HomeMy WebLinkAboutPA2022-0290_20230407_WQMP_PRR_02-16-2023Tmplt: 10/10/12
P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: WQMP/Geology – Gutierrez
Date: February 2, 2023
Please return PRR and Plans to Staff Planner
Joselyn Perez, Assistant Planner jperez@newportbeachca.gov, 949-644-3312 Applicant: Brandon Architects Contact: Kennedy Year kennedy@brandonarchitects.com Project Name Antepara Residence
Address: 604 Via Lido Nord
PA2022-0209 Coastal Development Permit
Demo existing single-family residence (SFR). Construct new, 3,168-square-foot, 2-story SFR with attached 508-square-foot 2-car garage. Raise and reinforce existing seawall.
REPORT REQUESTED BY: February 14, 2022
Zoning Administrator HEARING DATE: TBD
Check all that apply:
No comments on the project as presented.
Notes:
Please be advice that the proposed Finish First Floor must meet the
elevation of the horizontal distance to curb times two percent and
twelve inches of the nearest approved City flow line grade
elevation. Preliminary WQMP is satisfactory pending Building
Review Approval.
Sergio Gutierrez 1332 2/16/2023
Signature Ext. Date
Application of Standard Code requirements are not expected to alter the project design.
Recommended conditions of approval are attached. X Application of Standard Code
requirements or the attached conditions of approval will substantially impact or alter the design of the project.
I contacted the applicant on
To schedule an appt. for
Code review
To discuss the following (see notes)
Please indicate the approximate time spent on reviewing this project: