HomeMy WebLinkAboutX2021-3285 - LandscapeAppendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at 2001 Port Ramsgate PI.
Newport Beach, Ca 92660 (provide
address or parcel number(s)) was installed by me or under my supervision.
street
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
Yes No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
Jack Locker
Print Name
/ eCA,2,
Sig ature
10 Portland PI., Laguna Niguel, Ca
Address
(949)443-4200
Telephone
Landscape Design Professional's Stamp
(If Appropriate)
March 8, 2023
Date
937052
License Number
Lockerjr@gmail.com
E-mail Address
34
IRRIGATION CONTROLLER SCHEDULE
CIMLS. STATION: NEWPORT BEACH AN I FEB I MAR I All I MAY I JUN I ILL. I AUG I SEP, I OCT. I NOV. I DEC. I TOTAL
ET DATA MONTHLY 2.6 2.5 3.5 42 5,0 4,7 53 5.3 4.5 3,3 2.5 2.0 = 45.4
IRRIGATION SCHEDULE: DRIPPEAlINE Wha AVERUM PRECIPITATION MlEd06M.
THISSCHEDULE IS INTENDED ASA STARTING
POVONLY.
THE IRRIGATION CONTRACTOR SHALL ADJUST
RUN TIMES FOR ACTUAL SITE CONDITIONS and
MICR06CLIMATES,
SPLIT RUN TIMES MAY BE REQUIRED hY SLOPE
CONDITIONS and VARYING 8 0 IL I NF ILTRATION
RATES.
APPLICATION RATE SHALL NOT EXCEED THE
INFILTRATION PATE of THESOIL,
IRRIGATION RUN-TIMES SHALL be BETWEEN THE
HOURS of B:00 P.M. AND 10:00 A.M.
PRESSURE LOSS CALCULATION I IRRIGATION SCHEDULE SAMPLE: JULY 5.3 ETD for DRIP I
Raal P I
FRcnaxLosecxcuunoxs xwNMxxvm
WATRMETEAM W4
ash 34-
FLWAMM P
STATb'NMS. not
LUH=
WA mma
PHoxe
Mi UEWEO.
NGI, A.
NEUIIEIEV.
A XP= .
1®1111E(AN11{(A VAIVEno. AI —
NiE 1'
ll u
a..UEAln
ElEV.6NICVItlI1EM
PRE63.AiRN — PN
LP
VATMMUER
CL
PS
_
Efl69.IC[LIAKE RALLCiFj
Pa
_
—_ —_
fiAftiiLbNPKEYENEFR
"I
ELbxVEiEA
-
PSI
MMTFAVALVE
Pal
1 UNE
OATv&w
Psi
w LEE
"mm
os
PSI
_
VAIRM
PIN
VANLYE
PoI
I I
IAMfnaL.
02
ni
_
NIEIULLP£
ml
t,MTAV LPE
PM
r
wLPPLLPE
n
.1
x w
UUV IRA
0A
ml
IMMOLWSnNM
02
Pal
NEvgn%IPV.IMr •I•l
PSI
TmksMT9l
Loss:
xs
Psl
PRUNURETUCPEPATE"
W
Psi
TOTALM IRERE(MREP Ids PSI
LUMaiSTUXPVIYMEAVUL - ES
PPidFTRWUAIFOPRF591REpE18Wf P51
RENDUVERTERPRENSURE f011 PSI
PLANT WATER MO.
VALUE
UNITS
A
MRWA4F
ipgl9lglIBIG90UWCWER
B
RFfERENCEPEAKIO
31
SAYS
C
RFAEP0ICEEM
63
INCHES
0
LMIORCAREaO.K
09
1
PLANTFACiORK
am
2
VEQ.DENMW
I
3
NCROMMATE
10
E
MOSCAPEET
3.18
INCHES
F
AVERAGEONLYE
MIoB
INCITES
"I PER(AS.RCE VALUE UNITS
G
PHECIPMTE
am
INMR
N
OLSNiM.UN EOPHITY
San
nEC M9L
SOIEWLEMADRER
1R1
9CRED LINO
PARAMETERM VALUE UNITS
A
IRRIGATION AL
35
RAYS
K
IVATERTOAPPLY
om
INCHES
L
LOYIBABWNOWY
30
NAMES
IA
UPPER 3081ANRY
61
NNUIEB
N
MICTEORUNTIME
v
MINUTES
0
CYCLE STARTS:
e
TWETOPoA40FF
WA
UP D
8IIEWIYallm
2
aYaLE$
I
SILCAMORY
2
2
ROPE
a
3
COMPACEION
0
1
9xUa(IIIs1WE
0
SUMMARY VALUE UNITS
WATERIPA EO
Dan
INCHES
INIERJPI
3s
DAYS
MOESEEROAr
p
MINUTESPERCYCLE
2M
MINUTES
THIS IRRIGATION SYSTEM HASBEEN DESIGN FOR A PRESSURE THESE IRRIGATION SCHEDULES ARE FOR TWICE WEEKLY IRRIGATION PER CITY OF NEWPORT BEACH REQUIREMENTS. THE
OF55PSI, IF THE WATER PRESSURE VARIES BY MORE THAN 20% UPPER BOUNDARY IRRIGATION RUN TIME HAS BEEN SELECTED FOR THE INITIAL PLANT ESTABLISHMENT PERIOD (MINIMUM
THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT ONEYEAR), ONCE PLANTS ARE ESTABLISHED THE RUN TIMES MAYBE SHORTENED TO THE LOWER BOUNDARY. ROUTINE
ON HOW TO PROCEED. FAILURE TO DO SO WILL ALL PLANT OBSERVATION AND MAINTENANCE ARE REQUIRED FOR OPTIMAL PLANT HEALTH.
REPAIRWREPLACEMENTS ON THE RESPONSIBILITY OF THE
CONTRACTOR.
MAXIMUM APPLIED WATER ALLOWANCE and ESTIMATED APPLIED WATER USE CALCULATIONS:
M.A.W.A
E.A,W,U, - SEE TABLE BELOW
MAWA = (ETO) (0.62) i(0,55 x LA) EAWU = (ET) x (Plant Factor) x (Hydnozone Ama)x (,62)
=(45.4) x(62)[(0.55 x 1,443)= 22,3409allonslyear ImOation Efficiency (72%-90%) = 15,0440allanslyear
Hydrozones (by r.c.v. station):
RCV STATION
WATER USE
ETO
PLANT FACTOR
xTOa4lZOxa
MSA ISO.
CONY. FACTOR
IRRIGATION EFFICIENCY
Gallmsftar
Al
DRIP
LOW
45.4
03
734
0.62
81%
7,652
A2
TREE DRIP
LOW
45,4
03
20
0,62
81%
209
A3
TREE DRIP
LOW
45.4
0.3
20
0.62
81%
209
A4
DRIP
LOW
45,4
0.3
669
0.82
111%
6,974
TOTAL 15,044