HomeMy WebLinkAboutPA2023-0003_20230321_Pilates Plus Building Dept Response ListCORRECTION NOTES (BUILDING DIVISION)
PROJECT: 1220 BISON AVE., SUITES A5 AND A6
UP #: UP2023-0003
SUBMITTAL: 2nd
DATE: 03/21/22
Page 1 of 1
APPLICATION
COMMENT # RESPONSE APPLICANT RESPONSES
1. COMPLIED PLEASE SEE REVISED UPLOADED PLANS. SEE
SHEET A1.3 FOR OCCUPANT LOAD CALCULATION.
2. COMPLIED
PLEASE SEE REVISED UPLOADED PLANS. SEE
SHEET A1.3 FOR EXIT ANALYSIS AND LOCATIONS
OF THE TWO REQUIRED EXITS.
3. COMPLIED THE SLOPE OF THE RAMP IS 1:12 MAX. OR 8.33%.
SEE A1.3 FOR REFERENCED DETAIL 1/A6.1
4. COMPLIED
PLEASE SEE REVISED UPLOADED PLANS. THE SITE
IS IN COMPIANCE WITH CURRENT ACCESSIBLE
REQUIREMENTS. SEE SHEET A1.0 FOR SITE PLAN
ILLUSTRATING AS-BUILT CONDITIONS.
5. COMPLIED PLEASE SEE REVISED UPLOADED PLANS. SEE
SHEET A1.0 FOR REVISED SITE PLAN.
6. COMPLIED COMPLIANCE HAS BEEN FIELD VERIFIED.
7. COMPLIED PLEASE SEE A1.0. RESTROOM HAS BEEN RE-
DESIGNED TO BE IN COMPLIANCE WITH CBC 11B.
8. COMPLIED PLEASE SEE A1.0 FOR ADDED REFERENCE TO
DETAIL 6/A6.1.
9. COMPLIED PLEASE SEE A1.0 AND ADDED REFERENCE TO
DETAIL 5/A6.0.
10. COMPLIED PLEASE SEE ACS.0 FOR ADDED DEFERRED
SUBMITTAL INFORMATION.