HomeMy WebLinkAboutM2023-0033 - Alternative Material & Methods/L12a2 3 -
D633
E Rr
CITY OF NEWPORT BEACH
COMMUNITY
DEVELOPMENT
o
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
FES 15 2023
'C941po FNVP
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.0ov 1 (949) 644-3200
CITY OF
CASE NO.: l _ _
•
NEWPORTBEACH
FOR STAFF USE ONLY
® REQUEST
TIT9 IFIRE COIDE) OR TITLE PROVISIONSFICATION TO OFE 5 (BUILDING CODE) Plan Check # a Stories OF THE NEWPORT BEACH MUNICIPAL CODE Occupancy Classification
(See Reverse for Basis for Approval) (Fee $297) Use of Building of Units
Project Status L"
I
REQUEST FOR ALTERNATE MATERIAL construction type
Verified by
OR METHOD OF CONSTRUCTION No. of Items
(See Reverse for Basis for Approval) (Fee $297)
Fee due
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
SITE ADDRESS: 439 HARBOR ISLAND DRIVE
Owner MICHAEL FLETCHER
Address 439 HARBOR ISLAND DRIVE
NEWPORT BEACH, CA Zip 92660
Daytime Phone ( I
Petitioner's
DISTRIBUTION:
El Owner lan Check
Petitioner IMInspector
❑ Fire ❑ Other
PETITIONER:
Petitioner PLAMEN PETROV, P.E.
(PNl#onertobe erohaecta,. gmeerl
Address 28161 CASITAS CT.
LAGUNA NIGUEL CA Zip 92867
Daytime Phone ( 714) 717-7542
Email: CONSULTING@PMA-BG.COM
HARBOR DESIGN CRITERIA
Position PRINCIPAL AT PMA CONSULTING, INC.
CA Professional Lic. # C66947
02/07/23
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: ❑ CDC 104.11/CFC 104.9 CBC 104.10/CFC 104.8
(Alternate materials & methods) ( C Modification)
❑ Concurrence from Fire Code. Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached
By: Date
Request (DOESa seen any fire protection requirements.
Request (DOESseen the structural integrity
The Request is:
Granted (see see reverse forp appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
Signatures u
Print Name�
PositionC EF RIM T)ING OFFIGM OZ— Z7—Zp Z3,
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant statement
fr
ernt of reasons for appeal and fling fees are required.)
CASHIER RECEIPT NUMBER:IcG W O - a t 24r5 Forms\modif 07/01/21
REVISED STRUCTURAL CALCULATIONS FOR
MODIFICATION REQUEST
for
REPLACEMENT OF TWO STEEL PILES AT AN EXISTING
FLOATING DOCK
Located at:
439 HARBOR ISLAND DRIVE
NEWPORT BEACH, CA 92660
Prepared for:
SWIFT SLIP DOCK & PIER BUILDERS, INC.
6351 INDUSTRY WAY
WESTMINSTER, CA 92683
Prepared by:
PMA CONSULTING, INC.
28161 CASITAS CT.
LAGUNA NIGUEL, CA 92677
JOB #39622SS
FEBRUARY 7, 2023
2/7/23
PNIA Consulting, Inc. Project: Piling Replacement Job: 39622SS
CONSULTING STRUCTURAL ENGINEERS 439 Harbor Island Drive Sheet: MOD-1
28161 CASITAG CT P (714) 717 - 7542 Newport Beach, CA 92660 Design: TPP
LAGUNA NIGUEL, CA 92677 Steel Piling IDate: 02/07/23
1
Docks
pile design below is based on the requirements of:
out & Design guidelines for Marina Berthing Facilities - Section D" - Department of Boating
Waterways of the State of California -July 2005 edition
>ign Criteria & Standard drawings for Harbor Construction"- City of Newport Beach - 2021 edition
Cut off >> 12.0'
.................................
hp = 8.50 ft above MLLW Point of application» 8.5Pill
(d)min = min [ 15' or (dreq'd penetration + T) ]
(h)cot off = 12 ft (pile cutoff height above MLLW)
MLLW
(L)pile = (h)cut off + (h)mud line + (d)min
(h)mudline= 3 it below MLLW
(h)cut off
(h)mud line
h
Try, Do = 12 in (D Steel Pipe
WI Fy =
42
ksi
(d)min
Wall (t) = 0.375 in nominal thickness
E =
29000
ksi
I
Wall (t) = 0.349 in design thickness
If Do / t = 32.0 < 3300 / Fy »»
Fb =
0.66
* Fy
3300 / Fy = 78.6 »»
Fb =
27.72
ksi Point of Fixity
A = (w / 4)*(Do^2 - D1^2) & »»
A =
12.8
inA2
S = (r / 321 -DI^4) & »»
S =
36.2
in^3
I = (r / 64)*(D&4 - DiA4) & »»
I =
217
inA4
Pall =?
ill= Fb`S
= 83527 ft-Ibs
h = (h)mudline + hp + 5' <<< Point of fixity 5' below mudline
= 16.5 ft «< Arm for flexural capacity calculations
By the flexural capacity of the steel pipe!
'de embedment
(d)=?
Pmax = 3280
Ibs
Lboat =
40
ft
<< Length of Boat
In = 11.5
ft
1
40
ft
<< Length of Dock
Try, b = 12.00
in
TEL
164
plf
<< Total Env. Load
DL Freeboard=
1.9
ft
<< Freeboard
Fcurrent=
5
plf
<< Current Load
Fdr=
12
plf
<< Wave Drift Force
Pw=
15
psf
<< Wind Pessure
Pmax =
((TEL*Lboat/2•Ld)*(2*Ld-Lboat)+(Ftlr*(Ld-Lboat)/3)+(Fcurrent*(Ld-Lboat)/3)+(PW
DLFreebcard*(Ld-Lboat)/3)
section 1807.3.2.1 of CBC
d=A/2*(1+sgrt[1+(4.36*h/A)]}
A = 2.34 * P / (S1 * b)
&S1=Fp*d/3
Fp = 200 1 <<< Per soils report Memorandum by EGA Consultants dated 02/06/23
section 1806.3.4, two times increase is permitted,
Fp design= 400 pcf (used in design)
section 1807.3.2.1, for (d) not over 12' deep,
& S1 <= 1600 psf 1/8" thickness added for
1806.1, 33% permissible increase for transient forces, corrosoin protection
:: S1 = 1956 psf
A = 3.92 ft
dreq'd = 9 ft »»
Pmax =
3280
Ibs & F = 42
ksi
Pile :
12.00
in x 0.500
in thick
(L)pile =
24
ft
Embed =
9
ft PILE #
1
Pau Consulting, Inc. Project: Piling Replacement 1Jo1b. 396227
URAL CONSULTING STRUCTENGINEERS 439 Harbor Island Drive Sheet: MOD-2
28161 cASITAS CT. P (714) 717-7542 Newport Beach, CA 92660 Design: TPP
LAGUNA NIGUEL, CA 92677 Steel Piling Date: 02/07/23
Docks
pile design below is based on the requirements of:
lout & Design guidelines for Marina Berthing Facilities - Section D" - Department of Boating
Waterways of the State of California - July 2005 edition
sign Criteria & Standard drawings for Harbor Construction% City of Newport Beach - 2021 edition
Cut off » 12.0'
............................
hp = 8.50 ft above MLLW Point of application>>
(d)min = min [ 15' or (dreq'd penetration + 3') ]
(h)cut off = 12 ft (pile cutoff height above MLLW)
MLLW
(L)pile = (h)cut off + (h)mud line + (d)min
(h)mudline= 4 ft below MLLW
(h)cut off
(h)mud line
h
Try, Do =
12 in cP Steel Pipe
W/ Fy =
42
ksi
(d)min
Wall (t) =
0.375 in nominal thickness
E =
29000
ksi
I
Wall (t) =
0.349 in design thickness
If Do / t =
32.0 < 3300 / Fy »»
Fb =
0.66
" Fy
3300 / Fy =
78.6 »»
Fb =
27.72
ksi Point of Fixity
A =
(r / 4)*(DoA2 - DiA2) & »»
A =
12.8
inA2
S =
(r / 32Do)*(DoA4 -DiA4) & »»
S =
36.2
inA3
1 =
(r, /64)*(DoA4-DiA4) & »»
I =
217
inA4
I Pall = 7
111= Fb-S
= 83527 ft-Ibs
In = (h)mudline + hp + 5' <<< Point of fixity 5' below mudline
= 17.5 ft <<< Arm for flexural capacity calculations
By the flexural capacity of the steel pipe!
Ile embedment
(d) = 7
Pmax = 3280
Ibs
Lboat =
40
ft
<< Length of Boat
h = 12.5
ft
Ld=
40
ft
<< Length of Dock
Try, b = 12.00
in
TEL
164
plf
<< Total Env. Load
DL Freeboard=
1.9
ft
<< Freeboard
Fcument=
5
plf
<< Current Load
Fdr=
12
plf
<< Wave Drift Force
Pw=
15
psi
<< Wind Pessure
Pmax =
((TEL*Lboat/2*Ld)*(2*Ld-Lboat) + (Fdr*(Ld-Lboat)/3) + (Fcurrent*(Ld-Lboat)/3) + (Pw*DLFreeboard*(Ld-Lboal)13)
section 1807.3.2.1 of CBC
d=A/2*{1+sgrt[1+(4.36*h/A)]}
A=2.34*P/(S1"b)
& S1=Fp*d/3
Fp = 200 psf <<< Per soils report Memorandum by EGA Consultants dated 02/06/23
section 1806.3.4, two times increase is permitted,
Fp design= 400 psf (used in design)
section 1807.3.2.1, for (d) not over 12' deep,
& S1 <= 1600 psf 1/8" thickness added for
1806.1, 33% permissible increase for transient forces, corrosoin protection
:: S1 = 2133 psf
A = 3.60 ft
dreg d = 9 ft »»
Pmax =
3280 Ibs & F = 42 ksi
Pile :
12.00 in x 0.500 in thick
(L)pile=
25 ft
Embed =
9 ft IPILE# 2