HomeMy WebLinkAboutXR2023-0908 - Alternative Material & Methods (2)CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT ERE
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 APR 2 4 20B
www.newportbeachca.gov 1 (949) 644-3200
C" OF
CASE NO.: , 7 ^ Nem)OR1M.CH
EQUEST FOR MODIFICATION TO PROVISIONS
✓✓✓✓✓✓��-��- OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $297)
REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $297)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
IF FOR STAFF USE ONLY III
Plan Check # li`202-3-OV03 # of Stories
Occupancy Classification 3"
Use of Building # of Units
Project Status
Construction Type s�i2�►�
Verified by
No. of Items
Fee due
DISTRIBUTION:
❑ Owner Plan Check
Petitioner ❑ Inspector
❑ Fire ❑ Other
PETITIONER:
SITE ADDRESS: 2� Z E }�—Zr�EnL t L{Z •'� Petitioner F[2,4f4K- L,-Ek)
MtZ M t2S. rry l N_STS t 1c1� (Petitioner to be architect or engineer)
Owner ��I� 164i L� CL(1-�Dr,,
Address 2 1 2 E Address
Nt- I�WP0?;T oett h ��zip 2 25 �JF-t't�F4-J Cam. z2 z G a
Daytimere Phone (Q�i-�Q 642 - S 21
Daytime Phone (�3 )!-91- r.S T* Email: T�?1&1IM 6rifWtt?Fr(,X12-COW
2" REQUEST: Submit plans if necessary to illustrate request. Additional sheets or data may be attached. 11
OF EQUIVALENCY:
CODE SECTIONS:
b A, fJ l r2 . F ac- tz.ATCp -L _ `R31a
yS� 67M �-0ivL St STl of 5 F t f2� G� k 2
CaIt_l N 4 W NO 6 a 4�1 (�7
2KIU UI L 't .0 W - G
U S a PK Mg—
L. ., O I _ _A-VT^1,-tfRQ
Petitioner's Position
Signature CA Professional Lic. # C 2-(S 2 5 Date: 4• -2LF" -' Z.o 23
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9
(Alternate materials & methods)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved
By: Date
Request (DOES (E OT)essen any fire protection requirements.
equest (DOES)lessen the structural integrity
�CBC 104.10/CFC 104.8
{ (CBC Modification)
❑ Written Comments Attached
The Request is: XaGranted ❑ Denied (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
CHEF r,1!L'"•,;^, n-r;rlAt_
Signature _ Position
Print Name 10ti C-e I rM3
Date 04- �)O-70ZS
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: / r,- old �1 �i y' 1-oZ3 Forms\modif 07/08/22
Guidelines for Approval of Alternate Materials Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
B Floor/Ceilings
........ ....... . __ __ .......... .......
Wood Framed
1 Hour Fire -Rated Construction0imensienai
Lumber
Acoustical
Performance
Reference
Construction Detail
Description
Test Number
"0"1 �
clg. wt.3
• 5/8. SeeemocK FHECaaE Core
UL Des L501
38
32
CK-5412-7
B-52
gypsum panels, ceiling
— 1" nominal wood sub and finished floor
Based on 1-114" nominal
wood floor
— 2 x 10 wood joist 16" o.c.
........................................................................
—joints finished
39
56
CK-6412-8
• optional LEWMCK floor underlayment
Based on 1-1/4" nominal wood
• optional SRM-25 or SRB sound mat
floor, 44 oz carpet and 40 oz
• optional veneer plaster
pad atop flooring
clg. wt, 3
• 112" Or 5/8" SHEETwCK FHocsoE C Core
gypsum panels, ceiling
— 1" nominal wood sub and finished floor
UL Des L512
B-53
—2 x 10 wood plat 16" so
—joints InIsnecl
• optional 3/4" LEvernocx floor underlayment
• optional SRM-25 or SRB sound mat
• optional veneer plaster
cig. wt. 3
• 1/2" or 5/8" Seeemom FIREGME C Core
UL Des L514
B-54
gypsum panels
—1" nominal wood sub and finished floor
— 2 x 10 wood joist 16" no
— RC-1 channel or equivalent spaced 24" o.c.
— joints finished
• dull veneer plaster
dig. as 3
• 112" or 5/8" SHEEmom Fsecoor C Core
UL Des L514
47
67
CK-6512-7
B-55
gypsum panels
Based on 112" SHEEraeCK
—1-1/4" nominal wood sub and finished floor
FlHeconr C Care gypsum panels
— 44 oz carpet and 40 oz pad atop fir
— 2 x 10 wood joist 16" o.c.
........................................................................
— RC-1 channel or equivalent
48
66
CK-6412-9
—joints finished
Based on 5/B" SHo_moar
FnECODE Core gypsum panels
clg. wt. 3
• 5/8" SHEEmOrX FlaEcooE C Core gypsum
UL Des L516
59
USG 740704
B-56
panels
Based on 3" mineral wool batt,
—1-5/8" perlite-sand concrete
3/4" gypsum concrete and
L
plywood subfloor
— 2 x 10 wood joists 16" o c
— RC-1 channel or equivalent
1/2" SHbb oce FFECAaE C
Core gypsum panels
— joints finished
• optional veneer plaster
47
USG 740703
Based on 3" mineral wool
batt, vinyl tile atop flooring
........................................................................
65
USG 740705
Based on 3" mineral wool
batt, 44 oz carpet and
40 oz pad atop flooring
34 USG Fire -Resistant Assemblies
Axp
° \
q2a 2 S
� _� ,r
|; !(F
(
�
)[D:(D
R
�