HomeMy WebLinkAboutPA2022-0306_20230413_Resolution_ZA2023-024Community Development Department
CITY OF NEWPORT BEACH
100 Civic Center Drive
Newport Beach, California 92660
949 644-3200
newportbeachca.gov/communitydevelopment
VIA EMAIL
April 13, 2023
Craig Hampton
5500 E. Quartersawn St.
Boise, ID 83716
craig@craigshampton.com
Subject: Coastal Development Permit No. (PA2022-0306)
Smith Residence CDP
2286 Channel Road
Dear Mr. Hampton,
It was a pleasure working with you on the above referenced application. Please be
advised that the subject application was approved by the Zoning Administrator on
April 13, 2023 and is now within the required City appeal period until April 27, 2023.
If no appeals are filed with the City, a Notice of Final Action will be mailed to the
California Coastal Commission. Upon receipt of the notice by the Coastal
Commission, the action will be subject to an additional 10-working-day appeal period.
You may track status of the Coastal Commission appeal period via the following link:
Statewide Appealable Projects PDF
At the conclusion of both appeal periods, a building permit may be issued for the
project.
A copy of the approved resolution with findings and conditions is attached. If you
have any questions, please do not hesitate to contact me directly. Thank you and I
look forward to working with you again in the future.
Sincerely,
RESOLUTION NO. ZA2023-024
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING A
COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN
EXISTING SINGLE-UNIT DWELLING AND CONSTRUCT A NEW
THREE (3)-STORY SINGLE-UNIT DWELLING AND ATTACHED
TWO (2)-CAR GARAGE LOCATED AT 2286 CHANNEL ROAD
(PA2022-0306)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Craig Hampton on behalf of the owners, Edward and Debra
Smith with respect to property located at 2286 Channel Road, and legally described as Lot
4 of Tract 518, requesting approval of a Coastal Development Permit.
2. The Applicant requests a coastal development permit (CDP) to allow the construction of a
new 4,220-square-foot, three (3)-story, single-unit dwelling with an attached 588-square
foot three (3)-car garage. The project includes landscape, hardscape, drainage, and
accessory structures all within the confines of the property. The project complies with all
development standards and no deviations are requested. All improvements authorized by
this CDP will be located on private property. This CDP (PA2022-0306) will supersede a
previously approved CDP (PA2020-323) that authorized demolition of the existing single-
family residence and construction of new single-family residence. Demolition of the existing
single-unit dwelling was completed under the prior CDP and the lot is currently vacant.
3. The project includes additional improvements that are subject to separate review by the
California Coastal Commission. The existing bulkhead is located beyond the front property
line, therefore a portion of the front deck and bulkhead are located within the California
Coastal Commission’s permit jurisdiction. This Coastal Development Permit is intended to
cover portions of the project within the City’s permit authority as designated in the Local
Coastal Program (Title 21 of the Newport Beach Municipal Code).
4. The subject property is categorized RS-D (Single Unit Residential Detached) by the
General Plan Land Use Element and is located within the R-1 (Single-Unit Residential)
Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is RSD-C (Single Unit Residential Detached – 10.0 – 19.9 DU/AC) and it is
located within the R-1 (Single-Unit Residential) Coastal Zoning District.
6. A public hearing was held on April 13, 2023, online via Zoom. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal Code
(NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
Zoning Administrator Resolution No. ZA2023-024
Page 2 of 10
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
2. Class 3 exempts the demolition and construction of up to three (3) single-unit dwellings
in urbanized areas. The proposed project consists of the demolition of an existing single-
unit dwelling and construction of a new 4,220-square-foot, three (3)-story, single-unit
dwelling with an attached 588-square foot three (3)-car garage.
3. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would
invalidate the use of these exemption. The project location does not impact an
environmental resource of hazardous or critical concern, does not result in cumulative
impacts, does not have a significant effect on the environment due to unusual
circumstances, does not damage scenic resources within a state scenic highway, is not
a hazardous waste site, and is not identified as a historical resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015(F) (Coastal Development Permits, Findings and
Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in
support of such findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 5,220 square feet and the proposed floor area
is 4,808 square feet.
b. The proposed development provides the minimum required setbacks, which are 0
feet along the front property line abutting Channel Road, 3 feet along each side
property line, and 10 feet along the other front property line abutting the water.
c. The highest flat roof/guardrail is below 24 feet from established grade and the
highest ridge is no more than 29 feet from established grade. The proposed
development complies with all height requirements.
Zoning Administrator Resolution No. ZA2023-024
Page 3 of 10
d. The proposed development provides a three (3)-car garage, meeting the minimum
three (3)-car garage requirement for a single-unit dwelling with more than 4,000
square feet of habitable floor area.
e. The proposed development complies with the minimum 9.0-foot North American
Vertical Datum of 1988 (NAVD 88) top of slab elevation requirement for interior
living areas of new structures.
2. The property currently consists of one vacant legal lot. The previous single-unit dwelling
on the Property was demolished under the previously approved CDP (PA2020-323).
The prior CDP will be superseded should this resolution be approved.
3. The neighborhood is predominantly developed with two (2)- and three (3)-story, single-
unit dwellings. The proposed design, bulk, and scale of the proposed three (3)-story
development is consistent with the existing neighborhood pattern of development.
4. The development fronts the Newport Bay and is protected by an existing bulkhead. A
Bulkhead Conditions Report was prepared by William Simpson and Associates, Inc.
dated October 31, 2022, for the project. The report concluded that while the bulkhead
is in good condition with minor, repairable cracks, it should be reinforced through the
installation of new tiebacks. Once the bulkhead is reinforced in accordance with the
report, no repair or replacement of the bulkhead is anticipated within the next 75 years.
5. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William
Simpson and Associates, Inc. dated October 31, 2022, for the project. The current
maximum bay water elevation is 7.7 feet (NAVD 88) and may exceed the current top of
bulkhead elevation of 10.58 feet (NAVD 88) during high tide or storm events. The report
analyzes future sea level rise scenarios assuming a 3.2-foot increase in the maximum
water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level
is estimated to reach approximately 10.9 feet (NAVD 88) - (the likely range for sea level
rise over 75-year design life of the structure based on low risk aversion estimates for
sea level rise provided by the State of California, Sea Level Rise Guidance: 2018
Update).
6. On March 23, 2021, the City Council approved updated Waterfront Project Design
Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities.
The guidelines require that any bulkhead structure permitted within the years 2021 through
2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD88) with a design for
adaptability elevation of 14.4 feet (NAVD 88). The project has been conditioned to raise
the bulkhead to an elevation of 10.9 feet (NAVD 88) in compliance with the proposed plans.
William Simpson and Associates, Inc. has confirmed the bulkhead design can be raised
up to 14.4 feet (NAVD88) if needed and in compliance with the updated guidelines.
7. The finished floor elevation of the proposed single-unit dwelling is 10.95 feet (NAVD 88),
which complies with the minimum 9.00-foot (NAVD 88) elevation standard for new
structures.
Zoning Administrator Resolution No. ZA2023-024
Page 4 of 10
8. The property is in an area known for the potential of seismic activity and liquefaction. All
projects are required to comply with the California Building Code (CBC) and Building
Division standards and policies. Geotechnical investigations specifically addressing
liquefaction are required to be reviewed and approved prior to the issuance of a building
permit. Permit issuance is also contingent on the inclusion of design mitigation identified in
the investigations. Construction plans are reviewed for compliance with approved
investigations and CBC prior to building permit issuance.
9. The property owner will be required to acknowledge any hazards present at the site and
unconditionally waive any claim to damage or liability against the decision authority,
consistent with Newport Beach Municipal Code (NBMC) Section 21.30.015(D)(3)(c) –
(Waterfront - Development Standards). The Acknowledgement of Coastal Hazards is
included as a condition of approval that will need to be recorded prior to the issuance of
building permits.
10. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv) - (Natural Landform and Shoreline
Protection), the property owner will be required to enter into an agreement with the City
waiving any potential right to protection to address situations in the future in which the
development is threatened with damage or destruction by coastal hazards (e.g., waves,
erosion, and sea level rise). The Waiver of Future Protection is included as a condition
of approval that will need to be recorded prior to final building inspection.
11. The property is located adjacent to coastal waters. Pursuant to Section 21.35.030
(Construction Pollution Prevention Plan) of the NBMC, a Construction Pollution Prevention
Plan (CPPP) is required to implement temporary Best Management Practices (BMPs)
during construction to minimize erosion and sedimentation, and to minimize pollution of
runoff, and coastal waters derived from construction chemicals and materials. A CPPP has
been provided and construction plans and activities will be required to adhere to the CPPP.
12. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), due to the
proximity of the development to the shoreline and the development containing more than
75 percent of impervious surface area, a preliminary Water Quality and Hydrology Plan
(WQHP) is required. The preliminary WQHP/WQMP was prepared by JT Consulting
Engineer dated June 8, 2021 and revised on January 19, 2023, for the project. The
WQHP/WQMP includes a polluted runoff and hydrologic site characterization, a sizing
standard for BMPs, use of an LID approach to retain the design storm runoff volume on
site, and documentation of the expected effectiveness of the proposed BMPs. Construction
plans will be reviewed for compliance with the approved WQHP prior to building permit
issuance.
13. The project design addresses water quality with a construction erosion control plan and a
post-construction drainage system that includes drainage and percolation features
designed to retain dry weather runoff and minor rain event runoff on-site. Any water not
retained onsite is directed to the City’s storm drain system.
14. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition
of approval is included that requires drought-tolerant species. Before the issuance of
Zoning Administrator Resolution No. ZA2023-024
Page 5 of 10
building permits, the final landscape plans will be reviewed to verify invasive species are
not planted.
15. The project site is not located adjacent to a coastal view road, but is located near a
designated Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest
viewpoint is located at West Jetty View Park, which is located approximately 150 feet to
the south of the project site. Views from West Jetty View Park are primarily toward the
water to the east and south of the project site and there are three other intervening
residential structures and palm trees that obscure views of the Property. The project may
be located within the viewshed of other distant public viewing areas; however, the
proposed single-unit dwelling complies with all applicable Local Coastal Program (LCP)
development standards and maintains a building envelope consistent with the existing
neighborhood pattern of development. Therefore, the project does not have the potential
to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to
public views.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal
Act if the project is located between the nearest public road and the sea or shoreline of any
body of water located within the coastal zone.
Facts in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline.
Implementation Plan Section 21.30A.040 – (Determination of Public Access/Recreation
Impacts) requires that the provision of public access bear a reasonable relationship
between the requirement and the project’s impact and be proportional to the impact. In this
case, the project replaces an existing single-unit dwelling located on a standard R-1 lot
with a new single-unit dwelling. Therefore, the project does not involve a change in land
use, density or intensity that will result in increased demand on public access and
recreation opportunities. Furthermore, the project is designed and sited (appropriate
height, setbacks, etc.) so as not to block or impede existing public access opportunities.
2. Vertical and Lateral access to the Newport Bay and Beach is available near the site along
Ocean Boulevard at West Jetty View Park and East Balboa Boulevard at a public beach
where there are access points. West Jetty Park is the start of a wide sandy beach that
provides lateral access down the coast of the Newport Beach Peninsula. The project does
not include any features that would obstruct access along these routes.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby finds this project is
categorically exempt from the California Environmental Quality Act pursuant to Section
15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA
Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has
Zoning Administrator Resolution No. ZA2023-024
Page 6 of 10
no potential to have a significant effect on the environment and the exceptions to the Class
3 Exemption do not apply.
2. The Zoning Administrator of the City of Newport Beach hereby approves the Coastal
Development Permit (PA2022-0306), subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
3. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code (NBMC). Final
action taken by the City may be appealed to the Coastal Commission in compliance with
Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and
Title 14 California Code of Regulations, Sections 13111 through 13120, and Section
30603 of the Coastal Act.
4. This resolution supersedes Coastal Development Permit No. PA2020-323 which upon
vesting of the rights authorized by this application shall become null and void.
PASSED, APPROVED, AND ADOPTED THIS 13TH DAY OF APRIL, 2023.
Zoning Administrator Resolution No. ZA2023-024
Page 7 of 10
EXHIBIT “A”
CONDITIONS OF APPROVAL
Planning Division
1. The development shall be in substantial conformance with the approved site plan, floor plans,
and building elevations stamped and dated with the date of this approval (except as modified
by applicable conditions of approval).
2. Revisions to the approved plans may require an amendment to this Coastal Development
Permit or the processing of a new Coastal Development Permit.
3. This Coastal Development Permit does not authorize any development bayward of the
private property.
4. Coastal Development Permit No. PA2022-0306 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code (NBMC), unless an extension is otherwise
granted.
5. Prior to final inspection of the building permit for the principal structure, the Applicant shall
obtain approval from the California Coastal Commission for any improvements or
construction bayward or seaward of the property.
6. Prior to submittal to California Coastal Commission, an Approval-In-Concept (AIC) shall be
required from the Planning Division and Public Works Department for the deck and bulkhead
improvements.
7. Prior to final inspection of the building permit for the principal structure, the existing seawall
shall be reinforced to a height of 10.90 feet (NAVD88) and capable to be raised up to 14.4
feet (NAVD88), in compliance with the City of Newport Beach Waterfront Project
Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities.
8. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury or
damage from such hazards, unconditionally waiving any claims of damage against the City
from such hazards, and to indemnify and hold harmless City, its City Council, its boards
and commissions, officials, officers, employees, and agents from and against any and all
claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development. The letter shall be scanned into the plan set prior to building permit issuance.
9. Prior to final building permit inspection, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded waiving
rights to the construction of future shoreline protection devices to address the threat of
Zoning Administrator Resolution No. ZA2023-024
Page 8 of 10
damage or destruction from waves, erosion, storm conditions, landslides, seismic activity,
bluff retreat, sea level rise, or other natural hazards that may affect the property, or
development of the property, today or in the future. The agreement shall be binding against
the property owners and successors and assigns.
10. Prior to issuance of a building permit, the final WQHP/WQMP shall be reviewed and
approved by the Building Division. Implementation shall comply with the approved CPPP
and WQHP/WQMP and any changes could require separate review and approval by the
Building Division.
11. Prior to the issuance of a building permit, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
12. Prior to the issuance of a building permit, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building Division.
13. Prior to the issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans.
14. Prior to the issuance of a building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
15. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right-of-way.
16. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or
result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands
or their buffers.
17. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in confined
areas specifically designed to control runoff. A designated fueling and vehicle maintenance
area with appropriate berms and protection to prevent spillage shall be provided as far
away from storm drain systems or receiving waters as possible.
18. Debris from demolition shall be removed from work areas each day and removed from the
project site within 24 hours of the completion of the project. Stock-piles and construction
materials shall be covered, enclosed on all sites, not stored in contact with the soil, and
located as far away as possible from drain inlets and any waterway.
19. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of
each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
Zoning Administrator Resolution No. ZA2023-024
Page 9 of 10
20. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant
species and water efficient irrigation design. The plans shall be approved by the Planning
Division.
21. All landscape materials and irrigation systems shall be maintained in accordance with the
approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All
landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be
kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
22. Construction activities shall comply with Section 10.28.040 of the Newport Beach
Municipal Code, which restricts hours of noise-generating construction activities that
produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday,
and 8:00 a.m. and 6:00 p.m. on Saturday. Noise-generating construction activities are not
allowed on Saturdays, Sundays or holidays.
23. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26
and other applicable noise control requirements of the Newport Beach Municipal Code.
The maximum noise shall be limited to no more than depicted below for the specified time
periods unless the ambient noise level is higher:
Between the hours of 7:00AM
and 10:00PM
Between the hours of
10:00PM and 7:00AM
Location Interior Exterior Interior Exterior
Residential Property 45dBA 55dBA 40dBA 50dBA
Residential Property located within
100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA
Mixed Use Property 45dBA 60dBA 45dBA 50dBA
Commercial Property N/A 65dBA N/A 60dBA
24. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In
compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and
similar construction activities shall occur between August 16 and January 31, outside of the
peak nesting period. If such activities must occur inside the peak nesting season from
February 1 to August 15, compliance with the following is required to prevent the taking of
Native Birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
Zoning Administrator Resolution No. ZA2023-024
Page 10 of 10
to determine when it is safe to commence construction activities. If an active nest is
found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest
and determine when the nest is no longer active.
25. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
26. The applicant shall comply with all federal, state, and local laws. Material violation of any
of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
27. This Coastal Development Permit may be modified or revoked by the Zoning Administrator
if determined that the proposed uses or conditions under which it is being operated or
maintained is detrimental to the public health, welfare or materially injurious to property or
improvements in the vicinity or if the property is operated or maintained so as to constitute
a public nuisance.
28. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the current
business owner, property owner, or the leasing agent.
29. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Smith Residence including, but not limited to, Coastal Development Permit
(PA2022-0306). This indemnification shall include, but not be limited to, damages awarded
against the City, if any, costs of suit, attorneys’ fees, and other expenses incurred in
connection with such claim, action, causes of action, suit or proceeding whether incurred by
applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall
indemnify the City for all of City’s costs, attorneys’ fees, and damages which City incurs in
enforcing the indemnification provisions set forth in this condition. The applicant shall pay to
the City upon demand any amount owed to the City pursuant to the indemnification
requirements prescribed in this condition.
Building Division
30. Project plans shall be prepared by licensed design professional in the State of CA for a three
(3)-story structure.
31. Project plans shall comply with Special Flood Hazard Area requirements. The lowest floor
elevations shall be above the minimum Design Flood Elevation (DFE) for flood zone AE8.