Loading...
HomeMy WebLinkAboutPA2023-0043_20230414_2nd Notice of Incomplete Filing - Responses COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 Fax: 949-644-3229 www.newportbeachca.gov 2nd NOTICE OF INCOMPLETE COASTAL DEVELOPMENT PERMIT APPLICATION FILING April 11, 2023 Allie Schieble 412 31st Street, Newport Beach, CA 92663 aschieble@oatmenarchitects.com Application No. (PA2023-0043) Address 306 Via Lido Nord Please be advised that after reviewing the subject application, your submittal has been deemed incomplete and further information is required before we are able to proceed with the application process. The following documentation is required to complete the application: 1. Property Development Standards. Please be advised, the project as designed does not comply with all required property development standards identified in Newport Beach Municipal Code (NBMC) Chapter 21.30 (Property Development Standards). Reference the attached plan check correction sheet for a list of the required changes. PLEASE PROVIDE A RESPONSE SHEET TO THE CORRECTIONS LISTED BELOW: a. Topographic survey needs to be signed. b. FAR maximum is 1.75, please revise mention on cover for record purposes. FYI: (4) The total gross floor area contained in all buildings and structures on a development site shall not exceed 1.75 times the buildable area of the site or 1.5 times the buildable area of the site in Corona del Mar; provided, that up to two hundred (200) square feet of floor area per required parking space devoted to enclosed parking shall not be included in calculations of total gross floor area. c. Under square footage calcs: Please provide garage square footage as a separate line item. d. Plot property lines with setbacks dimensioned on all floor plans as well. e. Label setbacks on site plan to face of finish. f. Elevations: label and measure heights from Newport Beach Establishment of Grade (12.58’) to top of all ridge peaks and flat elements on ALL exterior elevations. 2. Notice of Application Filing Posting. Please see attached. Needs to be posted on site until the end of the project appeal period date. Please take a picture and have it emailed to me when posted on site. 3. Please note that the Building Division is in the process of reviewing the plans and Project Review Request will be sent to you once received from the building division. Upon verification of completion, the application will be processed and scheduled for a Zoning Administrator Hearing. Should you have any questions regarding submittal requirements, please contact Afshin Atapour, Assistant Planner at 949-644-3237 or aatapour@newportbeachca.gov. By: Attachments: Notice of Application Filing PRR – Public Works