULE. STRUCTURAL OBSERVATION REPORT ISSUED PRIOR TO FINAL INSPECTION OR 5. THE REQUIRED SITE VISITS SHALL AT A MINIMUM INCLUDE THE FOLLOWNG: ACCEPTANCE OF STRUCTURAL WORK BY THE BUILDING INSPECTOR, A. OBSERVATION OF THE FOUNDATION SYSTEM PRIOR TO FINAL CONCRETE 11. THE FINAL STRUCTURAL OBSERVATION REPORT SHALL STATE THAT THE POUR; STRUCTURAL SYSTEM CONFORMS TO THE APPROVED CONSTRUCTION B. OBSERVATION OF BUILDING FRAMING PRIOR TO CALLING FOR THE CITY DOCUMENTS & THAT ALL PREVIOUSLY OBSERVED DEFICIENCIES HAVE BEEN OF NEWPORT BEACH'COMPLETE FRAMING INSPECTIOM; AND, CORRECTED. C. FINAL OBSERVATION OF THE COMPLETED STRUCTURE, 12. FINAL INSPECTION OR OTHER ACCEPTANCE OF THE STRUCTURAL SYS- TEM ADDITIONAL SITE VISITS MAY BE NEEDED AS DETERMINED BY THE DESIGN BY THE CHIEF BUILDING OFFICIAL, OR DESIGNEE, WILL NOT OCCUR UNTIL THE ENGINEER OR STRUCTURAL OBSERVER. FINAL STRUCTURAL OBSERVATION REPORT IS RECEIVED 6. THE STRUCTURAL OBSERVER SHALL PREPARE A STRUCTURAL OBSERVATION 13. THE LICENSED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL REPORT FOR EACH STAGE OF CONSTRUCTION OBSERVED. THE CITY OF PREPARE ALL CONSTRUCTION DOCUMENT CHANGES RELATING TO THE NEWPORT BEACH 'STRUCTURAL OBSERVATION REPORT' FORM, OR A STRUCTURAL SYSTEMS. REVIEW & APPROVAL OF SUCH CHANGES BY THE SIMILARLY FORMATTED REPORT, SHALL BE USED FOR ALL STRUCTURAL CHIEF BUILDING OFFICIAL, OR DESIGNEE, SHALL BE OBTAIN BY THE DESIGN OBSERVATION REPORT. PROFESSIONAL AND/OR CONTRACTOR PRIOR TO INSTALLATION AND/OR CONSTRUCTION OF SAID CHANGES. STRUCTURAL OBSERVATION SCHEDULE SITEADDRESS: 1140 WEST BAY AVENUE I PC#: TO BE COMPLETED BY THE DESIGN ENGINEER, AND INCLUDEDON THE CONSTRUCTION DRAWINGS. BASED ON THE PROJECT SCOPE, PLEASE IDENTIFY THE ELEMENTS AND/OR CONNECTIONS THAT REQUIRE STRUCTURAL OBSERVATION. SPECIFY THE INTERVAL OR STAGE OF CONSTRUCTION WHEN THE STRUCTURAL OBSERVATION WILL BE PERFORMED. TYPE STRUCTURAL ELEMENTS AND/OR SCHEDULED INTERVAL OR STAGE OF CONSTRUCTION CONNECTIONS TO BE OBSERVED I@ FOOTINGS, SLAB FOUNDATION, ANCHORS CONCRETE CAP PRIOR TO POURING CONCRETE 0 �.., ❑MAT FOUNDATION, PRESTRESSED CONC. SLAB c c ❑ CAISSON, PILE, GRADE BEAM ❑ OTHER: ❑ CONCRETE ❑ MASONRY ❑ WOOD OR MANUFACTURED SHEAR PANELS h ❑ OTHER: ❑ STEEL MOMENT OR BRACED FRAME Lu ❑ CONCRETE MOMENT FRAME ❑ MASONRY WALL FRAME ❑ OTHER: ❑ CONCRETE ❑ STEEL DECK x S ❑ WOOD c ❑ OTHER: FINAL ® FINAL OBSERVATION & REPORT FORMSSTRUCTLMLOSSERVANGN GENEFALNOTE$.& SCHE W LE 11-29-11. 0 " A101 . "� ion MAR 19 2020 N T APPLY DETAILS W- & W- AT THE ENTIRE PERIMETER OF ANY EXCAVATED MATERIAL PILED UP AT THE PROJECT SITE IN COMPLIANCE WITH ITEM 9 UNDER "GRADING NOTES" ON SHEET SW-0. N.T.S. I n o o � z Q ° 0 W U p C) O b Z, V) � z O1 O (n N b z = it 0 w Y U N l w Q m z a o �b _LJ I- d s Ld0 IRA g1 <�<�<� IRS, /Q�OFESS/\ ISS�L10 No.0 66947 (D CIV�� \Q y�F OF CA``�O�\, 03/06/2020 • V Cq Cq n � Q ww U o CID C3 U 00 00 N a 1 Cfl CD N 0) U) Q J > U W Q 2 Q Q �6 co co >W>O Z J Q �W VJ C� c� Z N Z U) X W > Q Q U U O > J W = f— Z � Q W I- Q U Q co W o W co06 F— p a �: Z n w j Z co N > O O N 0-) ro O ry ry I— N � W W o n' O O Z ZLd w Y F o O p 0 �� o S U SHEET OF BULKHEAD/SEAWALL ELEVATION NOTE: VERIFY ALL ELEVATIONS N.T.S. I v OUTSIDE FACE OF (E) o SEAWALL=OUTSIDE FACE OF (N) STEM WALL 1_g»t W z lk T.O. FUTURE STEM WALL ELEV=+13.70' NAVD88 PLANTER 81 =+13.88' MLLW - - - - - - r-1 WIDTH t t o P 1 I t I Z O o � 00 i l FUTURE CONC STEM WALL t i V) w _il W a IF DEEMED NECESSARY ' I (N) FINISHED SURFACE � I � o � TO ACCOMMODATE SEA I -H > BY OTHERS wll LEVEL RISE _H I I (N) CONC DECK �T.O._CAP ELEV=+10.60 ±NAVD88 _ _ _ _ BY OTHERS Vve (N) CAST -IN -PLACE CONC CAP/STEM WALL, o < < < 2EE_ T.OE_ SEAWALLELEV=+9.24'±NAVD88 _ _ — - - � �=T ? Itr1=&I I 1 ,�111- ii-►n- : lu�a �ii (E) DREDGE - 14. LINE/MUDLINE (, < 1 QROFESS/p�,. `l .. �Q� �pRISSpL A. 51I < • co C� No.0 66947 DESIGN DREDGE LINE/MUDLINE 9�F B C V 1'-0"t 3"f ° F O CAL 03/06/2020 (E) CAST -IN -PLACE CONC SEAWALL I' SAW -CUT AND REMOVE APPROXIMATELY 1'-0" OF CRACKED .°. { CONCRETE AT TOP OF SEAWALL. cw APPLY EPDXY COATING ON THE ° FACE OF CUT (E) VERT REINF TYP ' d {co N 14 A A rt'ij e'IR 19 202 LOWEST TIDE (ESTIMATED) =-2.5' M.L.LW. 4.` L �. 'r^ CD N cn H TYPICAL SECTION » 1/2 =' —° K —i W U w Q i �QQ J L.L 3; W LJ� Q 06 3 a L w �/ Z Li W CC r C Z O r 2 BAGS MIN. SANDBAGS, TYP El II I I 1 ' =1 I 1=► I I I I, � � i 11=1 I, , ,III; , .I =1.11—i'' TYPICAL SECTION TYPICAL ELEVATION a C14 3/4" CHAMFER TYP Of U SANDBAG VELOCITY REDUCER DETAIL J Q Y2" "V" REVEAL EA FACE AT MAX 12'-0" O.C. FOR 2 4 CONT AT TOP CRACK CONTROL TYP O W (N) 10" CAST -IN -PLACE CONC CAP/STEM WALL #4 CONT AT BOT #5 ADHESIVE DOWELS 0 - z N L M VELOCITY REDUCER DETAIL N.T.S. N 12" O.C. CENTERED AT ; ; a� WALL 8 EMBED TYP I ICI a "� "V" REVEAL EA I 9 FACE I ' -' I a I APPLY EPDXY COAT Q W U W _ AT COLD JOINT . a � ON THE FACE OF CUT I C.) FOR CRACK CONTROL 1 1 ( (E) VERT REBAR TYP W a a a I I Q Q W TWO ROWS OF SANDBAGS THREE BAGS HIGH I' (E) VERT REBAR TYP a m ONE ROW OF SANDBAGS I I W U) TWO BAGS HIGH a 1 a a (E) CAST -IN -PLACE Z T E OF SLOPE CONC SEAWALL I I. a. Q U) U J Q O SLOPE { al I. Z C] a o > o ONE ROW OF CURB FACE, SANDBAGS O 0-) O WHERE OCCURS 100' MAX TWO BAGS Q NLli HIGH O o Z Z Y �- a O 0 TOE OF SLOPE PROTECTION DETAIL 0 C U SHEET OF NOTE: THIS DETAIL SHALL APPLY AT THE ENTIRE PERIMETER OF ANY EXCAVATED MATERIAL PILED UP AT THE PROJECT SITE IN COMPLIANCE WITH ITEM 6 NOTE: FOR INFO NOT SHOWN, SEE DET K UNDER "EROSION CONTROL NOTES" ON SHEET S-0. _ SW-2 R S TOE OF SLOPE PROTECTION N.T.S. T STEM WALL CONN DETAIL"=1'—�" V I CO No. =* No. C 14146 1 1-30-19 FOp CAS -CFO u W4 �7 C� E O U .cu �®E V'W=1� @ U �-C V) CU U E 0 Pq E �P �® pq u PH u � �� e P � C DATE ®9-®9-209 PROJECT NO. 19-03 SHEET NO. 0 C