Loading...
HomeMy WebLinkAboutXR2023-0908 - Alternative Material & Methodsxle2 ot3 ID906 0 j cg4FoaN`r CITY OF NEWPORT BEACH, COMMUNITY DEVELOPMENT DEPARTMENT NT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 APR 2 4 20B www.newportbeachca.gov I (949) 644-3200 CITY OF CASE NO.: WMK)RTWZ" n EQUEST FOR MODIFICATION TO PROVISIONS ✓✓✓✓✓✓��-��- OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE) OF THE NEWPORT BEACH MUNICIPAL CODE (See Reverse for Basis for Approval) (Fee $297) REQUEST FOR ALTERNATE MATERIAL OR METHOD OF CONSTRUCTION (See Reverse for Basis for Approval) (Fee $297) For above requests, complete Sections 1, 2 & 3 below by printing in ink or typing. JOB ADDRESS: III FOR STAFF USE ONLY III Plan Check # V4dL3--0tO'3 # of Stories Occupancy Classification n IZ3 Use of Building # of Units Project Status I.CtIJ YC� Construction Type Verified by No. of Items Fee due DISTRIBUTION: ❑ Owner [Plan Check T) ,❑- Petitioner ❑ Inspector ❑ Fire ❑ Other PETITIONER: SITE ADDRESS: 2I 2 �4AZEL, :V>fZ . Petitioner Fi1`4< 6,-EQ MR � . A R�. (Petitioner to , architect or engineer) 1_t Owner �l� Address lt']Gi � ES-CCL(t'FPiL, Address 2l2 rc �L)Fb�T1�F�CLF Zip ZG Nr- ( G WPOZ7 BgA!! 4 Zip 2 25 2, y (QO ) o+e �- (u,5 Daytime Phone (Q4 ro42 ^ S 2I Da time Phone �+ Email:•t_1�0L:^.QY'Lk'iQ(-[tsr-Q •CoK. 2 1REQUEST: Submit plans if necessary to illustrate request. Additional sheets or data may be attached. 11 3 JUSTIFICATION/FINDINGS OF EQUIVALENCY: CODE SECTIONS: oSI N Q l H n , F 112C- lzA —Ln=n— R3 la ps� Ewl G�1 St c -ri K of s F t G+O k rL o M0o t I 4� X 1 U 0 l L lJ S (A plit ele-- I_ Petitioner's Position ,tI,PsL(TEC� Signature CA Professional Lic. # C 2 I S 2 tJ Date: 4• -24- -' 26 23 FOR STAFF USE ONLY DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9 (Alternate materials & methods) ❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved By: Date equest (DOES (D ES NOT) essen any fire protection requirements. Zecuest(DOES) lessen the structural integrity CBC 104.10/CFC 104.8 iV (CBC Modification) ❑ Written Comments Attached The Request is: Granted ❑ Denied (See reverse for appeal information) ❑ Granted (Ratification required) Conditions of Approval: Signature Position Print Name I oti C-e l rh,9a Date APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) (Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.) CASHIER RECEIPT NUMBER: Ae- D/D ?e, I/' 4oz3 Forms\modif 07/08/22 Guidelines for Approval of Alternate Materials Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made. Requirements for Submittals The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the applicable data listed below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative is compatible with balance of code requirements. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft [CC Building Performance Code Commentary Section 1.4.2.3 for background information). • Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as necessary. The design professional has the responsibility to coordinate all construction documents and ensure compatibility between documents. • The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal procedure. • For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to start of design. Alternative Design Review/Verification The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to the Building Division prior to commencing the review. • Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that evaluation and design methods used by designer are appropriate to the alternative proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and possible flaws that could affect performance of material in its installed state. • The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable reason(s). Inspection/Field Verification The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as follows: • To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification, quality assurance processes, and testing, as applicable. • When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved plans. Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or providing equivalency would create an unreasonable hardship. Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date. B Floor/Ceilings ...... -.--. Wood Framed Dimensional Lumber Acoustical Performance Reference r r clg. wt, 3 • 5/8" SHEUROCK Fucaoe Core UL Des L501 38 32 CK-6412-7 B-52 gypsum panels, ceiling — 1" nominal wood sub and finished floor Based on 1-114" nominal wood floor — 2 x 10 wood joist 16" ox. ........................................................................ —joints finished 39 56 CK-6412-8 • optional LMLRoCK floor underlayment Based on 1-1/4" nominal wood • optional SRM-25 or SRB sound mat floor, 44 oz carpet and 40 oz • optional veneer plaster pad atop flooring clg. wt. 3 • 112" or 5/8" Sxo= oa Foeceoe C Core UL Des L512 B-53 gypsum panels, ceiling — 1" nominal wood sub and finished floor — x 10 we of met 16" O.C. —joints ims e • optional 3/4" Lwo_RoCrc floor underlayment • optional SRM-25 or SRB sound mat • optional veneer plaster clg. wt, 3 • 1/2" or 5/8" SIH = ROCK Fri C Core UL Des L514 B-54 gypsum panels — 1" nominal wood sub and finished floor — 2 x 10 wood joist 16" o.c. — RC-1 channel or equivalent spaced 24" o,c. — joints finished • optional veneer plaster rig. wt 3 • 1/2" or 5/8" SRffiReCK Fnecooe C Core UL Des L514 47 67 CK-6512-7 B-55 gypsum panels Based on 1/2" SREETROCK — 1-1A nominal wood sub and finished floor FROMM C Core gypsum panel, — 44 oz carpet and 40 oz pad atop fir — 2 x 10 wood joist 16" o.c. .................. ............................................... ....... — RC-1 channel or equivalent 48 66 CK-6412-9 —joints finished Based on 5/8" SREFmeCK FRecom Core gypsum panels rig, wt. 3 • 5/8" 3aEEmOCK FneCooe C Core gypsum panels UL Des L516 59 USG 740704 Based on 3" mineral wool haft, B-56 —1-5/8" perlite-sand concrete plywood subfloor — 2 x 10 woad joists 16" o.c. — RC-1 channel or equivalent 3/4" gypsum concrete and 1/2" SReernocK FIRELeae C Care gypsum panels .............. �I joints finished • optional veneer plaster 47 USG 740703 Based on 3 mineral wool batt, vinyl tile atop flooring 65 USG 740705 Based on 3" mineral wool batt, 44 oz carpet and 40 oz pad atop flooring 34 USG Fire -Resistant Assemblies aaaaaN' \�[ : £tea q { : a, \/;/1 ;! !! |! | ! §D[:®\§B a |9 \ � � � �