Loading...
HomeMy WebLinkAboutX2019-0547 - LandscapeAppendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at 333 Holmwood Drive, Newport Beach, CA 92663 (provide address or parcel number(s)) was installed by me or under my supervision. street (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; (to be provided by contractor) b. Landscape and irrigation maintenance schedule; (to be provided by contractor) c. Irrigation audit report; and (Iu bu provided by uuru tor) d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (L'u be piuviued by s o+�6a(.vr) (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. Yes _ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 Alex Koutzoukis Print Nafne �IF-1 Siginiifute PO Rox 341, Wofford Heinhtc, GA, 93285 Address 714.519.1027 Telephone Landscape De ' ro (If Appro ' ~ _kCpE c ALI OF CALL Stamp 03.28.2023 Date License Number akoutzoukis@gmail.com E-mail Address 3�t 34 333 Holmwood Landscaping Watering Schedule(6AM run time every other day) • Zone 1 Drip System(18mins Every Other Day) • Zone 2 Drip System Shade(12mins Every Other Day) • Zone 3 Drip System Sunny(18mins Every Other Day) • Zone 4 Gravel Drip System Large Planting(18 mins Every Other Day) • Zone 5 Pottery Drip System(7mins Every Other Day) COAST GEOTECHNICAL, INC. 12001'vest conul'.gn vea:th Avenue, Fullerton, CA 92833 Ph: 714-870-1211 Fax: 714870-I222 e-mail: coasn-eutecimymiail.com March 5, 2023 W.O.557518-07 Mr. and Mrs. Jeff Atkins 333 Holmwood Drive Newport Beach, CA 92660 Subject: Final Soils Report for 333 Holmwood Drive, Newport Beach, California References: L Geotechnical Engineering Investigation for Proposed Residence at 333 Holmwood Drive, Newport Beach, California; by COAST GEOTECHNICAL, Inc., W.O. 557518-0 1, dated July 25, 2018. 2. Response to Geotechnical Report Review Checklist, Proposed New Residence at 333 Hohnwood Drive, Newport Beach, California; by COAST GEOTECHNICAL, Inc., W.O. 557518-02, dated November 21, 2018. 3. Response to Geotechnical Plan Review Comment, Proposed New Residence at 333 Holmwood Drive, Newport Beach, California; by COAST GEOTECBMCAL, INC., W.O.557518-03, dated January 11, 2019. 4. Rough Grade Compaction Report, Proposed New Residence at 333 Holmwood Drive, Newport Beach, California; by COAST GEOTECHNICAL, INC., W.O. 557518-04, dated September 17, 2021. S. Addendum Report for Basement Subgrade, Proposed New Residence at 333 Holmwood Drive, Newport Beach, California; by COAST GEOTECHNICAL, Inc., W.O. 557518-05, dated October 11, 2021. 6. Memorandum to Plan Change, New Residence at 333 Holmwood Drive, Newport Beach, California; by by COAST GEOTECHNICAL, Inc., W.O. 557518-06, dated July 13, 2022. Dear Mr. and Mrs. Atkins: In accordance with your request, this final soils report has been prepared to address geotechnical observations and testing performed since completion of rough grading. This report addresses requested observations and testing. Copies of our daily reports are maintained in our files. FOUNDATION EXCAVATIONS The foundation for basement/garage was observed on September 24, 2021 and September 29, 2021. The at -grade foundation excavations were observed on November 10, 2021 and November 17, 2021. The foundation excavation for the western retaining wall was observed on June 10, 2022. The bio-pit foundation excavation near the western courtyard area was observed on February 6, 2023. The foundation excavations were found to be acceptable at the time of our final observation. INTERIOR SLAB SUBGRADE AND TRENCH BACKFILLS The basement/garage mat slab foundation excavation was observed on October 11, 2021, see referenced addendum report. The at -grade slab subgrade was observed on November 22, 2021. COAST GEOTECHNICAL, INC. Mr. and Mrs. Atkins 2 W.O. 557518-07 Final Soils Reoort March 5 2023 Probing and testing of the slab subgrade areas showed acceptable geotechnical conditions for support of the proposed slab. BASEMENT/GARAGE WALL SUBDRAIN The subdrain for the basement/garage wall consisted of four inch diameter SDR 35 perforated drain pipe (holes down), surrounded by one cubic foot per lineal foot of 3/4 inch rock wrapped in filter cloth. The subdrain was placed in accordance with plans and geotechnical recommendations. Proper outlets of the subdrain system are the responsibility of the contractor. BASEMENT PALL BACKFILL Backfill of the basement walls, as requested periodically by the contractor, was observed from October 29, 2021 to November 2, 2021. The basement wall was backfilled with 3/4 inch gravel to three feet from top of wall. A soil cap was placed above the gravels and separated by filter fabric. Backfill soils were placed in thin lifts; moisture conditioned as needed and mechanically compacted to a minimum of 90% relative compaction up to finish pad grade elevations. Equipment used for compaction of fill soils consisted of mechanical hand compactors and a SvL 75. Earthwork was completed by Coast Concrete. I`. Hardscape subgrade areas around the residence were observed between December 13, 2022 and March 2, 2023. Probing and testing of the requested hardscape subgrade areas indicated acceptable geotechnical conditions for support of the proposed hardscape. OPINION It is opinion of COAST GEOTECHNICAL, INC. that the summarized geotechnical conditions approved by this office are in compliance with approved geotechnical reports and Newport Beach building codes. The final grades appear to conform to approved plans. We appreciate this opportunity to be of service to you. Respectfully Submitted: COAST GEOTECHNICAL, INC. Min amg A ".10FESSl1/y9` RCE 54011 `ac,,o(ARNGv eo � Fy y c No. 54011 a * Exp. 12/31/23 10, CIV1\ Q 9�FAr CAl1F�Ra\ AJI-e-160"Vkwa^ Andres Bareno Staff Geologist