Loading...
HomeMy WebLinkAboutXR2022-1900 - Alternative Material & MethodsX ¢12o2z-1900 o��EWP°R @ CITY OF NEWPORT BEACH RECEIVED E IMIVED BY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT )+Ca BUILDING DIVISION cy4 oRN�e• 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92668-8915 JA N 3 0 2023 www.newoortbeachca.aov 1(949) 644-3200 CASE NO.: REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE) OF THE NEWPORT BEACH MUNICIPAL CODE (See Reverse for Basis for Approval) (Fee $276) REQUEST FOR ALTERNATE MATERIAL JDa9� OR METHOD OF CONSTRUCTION (See Reverse for Basis for Approval) (Fee $276)- REQUEST FOR EXEMPTION FROM DISABLED ACCESS DUE TO PHYSICAL OR LEGAL CONSTRAINT (Fee $1,535) (Ratification by the Board of Appeals will be required.) For above requests, complete Sections 1, 2 & 3 below by printing in ink or typing. JOB ADDRESS: SITE ADDRESS: 2516 Ocean Blvd. Owner c/o C.J. Light Associates Address 2516 Ocean Blvd Corona Del Mar, CA Zip 92625 Daytime Phone ( : Submit plans if necessary lection of steel soldier piles it ITION/FINDINGS OF EQUIV product spec sheet. A small not have concrete cover bec CITY OF NEWPORT BEACH III FOR STAFF USE ONLY 1111 Plan Check# rC3oJd-1I57# of Stories 5+WE'NrcPT Occupancy Classification F.3 O Use of Building SFR wi AV V # of Units 1 Project Status YLAA CHECK Construction Typeyg-S PKtgKLE2E0 Verified by D.R•Ft. No. of Items 1 Fee due .la17 DISTRIBUTION: ❑ Owner 9Plan Check -31,tE ❑ Petitioner ❑ Inspector ❑ Fire ❑ Other Petitioner Roy Reed (Engineer) (PetfUonerto be architect or engineed Address 7727 Caminito Liliana San Diego, CA Zip 92129 Daytime Phone (760 ) 586-8121 be attached. Y; I CODE SECTIONS: µ of soldier beam web/fianae GQ5c- I' I 1 2 , 2t Petitioner's Position Principle Engineer Signature CA Professional Lic. # C80503 Data 5/20/2022 FOR STAFF USE ONLY DEPARTMENT ACTION: Inaccordancewith X BBC 104.11/CFC 104.9 El CBC 104.10/CFC 104.8 /— (Alternate materials 8 methods) (CBC Modification) ❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached \ By: Date Request (DOE (DO c unn Irsen any fire protection requirements. R uest DOE eq ( (DOES NOT) lessen the structural integrity The Request is �F5-Granted ❑ Denied (See reverse for ❑ Granted (Ratification required) appeal information) Condhions of Approval: Sig PositionCHIEF BUILDING OFFICI6ide Print Name I tliz OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) (Signature, statement of owner or applicant, statement of reasons for appeal and fling fees are required.) CASHIER RECEIPT NUMBER:'7,EG -6vi�5/1 - 7lI Formsvnodff 111=2016 Guidelines for Approval of Alternate Materials. Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made. Requirements for Submittals The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the applicable data listed below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative is compatible with balance of code requirements. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information). • Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as necessary. The design professional has the responsibility to coordinate all construction documents and ensure compatibility between documents. • The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal procedure. • For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to start of design. Alternative Design Review/Verification The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to the Building Division prior to commencing the review. • Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that evaluation and design methods used by designer are appropriate to the alternative proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and possible Flaws that could affect performance of material in its installed state. • The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable reason(s). Inspection/Field Verification The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as follows: • To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification, quality assurance processes, and testing, as applicable. • When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved plans. Information on Procedure for Appeal from a Determination or Action by the Chief Building Official or Fire Code Official Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or providing equivalency would create an unreasonable hardship. Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date.