CASE NO.:
REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $276)
REQUEST FOR ALTERNATE MATERIAL JDa9�
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $276)-
REQUEST FOR EXEMPTION FROM DISABLED
ACCESS DUE TO PHYSICAL OR LEGAL
CONSTRAINT (Fee $1,535)
(Ratification by the Board of Appeals will be required.)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
SITE ADDRESS: 2516 Ocean Blvd.
Owner c/o C.J. Light Associates
Address 2516 Ocean Blvd
Corona Del Mar, CA Zip 92625
Daytime Phone (
: Submit plans if necessary
lection of steel soldier piles it
ITION/FINDINGS OF EQUIV
product spec sheet. A small
not have concrete cover bec
CITY OF
NEWPORT BEACH
III FOR STAFF USE ONLY 1111
Plan Check# rC3oJd-1I57# of Stories 5+WE'NrcPT
Occupancy Classification F.3 O
Use of Building SFR wi AV V # of Units 1
Project Status YLAA CHECK
Construction Typeyg-S PKtgKLE2E0
Verified by D.R•Ft.
No. of Items 1
Fee due .la17
DISTRIBUTION:
❑ Owner
9Plan Check -31,tE
❑ Petitioner
❑ Inspector
❑ Fire
❑ Other
Petitioner Roy Reed (Engineer)
(PetfUonerto be architect or engineed
Address 7727 Caminito Liliana
San Diego, CA Zip 92129
Daytime Phone (760 ) 586-8121
be attached.
Y; I CODE SECTIONS:
µ
of soldier beam web/fianae GQ5c- I' I 1 2 , 2t
Petitioner's
Position Principle Engineer
Signature CA Professional Lic. # C80503 Data 5/20/2022
FOR STAFF USE ONLY
DEPARTMENT ACTION: Inaccordancewith X BBC 104.11/CFC 104.9 El CBC 104.10/CFC 104.8
/— (Alternate materials 8 methods) (CBC Modification)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached
\ By: Date
Request (DOE (DO c unn Irsen any fire protection requirements.
R uest DOE eq ( (DOES NOT) lessen the structural integrity
The Request is �F5-Granted ❑ Denied (See reverse for
❑ Granted (Ratification required) appeal information)
Condhions of Approval:
Sig PositionCHIEF BUILDING OFFICI6ide
Print Name I tliz
OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and fling fees are required.)
CASHIER RECEIPT NUMBER:'7,EG -6vi�5/1 - 7lI Formsvnodff 111=2016
Guidelines for Approval of Alternate Materials. Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that
such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate
method to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan
amendments as necessary. The design professional has the responsibility to coordinate all construction
documents and ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant
to the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible Flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Information on Procedure for Appeal from a Determination or Action by the Chief Building Official or
Fire Code Official
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You