HomeMy WebLinkAboutX2021-3285 - Alternative Material & MethodsX20ii - Sz$s
2ooi 121012T Rr►ras*ATE PC..
RECEIVED BY
@� CITY OF NEWPORT BEACH COMMUNITY
DEVELOPMENT
)1 COMMUNITY DEVELOPMENT DEPARTMENT APR 2 5 2023
BUILDING DIVISION
x 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
r.9i r ro i��P'
vsn/w.newportbeachca.pov 1 (949) 644-3200 CITY OF
NEWPORT BEACH
CASE NO.: is
FOR STAFF USE ONLY
❑ REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $297)
REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $297)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
SITE ADDRESS: GO& Opt 5
Owner : eo-rT
Plan Check # D SS(e' 2 >24 # of Stories 2-
Occupancy Classification 3 t.i
Use of Building 57� �^ # of Units
Project Status OOwS'('Pv C eW
Construction Type VS, Sev-
Verified by ITC
No. of Items
Fee due 2rf7
Owner DISTRIBUTION: Plan Check ! Oe��N NIK
Petitioner ❑ Inspector 5
❑ Other ~ ❑ Fire co _ _ ,
PETITIONER:
PetitionerSHA'W>J N1le
�((Pewttitiio^!Voner,ttto�� be architect or
Address t24C . VU6
Address lino j �j',,0�A--7y� e� W717gf/-r o � ,xz- Zip q �
/-1 T Zip Daytime Phone ('{i ) zi7 = L7 Qd
Daytime Phone
2 REQUEST: Submit plans if necessary to illustrate reque t. Additional ahqets or data maybe attached.
zll
VAJ
te0
o s
L N
3 JUSTIFICATION/FINDINGS OF EQUIVALENCY: Co�T%pl
1'ZJ7Af1,iri.n1wG /2 4 4.. 64-kVA*01?_11n�Of'/L Gg(.'L 05`12d1,2
Position6*a2AV=a 'ee AtZ'"'
Petitioner's L 1
Signature' i/!>CA Professional Lic. #,� Date:
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: �GBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8
(Alternate materials & methods) (CBC Modification)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached
By: Date
Request (DOE ) ( OES NO ) lessen any fire protection requirements.
Request (DOES) ) lessen the structural integrity
The Request is: Granted ❑ Denied (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
Signature
Position CHIEF BUILDING OFFICIAL Date
�-
Print Name <:
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: /ZEy' G/l 07 Vp - Forms\modif 07/08/22
Guidelines for Approval of Alternate Materials Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design ReviewNerification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
51MP50N
VPBGGZ"
ST BASE
_---- 445 VERT.
1 • L _
I I
L #3 TIES
1 2" O.C.
L 1
I I
I
1 3" CLR.
I
(----------J
PLAN VIEW
MOMENT F05T BASE CONN.
"W" PER PLAN
DOD P05T
51MP50N
"MPBGGZ"
M. P05T 5A5E
SLAB 4 REINF.
FOUND. PLAN
CKETE P05TAL
TING PER PLAN
3000. P51
CONC. PTG.
BM. PER PLAN
O O O
0 0
0 O O O
O
O
O
O
0
CAP °CCp' C
WOOD POST
PER PLAN
"CCo"
COL.
g
BM. TO POST CONN.
S
COLLAR TIE
PER Q
R/R RF. SHT'G.
PER PLAN PER PLAN
WOOD BEAM
PER PLAN
OL CAP
2x SHAPED
BLK'G.
n
B.N. 1x6 T&G
STARTER BOARD
--- ® O.H.
C.J. PER PLAN w/
5-16d NAILS ® END
E.N./
WHERE OCCURS
��Lv
2x FASCIA
"A35" CLIP
BOARD
® is" O.C.
U.N.O.
WALL FINISH
PER PLAN
DBL. TOP
PLATE
SHEAR WALL
STUDS ®
WHERE OCCURS
16" O.C.
(SEE FRAMING
PLAN)
tWac,E> S f-I>1NG
/(6MEFUT
SIDtrbG A."r QkS6
R
_1
00
SAW CU C NC.
SLAB TO INSERT
_21
COPPER OR
S.S.SHEET METAL
FLASH'G. OVER Z
"BITUTHENE" g
WATERPROOFING
COVER ALL EDGE
W/ SILICON
a0 ti �-�lc--
A
2X STUD WALL W/ WALL
SHEATHING PER PLAN ( W%+0 N•Cr e
v
5/8" ANCHOR BOLTS @ 48"
O.C. 12" MAX. FROM
CORNERS @ SPLICES. U.N.O.
(MIN. 2 EA. PIECE)
WF�C K'G
P.T.D.F. SILL PLATE
i PER PLAN
SEE FOUNDATION PLAN ' w
E.N. EFOR SLAB SPECIFICATION Y•
N
M
SAND
G
d � Q
XN244 CONT. TOP & BOT.
U.N.O. ON PLAN A
12" L �
EXTERJOR FOOTING (SINGLE POUR) 01
SIMPSON SSTB SELECTION TABLE
DBL. STUD
OR POST
PER PLAN
SEE (D
•
MODEL
NO.
2X, 3X, AND 2.2X SILL PL.
MONO POUR
TWO POUR
HDU2
SSTS16
SSTB20
HOU4
SST820
SSTB24
HDU5
SSTB24
SSTB24
HDUS
SST628
SSTB34
MODEL
NO.
DIA.
L
MIN.
EMBED.
SSTB16
5/8"
17-5/8
1
12-5/8
SSTB20
5/8"
21-5/8
16-5/8
SST624
5/8"
25-5/8
20-5/8
SSTB28
7/8"
29.7/8
24-7/8
SSTB34
1 7/8"
34-7/8
28-7/8
SSTB36
T71V
36-7/8
28-7/8
SAND
• SSTB ANCHOR BOLT -
SEE TABLE ABOVE
CONCRETE FOOTING SEE 1O