Loading...
HomeMy WebLinkAbout06 - Annual Measure M2 Eligibility SubmittalQ �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report June 13, 2023 Agenda Item No. 6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Theresa Schweitzer, Finance and Administrative Manager tchweitzer@newportbeachca.gov PHONE: 949-644-3335 TITLE: Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal ABSTRACT - The City of Newport Beach (City) must annually submit certain required documents in order to maintain eligibility to receive Measure M2 Fair Share and Competitive funding from the Orange County Transportation Authority (OCTA). The submittal documentation this year requires approval of an updated Measure M2 Seven -Year Capital Improvement Program (CIP) and a City Council resolution regarding the status and update of the Circulation Element/Master Plan of Arterial Highways (MPAH) Consistency, Mitigation Fee Program (MFP), a Local Signal Synchronization Plan (LSSP) consistent with the Regional Traffic Signal Synchronization Master Plan (RTSSMP), and a Pavement Management Plan (PMP). RECOMMENDATIONS: a) Determine this action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because this action will not result in a physical change to the environment, directly or indirectly; b) Adopt the Measure M2 Seven -Year Capital Improvement Program (CIP); c) Adopt Resolution No. 2023-35, A Resolution of the City Council of the City of Newport Beach, California, Concerning the Status and Update of the Circulation Element, Mitigation Fee Program, Local Signal Synchronization Plan, and Pavement Management Plan for the Measure M2 Program, and thereby adopting the updated Local Signal Synchronization Plan; and d) Direct staff to submit all necessary material to OCTA to satisfy the FY 2023-24 Measure M2 annual eligibility requirements. DISCUSSION: On November 7, 2006, Orange County voters approved Ordinance No. 3, the Renewed Measure M (M2) multi -billion -dollar program extension of the original Measure M. M2 authorized the imposition of a one-half cent retail transaction and use tax for a period of 30 years, starting in 2011. 6-1 Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal June 13, 2023 Page 2 Current M2 legislation provides local agencies with 18% of the sales tax revenue collected under a program called "Fair Share." The distribution to each local agency is based on a formula using population, miles of existing arterial highways located within each jurisdiction, and taxable sales. A forecast of Local Fair Share Funds was released by OCTA in April of 2023 and the City' s apportionment is approximately $2.7 million in FY 2023-24 for local street projects under the Fair Share Program. To maintain eligibility for Measure M2 funds, the City must satisfy the following requirements by June 30, 2023: 1. Adopt a Measure M2 Seven -Year CIP that includes all projects to be funded partially or fully by Measure M2 dollars (Attachment A); 2. Adopt a resolution concerning the status and update of the Circulation Element/MPAH Consistency, MFP, LSSP, and PMP for the Measure M2 Program; and 3. Submit all other required documentation required by OCTA Fiscal Year 2023-24 Measure M2 Eligibility Guidelines. The budgets shown on the Measure M2 Seven -Year CIP for Fiscal Years 2023-2024 to 2029-2030 are estimated based on anticipated spending and historic needs. The budget for Fiscal Year 2023-2024 is included in the proposed Capital Improvement Program budget for City Council adoption on June 13, 2023. Actual budgets for future years have not yet been established. The MFP assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to new development. These Fair Share Fees are adjusted annually based on the Consumer Price Index (Attachment C). The LSSP is a three-year plan identifying the City's traffic signal synchronization, street routes, and traffic signals to be improved. An updated LSSP is required to be submitted to OCTA every three years (Attachment D). The PMP outlines the processes in place for the planning, preventative maintenance, and repair of the City's roadways. An updated PMP report (Attachment E) is required to be submitted to OCTA on a biennial basis. This updated pavement system assessment was completed in May of 2023 and the results show that the City's overall weighted Pavement Condition Index (PCI) for the pavement network is 82, which is in the "Good" category. This report also verified that the City's overall pavement condition meets or exceeds the City Council's goal of maintaining a citywide PCI of 80 or higher. Additionally, as a result of maintaining a network PCI of 80 or higher, the City remains eligible for a local agency match reduction of 10 percent. A standard item included in the City's annual eligibility documentation is a Maintenance of Effort (MOE) Certification. This required certification is meant to ensure that the local jurisdiction maintains a minimum level of local street and road expenditures and that the M2 funds are used to supplement, rather than replace, local funds. The City has complied with this and all other eligibility requirements since the inception of the Measure M2 program. 6-2 Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal June 13, 2023 Page 3 The FY 2023-24 MOE benchmark for the City of Newport Beach was established at $14,292,404. The MOE benchmark was most recently adjusted in 2023 and is adjusted every three years. Historically, the City exceeds the benchmark by a considerable amount. Last year's MOE expenditures totaled $16.8 million. Upon the City Council' s approval of the recommended actions, a complete submittal of the City's eligibility packet will be transmitted to OCTA by the June 30, 2023, submission deadline. FISCAL IMPACT: Submittal of the eligibility documentation ensures that the City will continue to receive its Fair Share portion of the Measure M2 funds, as well as allow the City to participate in receiving additional funds through the Measure M2 Competitive grant funding programs. This amounts to several million dollars in roadway -related funding each year and is a key part of the City's roadway maintenance program. Annually, OCTA prepares a 7-year funding estimate (see table below). Year over year increases are projected around 3 percent. Estimated Measure M2 Local Fair Share Program Funding FY2023-24 FY2024-25 FY2025-26 FY2026-27 FY2027-28 FY2028-29 FY2029-30 7 Year Estimate $2,728,303 $2,831,037 $2,920,373 $3,006,962 $3,108,260 $3,208,400 $3,309,301 $21,112,636 ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A — Measure M2 Seven -Year Capital Improvement Program Attachment B — Resolution No. 2023-35 Attachment C — Mitigation Fee Program — Fair Share Fee Schedule Attachment D — Local Signal Synchronization Plan Attachment E — Pavement Management Plan 6-3 ATTACHMENT A Measure M Seven Year Capital Improvement Program For Fiscal Years 2023-2024 through 2029-2030 City of Newport Beach Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Estimated Project Name 23/24 24/25 25/26 26/27 27/28 28/29 29/30 Cost Fund Source Various Pavement 3,285,000 3,000,000 2,930,000 2,700,000 3,000,000 2,581,000 3,000,000 20,496,000.00 M Fair Share 19.3% Rehabilitation Projects 4,713,000 3,000,000 2,993,000 2,866,000 3,000,000 2,768,000 3,000,000 22,340,000.00 Gas Tax 21.0% 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 10,500,000.00 S61 - RMRA 9.9% 7,537,000 6,000,000 6,000,000 5,750,000 4,723,500 4,757,000 6,000,000 40,767,500.00 General Fund 38.4% 9,391,000 9,391,000.00 Neighborhood Enhancement 8.8% 650,000 650,000.00 Oceanfront Enroachment 0.6% 502,000 502,000.00 Contributions 0.5% 500,000 500,000.00 Tidelands/Tidelands Capital 0.5% 1,150,000 1,150,000.00 Water Capital Dist &Piping 1.1% Subtotal 29,228,000 13,500,000 13,423,000 12,816,000 12,223,500 11,606,000 13,500,000 106,296,500.00 Total 100% E 2,922,800 1,350,000 1,342,300 1,281,600 1,222,350 1,160,600 1,350,000 C / I 26, 305, 200 12 ,150, 000 12, 080, 700 11, 534, 400 11, 001,150 10, 445, 400 12,150, 000 Balboa Peninsula $124,490 $124,490 M Comp 79% Summer Trolley Project $33,640 $33,640 Balboa Village Pkg Mgmt District 21 % Subtotal $158,130 $158,130 Total 100% Balboa Peninsula 99,790 99,790 M Comp 29% Summer Trolley Expansion Program 239,580 239,580 Balboa Village Pkg Mgmt District 71 % Subtotal 339,370 339,370 Total 100% West Coast Hwy Intersection 1,400 11,250,000 11,251,400 M Comp. 75% Improvements and Pedestrian Bridge 0 3,000,000 3,000,000 M Fair Share 20% 0 750,000 750,000 Gas Tax 5% Subtotal 1,400 15,000,000 15,001,400 Total 100% Newport Bay Water Wheel 3,000 3,000 General Fund 0.16% 1,869,000 1,869,000 Contributions 99.57% 5,000 5,000 Tidelands 0.27% Subtotal 1,877,000 1,877,000 Total 100% Balboa Island/Corona del Mar 58,500 58,500 M Comp 90% Microtransit Feasibility Study 6,500 6,500 Contributions 10% Subtotal 65,000 65,000 Total 100% TOTAL PROJECTED BUDGET 31,668,900 13,500,000 13,423,000 12,816,000 27,223,500 11,606,000 13,500,000 123,737,400 I:\Users\PBW\Shared\COUNCIL\FY 22-23\21 - Jun 13\Measure M2\M2_FY 23-24 7-yr CIP TGS TAS SM TAS v2 06/06/2023 " CAPITAL IMPROVEMENT PROJECTS AS IDENTIFIED IN THE PROPOSED 2023-2024 CIP Measure M General Tidelands/ Measure M Comp. SB1 - Fund Tidelands Transportation Balboa Village Total Fair Share (1230050, RMRA Gas Tax (01201926, Contributions Capital &Circulation Parking Mgmt 1230051, (12101) (13501, 13801) (10001, District Neighborhood Oceanfront Wastewater Water Capital (12201) 1230052: (12601) 01201927, 10001940/ (14001) (53501) Enhancement Encroachment Enterprise Dist & Piping Description �wnnsvx 01201928) lnlnlx (53601) (01201938) (71101) (70201931) Balboa Island Drainage Master Plan / Pum Station 19D11 Balboa Island Street and Draina a Im rovements Collins BI Beach Access Street Ends - Peninsula Point 22R12 City Bridge Maintenance 21 R13 Concrete Replacement P m Dover, Mariners, Bay Knolls East Coast Hwy Pavement Rehab 21 R12 East Coast H Pavement Rehab 23R11 Goldenrod Pedestrian Brid a Im rovements 23R12 Irvine Avenue Pavement Rehabilitation with County 24R11 Landscape Enhancement Program 231-01 & 241-01 MacArthur Blvd Pavement Rehabilitation Jamboree to Cam Newport Coast Dr Pavement Rehabilitation 22R14 Old Ne ort Boulevard /West Coast Hi hwa Modifications Old Ne ort Curb/Gutter/Sidewalk Im rovements 15th St to Pavement Mana ement Plan Maintenance /Ins edion 233 Rubberized Pavement Grant Pro ram 23R02 San Mi uel Dr Pavement Rehab 23R13 Slur Seal Program 23R04 Slur Seal Program Dover, Mariners, BayKnolls 24R04 Storm Drain System Re air / Rehabilitation 23D02 Street Pavement Re air Proram 23R03 Street Pavement Re air Prorem 24R03 Streetlight Rehabilitation Program 23V02 and 24V02 Su erior Avenue and Hos ital Road Pavement Rehabilitatio Via Lido and Via O orto Intersection Improvements 24R12 Von Kaman Ave Pavement Rehab 23R15 kr wts funded by Measure M Comp, RAhna Panin—la Snmmar Trnllwv Fxnan.,inn (i gTI1) Balboa Peninsula Summer Trolley (17T13) $158,130 $124,490 $33,640 Balboa Island/Corona del Mar Microtransit Feasibility Study (21 T13) 1 $65,0001 1 $58,500 $6,500 West Coast Hwy Intersection Improvements & Pedestrian Bridge (21 R16) 1 $1,400 $1,400 Subtotal 1 $563,900 $0 $284,180 $0 $01 $0 $6,500 $01 $0 $273,220 $0 $0 $0 $0 6/6/23, 3:23 PM ocfundtracker.octa.net/CIP/report projectlisting Orange County Transportation Authority FY 2023/24 - FY 2029/30 Capital Improvement Program ITIP �^ �^ �� IMPLEMENTING AGENCY Newport Beach, City l Local Project Number: 20-NBCH-CBT-3956 Additional Project IDs: Type of Work: Transit Type of Work Description: Transit - Service Planning Limits Balboa Island and Corona del Mar Project Notes Other - Contributions. Last Revised: 23-00 - Submitted ITIP ID CP-10958 Project Title Balboa Island/Corona del Mar Microtransit Feasibility Study Project Description This project prepares a study to review the feasibility of a local transit program to serve the Balboa Island and Corona del Mar Communities. FISCAL TOTAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED 2024 Other $0 $0 $0 $6,500 $6,500 $6,500 2024 PROJECT V - Community $0 $0 $0 $58,500 $58,500 $58,500 Circulators Totals: $0 $0 $0 $65,000 $65,000 $65,000 Local Project Number: 16-NBCH-CBT-3832 Project Title Additional Project IDs: Balboa Peninsula Trolley Type of Work: Transit Project Description Type of Work Description: Transit - New Service Shuttle program for the Balboa Peninsula area. L' 't FISCAL Total Programmed: $65,000� IMPLEMENTING AGENCY Newport �seach, City i ims FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL Balboa Peninsula YEAR ESCALATED Project Notes 2024 PROJECT V - $0 $0 $0 $124,490 $124,490 $124,490 Community Circulators 2024 Other $0 $0 $0 $33,640 $33,640 $33,640 Totals: $0 $0 $0 $158,130 $158,130 $158,130 Last Revised: 23-00 - Submitted Total Programmed: $158,130 TIPID -- -- IMPLEMENTING AGENCY Newport Beach, City Local Project Number: 18-NBCH-CBT-3913 Project Title Additional Project IDs: Balboa Peninsula Trolley Expansion Type of Work: Transit Project Description Type of Work Description: Transit - New Service Provide trolley service for an additional 5 weekends in August through to Labor Day Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Balboa Peninsula YEAR ESCALATED Project Notes 2024 PROJECT V - Community Circulators $0 $0 $0 $99,790 $99,790 $99,790 Other: Balboa Village Parking Management District 2024 Other $0 $0 $0 $239,580 $239,580 $239,580 Last Revised: 23-00 - Submitted Totals: $0 $0 $0 $339,370 $339,370 $3399370 Total Programmed: $339,3701 https://ocfundtracker.octa.net/CIP/report—project—listing 6-61 /4 6/6/23, 3:23 PM TIP ID CP-11932 ocfundtracker.octa.net/CIP/report project_listing IMPLEMENTING AGENCY NewportBeach, Local Project Number: 20-NBCH-ECP-3986 Additional Project IDs: Type of Work: Other Type of Work Description: Other - Other Limits San Diego Creek Upstream of Jamboree Road Bridge Project Notes Other - Upper Newport Bay Restoration Fund & Contributions. Last Revised: 23-00 - Submitted Project Title Newport Bay Trash Wheel Project Description Trash interceptor collection vessel that captures trash floating in San Diego Creek from inland Orange County into Newport Bay. FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2024 Other $0 $0 $1,874,000 $0 $1,874,000 $1,930,220 2024 General Fund $0 $0 $0 $3,000 $3,000 $3,000 Totals: $0 $0 $1,874,000 $3,000 $1,877,000 $1,933,220 Total Programmed: $1,877,0001 https://ocfundtracker.octa.net/CIP/report_project_listing 6-7 2/4 6/6/23, 3:23 PM ocfundtracker.octa.net/CIP/report project_listing TIP ID CP-10982 IMPLEMENTING AGENCY Newport Beach, City of Local Project Number: N/A Project Title Additional Project IDs: Various Pavement Rehabilitation Projects Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance - Various pavement rehabilitation projects as determined by the Pavement Management Program and Rehabilitation of roadway field reviews Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O8M TOTAL TOTAL ESCALATED Citywide Project Notes 2024 Measure M2 Local Fairshare $328,500 $0 $2,956,500 $0 $3,285,000 $3,373,695 M %) LSR: SB1 Fund (10%) Share (19%) Gas Tax (19%) General Fund (39/0) 2024 Gas Tax $471,300 $0 $4,241,700 $0 $4,713,000 $4,840,251 2024 General Fund $753,700 $0 $6,783,300 $0 $7,537,000 $7,740,499 Local Streets and 2024 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,540,500 apportionments 2025 Measure M2 Local Fairshare $300,000 $0 $2,700,000 $0 $3,000,000 $3,164,430 2025 General Fund $600,000 $0 $5,400,000 $0 $6,000,000 $6,328,860 Local Streets and 2025 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,582,215 apportionments 2025 Gas Tax $300,000 $0 $2,700,000 $0 $3,000,000 $3,164,430 Local Streets and 2026 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,625,181 apportionments 2026 General Fund $600,000 $0 $5,400,000 $0 $6,000,000 $6,500,726 2026 Gas Tax $299,300 $0 $2,693,700 $0 $2,993,000 $3,242,779 2026 Measure M2 Local Fairshare $293,000 $0 $2,637,000 $0 $2,930,000 $3,174,521 2027 General Fund $575,000 $0 $5,175,000 $0 $5,750,000 $6,399,508 2027 Gas Tax $286,600 $0 $2,579,400 $0 $2,866,000 $3,189,737 2027 Measure M2 Local Fairshare $270,000 $0 $2,430,000 $0 $2,700,000 $3,004,986 Local Streets and 2027 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,669,437 apportionments Local Streets and 2028 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,715,020 apportionments 2028 Measure M2 Local Fairshare $300,000 $0 $2,700,000 $0 $3,000,000 $3,430,040 2028 Gas Tax $300,000 $0 $2,700,000 $0 $3,000,000 $3,430,040 2028 General Fund $472,350 $0 $4,251,150 $0 $4,723,500 $5,400,598 Local Streets and 2029 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,761,971 apportionments 2029 Measure M2 Local Fairshare $258,100 $0 $2,322,900 $0 $2,581,000 $3,031,764 2029 General Fund $475,700 $0 $4,281,300 $0 $4,757,000 $5,587,796 2029 Gas Tax $276,800 $0 $2,491,200 $0 $2,768,000 $3,251,423 Local Streets and 2030 Roads $150,000 $0 $1,350,000 $0 $1,500,000 $1,810,330 apportionments 2030 Gas Tax $300,000 $0 $2,700,000 $0 $3,000,000 $3,620,659 2030 General Fund $600,000 $0 $5,400,000 $0 $6,000,000 $7,241,319 2030 Measure M2 Local Fairshare $300,000 $0 $2,700,000 $0 $3,000,000 $3,620,659 Totals: $9,410,350 $0 $84,693,150 $0 $94,103,500 $104,443,374 Last Revised: 23-00 - Submitted Total Programmed: $94,103,500 https://ocfundtracker.octa.net/CIP/report_project_listing 6-8 3/4 6/6/23, 3:23 PM ocfundtracker.octa.net/CIP/report project_listing TIP ID CP-10962 IMPLEMENTING AGENCY Newport Beach, City of Local Project Number: 20-NBCH-ICE-3966 Project Title Additional Project IDs: West Coast Highway Intersection Improvements and Pedestrian Bridge Type of Work: Bridge Project Description Type of Work Description: Bridge - Construction Construction of a 240 feet long bicycle and pedestrian bridge over heavily trafficked, 8 lane Superior of new bridge crossing Avenue. Includes new landings on the south-east and north-east corners of the intersections, as well as site improvements. Limits FISCAL TOTAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED Bridge will span Superior Ave at the intersection of Pacific Coast Hwy and Balboa Blvd 2024 PROJECT V - $1,400 $0 $0 $0 $1,400 $1,400 Project Notes Community Circulators 2028 PROJECT V - Community Circulators $0 $0 $11,250,000 $0 $11,250,000 $13,041,833 2028 Gas Tax $0 $0 $750,000 $0 $750,000 $869,456 2028 Measure M2 Local $0 $0 $3,000,000 $0 $3,000,000 $3,477,822 Fairshare Last Revised: 23-00 - Submitted Totals: $1,400 $0 $15,000,000 $0 $15,001,400 $17,390,511 Total Programmed: $15,001,400� https://ocfundtracker.octa.net/CIP/report_project_listing 6-9 4/4 ATTACHMENT B RESOLUTION NO. 2023- 35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH, CALIFORNIA, CONCERNING THE STATUS AND UPDATE OF THE CIRCULATION ELEMENT, MITIGATION FEE PROGRAM, LOCAL SIGNAL SYNCHRONIZATION PLAN, AND PAVEMENT MANAGEMENT PLAN FOR THE MEASURE M2 PROGRAM WHEREAS, the City of Newport Beach ("City") desires to maintain and improve the streets within its jurisdiction, including those arterials contained in.the Master Plan of Arterial Highways ("MPAH") administered by the Orange County Transportation Authority ("OCTA"); WHEREAS, the City has endorsed a definition of and process for determining consistency of the City's Traffic Circulation Plan ("Circulation Element") with the MPAH; WHEREAS, the City's Circulation Element, which is incorporated into the City's General Plan, does not preclude implementation of the MPAH within its jurisdiction; WHEREAS, the City is required to adopt a resolution biennially informing OCTA that the City Circulation Element is in conformance with the MPAH and 'whether any changes to any arterial highways of said Circulation Element have been adopted by the City during Fiscal Years (FY) 2021-22 and FY 2022-23; WHEREAS, the City is required to send biennially to OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re -qualifying for participation in the Comprehensive Transportation Funding Programs, which are a collection of competitive grant program comprised primarily of Measure M2 funds (an Orange County transportation sales tax) offered to local agencies to assist in funding street improvements, transit expansion and even environmental mitigation projects; WHEREAS, the City is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new development; WHEREAS, OCTA has developed the Regional Traffic Signal Synchronization Master Plan to identify traffic signal synchronization street routes and traffic signals within and across jurisdictional boundaries, and defines the means of implementing the Regional Traffic Signal Synchronization Program; 6-10 Resolution No. 2023- Page 2 of 5 WHEREAS, the Regional Traffic Signal Synchronization Program requires that local jurisdictions adopt a Local Signal Synchronization Plan consistent with the Regional Traffic Signal Synchronization Master Plan as a key component of local jurisdictions' efforts to synchronize traffic signals across local jurisdictions' boundaries; WHEREAS, the Local Signal Synchronization Plan must be updated by June 30, 2023 to continue to be eligible to receive Net Revenues as part of OCTA's Measure M2; WHEREAS, "Net Revenues" is defined by OCTA in its Measure M2 Ordinance as "[a]II of the gross revenues generated from the transactions and use tax plus any interest or other earnings thereon (collectively, "Revenues"), after the deduction for: (i) amounts payable to the State Board of Equalization for the performance of functions incidental to the administration and operation of the Ordinance, (ii) costs for the administration of the Ordinance as provided herein, (iii) two percent (2%) of the Revenues annually allocated for Environmental Cleanup, and (iv) satisfaction of debt service requirements of all bonds issued pursuant to the Ordinance that are not satisfied out of separate allocations, shall be defined as 'Net Revenues' and shall be allocated solely for the transportation purposes described in the Ordinance."; WHEREAS, the City is required to meet eligibility requirements and submit eligibility verification packages to OCTA in order to remain eligible to receive M2 funds; WHEREAS, the City is required to adopt and update a Pavement Management Plan ("PMP"), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and WHEREAS, the City is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads. NOW, THEREFORE, the City Council of the City of Newport Beach resolves as follows: Section 1: The City Council does hereby inform OCTA that: a) The arterial highway portion of the City's Circulation Element is in conformance with the MPAH. 6-11 Resolution No. 2023- Page 3 of 5 b) The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2021-22 and FY 2022-23. c) The City affirms that it will bring forward requests to amend the MPAH, when necessary, in order to ensure that the MPAH and Circulation Element remain consistent. d) The City reaffirms that the existing Mitigation Fee Program is in effect. e) The City hereby adopts, and will maintain, the ;Local Signal Synchronization Plan presented to the City Council at the June 13, 2023, City Council Meeting, which is incorporated herein by reference, which includes goals that are consistent with those outlined as part of the Regional Signal Synchronization Master Plan, including signal synchronization across jurisdictions. f) The Local Signal Synchronization Plan identifies traffic signal synchronization street routes, including all elements of the Regional Signal Synchronization Network located within the City. g) The Local Si Synchronization nchronization Plan includes the traffic g Y signal inventory for all traffic signal synchronization street routes. h) The Local Signal Synchronization Plan includes a three-year plan showing capital, operations, and maintenance of signal synchronization along the traffic signal synchronization street routes and traffic signals. i) The Local Signal Synchronization Plan includes lan update on the status and performance of traffic signal synchronization activities. j) The Local Signal Synchronization Plan includes a discussion on the review and revision, as may be necessary, on the 6-12 Resolution No. 2023- Page 4 of 5 timing of traffic signals on the traffic signal synchronization street routes. k) The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan Guidelines. I) The City hereby adopts the PMP presented to the City Council at the June 13, 2023, City Council meeting, which is incorporated herein by reference, and has provided an updated PMP report, using the required format, to OCTA. m) The City's Public Works Director, City Engineer or designee is authorized to sign the PMP certification form. Section 2: The recitals provided in this resolution are true and correct and are incorporated into the operative part of this resolution. Section 3: If any section, subsection, sentence, clause or phrase of this resolution is, for any reason, held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this resolution. The City Council hereby declares that it would have passed this resolution, and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional. Section 4: The City Council finds the adoption of this resolution is not subject to the California Environmental Quality Act ("CEQA") pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. 6-13 Resolution No. 2023- Page 5 of 5 Section 5: This resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall certify the vote adopting the resolution. ADOPTED this 13th day of June, 2023. NOAH BLOM Mayor ATTEST: Leilani I. Brown City Clerk APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Aaron C. Harp City Attorney 6-14 ATTACHMENT C EW PO CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT 1 CIVIC CENTER DRIVE C, P.O. BOX 1768, NEWPORT BEACH, CA 92659-1768 (949) 644-3311 MEMORANDUM TO: PLANNING DEPARTMENT FROM: TRAFFIC ENGINEER DATE: June 23, 2022 SUBJECT: REVISED FAIR SHARE FEES — UPDATE 2022 Per City Ordinance 94-19, the Fair Share Fees are to be adjusted effective July 1 of each year based on the Consumer Price Index (the Los Angeles — Long Beach — Anaheim, All Urban Consumer Index). For 2021, the fee will be revised 8.0%, from $234.441trip to $25320/trip. A revised Fair Share Fee Summary Table of various land uses as defined by the 1996 NBTAM is attached for your use. If you have any questions regarding the new fee or help with fee calculations, please contact me at ext. 3329. Antony Brine City Traffic Engineer Attachment IaUsers1PBMSharedlTRAFF10Fair Share FeeVairsharememo2022.doc 6-15 FAIR SHARE FEE SUMMARY TABLE 06.23.22 FAIR SHARE FEE SUMMARY TABLE Fair Share Fee Per Trip $263.20 USE GEN RATE UNIT FEE/UNIT 1 Res-Low(SFD) 11.00 DU $2,785 2 Res -Medium (SFA) 8.60 DU $2,177 3 Apartment 6.50 DU $1,646 4 Elderly Residential 4.00 DU $1,013 5 Mobile Home 6.00 DU $1,519 6 Motel 10.10 ROOM $2,557 7 Hotel 10.50 ROOM $2,659 $ Resort Hotel 6.00 ROOM $1,519 9 Regional Commercial 22.00 TSF $5,570 10 General Commercial 40.00 TSF $10,128 11 Comm./Recreation 40.00 ACRE $10,128 12 Resort Commercial ' 35.00 TSF $8,862 13 Restaurant 66.90 TSF $16,939 14 Family Restaurant 177.87 TSF $45,036 15 Fast Food Restaurant 142.00 TSF $35,954 16 Auto Dealer/Sales 47.91 TSF $12,131 17 Yacht Club 50.00 TSF $12,660 18 Health Club 40.00 TSF $10,128 19 Tennis Club 44.30 CRT $11,217 20 Marina 0.50 SLIP $127 21 Theater 1.50 SEAT $380 22 Newport Dunes 5.70 ACRE $1,443 23 General Office 13.00 TSF $3,292 24 Medical Office 45.00 TSF $11,394 25 R & D 9.50 TSF $2,405 26Industrial 5.06 TSF $1,266 27 Mini-Storage(VUarehouse 2.61 TSF $661 28 Pre-School/Day Care 67.00 TSF $16,964 29 Elementary/Private School 1.00 STU $253 30 Junior/High School 1.40 STU $354 31 Civic Center/Museum 32.00 TSF $8,102 32 Library 41.80 TSF $10,584 33 Post Office 86.80 TSF $21,977 34 Hospital 11.40 BED $2,886 35 Nursing/Conv. Home 2.70 PAT $684 36 Church 7.70 TSF $1,950 37 YouthCtr/Service 4.00 TSF 38 Park 6.00 ACRE 39 Regional Park 5.00 ACRE U$1,266 40 Golf Course 6.00 ACRE 41 Resort Golf Course 3.00 ACRE 1:\Users\PBWIShared\TRAFFIC1Fair Share Fee1FSHARE2022UPDATE 6-16 ATTACHMENT D LOCAL SIGNAL SYNCHRONIZATION PLAN CONSISTENCY REVIEW CHECKLIST The Local Agency Name: City of Newport Beach Plan Date: 05/30/2023 Local agencies must submit a copy of the Local Signal Synchronization Plan, a completed consistency review checklist, and any supporting documentation. Complete the table below. Complete the table below: Local Agency Statement Page #s in LSSP Provided or NIA 1. Signal synchronization goals of the agency are consistent with those outlined as part of the Regional Traffic Signal 4-5 Provided Synchronization Master Plan. 2. Traffic signal synchronization street routes are identified, including all corridors along the regional signal synchronization network 7 Provided located within the local agency. 3. Traffic signal inventory for all traffic signal synchronization street 9-12 Provided routes. 4. Three-year plan separately showing costs, available funding, and phasing for capital, operations, and maintenance of signal synchronization along the traffic signal synchronization street 14-16 Provided routes and traffic signals for constrained, unconstrained, and build -out scenarios. 5. Signal synchronization review, revision, and assessment of synchronization activities along the traffic signal synchronization 18-20 Provided street routes and traffic signals. I certify that the above statements are true to the best of my knowledge. Sig JaMes Houlihan, Deputy PW Director/City Engineer, City of N Printed Name, Title, & Local Agency Date 6-17 LOCAL SIGNAL SYNCHRONIZATION PLAN .: SECTION ONE TRAFFIC SIGNAL SYNCHRONIZATION GOALS 6-19 Background Continued growth in Orange County and the City of Newport Beach creates increasing demands on regional and local roadways. With this demand comes increased travel time delays, which adversely affects the community. Roadways also have modern needs to suit the community, such as future development, landscaping, and signing/striping considerations of other roadway users. These users include, but not limited to, pedestrians, both conventional and, more recently, electric bikes and scooters. As the past practice of continually widening roadways is no longer sustainable, other efficiency -inducing alternatives, such as traffic signal synchronization are required. COVID-19 Impacts It is important to note that there was a prolonged period of significantly lighter traffic starting in mid -March 2020 due to the statewide stay-at-home order in response to the COVID-19 global pandemic. Traffic levels continued to be lower, along with associated reduced travel times for the next year to year -and -half, even as the stay-at-home order had been lifted, due to increased telework, reduced tourism, and changes in commuting patterns. However, it is important to note that these reduced travel times do not accurately represent normal traffic conditions with such changes as both increased demand for deliveries and alternative modes of transportation. The City of Newport Beach is continually working to address these impacts with the goal to adjust traffic signal synchronization as traffic equalizes to a new altered level. Strategies To achieve the City of Newport Beach's goal of reducing impacts from the movement of people and goods, while balancing the needs of the community and promoting other modes of travel, the City looks to increasing the efficiency of the roadway system through key improvements and traffic signal synchronization. Traffic Sianal Modernization Proiect The City of Newport Beach has completed a multi -year, eight -phase Traffic Signal Modernization Project. This project included the creation of a fiber optic communication network, construction of a working Traffic Management Center (TMC) at the Civic Center, updating 122 of the City -operated traffic signals, installing 74 Closed Circuit Television Cameras (CCTV), integrating signals and CCTVs into the TMC, and training staff to operate the advanced traffic signal system. Traffic Sianal Operations and Maintenance The City actively operates and maintains the traffic signals by use of City Traffic Engineering Staff, contract maintenance services, and consultant services for project design and traffic signal timing. Traffic signal rehabilitation is accomplished through the City's annual Capital Improvement Program. 6-20 Traffic Signal Timing Through the Traffic Signal Modernization Project, traffic signal timing, including corridor coordination, was reviewed and updated. Examination of traffic signal timing along arterial corridors is planned on a three-year cycle. During the review, the traffic signal timing will be checked for compliance with the latest adopted standards and updated if necessary. Regional corridors and shared intersections will include coordination with other agency stakeholders to ensure positive traffic flow across jurisdictional boundaries. Traffic signal timing will be monitored through bi-annual travel time studies and fine-tuned as necessary. Funding Funding for the past Traffic Signal Modernization Project has been a combination of local and Measure M1/M2 grant funding. The annual Traffic Signal Rehabilitation Projects and ongoing maintenance and operation of the traffic signal system are funded through local sources. Conclusion Traffic signal synchronization is a key tool for improving the efficiency of the roadway system in Newport Beach. The City is committed to ongoing efforts to improve traffic signal timing and coordination. 6-21 SECTION TWO TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES 6-22 LEGEND 0 COORDINATED ROUTE COORDINATED ROUTE (NON -CITY RIGHT-OF-WAY) NON -COORDINATED ROUTE UNIVERSITY DR - CITY BOUNDARY BISON AVE SAN O SECTION THREE TRAFFIC SIGNAL INVENTORY 6-24 Traffic Synchronization Inventory City of Newport Beach Corridor Cross Street Intersection Cycle LengthEquipment AM MID PM WKND Maintenance Responsibility Cabinet Type Software Detection Bike Detection CCTV Power Backup Comm Other ITS ATMS Status Avocado Avenue Corona Del Mar Plaza Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Civic Center Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Video Yes Cohu BBS Fiber Centracs Online San Miguel Road 140 140 1 150 150 1 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Balboa Boulevard Main Street Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu N/A Copper Centracs Online Palm Street Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu N/A Fiber Bluetoad Centracs Online 15th Street Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online 21st Street 90 110 110 120 Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online 22nd Street-23rd Street 90 110 110 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online 32nd Street Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online River Avenue Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Bayside Drive Marine Avenue Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Pedestrian Crossing Free Free Free Free Newport Beach M Cobalt ASC/3 Loops Yes N/A N/A Cellular Centracs Offline Bayview Place Bristol Street South 80 70 80 60 Newport Beach Other Cobalt ASC/3 Loops Yes N/A BBS Fiber Centracs Online Bayview Circle Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A N/A Wireless Centracs Online Birch Street -Mesa Drive Acacia Street Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Birch Street Orchard Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Wireless Centracs Online Bristol Street South 80 70 80 60 Newport Beach Other Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Bristol Street North 80 70 80 60 Newport Beach Other Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Quail Street 65 60 65 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online Dove Street 65 60 65 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A N/A Copper Centracs Online Von Karman Avenue Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Copper Centracs Online Bison Avenue Country Club Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Camelback Street Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Bayswater Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online 73 Freeway SB Ramps Free Free Free Free Caltrans 170/170E Bonita Canyon Drive Mesa View Drive Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Prairie Road Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Chambord Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online 73 Freeway SB Ramps Free Free Free Free Caltrans 170/170E Campus Drive Bristol Street North 80 70 80 60 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Quail Street 65 60 65 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Dove Street 65 60 65 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Airport Entrance 65 60 65 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Martin Avenue 120 100 120 100 Irvine 2070 Von Karman Avenue 100 100 100 100 Irvine 2070 Teller Avenue 75 60 75 60 Irvine 2070 Coast Highway Orange Street 120 100 120 100 Caltrans 2070 Prospect Street 120 100 120 100 Caltrans 2070 Superior Avenue 120 100 120 100 Caltrans 2070 Hoag Drive 120 100 120 100 Caltrans 2070 Newport Blvd SB Ramp 120 100 120 100 Caltrans 2070 Riverside Avenue 120 100 120 100 Caltrans 2070 6-25 Traffic Synchronization Inventory City of Newport Beach Corridor Cross Street Intersection Cycle LengthEquipment AM MID PM WKND Maintenance Responsibility Cabinet Type Software Detection Bike Detection CCTV Power Backup Comm Other ITS ATMS Status Tustin Avenue 120 100 120 100 Caltrans 2070 Balboa Bay Club 120 100 120 100 Caltrans 2070 Dover Drive 120 100 120 100 Caltrans 2070 Bayside Drive 120 100 120 100 Caltrans 2070 Promontory Drive 120 100 120 100 Caltrans 2070 Jamboree Road 150 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Irvine Terrace 150 140 160 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Newport Center Drive 75 140 160 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Avocado Avenue 150 140 160 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online MacArthur Blvd 150 140 160 140 Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Goldenrod Avenue 150 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Iris Avenue 150 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Marguerite Avenue 150 1 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Poppy Avenue 150 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Morning Canyon Road 150 140 160 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Cameo Shores/Highland 150 140 160 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Pelican Pointe Drive 150 140 160 1 140 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Newport Coast Drive 150 140 160 140 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Los Trancos 120 80 120 100 Caltrans 2070 Crystal Heights Drive 120 80 120 100 Caltrans 2070 Reef Point Drive 120 80 120 100 Caltrans 2070 Dover Drive Cliff Drive Free Free Free I Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online 16th Street/Castaways Lane Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Westcliff Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Ford Road Southern Hills Drive Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A BBS Copper Centracs Online Irvine Avenue Westcliff Drive 105 110 115 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Mariners School 105 110 1 115 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Dover Drive 105 110 115 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Highland Drive 105 110 115 Free Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Santiago Drive 105 110 115 1 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Santa Isabel Avenue Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online University Drive 105 110 115 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Mesa Drive 105 110 115 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Orchard Drive 105 110 115 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Bristol Street South 80 70 80 60 Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Jamboree Road Back Bay Drive 70 60 80 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Island Lagoon Drive 70 60 80 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Santa Barbara Drive 130 120 130 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online San Joaquin Hills Road 130 120 130 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Ford Road 130 120 130 Free Newport Beach Other Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Bison Avenue 130 120 130 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online University Drive 130 120 130 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online 10 6-26 Traffic Synchronization Inventory City of Newport Beach Corridor Cross Street Intersection Cycle LengthEquipment AM MID PM WKND Maintenance Responsibility Cabinet Type Software Detection Bike Detection CCTV Power Backup Comm Other ITS ATMS Status Bayview Way 160 140 160 Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Bristol Street South 160 140 160 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Video Yes Cohu BBS Fiber Centracs Online Bristol Street North 80 70 80 55 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Video Yes N/A BBS Fiber Centracs Online MacArthur Blvd 160 140 160 Free Newport Beach Other Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Centerpointe 160 140 160 Free Irvine 2070 Fairchild Road 160 140 160 Free Irvine 2070 Birch Street 160 140 160 140 Irvine 2070 Campus Drive 160 140 160 140 Irvine 2070 MacArthur Boulevard San Miguel Road 140 140 150 150 Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online San Joaquin Hills Road 160 160 180 160 Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Bonita Canyon Drive 160 140 1 180 Free I Newport Beach Other Cobalt ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Vilaggio 80 140 180 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A BBS Fiber Centracs Online Bison Avenue 160 140 180 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online 73 Freeway Ramps Free Free Free Free Caltrans 2070 Von Karman Avenue 120 120 120 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Birch Street 120 120 120 Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Campus Drive 120 120 120 120 Irvine 2070 Newport Boulevard 28th Street 90 55 55 60 Newport Beach P (TS2 Type 2) Cobalt ASC/3 Video Yes Cohu BBS Fiber Centracs Online 30th Street 90 110 110 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online 32nd Street 90 110 110 1 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Finley Avenue 90 110 110 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Via Lido 90 110 110 120 Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Hospital Road 144 150 160 150 Caltrans 2070 Newport Center Drive Corporate Plaza Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online Civic Center Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu N/A Copper Centracs Online Newport Center Dr East-West Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Copper Centracs Online Newport Center Drive E San Miguel Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu N/A Fiber Centracs Online Santa Rosa Drive Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A BBS Copper Centracs Online Newport Center Drive W Santa Cruz Drive Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online Santa Barbara Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Copper Centracs Online Newport Coast Drive Pelican Hill Road South Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Provence Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Pelican Hill Road North Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Vista Ridge Road Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Ridge Park Road Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online San Joaquin Hills Road Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Gas Recovery 90 80 80 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Sage Hill 90 80 80 Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Bluetoad Centracs Online Pelican Hill Road South Resort at Pelican Hill Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Villa Clubhouse Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Placentia Avenue Hospital Road Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Copper Centracs Online 15th Street Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online 11 6-27 Traffic Synchronization Inventory City of Newport Beach Corridor Cross Street Intersection Cycle LengthEquipment AM MID PM WKND Maintenance Responsibility Cabinet Type Software Detection Bike Detection CCTV Power Backup Comm Other ITS ATMS Status Ridge Park Road Fire Station Free Free Free Free Newport Beach M ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online San Joaquin Hills Road Santa Cruz Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Santa Rosa Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online San Miguel Road Free Free Free Free Newport Beach 332 2070 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Crown Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Marguerite Avenue Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Spyglass Hill Road Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Beaulieu Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Ridge Park Road Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online San Miguel Drive Pacific View Drive Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Yacht Coquette Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Video Yes N/A N/A Fiber Centracs Online Spyglass Hill Road Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Port Ramsey Place Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A BBS Fiber Centracs Online Santa Barbara Drive San Clemente Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Copper Centracs Online Santa Cruz Drive San Clemente Drive Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A N/A Fiber Centracs Online Superior Avenue Ticonderoga Street Free Free Free Free Newport Beach P (TS1) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online Hospital Road Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes N/A BBS Fiber Centracs Online Placentia Avenue Free Free Free Free Newport Beach Other ASC/3 ASC/3 Loops Yes Cohu BBS Fiber Centracs Online Hoag Health Care Free Free Free Free Newport Beach P (TS2 Type 2) ASC/3 ASC/3 Loops Yes N/A BBS Fiber Centracs Online University Drive La Vida Free Free Free Free Newport Beach P (TS2 Type 2) Cobalt ASC/3 Loops Yes Cohu BBS Copper Centracs Online 73 Freeway SB Ramps Free Free Free Free Caltrans 2070 MacArthur Blvd SB Ramps Free Free Free Free Caltrans 2070 12 6-28 SECTION FOUR TRAFFIC SIGNAL SYNCHRONIZATION SYSTEM AND THREE- YEAR PLAN 6-29 3-YEAR OUTLOOK TRAFFIC SIGNAL SYNCHRONIZATION Funding Needs for Synchronized Operation (Constrained) Reporting Jurisdiction Expenditures: City of Newport Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars MAINTENANCE PROJECT FY23/24 FY24/25 FY25/26 TOTAL Ongoing Equipment and Communication Maintenance $540,000 $540,000 $540,000 $1,620,000 Subtotal Maintenance $540,000 $540,000 $540,000 $1,620,000 CONSTRUCTION PROJECT FY23/24 FY24/25 FY25/26 TOTAL Annual Traffic Signal Rehabilitation Project $1,000,000 $750,000 $750,000 $2,500,000 Subtotal Construction $1,000,000 $750,000 $750,000 $2,500,000 OPERATIONS PROJECT FY23/24 FY24/25 FY25/26 TOTAL Subtotal Operations $1,540,000 $1,290,000 $1,290,000 $4,120,000 6-30 3-YEAR OUTLOOK TRAFFIC SIGNAL SYNCHRONIZATION Funding Needs for Synchronized Operation (Unconstrained) Reporting Jurisdiction Expenditures: City of Newport Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars MAINTENANCE PROJECT FY23/24 FY24/25 FY25/26 TOTAL Ongoing Equipment and Communication Maintenance $540,000 $540,000 $540,000 $1,620,000 Subtotal Maintenance $540,000 $540,000 $540,000 $1,620,000 CONSTRUCTION PROJECT FY23/24 FY24/25 FY25/26 TOTAL Annual Traffic Signal Rehabilitation Project $1,000,000 $750,000 $750,000 $2,500,000 Subtotal Construction $1,000,000 $750,000 $750,000 $2,500,000 OPERATIONS PROJECT FY23/24 FY24/25 FY25/26 TOTAL Subtotal Operations $1,540,000 $1,290,000 $1,290,000 $4,120,000 6-31 LSSP IMPLEMENTATION — CANDIDATE SIGNAL SYNCHRONIZATION PROJECTS WITH ESTIMATED COSTS Reporting Jurisdiction Expenditures: City of Newport Beach This includes potential signal synchronization -related upgrades and their respective estimated costs. These corridors are either currently uncoordinated or would benefit from incorporated improvements and provide existing corridors with improved compatibility, increased functionality, and reliability. CORRIDOR IMPROVEMENT SUMMARY ESTIMATED COST Newport Boulevard at 28th Street & at 21st Street Installation of dynamic / changeable message signs with luminaires, associated electrical connections, and integration into TMC $175,000 Newport Center Drive — Entire Loop Installation of new conduit, fiber optic cable upgrades, and integration into TMC $250,000 Newport Beach Civic Center (benefits all corridors) Upgrade / Modernization of Traffic Management Center (TMC) within the Newport Beach Civic Center $500,000 Total Estimated Cost $925,000 6-32 SECTION FIVE TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT REVIEW AND REVISE, AS MAY BE NECESSARY, THE TIMING OF TRAFFIC SIGNALS Significant timing plan updates and projects completed FY 2020/2021 through 2022/2023 6-33 Completed in FY16-17, the eight -phase, multi -year Traffic Signal Modernization Program has been the City of Newport Beach project to update traffic signal equipment, communication infrastructure and traffic signal timing to achieve the goal of synchronizing city -operated traffic signals. The project included equipment, communication, and signal timing updates at a total of 120 signalized intersections and installation of 43 CCTV cameras. As these program projects were completed with local funds, or through the original Measure M grant program, the City measured project success qualitatively. Considering many of the City's arterials were coordinated prior to the modernization project, the improvements to travel times have not been significant for daily commuters. Instead, the system has allowed for additional coordination patterns, fine-tuning and monitoring of the coastal areas during the peak season. Through use of the system, traffic engineering staff is better able to manage seasonal peaks and incidents. Additionally, there have been noticeable improvements in system reliability, incident/malfunction response time, and incident/special event support. The modern system has also allowed staff to further fine-tune the system through easier access and control. Through the City's TMC, traffic engineering staff actively monitors, manages, and optimizes signal timing via Centracs, an advanced traffic management system (ATMS). Signal maintenance provides continual operational functionality of field equipment. The traffic signal timing will be fine-tuned as necessary as bi-annual travel time studies and Corridor Synchronization Performance Index (CSPI) rankings provide corridor performance baselines and evaluation methodologies. In-depth review of coordination and arterial corridor traffic signal timing along with arterial corridors are planned on a three-year cycle. During the review, the traffic signal timing will be checked for compliance with the latest adopted standards and updated if necessary. The annual traffic signal rehabilitation projects provide ongoing maintenance and operation of the traffic signal system. Regional corridors and shared intersections will include coordination with other agency stakeholders to ensure positive traffic flow across jurisdictional boundaries. 6-34 TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT, REVIEW AND REVISION 19 6-35 COAST COLLEGE MICH COSTA ' w UANGUA D pF �.�P 0 6 v � MESA a UNIVE V �gQSP O� Q73TOl c �P WILSON `L �Sq � UNIVERSI VICTORIA = if, CONCORDIA rL UNIVERSITY QO �� IRVINE A m(if �Q� 221p Ca , CPMPUS = rq l O 4 r 19TH UNIV OF CALIFORNIA-IRVINE N 17TH BISO IRVINE BONITA CANY ON J���� SygDy � . q FORD n� CgNyON 70 ti \GJ�� FASHION Z a BLAND P� 0 00 f f O LJ P > G � SAN JOAO IN HILLS I Corridor Synchronization Performance Index Tier V Less than 50 Tier IV 50 to 60 Tier 111 60.01 to 70 Tier 11 70.01 to 80 Tier I More than 80 — Cuglole L orrluor — Currently Funded Corridor Source: OCTA; Data current as of September 2022. Please check with OCTA prior to CTFP Call for Projects * Eligible for funding upon completion per CTFP Guidelines 0 O1 F (VnVI Miles Pacific Ocean NEWPORT BEACH 6-36 1323.mxd ATTACHMENT E rc IQPxoRT�" City of Newport Beach Pavement Management Plan Prepared by: GMU Submitted to OCTA: 6-30-2023 OCTA 6-37 MPavement Management Plan Agency Submittal OGTA Agency Submittal Table of Contents I. Pavement Management Plan Certification..................................................................................................... 2 II. Executive Summary......................................................................................................................................... 3 III. Background (Optional)....................................................................................................................................5 IV. Current Pavement Conditions (PCI)................................................................................................................ 7 V. Projected Pavement Conditions(PCI)............................................................................................................. 7 VI. Alternative Funding Levels.............................................................................................................................. 8 Maintain Existing Average Network PCI.......................................................................................................... 8 Improve Average Network PCI......................................................................................................................... 8 VI I. Current and Projected Backlog by Year of Pavement Maintenance Needs ................................................... 9 VIII. Centerline Mileage..........................................................................................................................................9 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles ........................... 10 X. Reduction in Local Match.............................................................................................................................. 11 XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected FundingLevel................................................................................................................................................ 12 XII. Appendix B — Complete Listing of Current Street Conditions....................................................................... 13 XIII. Appendix C — GIS Digital Data....................................................................................................................... 14 Introduction................................................................................................................................................... 14 Structureof GIS Data..................................................................................................................................... 14 XIV. Appendix D — Quality Assurance/Quality Control Plan................................................................................. 16 Introduction................................................................................................................................................... 16 Objectives...................................................................................................................................................... 16 Structureof QA/QC Plan................................................................................................................................ 16 Condition Survey Procedures......................................................................................................................... 17 Accuracy Required for Data Collection.......................................................................................................... 18 Random and Systematic Re-Inspections........................................................................................................ 18 PCI Comparison with Past Surveys................................................................................................................. 19 Inspector's Qualifications and Experience..................................................................................................... 20 SafetyProcedures.......................................................................................................................................... 20 XV. Appendix E — Pavement Management Data Files......................................................................................... 21 XVI. Appendix F — GIS Maps — Current Conditions (Optional).............................................................................. 21 1 6-38 Pavement Management Plan Agency Submittal I. Pavement Management Plan Certification The City of Newport Beach certifies that it has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M2. The plan was developed by Newport Beach* using PAVER, a pavement management system, conforming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements: • Inventory of MPAH and local routes reviewed and updated biennially. The last update of the inventory was in February 2023 for Arterial (MPAH) streets and local streets. • Assessment of pavement condition for all routes in the system, updated biennially. The last field review of pavement condition was completed on February 2023. • Percentage of all sections of pavement needing: o Preventative Maintenance: 22% o Rehabilitation:22% o Reconstruction:1% • Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient sections of pavement for: o Current biennial period: $40.8 million o Following biennial period: $17.2 million • Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction: o Current biennial period: $15.8 million o Following biennial period: $15.8 million • Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs. • The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors. *An electronic copy of the Pavement Management Plan (with Micro Paver compatible files) has been, or will be, submitted with the certification statement. A copy of this certification is being provided to the Orange County Transportation Authority. Submitted by: Jim Houlihan, P.E. City of Newport Beach Jurisdiction Date Title (Public Works Director and/or City Engineer) P a g e 12 6-39 MPavement Management Plan Agency Submittal OCTA II. Executive Summary The City of Newport Beach performs a routine update of its Pavement Management Plan (PMP) in order to assist policy makers in making decisions for road maintenance budgets as well as to comply with the Orange County Transportation Authority (OCTA) Measure M2 Program. This report summarizes the findings and conclusions from the 2023 PMP Update. The City is responsible for maintaining approximately 204.9 centerline miles of streets, comprising of approximately 156.7 centerline miles of local streets and approximately 48.2 miles of MPAH. To monitor and analyze this vast network of streets and pertinent information, the City performs pavement management plan studies and utilizes PAVER pavement management software. The City collects pavement distresses in compliance with the American Society of Testing and Materials standard ASTM D6433, as required by the Orange County Transportation Authority. The condition of Master Plan of Arterial Highway (MPAH) streets is surveyed and updated on biennial basis, whereas the condition of local streets located in Zones 1-3 is surveyed every odd year, and condition of local streets in Zones 4-7 is surveyed in even years. The current year marks the time to update the PMP with the condition of MPAH streets and local streets located in Zones 1-3. This report represents the findings of the 2023 PMP update for the City of Newport Beach. Table 1 below summarizes the current City of Newport Beach network's Pavement Condition Index (PCI) breakdown by functional classification. Table 1. Network PCI Breakdown by Functional Classification The current citywide weighted average Pavement Condition Index (PCI) of the City of Newport Beach is 82. Overall, approximately 74% (by area) of the City's road network is in the "Very Good" and "Good" condition, approximately 25% of the roads are in the "Fair" and "Poor" condition categories, and the remaining 1% are in the "Very Poor" Category. The following three budget scenarios were evaluated as part of this study. Scenario 1: Current Funding Level ($ 7.9 million / Year) The current allocated budget for City of Newport Beach roadway rehabilitation projects is $7.9 million, and is comprised of $1.0 million from General Funds, $3.0 million from Measure M2, $2.4 million from the Gas Tax, and $1.5 million from Senate Bill-1 (SB-1). With this funding level, the network PCI is expected to decrease from its current 82 to a PCI of 78 by fiscal year 2029/30. Approximately 66% of the network will be in the "Very Good" and "Good" condition categories, 32% Page 13 . KE M OCTA Pavement Management Plan Agency Submittal will be in the "Fair" and "Poor" condition categories, and 2% of the sections will be in the "Very Poor" Category. The deferred maintenance will increase to $45.0 million by year fiscal year 2029/30. Scenario 2: Maintain Current Network PCI at 82 ($12.5 million per year) To maintain the current network PCI at 82, the city would need to spend $12.5 million annually over the next seven years. The total required budget over the next 7 years for this scenario is $87.5 million. In this scenario, the street network will consist of approximately 77% of streets with "Very Good" and "Good" condition categories, 21% will be in the "Fair" and "Poor" condition categories, and the remaining 2% will be in the "Very Poor" Category. The deferred maintenance will decrease to $23.2 million. Scenario 3: Increase Network PCI by One Point ($14.0 million per year) To increase the current network PCI by one point (i.e., PCI of 83), the City would need to fund $14.0 million annually over the next seven years. In this scenario, the street network will consist of approximately 79% of streets in the "Very Good" and "Good" condition categories, 20.0% will be in the "Fair" and "Poor" condition categories, and the remaining 1.0% will be in the "Very Poor" Category. The deferred maintenance will decrease to $8.1 million. Based on the analysis and results of study, GMU recommends the following: - Fund at least the "Current Funding Scenario" level over the next seven years in order to maintain eligibility for CTFP Measure M2 10% reduction in local matching funds. Monitor construction costs for consideration in future pavement management plan updates. - Continuously update the Maintenance and Rehabilitation (M&R) history of all the streets in the network - Perform project -level studies in order to develop site -specific pavement recommendations. Consider incorporating additional pavement maintenance and rehabilitation strategies that reuse in -place materials, such as Full Depth Reclamation (FDR) or Cold Recycled AC, which can help reduce pavement maintenance/repair costs. - Update the pavement management plan as required by OCTA to help ensure that Measure M2 funds are not jeopardized. Page 14 6-41 M OGTA III. Background (Optional) Pavement Management Plan Agency Submittal Maintaining a citywide street network is a complex undertaking. It involves many layers of information that can have a significant impact on pavement performance and cost. Some of these layers of information include: • Funding: The amount of funding impacts the amount of pavement improvement projects that can be carried out. • Pavement age and work history: The city's streets were constructed at different times and received different maintenance and rehabilitation activities over time. Differences in age and repairs will impact the pavement's current and future condition. • Pavement inventory: An inventory of streets defines the limits of the study and what the City is responsible for maintaining. Working with an updated pavement inventory will also allow for more accurate budget scenario analysis. • Historical costs for various types of repairs: Past pavement maintenance/rehabilitation costs are reviewed and updated to more accurately budget for future pavement maintenance/rehabilitation costs. • Current pavement condition: To objectively rate the pavement's condition, the roadway is surveyed by an OCTA-certified pavement inspector in accordance with ASTM D 6433 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys. • Predicted pavement condition: To understand the projected pavement condition, which will differ depending on the amount of available budget. The above information was identified, analyzed, and summarized into this 2023 Pavement Management Plan Update report. This report should be considered a tool for decision makers to use when deciding the amount of funding to allocate towards pavement maintenance and rehabilitation. The most cost-effective method for roadway maintenance is to keep them in "good" or better condition. Just like doing oil changes for vehicles, proactive pavement maintenance (i.e., slurry sealing) will help keep future repair costs down. Eventually, after so many oil changes, more costly but still relatively inexpensive repairs will be due (i.e., rehabilitation or mill -and -overlays). The most expensive approach is to "do-nothing" or defer maintenance substantially such that complete replacement will be the only option left to restore the pavement condition. The following graph illustrates this concept further. 5 6-42 M OCTA 10 Very Goad s Goad 75 C Fair O 0 O +� Poor e a� E 40 Very Poor Pavement Management Plan Agency Submittal Pavement Condition Index 50.35 - $0.401 SF TIMELY PAVEMENT PRESERVATION ......................... $14 - $19 P SF AC RECONSTRUCTION $291 SF PCC RECONSTRUCTION $3.60 - $6.506* r— f SF PAVEMENT — REHABILJITATION —I Age of Pavement The x-axis represents the age of roadway and y-axis represents pavement condition (Pavement Condition Index). Following a proactive maintenance schedule ("timely pavement maintenance curve") will help reduce pavement costs by several folds relative to the "reactive rehabilitation" or "pavement reconstruction" curves. Page 16 6-43 M OCTA Pavement Management Plan Agency Submittal IV. Current Pavement Conditions (PCI) 82 81 82 V. Projected Pavement Conditions (PCI) Fiscal Year Today Current Funding $7.9 million Entire Network PCI 82 MPAH 81 Local 82 2023-24 $7.9 million 83 84 83 2024-25 $7.9 million 82 83 81 2025-26 $7.9 million 81 84 80 2026-27 $7.9 million 80 84 78 2027-28 $7.9 million 80 83 77 2028-29 $7.9 million 79 84 76 2029-30 $7.9 million 78 84 75 Page 17 MPavement Management Plan Agency Submittal OCTA VI. Alternative Funding Levels Maintain Existing Average Network PCI Year Today Funding NeededFiscal $12.5 million Entire Network PCI 82 PA 81 82 2023-24 $12.5 million 84 83 84 2024-25 $12.5 million 84 81 85 2025-26 $12.5 million 84 82 85 2026-27 $12.5 million 83 82 84 2027-28 $12.5 million 83 83 82 2028-29 $12.5 million 83 85 82 2029-30 $12.5 million 82 84 81 Improve Average Network PCI Fiscal Year Today Funding Needed $14.0 million Entire Network PCI 82 MPAH 81 Local 82 2023-24 $14.0 million 84 83 85 2024-25 $14.0 million 84 81 86 2025-26 $14.0 million 84 83 85 2026-27 $14.0 million 84 84 84 2027-28 $14.0 million 83 84 83 2028-29 $14.0 million 84 84 83 2029-30 $14.0 million 83 84 82 P a g 6-45 MPavement Management Plan Agency Submittal OCTA VII. Current and Projected Backlog by Year of Pavement Maintenance Needs Year Current Current Funding BacklogFiscal 35.6 Maintain PCI Backlog 35.6 Increase PCI Backlog 35.6 2023-24 27.7 42.1 40.6 2024-25 27.1 38.1 35.0 2025-26 31.4 37.0 31.0 2026-27 32.9 32.6 24.4 2027-28 37.9 30.6 19.5 2028-29 41.6 27.6 14.7 2029-30 45.0 23.2 8.1 VIII. Centerline Mileage Entire Pavement Network I MPAH Local Roads Page 19 . 1 . MPavement Management Plan Agency Submittal OCTA IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles Condition Percent Area Area of Percent Centerline Centerline Category PCIRange Network of Total Pavement Pavement (SF) Mileage of Network Mileage of Network & MPAH 2O.5% 9,548,663 24.8 Very Good 86-100 51.0% Local 30.6% 14,248,278 79.6 MPAH 6.6% 3,100,938 8.1 Good 75-85 24.7% Local 16.6% 7,739,935 42.6 MPAH 8.3% 3,875,259 11.1 Fair 60-74 17.4% Local 9.7% 4,521,536 24.6 MPAH 3.7% 1,746,700 3.8 Poor 41-59 5.7% Local 3.1% 1,443,682 7.9 MPAH 0.2% 70,294 0.4 Very Poor 0-40 1.2% Local 0.7% 336,961 2.0 TOTAL 100% 46,632,247 100% 204.9 Page 1 10 6-47 M OCTA X. Reduction in Local Match Pavement Management Plan Agency Submittal A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either: a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local street categories; or b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in "good condition". If applicable, please use the space below to justify the local agency's eligibility for a reduction in Local Match based on the statement above. The City of Newport Beach has met both criteria above by having an average weighted PCI of 82, and at the same time by showing measurable improvement from the previous reporting period. Therefore, the City continues to remain eligible for M2 funding. 11 MPavement Management Plan Agency Submittal OCTA XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level The seven-year plan for road maintenance and rehabilitation should be based on current and projected budget. Street sections selected for treatment should be identified here. Specific data to be submitted should follow the format below: MPAH Limits of Work Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment LOCAL Limits of Work Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after this sheet. The plan should be labeled Appendix A. Page 1 12 Appendix A 4000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Balboa Blvd W EB 14th St 12th St 880 24 21,120 Mill and Overlay $131,457 2023 Campus Dr EB Von Karman Ave Teller Ave 1,315 36 47,340 Mill and Overlay $294,562 2023 Newport Blvd SB 28th St 26th St 410 41 16,810 Reconstruction $133,225 2023 Newport Center Dr W SB Santa Cruz Or Santa Barbara Dr 1,063 36 40,018 Mill and Overlay $240,594 2023 Superior Av NB Coast Highway West Ticonderga St 1,468 1 38 55,784 Reconstruction $440,712 1 2023 Bristol St South Birch St Cypress St 661 50 31,550 Reconstruction $253,199 2023 Bristol St South Cypress St Spruce Ave 825 34 31,350 Mill and Overlay $201,342 2023 Coast Highway E SB Irvine Ter Newport Center Dr 1,100 46 55,600 Reconstruction $650,524 2023 Newport Blvd SB Newport Channel Bridge Via Lido 546 42 22,932 Mill and Overlay $137,917 2023 Newport Center Dr E SB Anacapa Or Newport Center Dr 754 36 29,144 Mill and Overlay $175,218 2023 San Miguel Dr NB Yacht Coquette (North End) Spyglass Hill Rd/Eastgate Dr 1,494 29 45,326 Reconstruction $417,577 2023 Balboa Blvd NB 44th St Coast Highway 820 35 28,700 Slurry Seal $11,480 2023 Balboa Blvd SB Coast Highway 46th St 417 35 14,595 Slurry Seal $5,838 2023 Balboa Blvd E EB Island Ave Medina Way 515 44 21,910 Slurry Seal $8,764 2023 Balboa Blvd E WB Medina Way Island Ave 520 40 20,800 Slurry Seal $8,320 2023 Balboa Blvd W EB 16th St 14th St 951 24 22,824 Slurry Seal $9,130 2023 Balboa Blvd W EB 12th St 8th St 1,800 50 89,000 Slurry Seal $35,600 2023 Balboa Blvd W EB 8th St 6th St 893 1 42 36,506 Slurry Seal $14,603 2023 Balboa Blvd W EB 6th St Island Ave 450 42 18,400 Slurry Seal $7,360 2023 Balboa Blvd W WB Island Ave 6th St 390 40 15,100 Slurry Seal $6,040 2023 Balboa Blvd W WB 6th St 8th St 895 40 34,800 Slurry Seal $13,920 1 2023 Balboa Blvd W WB 8th St 12th St 1,790 40 70,600 Slurry Seal $28,240 2023 Balboa Blvd W WB 14th St 16th St 951 24 22,824 Slurry Seal $9,130 2023 Balboa Blvd W WB 21st St 23rd St 600 42 21,000 Slurry Seal $8,400 2023 Bristol St South Spruce Ave Bayview PI 807 1 50 42,750 Slurry Seal $17,100 2023 Campus Dr EB Bristol St North Quail St 950 41 40,450 Slurry Seal $16,180 2023 Campus Dr EB Quail St Dove St 1,325 42 58,150 Slurry Seal $23,260 2023 Campus Dr EB Dove St Airport 1,850 42 81,300 Slurry Seal $32,520 2023 Campus Dr EB Airport MacArthur Blvd 420 62 26,040 Slurry Seal $10,416 2023 Campus Dr EB MacArthur Ct Von Karman Ave 1,029 36 37,044 Slurry Seal $14,818 2023 Campus Dr EB Teller Ave Jamboree Rd 700 33 26,600 Slurry Seal $10,640 2023 Dover Dr NB Coast Highway Cliff Dr 957 39 40,823 Slurry Seal $16,329 2023 Dover Dr NB Cliff Dr Castaways Ln 1,236 30 39,080 Slurry Seal $15,632 2023 Dover Dr NB Castaways Ln Westcliff Dr 1,270 30 44,100 Slurry Seal $17,640 2023 Dover Dr SB Westcliff Dr 16th St 1,290 33 44,070 Slurry Seal $17,628 1 2023 Dover Dr SB 16th St Cliff Dr 1,250 30 37,500 Slurry Seal $15,000 2023 Dover Dr SB Cliff Dr Coast Highway 989 41 52,549 Slurry Seal $21,020 2023 Irvine Ave 16th St Mariners Dr 2,600 34 88,400 Slurry Seal $35,360 2023 Irvine Ave Mariners Dr Dover Dr 1,213 32 38,816 Slurry Seal $15,527 2023 Irvine Ave Dover Dr Linda Ln 645 34 21,930 Slurry Seal $8,772 2023 Irvine Ave Linda Ln Baycrest Rd 1,085 34 36,890 Slurry Seal $14,756 2023 Irvine Ave Santiago Dr 23rd St 1,573 77 103,606 Slurry Seal $41,443 2023 Irvine Ave 23rd St Santa Isabel Ave 1,500 76 114,000 Slurry Seal $45,600 2023 Irvine Ave Santa Isabel Ave University Dr 2,630 28 96,800 Slurry Seal $38,720 2023 Irvine Ave Mesa Dr Bristol St South 3,140 42 129,900 Slurry Seal $51,960 2023 Irvine Ave Baycrest Rd Francisco Dr 1,227 38 46,626 Slurry Seal $18,651 2023 Irvine Ave I Francisco Or Santiago Dr 991 38 37,658 Slurry Seal $15,063 2023 Irvine Ave ISantiago Dr Francisco Dr 996 38 37,848 Slurry Seal $15,139 1 2023 Irvine Ave I Francisco Or Baycrest Rd 1,223 38 46,474 Slurry Seal $18,590 12023 6-50 Appendix A - MPAH Page 1 of 7 Appendix A AVEE„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Irvine Ave 300' S of Monte Vista Ave Santa Isabel Ave 1,049 28 29,372 Slurry Seal $11,749 2023 Irvine Ave BRISTOL ST MESA DR 3,140 42 131,880 Slurry Seal $52,752 2023 Irvine Ave Baycrest Rd Santiago Dr 2,170 38 82,460 Slurry Seal $32,984 2023 Jamboree Rd NB Coast Highway East Back Bay Dr 990 53 37,014 Slurry Seal $14,806 2023 Jamboree Rd NB Back Bay Dr Island Lagoon Dr/Hyatt Newporter 675 61 1 42,175 Slurry Seal $16,870 2023 Jamboree Rd NB Island Lagoon Dr/Hyatt Newporter Santa Barbara Or 3,100 46 155,600 Slurry Seal $62,241 2023 Jamboree Rd NB Santa Barbara Dr San Joaquin Hills Rd 945 47 46,415 Slurry Seal $18,566 2023 Jamboree Rd NB San Joaquin Hills Rd Ford Rd 2,608 46 127,968 Slurry Seal $51,188 2023 Jamboree Rd NB Ford Rd Bison Ave 3,244 46 152,424 Slurry Seal $60,970 2023 Jamboree Rd NB Bison Ave University Dr/Eastbluff Dr 3,080 46 144,680 Slurry Seal $57,872 2023 Jamboree Rd NB University Dr/Eastbluff Dr Bayview Way 1,735 57 83,439 Slurry Seal $33,376 2023 Jamboree Rd SB Fairchild Rd Koll Center 699 58 42,542 Slurry Seal $17,017 2023 Jamboree Rd SB University Dr/Eastbluff Dr Bison Ave 3,030 1 46 151,880 Slurry Seal $60,753 2023 Jamboree Rd SB Bison Ave Ford Rd/Eastbluff Dr 3,205 46 154,430 Slurry Seal $61,773 2023 Jamboree Rd SB Ford Rd/Eastbluff Or San Joaquin Hills Rd 2,625 46 128,450 Slurry Seal $51,380 2023 Jamboree Rd SB San Joaquin Hills Rd Santa Barbara Dr 920 46 51,920 Slurry Seal $20,768 2023 Jamboree Rd SB Santa Barbara Dr Island Lagoon Dr/Hyatt Newporter 3,135 46 146,710 Slurry Seal $58,684 2023 Jamboree Rd SB Island Lagoon Dr/Hyatt Newporter Back Bay Dr 635 46 31,460 Slurry Seal $12,584 2023 Jamboree Rd 5B Back Bay Dr Coast Highway East 1,030 45 53,350 Slurry Seal $21,340 2023 MacArthur Blvd NB Coast Highway East San Miguel Dr 2,843 34 105,712 Slurry Seal $42,285 2023 MacArthur Blvd NB San Miguel Dr San Joaquin Hills Rd 1,463 1 46 74,798 Slurry Seal $29,919 2023 MacArthur Blvd NB San Joaqin Hills Rd 3400' N of San Joaqin Hills Rd 3,400 44 151,350 Slurry Seal $60,541 2023 MacArthur Blvd NB 3400' N of San Joaqin Hills Rd Bonita Canyon Dr/Ford Rd 2,600 44 140,900 Slurry Seal $56,360 2023 MacArthur Blvd SB Bonita Canyon Dr 2600' S Bonita Canyon Dr 2,600 46 125,600 Slurry Seal $50,240 2023 MacArthur Blvd SB 2600' S Bonita Canyon Dr San Joaqin Hills Rd 3,400 46 171,400 Slurry Seal $68,561 2023 MacArthur Blvd SB San Joaquin Hills Rd San Miguel Or 1,533 44 74,952 Slurry Seal $29,981 2023 MacArthur Blvd SB San Miguel Dr Coast Highway East 2,809 34 125,006 Slurry Seal $50,003 2023 Newport Blvd NB 21st St/Balboa Blvd West 23rd St 529 36 20,844 Slurry Seal $8,338 2023 Newport Blvd NB 32nd St Finley Ave 420 52 20,880 Slurry Seal $8,352 2023 Newport Blvd NB Finley Ave Via Lido 502 42 21,084 Slurry Seal $8,434 2023 Newport Blvd SB Finley Ave 32nd St 460 42 21,820 Slurry Seal $8,728 2023 Newport Blvd SB 32nd St 30th St 504 35 17,640 Slurry Seal $7,056 2023 Newport Blvd SB 26th St 23rd St 540 32 17,280 Slurry Seal $6,912 2023 Newport Blvd SB Via Lido Finley Ave 513 42 21,546 Slurry Seal $8,618 2023 Newport Center Dr E NB Anacapa Or San Miguel Or 830 36 31,630 Slurry Seal $12,652 2023 Newport Center Dr E NB San Miguel Dr Santa Rosa Dr 1,199 36 44,664 Slurry Seal $17,866 2023 Newport Center Dr E SB Santa Cruz Or Santa Rosa Dr 1,403 36 53,008 Slurry Seal $21,203 2023 Newport Center Dr E SB Santa Rosa Or San Miguel Or 1,135 36 43,360 Slurry Seal $17,344 2023 Newport Coast Dr NB Coast Highway East Pelican Hill Rd South 1,849 41 80,809 Slurry Seal $32,324 2023 Newport Coast Dr NB Pelican Hill Rd N/Ocean Ridge Dr Vista Ridge Rd/Pacific Pine Dr 3,388 41 140,908 Slurry Seal $56,364 2023 Newport Coast Dr NB Vista Ridge Rd/Pacific Pine Dr Ridge Park Rd 1,102 41 46,932 Slurry Seal $18,773 2023 Newport Coast Dr NB Ridge Park Rd San Joaquins Hills Rd 1,115 41 59,965 Slurry Seal $23,986 2023 Newport Coast Dr SB Provence Pelican Hill Rd South 1,581 41 1 70,821 Slurry Seal $28,329 2023 Newport Coast Dr SB Pelican Hill Rd South Coast Highway East 1,849 41 83,809 Slurry Seal $33,524 2023 San Joaquin Hills Rd EB MacArthur Blvd San Miguel Dr 983 40 44,320 Slurry Seal $17,728 2023 San Joaquin Hills Rd EB Marguerite Ave Spyglass Hill Rd 2,801 41 116,841 Slurry Seal $46,737 2023 San Joaquin Hills Rd EB Spyglass Hill Rd Newport Ridge Dr West 1 4,345 33 152,385 Slurry Seal $60,955 2023 San Joaquin Hills Rd EB Newport Ridge Dr East Newport Coast Dr 1,050 33 41,125 Slurry Seal $16,450 2023 San Joaquin Hills Rd WB ISpyglass Hill Rd I Marguerite Ave 2,759 1 41 115,619 1 Slurry Seal $46,248 2023 San Joaquin Hills Rd WB ISan Miguel Dr I MacArthur Blvd 965 1 41 41,565 1 Slurry Seal $16,626 2023 6-51 Appendix A - MPAH Page 2 of 7 Appendix A AVEE„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To San Miguel Or NB MacArthur Blvd San Joaquin Hills Rd 1,285 31 45,335 Slurry Seal $18,134 2023 San Miguel Dr SB Harbor Woods PI Pacific View Dr 505 29 15,645 Slurry Seal $6,258 2023 San Miguel Or SB San Joaquin Hills Rd MacArthur Blvd 1,240 30 41,200 Slurry Seal $16,480 2023 Superior Av NB Placentia Ave City Limit 1,750 38 66,500 Slurry Seal $26,600 2023 Westcliff Or EB Irvine Ave Dover Or 1,703 1 25 42,575 Slurry Seal $17,030 2023 Westcliff Or WB Dover Dr Irvine Ave 1,695 25 42,375 Slurry Seal $16,950 2023 32nd St Lafayette Ave Villa Way 455 48 24,564 Slurry Seal $9,826 2023 32nd St Villa Way Newport Blvd 530 62 29,150 Slurry Seal $11,660 2023 Avocado Ave Coast Highway East Farralon Or 1,865 64 120,360 Slurry Seal $48,144 2023 Avocado Ave Farralon Dr San Miguel Or 872 66 57,552 Slurry Seal $23,021 2023 Balboa Blvd E WB Washington St Palm St 264 30 7,920 Slurry Seal $3,168 2023 Dover Dr NB Westcliff Or Mariners Dr 2,535 37 96,795 Slurry Seal $38,718 2023 Dover Or NB Mariners Or Irvine Ave 942 1 37 34,854 Slurry Seal $13,942 2023 Ford Rd EB San Miguel Dr Hillside Dr 410 36 14,760 Slurry Seal $5,904 2023 Ford Rd WB Hillside Or San Miguel Or 405 32 12,960 Slurry Seal $5,184 2023 Marguerite Ave Harbor View Or Fifth Ave 1,542 55 84,810 Slurry Seal $33,924 2023 Marguerite Ave Harbor View Dr Sausalito Dr 1,047 60 62,820 Slurry Seal $25,128 2023 Marguerite Ave Sausalito Dr San Joaquin Hills Rd 1,845 60 110,700 Slurry Seal $44,280 2023 Mesa Or Irvine Ave Acacia St 1,365 66 90,090 Slurry Seal $36,036 2023 Mesa Dr Acacia St Mesa Dr/ Birch St 200 66 13,200 Slurry Seal $5,280 2023 Newport Blvd NB 30th St 32nd St 508 1 35 17,780 Slurry Seal $7,112 2023 Placentia Ave Hospital Rd Superior Ave 810 40 32,400 Slurry Seal $12,960 2023 Balboa Blvd NB 32nd St 34th St 488 34 1 16,592 Reconstruction $265,956 2024 Balboa Blvd NB 34th St 36th St 460 34 15,640 Reconstruction $290,967 2024 Balboa Blvd W EB 22nd St McFadden PI 445 48 21,360 Reconstruction $418,006 2024 Balboa Blvd W WB 12th St 14th St 880 24 21,120 Reconstruction $311,346 2024 Bristol St North Spruce St Birch St 1,486 46 72,856 Reconstruction $977,418 2024 Newport Center Dr SB Newport Center Dr West Farallon Dr/Granville Or 945 36 37,020 Mill and Overlay $233,100 2024 San Miguel Or 5B Ford Rd Spyglass Hill Rd/Eastgate Or 2,230 29 67,170 Reconstruction $1,314,489 2024 Superior Av NB Ticonderga St Placentia Ave 1,493 38 56,734 Mill and Overlay $351,326 2024 Superior Av SB Placentia Av Ticonderga St 1,552 38 58,976 Reconstruction $935,468 2024 Bristol St South Irvine Ave Birch St 600 58 33,900 Mill and Overlay $210,275 2024 San Miguel Or SB Spyglass Hill Rd/Eastgate Or Yacht Coquette (North Side) 1,494 29 43,326 Reconstruction $847,872 2024 San Miguel Dr SB Yacht Coquette (North Side) Port Sutton Dr/Yacht Coquette (S) 1,110 29 33,940 Reconstruction $496,841 2024 San Miguel Or Avocado Ave MacArthur Blvd 310 92 28,520 Mill and Overlay $182,548 2024 Bayside Or Jamboree Rd Coast Highway East 4,130 60 247,800 Slurry Seal $102,094 2024 Jamboree Rd Bayside Or Coast Highway East 800 60 48,000 Slurry Seal $19,776 2024 Balboa Blvd SB 41st St 38th St 670 24 17,330 Mill and Overlay $112,614 2025 Balboa Blvd SB 36th St 34th St 468 24 11,982 Mill and Overlay $76,590 2025 MacArthur Blvd SB Newport Place Or Jamboree Rd 1,844 61 104,984 Mill and Overlay $681,876 2025 Newport Blvd SB 23rd St 21st St/Balboa Blvd West 631 32 20,192 Mill and Overlay $128,833 2025 Newport Center Dr NB Coast Highway East Farallon Dr/Granville Or 1,189 36 46,304 Mill and Overlay $295,389 2025 San Miguel Or NB Spyglass Hill Rd/Eastgate Or Ford Rd 2,286 29 70,294 Reconstruction $1,416,893 2025 Von Karman Ave Campus Or Birch St 777 76 56,952 Mill and Overlay $369,423 2025 Bison Ave EB Jamboree Rd MacArthur Blvd 2,310 34 93,040 Slurry Seal $39,483 2025 Bison Ave EB MacArthur Blvd City limit 1,070 42 46,940 Slurry Seal $19,920 2025 Bison Ave WB lCity Limit MacArthur Blvd 1 1,070 1 42 48,340 1 Slurry Seal $20,514 2025 Bonita Canyon Dr EB I MacArthur Blvd lBridge 791 41 32,431 Slurry Seal $13,763 2025 Bonita Canyon Or EB 113ridge I Mesa View Or 1,000 30 35,000 Slurry Seal $14,853 2025 Bonita Canyon Dr EB Mesa View Dr Prarie Rd 1,565 30 49,950 Slurry Seal $21,197 2025 6-52 Appendix A - MPAH Page 3 of 7 Appendix A AVEM„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Bonita Canyon Dr EB Prarie Rd Bridge 820 42 34,440 Slurry Seal $14,615 2025 Bonita Canyon Dr EB Bridge Chambord 420 42 19,140 Slurry Seal $8,122 2025 Bonita Canyon Dr EB Chambord SR-73 1,055 42 44,310 Slurry Seal $18,804 2025 Bonita Canyon Dr WB SR-73 Chambord 1,055 44 46,420 Slurry Seal $19,699 2025 Bonita Canyon Dr WB Chambord Bridge 400 1 33 13,200 Slurry Seal $5,602 2025 Bonita Canyon Dr WB Bridge Prarie Rd 835 33 32,555 Slurry Seal $13,815 2025 Bonita Canyon Dr WB Prarie Rd Mesa View Dr 1,565 30 52,950 Slurry Seal $22,470 2025 Bonita Canyon Dr WB Mesa View Dr Bridge 1,000 30 30,000 Slurry Seal $12,731 2025 Bonita Canyon Dr WB Bridge MacArthur Blvd 791 38 39,758 Slurry Seal $16,872 2025 Ford Rd EB Jamboree Rd MacArthur Blvd 3,760 34 129,320 Slurry Seal $54,879 2025 Ford Rd WB MacArthur Blvd Jamboree Rd 3,760 34 1 127,840 Slurry Seal $54,251 2025 MacArthur Blvd NB Bonita Canyon Dr/Ford Rd Villaggio 1,616 59 97,144 Slurry Seal $41,224 2025 MacArthur Blvd NB Villaggio Bison Ave 1,292 55 84,560 Slurry Seal $35,884 2025 MacArthur Blvd NB Bison Ave City Limit 1,145 46 54,470 Slurry Seal $23,115 2025 MacArthur Blvd SB City Limit Bison Ave 1,145 60 75,450 Slurry Seal $32,018 2025 MacArthur Blvd SB Bison Ave Vilaggio 1,292 55 74,060 Slurry Seal $31,428 2025 MacArthur Blvd SB Villaggio Bonita Canyon Dr 1,616 55 101,380 Slurry Seal $43,022 2025 San Joaquin Hills Rd EB Jamboree Rd Santa Cruz Dr 1,510 40 61,900 Slurry Seal $26,268 2025 San Joaquin Hills Rd EB Santa Cruz Or Santa Rosa Dr 2,185 40 88,650 Slurry Seal $37,620 2025 San Joaquin Hills Rd EB Santa Rosa Or MacArthur Blvd 1,530 40 68,200 Slurry Seal $28,942 2025 San Joaquin Hills Rd WB MacArthur Blvd Santa Rosa Dr 1,534 40 70,360 Slurry Seal $29,858 2025 San Joaquin Hills Rd WB Santa Rosa Dr Santa Cruz Dr 2,180 40 92,200 Slurry Seal $39,126 2025 San Joaquin Hills Rd WB Santa Cruz Dr Jamboree Rd 1,531 40 63,240 Slurry Seal $26,837 2025 University Dr EB Jamboree Rd La Vida/Baypointe Dr 640 32 21,730 Slurry Seal $9,221 2025 University Or EB La Vida/Baypointe Dr Bonita Creek Bridge 665 32 21,280 Slurry Seal $9,030 2025 University Or EB Bonita Creek Bridge City Limit 780 44 34,320 Slurry Seal $14,564 2025 University Dr WB City Limit Bonita Creek Bridge 780 44 36,320 Slurry Seal $15,413 2025 University Or WB Bonita Creek Bridge La Vida/Baypointe Dr 675 42 29,600 Slurry Seal $12,561 2025 University Dr WB La Vida/Baypointe Or Jamboree Rd 640 1 42 30,130 Slurry Seal $12,786 2025 32nd St EB Balboa Blvd Newport Blvd 690 32 22,080 Reconstruction $419,880 2025 Birch St Von Karman Ave MacArthur Blvd 1,160 56 74,960 Mill and Overlay $486,233 1 2025 Eastbluff Dr NB Vista Del Sol Jamboree Rd/University Dr 4,000 30 120,000 Reconstruction $843,469 2025 Eastbluff Or SB Vista Del Sol Jamboree Rd 3,975 30 119,250 Reconstruction $861,916 2025 Santa Rosa Or Newport Center Dr East San Joaquin Hills Rd 550 72 39,600 Slurry Seal $16,805 2025 Balboa Blvd SB 44th St 41st St 630 24 15,870 Mill and Overlay $106,204 2026 Balboa Blvd SB 29th St 27th St 510 35 17,850 Mill and Overlay $119,454 2026 Bristol St North Jamboree Rd Dove St 566 1 46 26,036 Mill and Overlay $171,332 2026 Newport Center Dr W NB Newport Center Dr Santa Barbara Dr 1,418 36 53,548 Mill and Overlay $357,645 2026 Newport Center Dr W NB Santa Barbara Dr Santa Cruz Dr 1,087 36 41,632 Mill and Overlay $273,507 2026 Von Karman Ave Birch St MacArthur Blvd 2,180 76 163,580 Mill and Overlay $1,092,725 2026 San Joaquin Hills Rd EB San Miguel Dr Crown Dr 932 41 39,212 Mill and Overlay $257,995 2026 16th St City Limit Sea Gull Ln 1,465 60 89,380 Mill and Overlay $597,162 2026 San Miguel Dr Newport Center Dr East Avocado Ave 928 72 1 68,216 Reconstruction $1,055,687 2026 Balboa Blvd E WB Adams St Coronado Ave 630 28 17,640 Mill and Overlay $115,927 2026 Balboa Blvd E WB Coronado St Medina Way 330 28 9,240 Mill and Overlay $60,724 2026 Santa Cruz Or San Joaquin Hills Rd Newport Center Dr West 1,148 72 82,656 Reconstruction $1,503,813 2026 Spyglass Hill Rd lHarbor Ridge Dr Ridgeline Dr 1,283 44 56,452 Mill and Overlay $371,116 2026 Spyglass Hill Rd Ridgeline Dr lEl Capitan Dr 1,276 44 56,144 Reconstruction $1,165,627 2026 Balboa Blvd SB 132nd St 129th St 705 35 24,675 Mill and Overlay $167,303 2027 Bristol St North I Birch St ICampus Or 617 51 36,967 Mill and Overlay $254,725 2027 6-53 Appendix A - MPAH Page 4 of 7 Appendix A AVEE„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To MacArthur Blvd NB Jamboree Rd Von Karman Ave 1,763 39 99,757 Mill and Overlay $675,590 2027 San Miguel Dr NB San Joaquin Hills Rd Pacific View Dr 635 29 19,665 Mill and Overlay $133,178 2027 San Joaquin Hills Rd EB Crown Dr Marguerite Ave 1,573 41 65,993 Mill and Overlay $446,928 2027 Coast Highway E NB Newport Coast Dr Cameo Highlands Or 3,705 50 176,750 Slurry Seal $79,574 2027 Coast Highway E NB Cameo Highlands Dr Morning Canyon Rd 1,300 28 1 38,900 Slurry Seal $17,513 2027 Coast Highway E NB Morning Canyon Rd Poppy Ave 1,615 28 48,220 Slurry Seal $21,709 2027 Coast Highway E NB Poppy Ave Marguerite Ave 1,480 28 46,940 Slurry Seal $21,133 2027 Coast Highway E NB Marguerite Ave Goldenrod Ave 1,790 28 54,370 Slurry Seal $24,478 2027 Coast Highway E NB Goldenrod Ave MacArthur Blvd 1,089 28 35,057 Slurry Seal $15,783 2027 Coast Highway E SB MacArthur Blvd Goldenrod Ave 1,089 28 35,442 Slurry Seal $15,956 2027 Coast Highway E SB Goldenrod Ave Marguerite Ave 1,790 28 58,170 Slurry Seal $26,189 2027 Coast Highway E SB Marguerite Ave Poppy Ave 1,480 28 47,190 Slurry Seal $21,245 2027 Coast Highway E SB Poppy Ave Morning Canyon Rd 1,615 28 49,220 Slurry Seal $22,159 2027 Coast Highway E SB Morning Canyon Rd Cameo Highlands Dr 1,300 30 41,750 Slurry Seal $18,796 2027 Coast Highway E SB Cameo Highlands Dr Newport Coast Or 3,705 50 176,850 Slurry Seal $79,619 2027 Eastbluff Dr SB Jamboree Rd/University Dr Vista Del Sol 4,000 30 120,000 Reconstruction $2,566,106 2027 16th St Sea Gull Ln Dover Dr 450 38 17,100 Slurry Seal $7,699 2027 Marguerite Ave Fifth Ave Coast Hwy East 1,082 36 64,920 Slurry Seal $29,227 2027 Balboa Blvd SB 38th St 36th St 460 1 24 11,040 Mill and Overlay $78,393 2028 Coast Highway E SB Avocado Ave MacArthur Blvd 725 50 41,250 Mill and Overlay $292,477 2028 Newport Coast Dr NB Provence Pelican Hill Rd N/Ocean Ridge Dr 4,853 41 200,473 Mill and Overlay $1,399,336 2028 San Joaquin Hills Rd WB Newport Coast Dr Newport Ridge Dr East 1,030 33 42,890 Mill and Overlay $299,380 2028 Balboa Blvd NB 44th St Coast Highway 820 35 28,700 Slurry Seal $13,309 2028 Balboa Blvd E EB Island Ave Medina Way 515 44 21,910 Slurry Seal $10,160 2028 Balboa Blvd E WB Medina Way Island Ave 520 40 1 20,800 Slurry Seal $9,645 2028 Balboa Blvd W EB 16th St 14th St 951 24 22,824 Slurry Seal $10,584 2028 Balboa Blvd W EB 12th St 8th St 1,800 50 89,000 Slurry Seal $41,271 2028 Balboa Blvd W EB 8th St 6th St 893 42 36,506 Slurry Seal $16,928 2028 Balboa Blvd W EB 6th St Island Ave 450 42 18,400 Slurry Seal $8,532 2028 Balboa Blvd W WB Island Ave 6th St 390 40 15,100 Slurry Seal $7,002 2028 Balboa Blvd W WB 6th St 8th St 895 40 34,800 Slurry Seal $16,137 2028 Balboa Blvd W WB 8th St 12th St 1,790 40 70,600 Slurry Seal $32,738 2028 Balboa Blvd W WB 14th St 16th St 951 24 22,824 Slurry Seal $10,584 2028 Bristol St South Spruce Ave Bayview PI 807 50 42,750 Slurry Seal $19,824 2028 Campus Dr EB Bristol St North Quail St 950 41 40,450 Slurry Seal $18,757 2028 Campus Dr EB Quail St Dove St 1,325 42 58,150 Slurry Seal $26,965 2028 Campus Or EB Dove St Airport 1,850 42 81,300 Slurry Seal $37,700 2028 Campus Or EB Airport MacArthur Blvd 420 62 26,040 Slurry Seal $12,075 2028 Campus Or EB MacArthur Ct Von Karman Ave 1,029 36 1 37,044 Slurry Seal $17,178 2028 Campus Or EB Teller Ave Jamboree Rd 700 33 26,600 Slurry Seal $12,335 2028 Dover Dr NB Coast Highway Cliff Dr 957 39 40,823 Slurry Seal $18,930 2028 Dover Dr NB Cliff Dr Castaways Ln 1,236 30 39,080 Slurry Seal $18,122 2028 Dover Dr NB Castaways Ln Westcliff Dr 1,270 30 44,100 Slurry Seal $20,450 2028 Dover Dr SB Westcliff Dr 16th St 1,290 33 44,070 Slurry Seal $20,436 2028 Dover Dr SB 16th St Cliff Or 1,250 1 30 37,500 Slurry Seal $17,389 2028 Dover Dr SB Cliff Dr Coast Highway 989 41 52,549 Slurry Seal $24,368 2028 Irvine Ave 16th St Mariners Dr 2,600 34 88,400 Slurry Seal $40,992 2028 Irvine Ave Mariners Or Dover Dr 1,213 32 38,816 Slurry Seal $18,000 2028 Irvine Ave Dover Dr Linda Ln 645 34 21,930 Slurry Seal $10,169 2028 Irvine Ave I Linda Ln I Baycrest Rd 1,085 34 36,890 Slurry Seal $17,106 2028 6-54 Appendix A - MPAH Page 5 of 7 Appendix A AVEE„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Irvine Ave Santiago Dr 23rd St 1,573 77 103,606 Slurry Seal $48,043 2028 Irvine Ave 23rd St Santa Isabel Ave 1,500 76 114,000 Slurry Seal $52,863 2028 Irvine Ave Santa Isabel Ave University Dr 2,630 28 96,800 Slurry Seal $44,887 2028 Irvine Ave Mesa Dr Bristol St South 3,140 42 129,900 Slurry Seal $60,236 2028 Irvine Ave Baycrest Rd Francisco Dr 1,227 1 38 46,626 Slurry Seal $21,621 2028 Irvine Ave Francisco Dr Santiago Dr 991 38 37,658 Slurry Seal $17,463 2028 Irvine Ave Santiago Dr Francisco Dr 996 38 37,848 Slurry Seal $17,551 2028 Irvine Ave Francisco Dr Baycrest Rd 1,223 38 46,474 Slurry Seal $21,551 2028 Irvine Ave 300' S of Monte Vista Ave Santa Isabel Ave 1,049 28 29,372 Slurry Seal $13,620 2028 Irvine Ave BRISTOL ST MESA DR 3,140 42 131,880 Slurry Seal $61,155 2028 Irvine Ave Baycrest Rd Santiago Dr 2,170 38 1 82,460 Slurry Seal $38,238 2028 Jamboree Rd NB Coast Highway East Back Bay Dr 990 53 37,014 Slurry Seal $17,164 2028 Jamboree Rd NB Back Bay Dr Island Lagoon Dr/Hyatt Newporter 675 61 42,175 Slurry Seal $19,557 2028 Jamboree Rd NB Island Lagoon Dr/Hyatt Newporter Santa Barbara Dr 3,100 46 155,600 Slurry Seal $72,154 2028 Jamboree Rd NB Santa Barbara Dr San Joaquin Hills Rd 945 47 46,415 Slurry Seal $21,523 2028 Jamboree Rd NB San Joaquin Hills Rd Ford Rd 2,608 46 127,968 Slurry Seal $59,340 2028 Jamboree Rd NB Ford Rd Bison Ave 3,244 46 152,424 Slurry Seal $70,681 2028 Jamboree Rd NB Bison Ave University Dr/Eastbluff Dr 3,080 46 144,680 Slurry Seal $67,090 2028 Jamboree Rd NB University Dr/Eastbluff Dr Bayview Way 1,735 57 83,439 Slurry Seal $38,692 2028 Jamboree Rd SB Fairchild Rd Koll Center 699 58 42,542 Slurry Seal $19,727 2028 Jamboree Rd SB University Dr/Eastbluff Dr Bison Ave 3,030 46 151,880 Slurry Seal $70,429 2028 Jamboree Rd SB Bison Ave Ford Rd/Eastbluff Dr 3,205 46 154,430 Slurry Seal $71,611 2028 Jamboree Rd SB Ford Rd/Eastbluff Dr San Joaquin Hills Rd 2,625 46 128,450 Slurry Seal $59,564 2028 Jamboree Rd SB San Joaquin Hills Rd Santa Barbara Dr 920 1 46 51,920 Slurry Seal $24,076 2028 Jamboree Rd SB Santa Barbara Dr Island Lagoon Dr/Hyatt Newporter 3,135 46 1 146,710 Slurry Seal $68,031 2028 Jamboree Rd SB Island Lagoon Dr/Hyatt Newporter Back Bay Dr 635 46 31,460 Slurry Seal $14,588 2028 Jamboree Rd SB Back Bay Dr Coast Highway East 1,030 45 53,350 Slurry Seal $24,739 2028 MacArthur Blvd NB Coast Highway East San Miguel Dr 2,843 34 105,712 Slurry Seal $49,020 2028 MacArthur Blvd NB San Miguel Dr San Joaquin Hills Rd 1,463 46 74,798 Slurry Seal $34,685 2028 MacArthur Blvd NB San Joaqin Hills Rd 3400' N of San Joaqin Hills Rd 3,400 44 151,350 Slurry Seal $70,183 2028 MacArthur Blvd NB 3400' N of San Joaqin Hills Rd Bonita Canyon Dr/Ford Rd 2,600 44 140,900 Slurry Seal $65,337 2028 MacArthur Blvd SB Bonita Canyon Dr 2600' S Bonita Canyon Dr 2,600 46 125,600 Slurry Seal $58,242 2028 MacArthur Blvd SB 2600' S Bonita Canyon Dr San Joaqin Hills Rd 3,400 46 171,400 Slurry Seal $79,480 2028 MacArthur Blvd SB San Joaquin Hills Rd San Miguel Dr 1,533 44 74,952 Slurry Seal $34,756 2028 MacArthur Blvd SB San Miguel Dr Coast Highway East 2,809 34 125,006 Slurry Seal $57,967 2028 Newport Blvd NB 32nd St Finley Ave 420 52 20,880 Slurry Seal $9,682 2028 Newport Blvd NB Finley Ave Via Lido 502 42 21,084 Slurry Seal $9,777 2028 Newport Blvd SB Finley Ave 32nd St 460 42 21,820 Slurry Seal $10,118 2028 Newport Blvd SB 32nd St 30th St 504 35 17,640 Slurry Seal $8,180 2028 Newport Blvd SB 26th St 23rd St 540 1 32 17,280 Slurry Seal $8,013 2028 Newport Blvd SB Via Lido Finley Ave 513 42 21,546 Slurry Seal $9,991 2028 Newport Center Dr E SB Santa Cruz Dr Santa Rosa Dr 1,403 36 53,008 Slurry Seal $24,581 2028 Newport Coast Dr SB Provence Pelican Hill Rd South 1,581 41 70,821 Slurry Seal $32,841 2028 Newport Coast Dr SB Pelican Hill Rd South Coast Highway East 1,849 41 83,809 Slurry Seal $38,863 2028 San Joaquin Hills Rd EB MacArthur Blvd San Miguel Dr 983 40 44,320 Slurry Seal $20,552 2028 San Joaquin Hills Rd EB Marguerite Ave Spyglass Hill Rd 2,801 41 116,841 Slurry Seal $54,181 2028 San Joaquin Hills Rd EB Newport Ridge Dr East Newport Coast Dr 1 1,050 1 33 1 41,125 Slurry Seal $19,070 2028 San Joaquin Hills Rd WB Spyglass Hill Rd 1 Marguerite Ave 2,759 41 115,619 Slurry Seal $53,614 2028 San Joaquin Hills Rd WB San Miguel Dr I MacArthur Blvd 965 41 41,565 Slurry Seal $19,274 2028 San Miguel Dr NB MacArthur Blvd ISan Joaquin Hills Rd 1,285 31 45,335 Slurry Seal $21,022 2028 6-55 Appendix A - MPAH Page 6 of 7 Appendix A ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level PAVEMENT ENGINEERING MPAH Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To San Miguel Dr SB Harbor Woods PI Pacific View Dr 505 29 15,645 Slurry Seal $7,255 2028 San Miguel Or SB San Joaquin Hills Rd MacArthur Blvd 1,240 30 41,200 Slurry Seal $19,105 2028 Superior Av NB Placentia Ave City Limit 1,750 38 66,500 Slurry Seal $30,837 2028 Westcliff Or EB Irvine Ave Dover Dr 1,703 25 42,575 Slurry Seal $19,743 2028 Westcliff Or WB Dover Dr Irvine Ave 1,695 1 25 42,375 Slurry Seal $19,650 2028 Hospital Rd Placentia Ave Newport Blvd 700 57 39,900 Mill and Overlay $282,813 2028 Balboa Blvd E WB Palm St Adams St 250 22 5,500 Mill and Overlay $38,984 2028 32nd St Lafayette Ave Villa Way 455 48 24,564 Slurry Seal $11,391 2028 32nd St Villa Way Newport Blvd 530 62 29,150 Slurry Seal $13,517 2028 Avocado Ave Coast Highway East Farralon Dr 1,865 64 120,360 Slurry Seal $55,813 2028 Balboa Blvd E WB Washington St Palm St 264 30 7,920 Slurry Seal $3,673 2028 Dover Dr NB Westcliff Or Mariners Dr 2,535 37 96,795 Slurry Seal $44,885 2028 Dover Dr NB Mariners Or Irvine Ave 942 37 34,854 Slurry Seal $16,162 2028 Ford Rd EB San Miguel Dr Hillside Dr 410 36 14,760 Slurry Seal $6,844 2028 Ford Rd WB Hillside Dr San Miguel Dr 405 32 12,960 Slurry Seal $6,010 2028 Marguerite Ave Harbor View Or Fifth Ave 1,542 55 1 84,810 Slurry Seal $39,328 2028 Marguerite Ave Harbor View Dr Sausalito Dr 1,047 60 62,820 Slurry Seal $29,130 2028 Marguerite Ave Sausalito Or San Joaquin Hills Rd 1,845 60 110,700 Slurry Seal $51,333 2028 Mesa Dr Acacia St Mesa Dr/ Birch St 200 66 13,200 Slurry Seal $6,121 2028 Newport Blvd NB 30th St 32nd St 508 35 17,780 Slurry Seal $8,245 2028 Balboa Blvd NB 23rd St 25th St 400 35 11,600 Mill and Overlay $84,840 2029 Balboa Blvd NB 25th St 27th St 360 35 12,600 Mill and Overlay $90,649 2029 Bristol St North Dove St Spruce St 1,261 1 46 58,006 Mill and Overlay $424,038 2029 Jamboree Rd SB Campus Dr Birch St 840 49 43,740 Mill and Overlay $319,436 2029 MacArthur Blvd NB Von Karman Ave Birch St 2,449 60 146,940 Mill and Overlay $1,056,611 2029 MacArthur Blvd SB Campus Dr Birch St 860 61 81,960 Mill and Overlay $589,355 2029 MacArthur Blvd SB Birch St Newport Place Dr 2,454 60 147,240 Mill and Overlay $1,076,359 2029 Balboa Blvd W EB 123rd St 22nd St 300 29 8,700 1 Mill and Overlay 1 $63,516 1 2029 Bristol St South I Bayview PI Jamboree Rd 1,000 50 52,000 Mill and Overlay $380,132 2029 Bayside Dr J.Jamboree Rd lCoast Highway East 4,130 60 247,800 Slurry Seal $118,355 2029 Jamboree Rd Bayside Dr Coast Highway East 800 60 48,000 Slurry Seal $22,926 2029 6-56 Appendix A - MPAH Page 7 of 7 Appendix A 4000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To 42nd St River Ave Balboa Blvd 158 20 3160 Reconstruction $3,716 2023 Seaview Ave Marguerite Ave Narcissus Ave 615 30 18450 Reconstruction $103,320 2023 26th St East End Newport Blvd 140 29 4060 Slurry Seal $1,421 2023 28th St Newport Blvd West SB Balboa Blvd 220 60 13200 Slurry Seal $4,620 2023 54th St Neptune Ave Seashore Dr 75 27 2025 1 Slurry Seal $709 2023 60th St North End Coast Highway West 155 28 4340 Slurry Seal $1,519 2023 Acacia Ave Coast Highway East Second Ave 1,075 27 29025 Slurry Seal $10,159 2023 Acacia Ave Second Ave Pacific Dr 717 27 19359 Slurry Seal $6,776 2023 Aldebaran Cir Galaxy Dr End 135 55 9925 Slurry Seal $3,474 2023 Anita Ln Estelle Ln Marian Ln 1,102 33 36366 Slurry Seal $12,728 2023 Antigua Cir Santiago Dr End 165 33 7945 Slurry Seal $2,781 2023 Antigua Way Santiago Dr (North End) Mariners Dr 1,980 37 74460 Slurry Seal $26,061 2023 Antigua Way Mariners Dr Santiago Dr (South End) 1,006 35 35210 Slurry Seal $12,324 2023 Ashford Ln Glenwood Ln Santiago Dr 315 33 10995 Slurry Seal $3,848 2023 Avocado Ave Pacific Dr 160' N of Pacific Dr 160 16 2560 Slurry Seal $896 2023 Back Bay Dr Shellmaker Rd Beginning of PCC Section 800 22 17600 Slurry Seal $6,160 2023 Back Bay Dr End of PCC Section San Joaquin Hills Rd 1,649 22 36278 Slurry Seal $12,697 2023 Back Bay Dr End of PCC Section Backbay sewer pump station 3,106 22 68332 Slurry Seal $23,916 2023 Back Bay Dr Access Rd Staired Path to Landmark 2,394 22 52668 Slurry Seal $18,434 2023 Baycrest Rd Irvine Ave Tradewinds Ln 238 38 9044 Slurry Seal $3,165 2023 Bayport Way Holiday Rd South End 232 33 7656 Slurry Seal $2,680 2023 Bayport Way Francisco Dr North End 213 34 9742 Slurry Seal $3,410 2023 Bayside Dr Marguerite Ave Carnation Ave 2,415 37 74855 Slurry Seal $26,199 2023 Bayside Dr Coast Highway East End 1,187 38 45106 Slurry Seal $15,787 2023 Bayview Dr Ocean Blvd Goldenrod Ave 157 28 4396 Slurry Seal $1,539 2023 Bayview Dr Goldenrod Ave Heliotrope Ave 251 28 7028 Slurry Seal $2,460 2023 Bayview Dr Heliotrope Ave Iris Ave 260 28 7280 Slurry Seal $2,548 2023 Beacon Bay Harbor Island Rd End 1,170 24 28080 Slurry Seal $9,828 2023 Beacon St Westminster Ave Holmwood Dr 240 34 8160 Slurry Seal $2,856 2023 Beacon St La Jolla Dr Santa Ana Ave 105 33 3465 1 Slurry Seal $1,213 2023 Bedford Ln Rutland Rd Buckingham Ln 641 36 23076 Slurry Seal $8,077 2023 Begonia Ave Pacific Dr Coast Highway East 1,885 28 52780 Slurry Seal $18,473 2023 Berkshire Ln Oxford Ln Cambridge Ln 947 34 32198 Slurry Seal $11,269 2023 Birch St Mesa Dr End 232 36 9552 Slurry Seal $3,343 2023 Bonaire Way Holiday Rd South End 235 33 10255 Slurry Seal $3,589 2023 Bonaire Way Francisco Dr North End 225 33 7425 Slurry Seal $2,599 2023 Braemar Way Francisco Dr End 215 34 9810 Slurry Seal $3,434 2023 Breakers Dr Breakers Dr End 1,035 25 25875 Slurry Seal $9,056 2023 Brighton Rd Cameo Shores Rd Camden Dr 1,390 33 48370 Slurry Seal $16,930 2023 Buck Gully Dr Sandcastle Dr End 126 36 5786 Slurry Seal $2,025 2023 Buckingham Ln Westcliff Dr Cornwall Ln 620 36 22320 Slurry Seal $7,812 2023 Buttonshell Ln Holiday Rd Nautilus Ln 410 33 14130 Slurry Seal $4,946 2023 Cambria Dr El Capitan Dr Drakes Bay Dr 2,510 32 80320 Slurry Seal $28,112 2023 Cambridge Ln Devon Ln Highland Dr 803 34 27902 1 Slurry Seal $9,766 2023 Camden Dr Cameo Shores Rd Milford Dr 1,345 33 44385 Slurry Seal $15,535 2023 Cameo Shores Rd Coast Highway East Orrington Rd 1,088 37 37777 Slurry Seal $13,222 2023 Cameo Shores Rd Orrington Rd Brighton Rd 956 37 35372 Slurry Seal $12,380 2023 Candlestick Ln lGlenwood Ln ISandalwood Ln 630 35 23250 Slurry Seal $8,138 2023 Castaways Ln I Dover Dr ICastaways (private) North 462 1 54 24948 Slurry Seal $8,732 2023 6-57 Appendix A - Local Streets Page 1 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Centella PI Holiday Rd South End 369 33 12177 Slurry Seal $4,262 2023 Centella PI Santiago Dr North End 265 37 12305 Slurry Seal $4,307 2023 Commodore Rd Tradewinds Ln Mariners Dr 1,950 38 75300 Slurry Seal $26,355 2023 Constellation Dr Santiago Dr End 135 38 5130 Slurry Seal $1,796 2023 Cornwall Ln Pembroke Ln Dover Dr 712 34 24808 Slurry Seal $8,683 2023 Court Ave 20th St McFadden PI 85 28 2380 1 Slurry Seal $833 2023 Crown Dr North Crown Dr San Joaquin Hills Rd 1,370 36 49320 Slurry Seal $17,262 2023 Cumberland Ln Sussex Ln Dover Dr 435 34 15390 Slurry Seal $5,387 2023 Cutter Rd Beacon Bay End 380 24 9120 Slurry Seal $3,192 2023 Dahlia Ave Ocean Blvd Seaview Ave 275 27 7425 Slurry Seal $2,599 2023 Dahlia Ave 200' S of First St Coast Highway East 1,490 27 40230 Slurry Seal $14,081 2023 Deborah Ln Mariners Dr Vivian Ln 243 34 8262 Slurry Seal $2,892 2023 Deborah Ln Vivian Ln Sylvia Ln 633 34 22122 Slurry Seal $7,743 2023 Diana Ln Priscilla Ln Vivian Ln 762 34 27108 1 Slurry Seal $9,488 2023 Donnie Rd 22nd St End 540 33 20320 Slurry Seal $7,112 2023 Doris Ln Dover Dr Ruth Ln 241 36 8676 Slurry Seal $3,037 2023 Dorothy Ln Mariners Dr Estelle Ln 238 33 7854 Slurry Seal $2,749 2023 Dorothy Ln Estelle Ln Marian Ln 920 34 31280 Slurry Seal $10,948 2023 Dover Dr End Leila Ln 492 29 15768 Slurry Seal $5,519 2023 Dover Dr Leila Ln Mariners Dr 500 29 14500 Slurry Seal $5,075 2023 Dover Dr Mariners Dr Doris Ln 510 29 14790 Slurry Seal $5,177 2023 Dover Dr Doris Ln Nottingham Rd 590 29 17110 Slurry Seal $5,989 2023 Dover Dr Nottingham Rd Norfolk Ln 665 29 19285 Slurry Seal $6,750 2023 Dover Dr Norfolk Ln Westcliff Dr 490 29 14210 Slurry Seal $4,974 2023 Dover Dr Westcliff Dr Dover Dr (Arterial) 170 36 5460 Slurry Seal $1,911 2023 Essex Ln Cambridge Ln Oxford Ln 836 34 28424 Slurry Seal $9,948 2023 Estelle Ln Ruth Ln Highland Dr 1,368 33 45744 Slurry Seal $16,011 2023 Eton PI Dover Dr End 163 33 7879 Slurry Seal $2,758 2023 Evening Star Ln Polaris Dr End 980 33 34840 Slurry Seal $12,194 2023 Fairfield Dr Cameo Shores Rd Milford Dr 1,355 33 44715 Slurry Seal $15,650 2023 Fernleaf Ave Seaview Ave 150' N Seaview Ave 150 27 4050 Slurry Seal $1,418 2023 Fernleaf Ave 250' S of First St Coast Highway East 1,260 27 34020 Slurry Seal $11,907 2023 First Ave Carnation Ave Dahlia Ave 271 27 7317 Slurry Seal $2,561 2023 First Ave Dahlia Ave Fernleaf Ave 270 27 7290 Slurry Seal $2,552 2023 First Ave Fernleaf Ave Goldenrod Ave 270 27 7290 Slurry Seal $2,552 2023 First Ave Goldenrod Ave Heliotrope Ave 270 27 7290 Slurry Seal $2,552 2023 First Ave Iris Ave Jasmine Ave 270 27 7290 Slurry Seal $2,552 2023 Ford Rd Hillside Dr East End 590 32 22320 Slurry Seal $7,812 2023 Ford Rd EB West End San Miguel Dr 840 30 26900 Slurry Seal $9,415 2023 Ford Rd WB Newport Hills Dr West End 877 29 25433 Slurry Seal $8,902 2023 Fourth Ave Avocado Ave Acacia Ave 265 27 7155 Slurry Seal $2,504 2023 Fourth Ave Acacia Ave Begonia Ave 267 27 7209 Slurry Seal $2,523 2023 Fourth Ave Begonia Ave Carnation Ave 265 27 7155 Slurry Seal $2,504 2023 Fourth Ave Carnation Ave Dahlia Ave 265 27 7155 Slurry Seal $2,504 2023 Francisco Dr Tustin Ave Irvine Ave 1,290 37 47730 Slurry Seal $16,706 2023 Francisco Dr Irvine Ave Tradewinds Ln 236 36 8496 1 Slurry Seal $2,974 2023 Galatea Ter Bayadere Ter Angelita Dr 1,750 33 57750 Slurry Seal $20,213 2023 Glenwood Ln lCandlestick Ln lAshford Ln 640 1 33 22320 Slurry Seal $7,812 1 2023 Goldenrod Ave 150' S of Seaview Ave I Seaview Ave 150 1 28 4200 Slurry Seal $1,470 1 2023 6-58 Appendix A - Local Streets Page 2 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Goldenrod Ave End Coast Highway East 1,124 28 31472 Slurry Seal $11,015 2023 Gorham Dr Cameo Shores Rd Milford Dr 1,400 33 46200 Slurry Seal $16,170 2023 Hampden Rd Milford Dr Cameo Shores Rd 930 37 34410 Slurry Seal $12,044 2023 Hampden Rd Cameo Shores Rd End 213 37 8131 Slurry Seal $2,846 2023 Hampshire Cir Antigua Way Antigua Way 751 34 25534 Slurry Seal $8,937 2023 Hampshire Ct Hampshire Cir End 134 50 9200 1 Slurry Seal $3,220 2023 Hampshire Ln Lincoln Ln Santiago Dr 250 34 8500 Slurry Seal $2,975 2023 Hampshire Ln Santiago Dr Antigua Way 250 34 8500 Slurry Seal $2,975 2023 Harbor Island Dr Bayside Dr Harbor Island Rd 750 43 34250 Slurry Seal $11,988 2023 Harbor Island Dr Harbor Island Rd E End 1,862 37 68894 Slurry Seal $24,113 2023 Harbor Island Dr Harbor Island Dr N End 190 36 6840 Slurry Seal $2,394 2023 Hazel Dr Coast Highway East 577' N of Coast Highway East 577 30 17310 Slurry Seal $6,059 2023 Hazel Dr 577' N of Coast Highway East Poppy Ave (north side) 393 29 11397 Slurry Seal $3,989 2023 Heather Ln Irvine Ave End 955 34 36390 1 Slurry Seal $12,737 2023 Heliotrope Ave Ocean Blvd Bayview Dr 400 27 10800 Slurry Seal $3,780 2023 Heliotrope Ave Seaview Ave End 314 27 8478 Slurry Seal $2,967 2023 Heliotrope Ave Bayside Dr Coast Highway East 1,015 28 28420 Slurry Seal $9,947 2023 Highland Dr Westcliff Dr Nottingham Rd 1,592 38 60496 Slurry Seal $21,174 2023 Highland Dr Nottingham Rd Mariners Dr 1,858 38 70604 Slurry Seal $24,712 2023 Highland Dr Mariners Dr Irvine Ave 1,945 37 71965 Slurry Seal $25,188 2023 Holiday Rd Galaxy Dr Santiago Dr 165 38 6270 Slurry Seal $2,195 2023 Holiday Rd Santiago Dr Tradewinds Ln 1,485 38 56430 1 Slurry Seal $19,751 2023 Holiday Rd Irvine Ave Tustin Ave 1,290 38 49020 Slurry Seal $17,157 2023 Hospital Rd Superior Ave Placentia Ave 976 44 42944 Slurry Seal $15,031 2023 Indian Spring Ln Irvine Ave End 78 52 6556 Slurry Seal $2,295 2023 Iris Ave Ocean Blvd Seaview Ave 625 28 17500 Slurry Seal $6,125 2023 Iris Ave Seaview Ave North End 320 28 8960 Slurry Seal $3,136 2023 Island Ave Bay Ave East Balboa Blvd West 164 33 5412 Slurry Seal $1,894 1 2023 Jasmine Ave 88' N of Ocean Blvd Seaview Ave 432 28 12096 Slurry Seal $4,234 2023 Jasmine Ave Seaview Ave North End 283 27 7641 1 Slurry Seal $2,674 2023 Jasmine Ave Bayside Dr Coast Highway East 480 28 13440 Slurry Seal $4,704 2023 Kathleen Ln Teresita Ln Beryl Ln 255 34 9270 Slurry Seal $3,245 2023 Kathleen Ln Beryl Ln Highland Dr 260 34 8840 Slurry Seal $3,094 2023 Kent Ln Sussex Ln Dover Dr 415 34 14110 Slurry Seal $4,939 2023 Ketch Rd Beacon Bay End 310 24 7440 Slurry Seal $2,604 2023 Larkspur Ave Ocean Blvd Seaview Ave 470 28 13160 Slurry Seal $4,606 2023 Larkspur Ave Seaview Ave North End 360 28 10080 Slurry Seal $3,528 2023 Larkspur Ave Bayside Dr Coast Highway East 247 28 6916 Slurry Seal $2,421 2023 Leila Lane Dover Dr (Cul-de-Sac) Diana Ln 240 33 7920 Slurry Seal $2,772 2023 Lincoln Ln Estelle Ln Marian Ln 1,563 34 53742 Slurry Seal $18,810 2023 Linda Ln Irvine Ave Priscilla Ave 234 34 7956 Slurry Seal $2,785 2023 Malabar Dr Seadrift Dr/El Paseo Dr Bonnie Doone Ter 688 37 25456 Slurry Seal $8,910 2023 Marguerite Ave San Joaquin Hills Rd Pacific View Dr 721 36 26406 Slurry Seal $9,242 2023 Marian Ln Lincoln Ln Highland Dr 279 38 11202 1 Slurry Seal $3,921 2023 Marigold Ave Seaview Ave Coast Highway East 585 28 16380 Slurry Seal $5,733 2023 Mariners Dr Irvine Ave Dover Dr 1,450 38 55100 Slurry Seal $19,285 2023 Mariners Dr Dover Dr Santiago Dr 2,212 38 84056 Slurry Seal $29,420 2023 Mariners Dr ISantiago Dr I East End 1,232 1 37 48084 Slurry Seal $16,830 1 2023 Marlin Way IShipway Ln ITerrapin Way 725 1 33 25725 Slurry Seal $9,004 1 2023 6-59 Appendix A - Local Streets Page 3 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Mesa View North Ford Rd Bonita Canyon Dr 400 43 17200 Slurry Seal $6,020 2023 Milford Dr Hampden Rd Orrington Rd 875 37 32375 Slurry Seal $11,331 2023 Milford Dr Orrington Rd Camden Dr 801 37 32137 Slurry Seal $11,248 2023 Morning Canyon Rd Coast Highway East Shorecliff Rd 1,462 27 41964 Slurry Seal $14,688 2023 Morning Star Ln Polaris Dr End 675 33 24775 Slurry Seal $8,671 2023 Narcissus Ave Ocean Blvd Seaview Ave 366 27 9882 Slurry Seal $3,459 2023 Narcissus Ave Seaview Ave Coast Highway East 553 27 14931 Slurry Seal $5,226 2023 Nautilus Lane Toyon Ln Buttonshell Ln 320 33 11760 Slurry Seal $4,116 2023 Newport Coast Dr SB 73 Freeway Bridge Sage Hill 2,235 44 98340 Slurry Seal $34,419 2023 Newport Hills Dr E Port Ramsgate PI Port Seabourne Way 1,550 37 57350 Slurry Seal $20,073 2023 Newport Hills Dr E Port Sutton Dr Newport Hills Dr West 1,985 38 75430 Slurry Seal $26,401 2023 Norfolk Ln Dover Dr Devon Ln 220 33 7260 1 Slurry Seal $2,541 2023 North Star Ln White Cliffs Dr End 850 33 30550 Slurry Seal $10,693 2023 Nottingham Rd Dover Dr Santiago Dr 1,758 38 66804 Slurry Seal $23,382 2023 Orchid Ave Ocean Blvd Coast Highway East 1,106 27 29862 Slurry Seal $10,452 2023 Orrington Rd Cameo Shores Rd Milford Dr 1,425 33 47025 Slurry Seal $16,459 2023 Paloma Dr Holiday Rd City Limit 650 35 22750 Slurry Seal $7,963 2023 Pembroke Ln Mariners Dr Cornwall Ln 930 34 32220 Slurry Seal $11,277 2023 Perham Rd Cameo Shores Rd Milford Dr 1,380 33 45540 Slurry Seal $15,939 2023 Pescador Dr Nottingham Rd Santiago Dr 1,487 33 50271 Slurry Seal $17,595 2023 Piazza Genoa Via Lido Soud Via Genoa 192 45 8640 Slurry Seal $3,024 2023 Piazza Lido Via Florence Via Havre 510 58 29580 Slurry Seal $10,353 2023 Piazza Lido Via Havre Via Koron 428 24 10272 Slurry Seal $3,595 2023 Poinsettia Ave Ocean Blvd Seaview Ave 547 28 15316 Slurry Seal $5,361 2023 Poinsettia Ave Seaview Ave Coast Highway East 638 28 17864 Slurry Seal $6,252 2023 Point Conception Way El Capitan Dr Drakes Bay Dr 168 36 6798 Slurry Seal $2,379 2023 Poppy Ave 190'S Coast Highway East Coast Highway East 190 21 3990 Slurry Seal $1,397 2023 Pork Barrel Way (35th 1/2 St) Finley Ave S End 80 16 1280 Slurry Seal $448 2023 Port Abbey PI Port Sheffield PI (West End) Newport Hills Drive West 772 32 24704 Slurry Seal $8,646 2023 Port Albans Cir Newport Hills Dr East End 175 54 9450 Slurry Seal $3,308 2023 Port Ashley PI Newport Hills Drive West Port Stirling PI (East End) 620 32 19840 Slurry Seal $6,944 2023 Port Cardiff PI Port Bristol Cir (West End) Newport Hills Drive East 958 32 30656 Slurry Seal $10,730 2023 Port Carlisle PI Port Whitby PI Port Lerwick PI 1,461 32 47252 Slurry Seal $16,538 2023 Port Ramsey PI San Miguel Dr Port Whitby PI 153 36 6008 Slurry Seal $2,103 2023 Port Ramsgate PI Newport Hills Drive East Port Chelsea PI (East End) 430 32 13760 Slurry Seal $4,816 2023 Port Stanhope Cir Newport Hills Dr West End 115 38 5330 1 Slurry Seal $1,866 2023 Port Stirling PI Port Ashley PI (West Side) Newport Hills Drive West 615 32 19680 Slurry Seal $6,888 2023 Port Tiffin Cir Newport Hills Dr West End 115 54 6210 Slurry Seal $2,174 2023 Port Whitby PI Port Ramsey PI Port Durness PI 1,020 36 37220 Slurry Seal $13,027 2023 Prairie Road NB Ford Rd Bonita Canyon Dr 350 46 16100 Slurry Seal $5,635 2023 Prairie Road SB Bonita Canyon Dr Ford Rd 350 35 12250 Slurry Seal $4,288 2023 Priscilla Ln Beryl Ln Diana Ln 658 34 23572 Slurry Seal $8,250 2023 Ruth Ln Estelle Ln Marian Ln 631 34 22654 Slurry Seal $7,929 2023 Rutland Rd Mariners Dr Westcliff Dr 1,350 36 48600 1 Slurry Seal $17,010 2023 Sandalwood Ln Santiago Dr Candlestick Ln 402 35 14670 Slurry Seal $5,135 2023 Santa Isabel Ave Irvine Ave Tustin Ave 290 56 16240 Slurry Seal $5,684 2023 Santiago Dr Tustin Ave Irvine Ave 1,275 37 48375 Slurry Seal $16,931 2023 Santiago Dr lAntigua Way lMariners Dr 953 1 36 34308 Slurry Seal 1 $12,008 1 2023 Schooner Rd I Beacon Bay I End 290 1 24 6960 Slurry Seal 1 $2,436 1 2023 6-60 Appendix A - Local Streets Page 4 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Seaview Ave Narcissus Ave Orchid Ave 256 28 7040 Slurry Seal $2,464 2023 Seaview Ave Orchid Ave Poinsettia Ave 270 28 7425 Slurry Seal $2,599 2023 Seaward Rd Evening Canyon Rd Driftwood Rd 287 27 7749 Slurry Seal $2,712 2023 Second Ave Carnation Ave Heliotrope Ave 1,200 28 33600 Slurry Seal $11,760 2023 Shipway Ln Tradewinds Ln Skylark Ln 782 38 29716 Slurry Seal $10,401 2023 Skylark Ln Highland Dr Commodore Rd 245 37 9065 1 Slurry Seal $3,173 2023 Skylark Ln Commodore Rd Holiday Rd 1,088 38 41344 Slurry Seal $14,471 2023 Somerset Ln Highland Dr Highland Dr 1,445 34 50330 Slurry Seal $17,616 2023 Starlight Cir Commodore Rd Glenwood Ln 233 35 8155 Slurry Seal $2,854 2023 Starlight Cir Glenwood Ln End 195 33 8935 Slurry Seal $3,127 2023 Sussex Ln Dover Dr Cumberland Ln 1,205 34 41570 Slurry Seal $14,550 2023 Sylvia Ln Beryl Ln Deborah Ln 462 34 16308 Slurry Seal $5,708 2023 Teresita Ln Kathleen Ln Vivian Ln 530 35 19150 Slurry Seal $6,703 2023 Third Ave Avocado Ave Acacia Ave 270 27 7290 Slurry Seal $2,552 2023 Third Ave Acacia Ave Begonia Ave 265 27 7155 Slurry Seal $2,504 2023 Third Ave Begonia Ave Carnation Ave 265 27 7155 Slurry Seal $2,504 2023 Third Ave Dahlia Ave Fernleaf Ave 265 27 7155 Slurry Seal $2,504 2023 Toyon Ln Holiday Rd Nautilus Ln 445 33 15285 Slurry Seal $5,350 2023 Tradewinds Ln Santiago Dr Commodore Rd 2,275 38 86450 Slurry Seal $30,258 2023 Tremont Ln Cameo Shores Rd Milford Dr 1,420 33 46860 Slurry Seal $16,401 2023 Tustin Ave South End Santa Isabel Ave 330 37 12700 Slurry Seal $4,445 2023 Tustin Ave Santa Isabel Ave North End 580 37 25400 Slurry Seal $8,890 1 2023 Via Marina Tustin Ave End 486 33 18538 Slurry Seal $6,488 2023 Via Oporto Via Lido Central Ave 600 29 17400 Slurry Seal $6,090 2023 Vivian Ln Beryl Ln Diana Ln 794 34 28196 Slurry Seal $9,869 2023 Warwick Ln Estelle Ln Marian Ln 742 33 24486 Slurry Seal $8,570 2023 Warwick Ln Marian Ln Nottingham Rd 244 33 8052 Slurry Seal $2,818 2023 West Wind Way Polaris Dr End 822 34 29448 Slurry Seal $10,307 2023 Westcliff Dr Dover Dr Santiago Dr 1,531 32 48992 Slurry Seal $17,147 2023 White Cliffs Dr Polaris Dr North Star Ln 224 38 8400 Slurry Seal $2,940 2023 Windward Ln Tustin Ave Irvine Ave 1,290 33 42570 Slurry Seal $14,900 2023 Windward Ln Tradewinds Ln Leeward Ln 1,420 33 48060 Slurry Seal $16,821 2023 Yawl Rd Beacon Bay End 250 24 6000 Slurry Seal $2,100 2023 Rigel Cir Galaxy Dr End 170 56 12020 Mill and Overlay $173,323 2024 C St Balboa Blvd East Ocean Front East 80 20 1600 Reconstruction $34,147 2024 Collins Ave Bay Front North Balboa Ave 440 28 12320 Reconstruction $138,926 2024 Alba St Eastbluff Dr Aralia St 137 36 4932 Slurry Seal $1,778 2024 Alder PI Alta Vista Dr End 305 32 9760 Slurry Seal $3,519 2024 Aleppo St Alta Vista Dr End 385 32 12320 Slurry Seal $4,441 2024 Alta Vista Dr Carob St Bison Ave 2,220 36 79920 Slurry Seal $28,811 2024 Azure Ave Orchid St Bay View Ave 630 35 22050 Slurry Seal $7,949 2024 Back Bay Dr Jamboree Rd Entrance to Newport Dunes 1,110 61 67710 Slurry Seal $24,410 2024 Back Bay Dr Entrance to Newport Dunes Shellmaker Rd 1,225 48 58800 Slurry Seal $21,198 2024 Bay Farm PI Upper Bay Dr End 425 34 14450 Slurry Seal $5,209 2024 Bay View Ave Orchard Dr Zenith Ave 1,200 35 42000 Slurry Seal $15,141 2024 Bayview Way EB Bayview PI Jamboree Rd 587 33 1 21371 1 Slurry Seal $7,704 1 2024 Bayview Way WB Jamboree Rd Bayview PI 617 32 19744 Slurry Seal $7,118 2024 Bellis St Alta Vista Dr End 475 32 15200 Slurry Seal $5,480 2024 Bison Ave Bamboo St Jamboree Rd 1,105 36 41780 Slurry Seal $15,062 2024 6-61 Appendix A - Local Streets Page 5 of 18 Appendix A J000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Bixia St Eastbluff Dr Bamboo St 150 35 5250 Slurry Seal $1,893 2024 Blackthorn St Bellis St Bison Ave 1,385 34 47090 Slurry Seal $16,976 2024 Bowsprit Dr MacArthur Blvd Dove St 306 44 13464 Slurry Seal $4,854 2024 Cacao St Eastbluff Or Catalpa St 150 36 5400 Slurry Seal $1,947 2024 Camelback St Jamboree Rd La Felicidad 1,505 40 60825 Slurry Seal $21,928 2024 Celtis PI Alta Vista Dr End 190 54 10260 1 Slurry Seal $3,699 2024 Cercis PI Alta Vista Dr End 220 32 7040 Slurry Seal $2,538 2024 Chestnut PI Alta Vista Dr End 220 32 7040 Slurry Seal $2,538 2024 Corinthian Way MacArthur Blvd Birch St 876 44 38544 Slurry Seal $13,895 2024 Cypress St (S/A Heights) Mesa Dr Orchard Dr 1,320 36 47520 Slurry Seal $17,131 2024 Cypress St (S/A Heights) Orchard Dr Cul De Sac 980 36 35280 Slurry Seal $12,719 2024 Cypress St (S/A Heights) Cul De Sac Bristol St South 260 36 9360 Slurry Seal $3,374 2024 Dolphin -Striker Way Dove St End 335 44 16740 Slurry Seal $6,035 2024 Dove St Campus Dr Birch St 585 37 21645 1 Slurry Seal $7,803 2024 Indus St Kline Dr West End 800 33 28400 Slurry Seal $10,238 2024 Kline Dr South End Orchard Dr 625 28 19000 Slurry Seal $6,850 2024 Kline Dr Pegasus St North End 570 33 21060 Slurry Seal $7,592 2024 La Felicidad Camelback St La Salud 300 44 13200 Slurry Seal $4,759 2024 La Salud North End La Vida 499 44 23956 Slurry Seal $8,636 2024 La Salud La Vida Corsica Dr N 1,335 44 58740 Slurry Seal $21,176 2024 La Salud Corsica Dr N La Felicidad 1,005 44 44220 Slurry Seal $15,941 2024 La Salud La Felicidad South End 431 44 20964 Slurry Seal $7,558 2024 La Vida University Or La Salud 843 44 40092 Slurry Seal $14,453 2024 Marine Ave South Bridge End North Bridge End 400 20 8000 Slurry Seal $2,884 2024 Marine Ave North Bridge End Bayside Dr 300 20 10800 Slurry Seal $3,893 2024 Martingale Way Corinthian Way End 562 44 26228 Slurry Seal $9,455 2024 Mesa Dr Mesa Dr/Birch St Cypress St 1,140 37 42180 Slurry Seal $15,206 2024 Mesa Dr Cypress St End 1,345 37 49765 Slurry Seal $17,940 2024 Orchard Dr Irvine Ave Birch St 800 40 32000 Slurry Seal $11,536 2024 Orchard Dr Birch St Cypress St 630 36 22680 Slurry Seal $8,176 2024 Orchard Dr Cypress St Orchid St 465 35 16275 Slurry Seal $5,867 2024 Orchard Dr Bay View Ave End 148 35 5180 Slurry Seal $1,867 2024 Orchid Hill PI Upper Bay Dr End 425 34 14450 Slurry Seal $5,209 2024 Orchid St Zenith Ave Orchard Dr 957 35 33495 Slurry Seal $12,075 2024 Orchid St Orchard Or Azure Ave 500 35 17500 Slurry Seal $6,309 2024 Pegasus St Santa Ana Ave Kline Dr 1,177 33 38841 Slurry Seal $14,002 2024 Redlands Or Orchard Or Indus St 565 33 18645 Slurry Seal $6,722 2024 Riverside Dr Indus St End 210 33 8430 Slurry Seal $3,039 2024 Riverside Dr Orchard Or End 520 33 18960 Slurry Seal $6,835 2024 Scott Dr Corinthian Way Dove St 513 44 22572 Slurry Seal $8,137 2024 Spruce Ave Bristol St South Azure Ave 1,824 35 63840 Slurry Seal $23,015 2024 Spruce St Bristol St North Quail St 600 60 36000 Slurry Seal $12,978 2024 Upper Bay Dr Mesa Dr Orchid Hill PI 527 36 18972 Slurry Seal $6,839 2024 Vista Del Oro Vista Nobleza Vista Umbrosa 1,880 35 65800 Slurry Seal $23,721 2024 Westerly PI Dove St Quail St 1,406 44 61864 Slurry Seal $22,302 2024 Zenith Ave Bayview Ave Spruce Ave 283 35 9905 Slurry Seal $3,571 2024 Balboa Blvd E WB G St D St 1,066 22 23452 Mill and Overlay $348,312 2025 C St North End Balboa Blvd East 78 15 1170 Reconstruction $1,390 2025 Marigold Ave Ocean Blvd Seaview Ave 1 370 1 27 1 9990 1 Reconstruction 1 $18,102 1 2025 6-62 Appendix A - Local Streets Page 6 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Santa Ana Ave Clay St 15th St 627 20 12540 Reconstruction $14,528 2025 Avocado Ave SB 167' S/O San Joaquin Hills Bus Station 107 22 3674 Slurry Seal $1,364 2025 Blue Key Sandcastle Dr End 750 32 26700 Slurry Seal $9,914 2025 Blue Water Dr Salt Air Dr Crown Dr North 1,100 32 35028 Slurry Seal $13,007 2025 Cabrillo Ter Serra Or De Anza Dr 869 23 19787 Slurry Seal $7,347 2025 Catamaran Dr Keel Dr End 975 36 37350 Slurry Seal $13,869 2025 Columbus Cir Serra Or End 112 22 3464 Slurry Seal $1,286 2025 Crown Dr Sea Ln Crown Dr North 1,152 37 42624 Slurry Seal $15,827 2025 De Anza Dr Seaward Rd De Sola Ter 750 35 26250 Slurry Seal $9,747 2025 Ebbtide Rd Crown Dr Sandpiper Dr 1,317 33 43461 Slurry Seal $16,138 2025 Civic Center Dr Avocado Ave Newport Center Dr 1,559 48 74832 Slurry Seal $27,786 2025 Fernleaf Ave Coast Highway East Fifth Ave 370 27 9990 Slurry Seal $3,709 2025 Fifth Avenue Marguerite Ave Marigold Ave 320 36 11520 Slurry Seal $4,278 2025 Fifth Avenue Marigold Ave Poppy Ave 1,175 36 42300 Slurry Seal $15,707 2025 First Ave Acacia Ave Begonia Ave 272 27 7344 Slurry Seal $2,727 2025 First Ave Begonia Ave Carnation Ave 270 27 7290 Slurry Seal $2,707 2025 Fourth Ave Goldenrod Ave Heliotrope Ave 260 27 7020 Slurry Seal $2,607 2025 Fourth Ave Heliotrope Ave Iris Ave 268 27 7236 Slurry Seal $2,687 2025 Fourth Ave Larkspur Ave Marguerite Ave 280 27 7560 Slurry Seal $2,807 2025 Fourth Ave Narcissus Ave Orchid Ave 273 27 7371 Slurry Seal $2,737 2025 Fourth Ave Poinsettia Ave Poppy Ave 269 27 7263 Slurry Seal $2,697 2025 Goldenrod Ave Coast Highway East Fourth Ave 190 27 5130 Slurry Seal $1,905 2025 Goldenrod Ave Fourth Ave Fifth Ave 350 27 9450 Slurry Seal $3,509 2025 Goldenrod Ave Harbor View Dr Crown Dr 1,165 33 38445 1 Slurry Seal $14,275 2025 Goldenrod Ave Crown Dr Wavecrest Or 635 35 22225 Slurry Seal $8,253 2025 Harbor View Dr MacArthur Blvd Goldenrod Ave 685 38 26030 Slurry Seal $9,665 2025 Harbor View Dr Goldenrod Ave Marguerite Ave 1,945 38 73910 Slurry Seal $27,444 2025 Hazel Dr Poppy Ave (south side) Coast Highway East 1,375 21 29875 Slurry Seal $11,093 2025 Heliotrope Ave Coast Highway East Fifth Ave 785 27 21195 Slurry Seal $7,870 2025 Inlet Dr Marguerite Ave Keel Dr 150 36 5400 Slurry Seal $2,005 2025 Inlet Isle Dr Topside Ln Sandcastle Dr 1,088 32 37066 Slurry Seal $13,763 2025 Iris Ave Coast Highway East Fifth Ave 945 27 25515 Slurry Seal $9,474 2025 Island View Or Salt Air Dr Lighthouse Ln 815 32 26080 Slurry Seal $9,684 2025 Jasmine Ave Coast Highway East Third Ave 508 27 13716 Slurry Seal $5,093 2025 Jasmine Ave Third Ave Fifth Ave 760 27 20520 Slurry Seal $7,619 2025 Keel Dr Catamaran Dr Outrigger Dr 583 32 21014 Slurry Seal $7,803 2025 Keel Dr Outrigger Dr End 1,394 32 46108 Slurry Seal $17,121 2025 Larkspur Ave Coast Highway East Fifth Ave 1,406 27 37962 1 Slurry Seal $14,096 2025 Lighthouse Ln Salt Air Dr Blue Water Dr 1,065 32 35580 Slurry Seal $13,211 2025 Marigold Ave Coast Highway East Third Ave 825 27 22275 Slurry Seal $8,271 2025 Marigold Ave Third Ave Fourth Ave 345 27 9315 Slurry Seal $3,459 2025 Morning Canyon Rd Serra Dr Seaward Rd 920 35 32200 Slurry Seal $11,956 2025 Morning Canyon Rd Seaward Rd Coast Highway East 350 35 12250 Slurry Seal $4,549 2025 Narcissus Ave Fifth Ave Geranium 344 36 12384 Slurry Seal $4,598 2025 Pelican Hill Rd N Pelicans Dr Pelican Hill Cir (North Side) 2,684 19 50996 Slurry Seal $18,936 2025 Pelican Hill Rd S Newport Coast Dr Pelican Hill Cir S 5,650 24 1 142100 1 Slurry Seal $52,764 2025 Pelican Hill Rd S Pelican Hill Cir (North Side) Pelican Hill Cir (South Side) 1,352 24 31798 Slurry Seal $11,807 2025 Orchid Ave lCoast Highway East Third Ave 850 1 28 23800 Slurry Seal 1 $8,837 1 2025 Outrigger Dr IKeelDr ISandcastle Dr 1,454 1 33 47255 Slurry Seal 1 $17,547 1 2025 6-63 Appendix A - Local Streets Page 7 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Pacific Or Begonia Ave Acacia Ave 330 27 8910 Slurry Seal $3,308 2025 Pacific Dr Acacia Ave Avocado Ave 305 27 8235 Slurry Seal $3,058 2025 Park Green Or Sausalito Or Sandcastle Dr 1,110 40 44400 Slurry Seal $16,487 2025 Pebble Or Goldenrod Ave Sandpiper Dr 1,247 34 42398 Slurry Seal $15,743 2025 Poppy Ave Second Ave Fifth Ave 1,150 27 31050 Slurry Seal $11,529 2025 Portside Way Windover Or Wavecrest Or 576 32 18432 1 Slurry Seal $6,844 2025 San Clemente Or Santa Barbara Dr Santa Cruz Dr 1,140 48 54720 Slurry Seal $20,319 2025 Sand Key Park Green Or End 501 33 17783 Slurry Seal $6,603 2025 Sand Point Way Windover Or Wavecrest Or 280 36 11580 Slurry Seal $4,300 2025 Sandcastle Dr Tiller Way Inlet Isle Dr 2,588 36 93168 Slurry Seal $34,595 2025 Sandcastle Dr Inlet Isle Or Park Green Dr 654 36 23544 Slurry Seal $8,742 2025 Sandcastle Dr Park Green Or Seacrest Or 975 36 35100 Slurry Seal $13,033 2025 Sandcastle Dr Seacrest Or Catamaran Or 1,465 36 52740 Slurry Seal $19,583 2025 Sandune Ln Inlet Isle Or End 670 32 23240 1 Slurry Seal $8,629 2025 Sea Ln Crown Dr Harbor View Dr 1,078 38 40964 Slurry Seal $15,211 2025 Sea Ln Harbor View Or Goldenrod Ave 1,340 37 49580 Slurry Seal $18,410 2025 Seacrest Dr Catamaran Dr Sandcastle Or 1,475 32 47200 Slurry Seal $17,526 2025 Second Ave Jasmine Ave Marguerite Ave 536 27 14472 Slurry Seal $5,374 2025 Second Ave Narcissus Ave Orchid Ave 269 27 7263 Slurry Seal $2,697 2025 Second Ave Orchid Ave Poinsettia Ave 268 27 7236 Slurry Seal $2,687 2025 Second Ave Poinsettia Ave Poppy Ave 270 27 7290 Slurry Seal $2,707 2025 Second Ave Poppy Ave Hazel Ave 125 27 3375 1 Slurry Seal $1,253 2025 Starboard Way Windover Or Wavecrest Or 357 32 11424 Slurry Seal $4,242 2025 Surfline Way Windover Or Wavecrest Or 658 32 22556 Slurry Seal $8,375 2025 Third Ave Heliotrope Ave Iris Ave 263 27 7101 Slurry Seal $2,637 2025 Third Ave Iris Ave Jasmine Ave 270 27 7290 Slurry Seal $2,707 2025 Third Ave Larkspur Ave Marguerite Ave 276 27 7452 Slurry Seal $2,767 2025 Third Ave Narcissus Ave Orchid Ave 264 28 7392 Slurry Seal $2,745 2025 Third Ave Orchid Ave Poinsettia Ave 265 28 7420 Slurry Seal $2,755 2025 Third Ave Poinsettia Ave Poppy Ave 270 28 7560 1 Slurry Seal $2,807 2025 Tiller Way Sandcastle Dr Sausalito Dr 1,475 36 53100 Slurry Seal $19,717 2025 Topside Ln Sandcastle Or Inlet Isle Dr 626 32 20782 Slurry Seal $7,717 2025 Vista Ridge Rd Newport Coast Dr Altezza Dr 1,493 37 55241 Slurry Seal $20,512 2025 Vista Ridge Rd Ocean Heights Dr Coastal Canyon Or 2,067 37 76479 Slurry Seal $28,398 2025 Vista Ridge Rd Ocean Heights Or Ridge Park Rd 619 37 22903 Slurry Seal $8,504 2025 Wavecrest Or Surfline Wy Sand Point Wy 1,060 36 41660 Slurry Seal $15,469 2025 White Sails Way Crown Dr Harbor View Dr 1,045 33 34485 Slurry Seal $12,805 2025 Windover Or Surfline Way Sand Point Way 1,023 36 38328 1 Slurry Seal $14,232 2025 Newport Ridge Dr East San Joaquin Hills Rd Park Crest 1,520 40 59300 Slurry Seal $22,019 2025 Newport Ridge Dr East Park Crest St Michael 2,215 40 88600 Slurry Seal $32,899 2025 Eastgate Or Newport Hills Dr East San Miguel Or 270 56 11110 Mill and Overlay $169,957 2026 23rd St Tustin Ave Irvine Ave 778 35 27230 Mill and Overlay $416,556 2026 Santa Ana Ave Cliff Dr Clay St 1,655 20 33100 Reconstruction $39,497 2026 16th St W West End Placentia Ave 2,400 36 86400 Mill and Overlay $1,361,373 2027 Bonnie Doon Ter Dolphin Ter Patolita Or 1,067 37 39479 Mill and Overlay $622,056 2027 Garnet Ave Bay Front North Park Ave 481 27 12987 Reconstruction $409 2027 10th St North End Bay Ave West 36 26 936 Slurry Seal $369 2027 loth St 1 Bay Ave West 1 Balboa Blvd West 216 28 5180 Slurry Seal 1 $2,041 2027 15th St lirvine Ave I St Andrew Rd 560 62 33720 Slurry Seal 1 $13,283 2027 6-64 Appendix A - Local Streets Page 8 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To 15th St St Andrew Rd Kings PI 1,180 35 41300 Slurry Seal $16,269 2027 15th St Kings PI St James PI 210 35 7350 Slurry Seal $2,895 2027 18th St North End Balboa Blvd West 300 28 8400 Slurry Seal $3,309 2027 28th St East End Villa Way 75 14 1050 Slurry Seal $414 2027 29th St East End Lafayette Ave 75 24 1800 Slurry Seal $709 2027 29th St Lafayette Ave Newport Blvd NB 535 24 12840 1 Slurry Seal $5,058 2027 30th St Villa Way Newport Blvd 450 25 11250 Slurry Seal $4,432 2027 30th St Newport Blvd 180' E of Balboa Blvd 220 34 7480 Slurry Seal $2,947 2027 31st St Lafayette Ave Villa Way 351 24 8424 Slurry Seal $3,318 2027 31st St Balboa Blvd Ocean Front West 376 32 12032 Slurry Seal $4,740 1 2027 32nd St Seashore Dr Ocean Front West 190 16 3040 Slurry Seal $1,198 2027 33rd St East End Marcus Ave 75 18 1350 Slurry Seal $532 2027 33rd St Marcus Ave Lake Ave 220 18 3960 Slurry Seal $1,560 2027 33rd St Lake Ave Balboa Blvd 275 18 4950 1 Slurry Seal $1,950 2027 33rd St Balboa Blvd Seashore Dr 248 20 4960 Slurry Seal $1,954 2027 33rd St Seashore Dr Ocean Front West 135 16 2160 Slurry Seal $851 2027 34th St Clubhouse Ave Rivo Alto 165 16 2640 Slurry Seal $1,040 2027 34th St Rivo Alto Marcus Ave 66 16 1056 Slurry Seal $416 2027 34th St Marcus Ave Lake Ave 216 18 3888 Slurry Seal $1,532 2027 34th St Lake Ave Balboa Blvd 280 18 5040 Slurry Seal $1,985 2027 34th St Balboa Blvd Seashore Dr 257 18 4756 Slurry Seal $1,874 2027 34th St Seashore Dr Ocean Front West 100 17 1700 Slurry Seal $670 2027 35th St Short St Finley Ave 305 16 4880 Slurry Seal $1,922 2027 35th St Finley Ave Rivo Alto 70 16 1120 Slurry Seal $441 2027 35th St Rivo Alto Marcus Ave 85 16 1360 Slurry Seal $536 2027 35th St Seashore Dr Ocean Front West 90 20 1800 Slurry Seal $709 2027 36th St Short St Clubhouse Ave 340 16 5440 Slurry Seal $2,143 2027 36th St Finley Ave Short St 305 16 4880 Slurry Seal $1,922 2027 36th St Finley Ave End 70 16 1120 Slurry Seal $441 2027 36th St Balboa Blvd Seashore Dr 195 20 3124 Slurry Seal $1,231 2027 37th St 48' E of Park Ln Park Ln 48 20 960 Slurry Seal $378 2027 37th St Balboa Blvd Seashore Dr 284 20 5340 Slurry Seal $2,104 2027 38th St Channel PI Finley Ave 226 16 3616 Slurry Seal $1,424 2027 38th St Marcus Ave East End of Bridge 83 16 1328 Slurry Seal $523 2027 39th St Channel PI Marcus Ave 275 16 4400 Slurry Seal $1,733 2027 40th St Channel PI Marcus Ave 130 16 2080 Slurry Seal $819 2027 40th St Marcus Ave Rivo Alta 35 16 560 Slurry Seal $221 2027 44th St Channel PI Balboa Blvd 100 21 2100 Slurry Seal $827 2027 47th St River Ave Neptune Ave 315 21 6615 Slurry Seal $2,606 2027 47th St Neptune Ave Seashore Dr 84 20 1680 Slurry Seal $662 2027 49th St River Dr Neptune Ave 245 20 4900 Slurry Seal $1,930 2027 50th St River Ave Neptune Ave 230 20 4600 Slurry Seal $1,812 2027 51st St River Ave Seashore Dr 330 20 6600 Slurry Seal $2,600 2027 52nd St River Ave Neptune Ave 215 20 4300 Slurry Seal $1,694 2027 53rd St River Ave Neptune Ave 181 20 3620 Slurry Seal $1,426 2027 54th St River Ave Neptune Ave 140 38 5320 Slurry Seal $2,096 2027 61st St Seashore Dr Ocean Front West 85 19 1615 Slurry Seal $636 2027 62nd St lCanal St lCedarSt 860 29 24940 Slurry Seal $9,825 2027 62nd St Cedar St Lancaster St 480 29 13920 Slurry Seal $5,484 2027 62nd St I Newport Shores Dr I Coast Highway West 165 18 2970 Slurry Seal $1,170 2027 6-65 Appendix A - Local Streets Page 9 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To 62nd St Seashore Dr Ocean Front Alley West 55 18 990 Slurry Seal $390 2027 Aliso Ave 15th St Clay St 643 35 22505 Slurry Seal $8,865 2027 Aliso Ave Clay St Beacon St 667 35 23345 Slurry Seal $9,196 2027 Aliso Ave Beacon St Cliff Dr 420 35 14700 Slurry Seal $5,791 2027 Avon St West End Riverside Ave 835 21 18747 Slurry Seal $7,385 2027 Avon St Riverside Ave Tustin Ave 458 34 15572 Slurry Seal $6,134 2027 B St Ocean Front East South End 320 60 19200 Slurry Seal $7,563 2027 Bay Ave W 19th St 18th St 425 42 24350 Slurry Seal $9,592 2027 Bay Ave W An St 6th St 450 28 12600 Slurry Seal $4,964 2027 Beacon St Tustin Ave Aliso Ave 600 35 21000 Slurry Seal $8,273 2027 Beacon St Aliso Ave Irvine Ave 638 35 22330 Slurry Seal $8,796 2027 Bolsa Ave Clay St 15th St 406 36 14616 1 Slurry Seal $5,758 2027 Broad St Bolsa Ave Westminster Ave 628 36 22608 Slurry Seal $8,906 2027 Broad St Santa Ana Ave San Bernardino Ave 280 16 4480 Slurry Seal $1,765 2027 Canal Cir Canal St Canal St 265 29 7685 Slurry Seal $3,027 2027 Canal St 62nd St Canal Cir (West End) 270 30 8100 Slurry Seal $3,191 2027 Canal St Canal Cir (West End) Sunset Dr 420 30 12600 Slurry Seal $4,964 2027 Canal St Sunset Dr Grant St 969 30 29070 Slurry Seal $11,452 2027 Cedar St East End Prospect St 300 29 8700 Slurry Seal $3,427 2027 Cedar St Newport Shores Dr Coast Highway West 185 19 3515 Slurry Seal $1,385 2027 Cedar St Seashore Dr Ocean Front Alley West 57 19 1083 Slurry Seal $427 2027 Channel PI Balboa Blvd Rivo Alto (River) 295 21 6195 Slurry Seal $2,440 2027 Channel PI Rivo Alto 39th St 743 16 11888 Slurry Seal $4,683 2027 Channel PI 39th St Rialto 440 16 7040 Slurry Seal $2,773 2027 Clay St 15th St St Andrews Rd 760 34 25840 Slurry Seal $10,179 2027 Clay St St Andrews Rd Irvine Ave 658 34 22372 1 Slurry Seal $8,813 2027 Cliff Dr Irvine Ave Riverside Ave 1,684 56 92820 Slurry Seal $36,565 2027 Cliff Dr Santa Ana Ave La Jolla Dr 300 52 15600 Slurry Seal $6,145 2027 Clubhouse Ave Newport Island Channel Rivo Alto 1,057 17 17441 Slurry Seal $6,870 2027 Coast Blvd 61st St End 133 30 3990 Slurry Seal $1,572 2027 Coral PI Irvine Ave St Andrews Ave 802 35 28070 Slurry Seal $11,058 2027 El Modena Ave Beacon St Clay St 667 35 23345 Slurry Seal $9,196 2027 El Modena Ave Clay St 15th St 655 35 22925 Slurry Seal $9,031 2027 Fifth Avenue Dahlia Ave Heliotrope Ave 895 33 29535 1 Slurry Seal $11,635 2027 Fifth Avenue Heliotrope Ave Iris Ave 290 32 9280 Slurry Seal $3,656 2027 Finley Ave Newport Blvd Clubhouse Ave 190 16 3040 Slurry Seal $1,198 2027 Finley Ave Clubhouse Ave End 665 16 10640 Slurry Seal $4,191 2027 Finley Ave Rialto 38th St 35 16 560 Slurry Seal $221 2027 Finley Ave 38th St Channel PI 220 16 3520 Slurry Seal $1,387 2027 Fullerton Ave Cliff Dr Beacon St 423 35 14805 Slurry Seal $5,832 2027 Fullerton Ave Beacon St Clay St 667 35 23345 Slurry Seal $9,196 2027 Fullerton Ave Clay St 15th St 643 35 22505 1 Slurry Seal $8,865 2027 Grant St North End Coast Highway West 325 29 9425 Slurry Seal $3,713 2027 Highland St North End Coast Highway West 260 30 7800 Slurry Seal $3,073 2027 Highland St Seashore Dr Ocean Front Alley West 72 17 1224 Slurry Seal $482 2027 Hospital Rd Newport Blvd Old Newport Blvd 160 70 11200 Slurry Seal $4,412 2027 Irvine Ave Clay St 15th St 630 38 23940 Slurry Seal $9,431 2027 Irvine Ave 15th St 16th St 1,267 62 78554 Slurry Seal $30,945 2027 Kings PI St James Rd Kings Rd 1,888 35 66080 Slurry Seal $26,031 2027 Kings Rd I St Andrews Rd Kings PI 1 1,915 35 67025 Slurry Seal $26,403 2027 6-66 Appendix A - Local Streets Page 10 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To La Jolla Or End Cliff Dr 227 20 4540 Slurry Seal $1,788 2027 La Jolla Dr Cliff Dr Beacon St 715 20 14300 Slurry Seal $5,633 2027 Lafayette Ave 28th St 31st St 860 24 21140 Slurry Seal $8,328 2027 Lake Ave 50' S of 38th St 36th St 320 25 8000 Slurry Seal $3,151 2027 Lake Ave 36th St 35th St 205 26 5330 Slurry Seal $2,100 2027 Lake Ave 35th St 34th St 205 26 5330 1 Slurry Seal $2,100 2027 Lake Ave 34th St 33rd St 205 26 5330 Slurry Seal $2,100 2027 Lake Ave 33rd St 32nd St 205 26 5330 Slurry Seal $2,100 2027 Lancaster St 62nd St 61st St 79 30 2370 Slurry Seal $934 2027 Lancaster St Canal St 30' S of End 60 29 1740 Slurry Seal $685 2027 Lindo Ave Bay Ave West Alley N of Bay Ave West 553 23 12719 Slurry Seal $5,010 2027 Lugonia St Seashore Dr Ocean Front Alley West 59 19 1121 Slurry Seal $442 2027 Marcus Ave 32nd St 33rd St 213 26 5538 Slurry Seal $2,182 2027 Marcus Ave 33rd St 34th St 229 26 5954 1 Slurry Seal $2,345 2027 Marcus Ave 34th St 35th St 209 26 5434 Slurry Seal $2,141 2027 Marcus Ave 35th St 36th St 220 26 5720 Slurry Seal $2,253 2027 Newport Shores Dr Orange St Walnut St 632 20 12640 Slurry Seal $4,979 2027 Newport Shores Or Walnut St 61st St 827 20 16540 Slurry Seal $6,516 2027 Nordina St Seashore Dr Ocean Front Alley West 85 17 1445 Slurry Seal $569 2027 Ocean View Ave Tustin Ave Cliff Dr 922 24 22128 Slurry Seal $8,717 2027 Olive St Seashore Dr Ocean Front West 172 17 2924 Slurry Seal $1,152 2027 Orange Ave Old Newport Blvd 15th St 436 36 15696 Slurry Seal $6,183 2027 Orange St Canal St Coast Highway West 468 35 16380 Slurry Seal $6,453 2027 Orange St Coast Highway West Ocean Front Alley West 166 32 5312 Slurry Seal $2,093 2027 Palm St Bay AveEast Balboa Blvd East 193 34 6562 Slurry Seal $2,585 2027 Palm St Balboa Blvd East Ocean Front Alley East 75 31 2325 Slurry Seal $916 2027 Palm St Ocean Front Alley East Ocean Front East 135 31 4185 Slurry Seal $1,649 2027 Park Ln 38th St 36th St 442 24 10608 Slurry Seal $4,179 2027 Pirate Rd Cliff Dr Clay St 821 35 28735 Slurry Seal $11,320 2027 Prospect St Canal St Cedar St 856 29 24824 Slurry Seal $9,779 2027 Prospect St Cedar St Newport Shores Dr 785 29 22765 Slurry Seal $8,968 2027 Prospect St Newport Shores Dr Coast Highway West 180 24 4320 Slurry Seal $1,702 2027 Prospect St Coast Highway West Seashore Dr 75 46 3450 Slurry Seal $1,359 2027 Redlands Ave 15th St Clay St 680 34 23120 Slurry Seal $9,108 2027 Redlands Ave Clay St Cliff Dr 730 34 24820 Slurry Seal $9,777 2027 River Ave 42nd St Channel PI 340 28 9520 Slurry Seal $3,750 2027 River Ave Alley #325 Balboa Blvd 330 25 8250 Slurry Seal $3,250 2027 River Ave 51st St End 1,250 38 47500 Slurry Seal $18,712 2027 Riverside Ave Coast Highway West Avon St (West Side) 475 52 24700 Slurry Seal $9,730 2027 Riverside Ave Avon St Cliff Dr 943 52 49036 Slurry Seal $19,317 2027 San Bernardino Ave 15th St Clay Ave 630 34 21420 Slurry Seal $8,438 2027 San Bernardino Ave Clay Ave Cliff Dr 860 14 12040 Slurry Seal $4,743 2027 Santa Ana Ave Cliff Dr Clay St 1,655 34 56270 Slurry Seal $22,167 2027 Santa Ana Ave Clay St 15th St 627 36 22572 Slurry Seal $8,892 2027 Santa Ana Ave 15th St City Limit 640 19 12160 Slurry Seal $4,790 2027 Sea Gull Ln Sherington PI 16th St 900 37 1 33300 1 Slurry Seal $13,118 2027 Seashore Dr 36th St 33rd St 690 28 19320 Slurry Seal $7,611 2027 Seashore Dr 39th St 36th St 690 28 19320 Slurry Seal $7,611 1 2027 Seashore Dr 42nd St 39th St 650 28 18200 Slurry Seal $7,170 2027 Seashore Dr 42nd St 45th St 630 28 17640 Slurry Seal $6,949 2027 6-67 Appendix A - Local Streets Page 11 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Seashore Dr 46tth St 45th St 205 28 5740 Slurry Seal $2,261 2027 Seashore Dr 46th St 53rd St 1,500 28 42000 Slurry Seal $16,545 2027 Seashore Dr 60th St Prospect St 630 28 17640 Slurry Seal $6,949 2027 Sherington PI Irvine Ave Sea Gull Ln 1,432 37 52984 Slurry Seal $20,872 2027 Short St Newport Blvd Clubhouse Ave 135 32 4320 Slurry Seal $1,702 2027 Short St Clubhouse Ave End 315 16 5040 1 Slurry Seal $1,985 2027 Signal Rd Kings Rd 15th St 1,190 35 41650 Slurry Seal $16,407 2027 Snug Harbor Rd Cliff Dr Clay St 936 35 32760 Slurry Seal $12,905 2027 Sonora St Seashore Dr Ocean Front Alley West 95 16 1520 Slurry Seal $599 2027 St Andrews Rd Kings Rd Clay St 1,045 34 35530 Slurry Seal $13,996 2027 St Andrews Rd Clay St 15th St 600 34 20400 Slurry Seal $8,036 2027 St James PI 15th St St lames Rd 641 35 24635 Slurry Seal $9,704 2027 St James Rd 15th St St lames PI 945 35 35275 Slurry Seal $13,896 2027 Sunset Dr Lugonia St End 363 29 10527 Slurry Seal $4,147 2027 The Arcade 22nd St 21st St 167 10 1670 Slurry Seal $658 2027 Tustin Ave Coast Highway West Ocean View Ave (S)) 400 34 13600 Slurry Seal $5,357 2027 Tustin Ave Cliff Dr Clay St 807 35 28245 Slurry Seal $11,127 2027 Via Antibes Via Lido Soud Via Lido Nord 248 36 8928 Slurry Seal $3,517 2027 Via Antibes Via Lido Nord Via Lido Soud 248 36 8928 Slurry Seal $3,517 2027 Via Barcelona Via Lido Soud Via Lido Nord 327 20 6540 Slurry Seal $2,576 2027 Via Fermo Via Lido Soud Via Firenze 256 16 4096 Slurry Seal $1,614 2027 Via Firenze Via Lido Nord Piazza Lido 447 16 7152 Slurry Seal $2,817 2027 Via Firenze Piazza Lido Via Lido Soud 356 16 5696 Slurry Seal $2,244 2027 Via Florence Via Lido Soud Piazza Lido 270 24 6480 Slurry Seal $2,553 2027 Via Graziana Via Havre Piazza Lido 490 18 8820 Slurry Seal $3,474 2027 Via Graziana Piazza Lido Via Lido Nord 470 16 7520 Slurry Seal $2,962 2027 Via Jucar Via Lido Soud Via Lido Nord 925 23 21275 Slurry Seal $8,381 2027 Via Koron Via Lido Soud Via Lido Nord 910 23 20930 Slurry Seal $8,245 2027 Via Lido Bridge (West End) Via Lido Soud 760 22 28420 Slurry Seal $11,196 2027 Via Lido Nord Via Lido Soud (East Side) Via Zurich 459 33 18647 Slurry Seal $7,346 2027 Via Lido Nord Via Zurich Via Waziers 540 33 17820 Slurry Seal $7,020 2027 Via Lido Nord Via Waziers Via San Remo 661 33 21813 Slurry Seal $8,593 2027 Via Lido Nord Via San Remo Via Palermo 541 33 17853 Slurry Seal $7,033 2027 Via Lido Nord Via Palermo Via Lorca 646 33 21318 Slurry Seal $8,398 2027 Via Lido Nord Via Lorca Via Genoa 769 33 25377 Slurry Seal $9,997 2027 Via Lido Nord Via Genoa Via Dijon 571 33 18843 Slurry Seal $7,423 2027 Via Lido Nord Via Dijon Via Antibes 530 33 17490 Slurry Seal $6,890 2027 Via Lido Nord Via Antibes Via Lido Soud (West Side) 400 20 9200 Slurry Seal $3,624 2027 Via Lido Soud Via Lido Nord (West Side) Via Antibes 280 20 6800 Slurry Seal $2,679 2027 Via Lido Soud Via Antibes Via Dijon 625 33 20625 1 Slurry Seal $8,125 2027 Via Lido Soud Via Dijon Via Genoa 820 33 27060 Slurry Seal $10,660 2027 Via Lido Soud Via Genoa Via Koron 850 33 28050 Slurry Seal $11,050 2027 Via Lido Soud Via Koron Via Orvieto 660 33 21780 Slurry Seal $8,580 2027 Via Lido Soud Via Orvieto Via San Remo 670 33 22110 Slurry Seal $8,710 2027 Via Lido Soud Via San Remo Via Venezia 520 33 17160 Slurry Seal $6,760 2027 Via Lido Soud Via Venezia Via Zurich 660 33 21780 Slurry Seal $8,580 2027 Via Lido Soud Via Zurich Via Lido Nord (East Side) 405 53 24965 Slurry Seal $9,834 2027 Via Lorca lVia Lido Soud Via Lido Nord 875 1 20 1 17500 1 Slurry Seal $6,894 2027 Via Malaga IVia Oporto Via Lido 295 1 22 1 6490 1 Slurry Seal $2,557 2027 Via Mentone IVai Lido Soud Via Lido Nord 850 1 20 1 17000 1 Slurry Seal $6,697 2027 6-68 Appendix A - Local Streets Page 12 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Via Nice Via Lido Soud Via Lido Nord 810 20 16200 Slurry Seal $6,382 2027 Via Oporto 32nd St Via Lido 575 23 13225 Slurry Seal $5,210 2027 Via Orvieto Via Lido Soud Via Lido Nord 785 23 18055 Slurry Seal $7,112 2027 Via Palermo Via Lido Soud Via Lido Nord 762 22 16764 Slurry Seal $6,604 2027 Via Quito Vai Lido Soud Via Lido Nord 710 20 14200 Slurry Seal $5,594 2027 Via San Remo Via Lido Soud Via Lido Nord 630 23 15240 Slurry Seal $6,004 2027 Via Trieste Via Lido Soud Via Lido Nord 600 20 12000 Slurry Seal $4,727 2027 Via Undine Via Lido Soud Via Lido Nord 570 20 11400 Slurry Seal $4,491 2027 Via Venezia Via Lido Soud Via Lido Nord 535 20 10700 Slurry Seal $4,215 2027 Via Waziers Via Lido Soud Via Lido Nord 515 23 11845 Slurry Seal $4,666 2027 Via Xanthe Via Lido Soud Via Lido Nord 490 20 9800 Slurry Seal $3,861 2027 Via Yella Via Lido Soud Via Lido Nord 465 20 9300 1 Slurry Seal $3,664 2027 Via Zurich Via Lido Soud Via Lido Nord 430 21 9030 Slurry Seal $3,557 2027 Villa Way 28th St 29th St 320 25 8000 Slurry Seal $3,151 2027 Washington St Bay Ave East Balboa Blvd East 140 20 2800 Slurry Seal $1,103 2027 Washington St Balboa Blvd East Ocean Front Alley East 85 14 1190 Slurry Seal $469 2027 Washington St Ocean Front East Ocean Front Alley East 135 14 1890 Slurry Seal $745 2027 Westminster Ave Old Newport Blvd 15th St 1,720 36 61920 Slurry Seal $24,392 2027 Zurich Cir Via Zurich Via Zurich 450 16 7200 Slurry Seal $2,836 2027 La Linda Ct 23rd St End 199 32 6368 Mill and Overlay $103,348 2028 Production PI Monrovia Ave Placentia Ave 1,265 38 48070 Mill and Overlay $780,144 2028 20th St 91' S of North End Balboa Blvd West 325 34 11050 Reconstruction $15,423 2028 24th St Balboa Blvd Ocean Front West 390 16 6240 Reconstruction $8,710 2028 Diamond Ave Bay Front North Balboa Ave 496 28 13888 Reconstruction $41,023 2028 F St North End Balboa Blvd East 145 20 2900 Reconstruction $3,765 2028 Jasmine Ave Ocean Blvd 88' N of Ocean Blvd 88 28 2464 1 Reconstruction $7,998 2028 Ocean Blvd G St L St 1,525 36 54900 Reconstruction $71,282 2028 Park Ave Collins Ave Sapphire Ave 660 48 25920 Reconstruction $76,563 2028 28th St Newport Blvd West SB Balboa Blvd 220 60 13200 Slurry Seal $5,356 2028 54th St Neptune Ave Seashore Dr 75 27 2025 Slurry Seal $822 2028 Acacia Ave Coast Highway East Second Ave 1,075 27 29025 Slurry Seal $11,777 2028 Acacia Ave Second Ave Pacific Dr 717 27 19359 Slurry Seal $7,855 2028 Aldebaran Cir Galaxy Dr End 135 55 9925 Slurry Seal $4,027 2028 Anita Ln Estelle Ln Marian Ln 1,102 33 36366 Slurry Seal $14,755 2028 Antigua Cir Santiago Dr End 165 33 7945 Slurry Seal $3,224 2028 Antigua Way Santiago Dr (North End) Mariners Dr 1,980 37 74460 Slurry Seal $30,212 2028 Antigua Way Mariners Dr Santiago Dr (South End) 1,006 35 35210 Slurry Seal $14,286 2028 Ashford Ln Glenwood Ln Santiago Dr 315 33 10995 Slurry Seal $4,461 2028 Avocado Ave Pacific Dr 160' N of Pacific Dr 160 16 2560 Slurry Seal $1,039 2028 Back Bay Dr End of PCC Section San Joaquin Hills Rd 1,649 22 36278 1 Slurry Seal $14,720 2028 Back Bay Dr End of PCC Section Backbay sewer pump station 3,106 22 68332 Slurry Seal $27,726 2028 Baycrest Rd Irvine Ave Tradewinds Ln 238 38 9044 Slurry Seal $3,670 2028 Bayport Way Holiday Rd South End 232 33 7656 Slurry Seal $3,106 2028 Bayport Way Francisco Dr North End 213 34 9742 Slurry Seal $3,953 2028 Bayside Dr Marguerite Ave Carnation Ave 2,415 37 74855 Slurry Seal $30,372 2028 Bayside Dr Coast Highway East End 1,187 38 45106 Slurry Seal $18,302 2028 Bayview Dr Ocean Blvd Goldenrod Ave 157 28 4396 Slurry Seal $1,784 2028 Bayview Dr lGoldenrod Ave I Heliotrope Ave 251 28 7028 Slurry Seal $2,852 2028 Bayview Dr Heliotrope Ave Iris Ave 260 28 7280 Slurry Seal $2,954 2028 Beacon Bay lHarbor Island Rd jEnd 1,170 24 1 28080 1 Slurry Seal 1 $11,393 2028 6-69 Appendix A - Local Streets Page 13 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Beacon St Westminster Ave Holmwood Dr 240 34 8160 Slurry Seal $3,311 2028 Beacon St La Jolla Dr Santa Ana Ave 105 33 3465 Slurry Seal $1,406 2028 Bedford Ln Rutland Rd Buckingham Ln 641 36 23076 Slurry Seal $9,363 2028 Begonia Ave Pacific Dr Coast Highway East 1,885 28 52780 Slurry Seal $21,415 2028 Birch St Mesa Dr End 232 36 9552 Slurry Seal $3,876 2028 Bonaire Way Holiday Rd South End 235 33 10255 1 Slurry Seal $4,161 2028 Bonaire Way Francisco Dr North End 225 33 7425 Slurry Seal $3,013 2028 Braemar Way Francisco Dr End 215 34 9810 Slurry Seal $3,980 2028 Breakers Dr Breakers Dr End 1,035 25 25875 Slurry Seal $10,499 2028 Brighton Rd Cameo Shores Rd Camden Dr 1,390 33 48370 Slurry Seal $19,626 2028 Buck Gully Dr Sandcastle Dr End 126 36 5786 Slurry Seal $2,348 2028 Buckingham Ln Westcliff Dr Cornwall Ln 620 36 22320 Slurry Seal $9,056 2028 Buttonshell Ln Holiday Rd Nautilus Ln 410 33 14130 Slurry Seal $5,733 2028 Camden Dr Cameo Shores Rd Milford Dr 1,345 33 44385 1 Slurry Seal $18,009 2028 Cameo Shores Rd Coast Highway East Orrington Rd 1,088 37 37777 Slurry Seal $15,328 2028 Cameo Shores Rd Orrington Rd Brighton Rd 956 37 35372 Slurry Seal $14,352 2028 Candlestick Ln Glenwood Ln Sandalwood Ln 630 35 23250 Slurry Seal $9,434 2028 Castaways Ln Dover Dr Castaways (private) North 462 54 24948 Slurry Seal $10,123 2028 Centella PI Holiday Rd South End 369 33 12177 Slurry Seal $4,941 2028 Centella PI Santiago Dr North End 265 37 12305 Slurry Seal $4,993 2028 Commodore Rd Tradewinds Ln Mariners Dr 1,950 38 75300 Slurry Seal $30,553 2028 Constellation Dr Santiago Dr End 135 38 5130 1 Slurry Seal $2,081 2028 Court Ave 20th St McFadden PI 85 28 2380 Slurry Seal $966 2028 Crown Dr North Crown Dr San Joaquin Hills Rd 1,370 36 49320 Slurry Seal $20,012 2028 Cumberland Ln Sussex Ln Dover Dr 435 34 15390 Slurry Seal $6,244 2028 Cutter Rd Beacon Bay End 380 24 9120 Slurry Seal $3,700 2028 Dahlia Ave Ocean Blvd Seaview Ave 275 27 7425 Slurry Seal $3,013 2028 Dahlia Ave 200' S of First St Coast Highway East 1,490 27 40230 Slurry Seal $16,323 2028 Deborah Ln Mariners Dr Vivian Ln 243 34 8262 Slurry Seal $3,352 2028 Deborah Ln Vivian Ln Sylvia Ln 633 34 22122 1 Slurry Seal $8,976 2028 Diana Ln Priscilla Ln Vivian Ln 762 34 27108 Slurry Seal $10,999 2028 Donnie Rd 22nd St End 540 33 20320 Slurry Seal $8,245 2028 Dorothy Ln Mariners Dr Estelle Ln 238 33 7854 Slurry Seal $3,187 2028 Dover Dr End Leila Ln 492 29 15768 Slurry Seal $6,398 2028 Dover Dr Leila Ln Mariners Dr 500 29 14500 Slurry Seal $5,883 2028 Dover Dr Mariners Dr Doris Ln 510 29 14790 Slurry Seal $6,001 2028 Dover Dr Doris Ln Nottingham Rd 590 29 17110 Slurry Seal $6,942 2028 Dover Dr Nottingham Rd Norfolk Ln 665 29 19285 Slurry Seal $7,825 2028 Dover Dr Norfolk Ln Westcliff Dr 490 29 14210 Slurry Seal $5,766 2028 Dover Dr Westcliff Dr Dover Dr (Arterial) 170 36 5460 Slurry Seal $2,215 2028 Essex Ln Cambridge Ln Oxford Ln 836 34 28424 Slurry Seal $11,533 2028 Eton PI Dover Dr End 163 33 7879 Slurry Seal $3,197 2028 Evening Star Ln Polaris Dr End 980 33 34840 Slurry Seal $14,136 2028 Fairfield Dr Cameo Shores Rd Milford Dr 1,355 33 44715 Slurry Seal $18,143 2028 Fernleaf Ave Seaview Ave 150' N Seaview Ave 150 27 4050 Slurry Seal $1,643 2028 Fernleaf Ave 250' S of First St Coast Highway East 1,260 27 34020 1 Slurry Seal $13,804 2028 First Ave Carnation Ave Dahlia Ave 271 27 7317 Slurry Seal $2,969 2028 First Ave Dahlia Ave Fernleaf Ave 270 27 7290 Slurry Seal $2,958 2028 First Ave Fernleaf Ave Goldenrod Ave 270 27 7290 Slurry Seal $2,958 2028 First Ave Goldenrod Ave Heliotrope Ave 270 27 7290 Slurry Seal $2,958 2028 6- 70 Appendix A - Local Streets Page 14 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To First Ave Iris Ave Jasmine Ave 270 27 7290 Slurry Seal $2,958 2028 Ford Rd EB West End San Miguel Dr 840 30 26900 Slurry Seal $10,915 2028 Ford Rd WB Newport Hills Dr West End 877 29 25433 Slurry Seal $10,319 2028 Fourth Ave Avocado Ave Acacia Ave 265 27 7155 Slurry Seal $2,903 2028 Fourth Ave Acacia Ave Begonia Ave 267 27 7209 1 Slurry Seal $2,925 2028 Fourth Ave Begonia Ave Carnation Ave 265 27 7155 Slurry Seal $2,903 2028 Fourth Ave Carnation Ave Dahlia Ave 265 27 7155 Slurry Seal $2,903 2028 Francisco Dr Irvine Ave Tradewinds Ln 236 36 8496 Slurry Seal $3,447 2028 Glenwood Ln Candlestick Ln Ashford Ln 640 33 22320 Slurry Seal $9,056 2028 Goldenrod Ave 150' S of Seaview Ave Seaview Ave 150 28 4200 Slurry Seal $1,704 2028 Goldenrod Ave End Coast Highway East 1,124 28 31472 Slurry Seal $12,770 2028 Gorham Dr Cameo Shores Rd Milford Dr 1,400 33 46200 1 Slurry Seal $18,746 2028 Hampden Rd Milford Dr Cameo Shores Rd 930 37 34410 Slurry Seal $13,962 2028 Hampden Rd Cameo Shores Rd End 213 37 8131 Slurry Seal $3,299 2028 Hampshire Cir Antigua Way Antigua Way 751 34 25534 Slurry Seal $10,360 2028 Hampshire Ct Hampshire Cir End 134 50 9200 Slurry Seal $3,733 2028 Hampshire Ln Lincoln Ln Santiago Dr 250 34 8500 Slurry Seal $3,449 2028 Hampshire Ln Santiago Dr Antigua Way 250 34 8500 Slurry Seal $3,449 2028 Harbor Island Dr Bayside Dr Harbor Island Rd 750 43 34250 Slurry Seal $13,897 2028 Harbor Island Dr Harbor Island Rd E End 1,862 37 68894 Slurry Seal $27,954 2028 Harbor Island Dr Harbor Island Dr N End 190 36 6840 Slurry Seal $2,775 2028 Hazel Dr Coast Highway East 577' N of Coast Highway East 577 30 17310 Slurry Seal $7,024 2028 Hazel Dr 577' N of Coast Highway East Poppy Ave (north side) 393 29 11397 Slurry Seal $4,624 2028 Heather Ln Irvine Ave End 955 34 36390 Slurry Seal $14,765 2028 Heliotrope Ave Ocean Blvd Bayview Dr 400 27 10800 Slurry Seal $4,382 2028 Heliotrope Ave Seaview Ave End 314 27 8478 1 Slurry Seal $3,440 2028 Heliotrope Ave Bayside Dr Coast Highway East 1,015 28 28420 Slurry Seal $11,531 2028 Highland Dr Westcliff Dr Nottingham Rd 1,592 38 60496 Slurry Seal $24,546 2028 Highland Dr Nottingham Rd Mariners Dr 1,858 38 70604 Slurry Seal $28,648 2028 Holiday Rd Galaxy Dr Santiago Dr 165 38 6270 Slurry Seal $2,544 2028 Hospital Rd Superior Ave Placentia Ave 976 44 42944 Slurry Seal $17,424 2028 Indian Spring Ln Irvine Ave End 78 52 6556 Slurry Seal $2,660 2028 Iris Ave Ocean Blvd Seaview Ave 625 28 17500 Slurry Seal $7,101 2028 Iris Ave Seaview Ave North End 320 28 8960 Slurry Seal $3,636 2028 Island Ave Bay Ave East Balboa Blvd West 164 33 5412 Slurry Seal $2,196 2028 Jasmine Ave 88' N of Ocean Blvd Seaview Ave 432 28 12096 Slurry Seal $4,908 2028 Jasmine Ave Seaview Ave North End 283 27 7641 Slurry Seal $3,100 2028 Jasmine Ave Bayside Dr Coast Highway East 480 28 13440 Slurry Seal $5,453 2028 Kathleen Ln Teresita Ln Beryl Ln 255 34 9270 Slurry Seal $3,761 2028 Kathleen Ln Beryl Ln Highland Dr 260 34 8840 1 Slurry Seal $3,587 2028 Ketch Rd Beacon Bay End 310 24 7440 Slurry Seal $3,019 2028 Larkspur Ave Ocean Blvd Seaview Ave 470 28 13160 Slurry Seal $5,340 2028 Larkspur Ave Seaview Ave North End 360 28 10080 Slurry Seal $4,090 2028 Leila Lane Dover Dr (Cul-de-Sac) Diana Ln 240 33 7920 Slurry Seal $3,214 2028 Linda Ln Irvine Ave Priscilla Ave 234 34 7956 Slurry Seal $3,228 2028 Marguerite Ave San Joaquin Hills Rd Pacific View Dr 721 36 26406 Slurry Seal $10,714 2028 Marian Ln Lincoln Ln Highland Dr 279 38 11202 Slurry Seal $4,545 2028 Mariners Dr I Irvine Ave overDr 1,450 38 55100 Slurry Seal $22,357 2028 Mariners Dr Santiago Dr East End 1,232 37 48084 Slurry Seal $19,510 2028 Marlin Way IShipway Ln ITerrapin Way 725 1 33 1 25725 1 Slurry Seal $10,438 2028 6-71 Appendix A - Local Streets Page 15 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment Pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Mesa View North Ford Rd Bonita Canyon Dr 400 43 17200 Slurry Seal $6,979 2028 Milford Dr Orrington Rd Camden Dr 801 37 32137 Slurry Seal $13,040 2028 Morning Star Ln Polaris Dr End 675 33 24775 Slurry Seal $10,052 2028 Narcissus Ave Ocean Blvd Seaview Ave 366 27 9882 Slurry Seal $4,010 2028 Narcissus Ave Seaview Ave Coast Highway East 5S3 27 14931 Slurry Seal $6,058 2028 Nautilus Lane Toyon Ln Buttonshell Ln 320 33 11760 1 Slurry Seal $4,772 2028 Newport Hills Dr E Port Ramsgate PI Port Seabourne Way 1,550 37 57350 Slurry Seal $23,270 2028 Norfolk Ln Dover Dr Devon Ln 220 33 7260 Slurry Seal $2,946 2028 North Star Ln White Cliffs Dr End 850 33 30550 Slurry Seal $12,396 2028 Orchid Ave Ocean Blvd Coast Highway East 1,106 27 29862 Slurry Seal $12,116 2028 Orrington Rd Cameo Shores Rd Milford Dr 1,425 33 47025 Slurry Seal $19,080 2028 Pescador Dr Nottingham Rd Santiago Dr 1,487 33 50271 Slurry Seal $20,397 2028 Piazza Lido Via Florence Via Havre 510 58 29580 Slurry Seal $12,002 2028 Piazza Lido Via Havre Via Koron 428 24 10272 Slurry Seal $4,168 2028 Poinsettia Ave Ocean Blvd Seaview Ave 547 28 15316 Slurry Seal $6,214 2028 Poinsettia Ave Seaview Ave Coast Highway East 638 28 17864 Slurry Seal $7,248 2028 Point Conception Way El Capitan Dr Drakes Bay Dr 168 36 6798 Slurry Seal $2,758 2028 Poppy Ave 190'S Coast Highway East Coast Highway East 190 21 3990 Slurry Seal $1,619 2028 Pork Barrel Way (35th 1/2 St) Finley Ave S End 80 16 1280 Slurry Seal $519 2028 Port Albans Cir Newport Hills Dr East End 175 54 9450 Slurry Seal $3,834 2028 Port Ashley PI Newport Hills Drive West Port Stirling PI (East End) 620 32 19840 Slurry Seal $8,050 2028 Port Cardiff PI Port Bristol Cir (West End) Newport Hills Drive East 958 32 30656 Slurry Seal $12,439 2028 Port Ramsey PI San Miguel Dr Port Whitby PI 153 36 6008 Slurry Seal $2,438 2028 Port Ramsgate PI Newport Hills Drive East Port Chelsea PI (East End) 430 32 13760 Slurry Seal $5,583 2028 Port Stanhope Cir Newport Hills Dr West End 115 38 5330 Slurry Seal $2,163 2028 Port Tiffin Cir Newport Hills Dr West End 115 54 6210 Slurry Seal $2,520 2028 Port Whitby PI Port Ramsey PI Port Durness PI 1,020 36 37220 Slurry Seal $15,102 2028 Prairie Road NB Ford Rd Bonita Canyon Dr 350 46 16100 Slurry Seal $6,533 2028 Prairie Road SB Bonita Canyon Dr Ford Rd 350 35 12250 Slurry Seal $4,970 2028 Priscilla Ln Beryl Ln Diana Ln 658 34 23572 Slurry Seal $9,564 2028 Sandalwood Ln Santiago Dr Candlestick Ln 402 35 14670 Slurry Seal $5,952 2028 Santa Isabel Ave Irvine Ave Tustin Ave 290 56 16240 1 Slurry Seal $6,589 2028 Santiago Dr Tustin Ave Irvine Ave 1,275 37 48375 Slurry Seal $19,628 2028 Schooner Rd Beacon Bay End 290 24 6960 Slurry Seal $2,824 2028 Second Ave Carnation Ave Heliotrope Ave 1,200 28 33600 Slurry Seal $13,633 2028 Shipway Ln Tradewinds Ln Skylark Ln 782 38 29716 Slurry Seal $12,057 2028 Skylark Ln Highland Dr Commodore Rd 245 37 9065 Slurry Seal $3,678 2028 Skylark Ln Commodore Rd Holiday Rd 1,088 38 41344 Slurry Seal $16,775 2028 Somerset Ln Highland Dr Highland Dr 1,445 34 50330 Slurry Seal $20,421 2028 Starlight Cir Commodore Rd Glenwood Ln 233 35 8155 1 Slurry Seal $3,309 2028 Starlight Cir Glenwood Ln End 195 33 8935 Slurry Seal $3,625 2028 Sylvia Ln Beryl Ln Deborah Ln 462 34 16308 Slurry Seal $6,617 2028 Third Ave Avocado Ave Acacia Ave 270 27 7290 Slurry Seal $2,958 2028 Third Ave Acacia Ave Begonia Ave 265 27 7155 Slurry Seal $2,903 2028 Third Ave Begonia Ave Carnation Ave 265 27 7155 Slurry Seal $2,903 2028 Third Ave Dahlia Ave Fernleaf Ave 265 27 7155 Slurry Seal $2,903 2028 Toyon Ln Holiday Rd Nautilus Ln 445 33 15285 Slurry Seal $6,202 2028 Tradewinds Ln ntiago Dr Commodore Rd 2,275 38 86450 Slurry Seal $35,077 2028 Tremont Ln Cameo Shores Rd Milford Dr 1,420Sa 33 46860 Slurry Seal $19,0,3 2628 Via Marina ITustin Ave jEnd 486 1 33 1 18538 1 Slurry Seal 1 $7,522 1 2028 6-72 Appendix A - Local Streets Page 16 of 18 Appendix A 110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of work Length of Segment Width of Segment pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Via Oporto Via Lido Central Ave 600 29 17400 Slurry Seal $7,060 2028 Vivian Ln Beryl Ln Diana Ln 794 34 28196 Slurry Seal $11,441 2028 West Wind Way Polaris Dr End 822 34 29448 Slurry Seal $11,949 2028 White Cliffs Dr Polaris Dr North Star Ln 224 38 8400 Slurry Seal $3,408 2028 Windward Ln Tradewinds Ln Leeward Ln 1,420 33 48060 Slurry Seal $19,500 2028 Yawl Rd Beacon Bay End 250 24 6000 1 Slurry Seal $2,434 2028 Carnation Ave First Ave Coast Highway East 1,425 27 38475 Mill and Overlay $643,156 2029 Zahma Dr Kewamee Dr Chubasco Dr 530 37 19610 Mill and Overlay $327,805 2029 Cherry Tree Ln Redland Dr End 200 34 6800 Mill and Overlay $113,670 2029 Patrice Rd Flagship Rd South End 315 37 11655 Mill and Overlay $194,827 2029 Polaris Dr Galaxy Dr Evening Star Ln 1,232 36 44352 Mill and Overlay $741,397 2029 Redlands Dr South End 23rd St 203 33 6699 Mill and Overlay $111,982 2029 Santiago Dr Nottingham Rd Pescador Dr 1,445 36 52020 Mill and Overlay $869,577 2029 Twin Lakes Cir Carmel Bay Dr End 162 32 6684 1 Mill and Overlay $111,731 2029 38th St East End of Bridge Lake Ave 113 19 2147 Reconstruction $3,087 2029 D St North End Balboa Blvd East 75 20 1500 Reconstruction $50,150 2029 Alba St Eastbluff Or Aralia St 137 36 4932 Slurry Seal $2,061 2029 Alta Vista Dr Carob St Bison Ave 2,220 36 79920 Slurry Seal $33,400 2029 Azure Ave Orchid St Bay View Ave 630 35 22050 Slurry Seal $9,215 2029 Back Bay Dr Jamboree Rd Entrance to Newport Dunes 1,110 61 67710 Slurry Seal $28,297 2029 Back Bay Dr Entrance to Newport Dunes Shellmaker Rd 1,225 48 58800 Slurry Seal $24,574 2029 Bay Farm PI Upper Bay Or End 425 34 14450 1 Slurry Seal $6,039 2029 Bayview Way EB Bayview PI Jamboree Rd 587 33 21371 Slurry Seal $8,931 2029 Bayview Way WB Jamboree Rd Bayview PI 617 32 19744 Slurry Seal $8,251 2029 Bowsprit Dr MacArthur Blvd Dove St 306 44 13464 Slurry Seal $5,627 2029 Camelback St Jamboree Rd La Felicidad 1,505 40 60825 Slurry Seal $25,420 2029 Cercis PI Alta Vista Dr End 220 32 7040 Slurry Seal $2,942 2029 Cypress St (S/A Heights) Mesa Dr Orchard Dr 1,320 36 47520 Slurry Seal $19,860 2029 Cypress St (S/A Heights) Orchard Dr Cul De Sac 980 36 35280 Slurry Seal $14,744 2029 Cypress St (S/A Heights) Cul De Sac Bristol St South 260 36 9360 1 Slurry Seal $3,912 2029 Dolphin -Striker Way Dove St End 335 44 16740 Slurry Seal $6,996 2029 Dove St Campus Dr Birch St 585 37 21645 Slurry Seal $9,046 2029 Indus St Kline Dr West End 800 33 28400 Slurry Seal $11,869 2029 Kline Dr Pegasus St North End 570 33 21060 Slurry Seal $8,801 2029 La Felicidad Camelback St La Salud 300 44 13200 Slurry Seal $5,517 2029 La Salud North End La Vida 499 44 23956 Slurry Seal $10,012 2029 La Salud La Vida Corsica Dr N 1,335 44 58740 Slurry Seal $24,549 2029 La Salud Corsica Dr N La Felicidad 1,005 44 44220 1 Slurry Seal $18,481 2029 Marine Ave South Bridge End North Bridge End 400 20 8000 Slurry Seal $3,343 2029 Marine Ave North Bridge End Bayside Or 300 20 10800 Slurry Seal $4,514 2029 Martingale Way Corinthian Way End 562 44 26228 Slurry Seal $10,961 2029 Mesa Dr Mesa Dr/Birch St Cypress St 1,140 37 42180 Slurry Seal $17,628 2029 Mesa Dr Cypress St End 1,345 37 49765 Slurry Seal $20,798 2029 Orchard Or Irvine Ave Birch St 800 40 32000 Slurry Seal $13,373 2029 Orchard Or Birch St Cypress St 630 36 22680 Slurry Seal $9,478 2029 Orchard Or Cypress St Orchid St 465 35 16275 1 Slurry Seal $6,802 2029 Orchard Or Bay View Ave End 148 35 5180 Slurry Seal $2,165 2029 Orchid Hill PI Upper Bay Dr End 425 34 14450 Slurry Seal $6,039 2029 Orchid St Zenith Ave Orchard Dr 957 35 33495 Slurry Seal 1 $13,998 1 2029 Orchid St jOrchard Or Azure Ave 500 1 35 17500 Slurry Seal 1 $7,314 1 2029 6- 73 Appendix A - Local Streets Page 17 of 18 Appendix A 1110000„I ' Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V PAVEMENT ENGINEERING Local Streets Street Name Limits of Work Length of Segment Width of Segment pavement Area (SF) Type of Treatment Cost of Treatment Year of Treatment From To Redlands Dr Orchard Dr Indus St 565 33 18645 Slurry Seal $7,792 2029 Riverside Dr Indus St End 210 33 8430 Slurry Seal $3,523 2029 Scott Dr Corinthian Way Dove St 513 44 22572 Slurry Seal $9,433 2029 Spruce St Bristol St North Quail St 600 60 36000 Slurry Seal $15,045 2029 Upper Bay Dr Mesa Dr Orchid Hill PI 1 527 36 18972 Slurry Seal $7,929 2029 Vista Del Oro Vista Nobleza Vista Umbrosa 1,880 35 65800 Slurry Seal $27,499 2029 Westerly PI Dove St Quail St 1,406 44 61864 Slurry Seal $25,854 2029 Zenith Ave Bayview Ave Spruce Ave 283 35 9905 Slurry Seal $4,140 2029 6-74 Appendix A - Local Streets Page 18 of 18 MPavement Management Plan Agency Submittal OCTA XII. Appendix B — Complete Listing of Current Street Conditions A complete listing of current pavement conditions should be included in this report. Specific data to be submitted should follow the format below: M PAH Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date LOCAL Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date Please attach the complete street listing, following the above template, after this sheet. The pages should be labeled Appendix B. Page 1 13 6-75 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date 16th St City Limit Sea Gull Ln 60 89,380 61 12/5/2022 16th St Sea Gull Ln Dover Dr 38 17,100 95 12/5/2022 32nd St Villa Way Newport Blvd 62 29,150 94 12/5/2022 32nd St Lafayette Ave Villa Way 48 24,564 95 12/5/2022 32nd St EB Balboa Blvd Newport Blvd 32 22,080 46 12/5/2022 32nd St WB Newport Blvd Balboa Blvd 32 22,080 70 12/6/2022 Adams St Ocean Front Alley East Ocean Front East 15 1,395 89 2/21/2023 Adams St Ocean Front Alley East Ocean Front East 15 1,395 92 2/21/2023 Avocado Ave Farralon Dr San Miguel Dr 66 57,552 85 11/22/2022 Avocado Ave Coast Highway East Farralon Or 64 120,360 93 11/22/2022 Balboa Blvd E EB Island Ave Medina Way 44 21,910 95 11/16/2022 Balboa Blvd E EB Adams St Main St 22 17,006 70 12/5/2022 Balboa Blvd E EB Medina Way Adams St 28 26,696 71 12/5/2022 Balboa Blvd E WB Medina Way Island Ave 40 20,800 95 11/16/2022 Balboa Blvd E WB Adams St Coronado Ave 28 17,640 62 12/5/2022 Balboa Blvd E WB Coronado St Medina Way 28 9,240 62 12/5/2022 Balboa Blvd E WB Palm St Adams St 22 5,500 65 12/5/2022 Balboa Blvd E WB Main St Washington St 22 5,610 76 12/5/2022 Balboa Blvd E WB Washington St Palm St 30 7,920 86 12/9/2022 Balboa Blvd NB 34th St 36th St 34 15,640 44 11/16/2022 Balboa Blvd NB 32nd St 34th St 34 16,592 46 11/16/2022 Balboa Blvd NB 23rd St 25th St 35 11,600 67 11/16/2022 Balboa Blvd NB 25th St 27th St 35 12,600 68 11/16/2022 Balboa Blvd NB 29th St 32nd St 35 25,875 69 11/16/2022 Balboa Blvd NB 27th St 29th St 35 17,850 70 11/16/2022 Balboa Blvd NB 110' N of 39th St 42nd St 40 22,100 70 11/16/2022 Balboa Blvd NB 36th St 110' N of 39th St 34 28,200 72 11/16/2022 Balboa Blvd NB 42nd St 44th St 40 16,800 73 11/16/2022 Balboa Blvd NB 44th St Coast Highway 35 28,700 86 11/16/2022 Balboa Blvd SB 41stSt 38th St 24 17,330 59 11/16/2022 Balboa Blvd SB 36th St 34th St 24 11,982 60 11/16/2022 Balboa Blvd SB 44th St 41st St 24 15,870 61 11/16/2022 Balboa Blvd SB 29th St 27th St 35 17,850 61 11/16/2022 Balboa Blvd SB 32nd St 29th St 35 24,675 64 11/16/2022 Balboa Blvd SB 38th St 36th St 24 11,040 65 11/16/2022 Balboa Blvd SB 27th St 25th St 35 12,600 69 11/16/2022 Balboa Blvd SB 25th St 23rd St 35 14,000 69 12/13/2022 Balboa Blvd SB 34th St 32nd St 24 12,712 71 11/16/2022 Balboa Blvd SB 46th St 44th St 35 16,205 75 11/16/2022 Balboa Blvd SB Coast Highway 46th St 35 14,595 85 11/16/2022 Balboa Blvd W EB 22nd St McFadden PI 48 21,360 41 12/5/2022 Balboa Blvd W EB 14th St 12th St 24 21,120 54 11/16/2022 Balboa Blvd W EB 23rd St 22nd St 29 8,700 67 12/5/2022 Balboa Blvd W EB McFadden PI 16th St 39 73,320 1 70 12/5/2022 Balboa Blvd W EB 16th St 14th St 24 22,824 88 11/16/2022 Balboa Blvd W EB 16th St 14th St 18 17,100 91 2/21/2023 Balboa Blvd W EB 14th St 12th St 18 15,840 91 2/21/2023 6-76 Appendix B - MPAH Page 1 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Balboa Blvd W EB 12th St 8th St 50 89,000 95 11/16/2022 Balboa Blvd W EB 8th St 6th St 42 36,506 95 11/16/2022 Balboa Blvd W EB 6th St Island Ave 42 18,400 95 11/16/2022 Balboa Blvd W WB 12th St 14th St 24 21,120 47 11/16/2022 Balboa Blvd W WB 16th St 21st St 38 69,940 71 11/16/2022 Balboa Blvd W WB 21st St 23rd St 42 21,000 82 11/16/2022 Balboa Blvd W WB 14th St 16th St 24 22,824 87 11/16/2022 Balboa Blvd W WB 14th St 16th St 18 17,100 90 2/21/2023 Balboa Blvd W WB 12th St 14th St 18 15,840 92 2/21/2023 Balboa Blvd W WB Island Ave 6th St 40 15,100 95 11/16/2022 Balboa Blvd W WB 6th St 8th St 40 34,800 95 11/16/2022 Balboa Blvd W WB 8th St 12th St 40 70,600 95 11/16/2022 Bayside Dr Jamboree Rd Coast Highway East 60 247,800 95 12/6/2022 Birch St Von Karman Ave MacArthur Blvd 56 74,960 59 12/6/2022 Birch St Jamboree Rd Von Karman Ave 60 114,000 69 12/6/2022 Birch St MacArthur Blvd Dove St 61 91,195 69 12/6/2022 Birch St Orchard St Mesa Dr 64 79,744 73 11/15/2022 Birch St Dove St Quail St 61 81,130 75 11/15/2022 Birch St Quail St Bristol St North 61 67,885 76 11/15/2022 Birch St Bristol St South Orchard St 64 90,130 77 11/15/2022 Bison Ave EB Jamboree Rd MacArthur Blvd 34 93,040 95 11/18/2022 Bison Ave EB MacArthur Blvd City limit 42 46,940 95 11/18/2022 Bison Ave WB City Limit MacArthur Blvd 42 48,340 95 11/18/2022 Bison Ave WB MacArthur Blvd Jamboree Rd 41 104,210 96 2/4/2021 Bonita Canyon Dr EB MacArthur Blvd Bridge 41 32,431 95 11/15/2022 Bonita Canyon Dr EB Bridge Mesa View Dr 30 35,000 95 11/15/2022 Bonita Canyon Dr EB Mesa View Dr Prarie Rd 30 49,950 95 11/15/2022 Bonita Canyon Dr EB Prarie Rd Bridge 42 34,440 95 11/15/2022 Bonita Canyon Dr EB Bridge Chambord 42 19,140 95 11/15/2022 Bonita Canyon Dr EB Chambord SR-73 42 44,310 95 11/15/2022 Bonita Canyon Dr WB SR-73 Chambord 44 46,420 95 11/15/2022 Bonita Canyon Dr WB Chambord Bridge 33 13,200 95 11/15/2022 Bonita Canyon Dr WB Bridge Prarie Rd 33 32,555 95 11/15/2022 Bonita Canyon Dr WB Prarie Rd Mesa View Dr 30 52,950 95 11/15/2022 Bonita Canyon Dr WB Mesa View Dr Bridge 30 30,000 95 11/15/2022 Bonita Canyon Dr WB Bridge MacArthur Blvd 38 39,758 95 11/15/2022 Bristol St North Spruce St Birch St 46 72,856 48 11/21/2022 Bristol St North Jamboree Rd Dove St 46 26,036 62 11/21/2022 Bristol St North Birch St Campus Dr 51 36,967 63 11/21/2022 Bristol St North Dove St Spruce St 46 58,006 67 11/21/2022 Bristol St South Birch St Cypress St 50 31,550 50 11/21/2022 Bristol St South Cypress St Spruce Ave 34 31,350 52 11/21/2022 Bristol St South Irvine Ave Birch St 58 33,900 58 11/21/2022 Bristol St South Bayview PI Jamboree Rd 50 52,000 67 11/21/2022 Bristol St South Spruce Ave Bayview PI 50 42,750 90 11/21/2022 Campus Dr EB IVon Karman Ave Teller Ave 1 36 1 47,340 1 54 1 11/21/2022 Campus Dr EB MacArthur Blvd MacArthur Ct 40 20,400 80 11/29/2022 Campus Dr EB ITeller Ave Jamboree Rd 33 26,600 86 L-- 11/21/2022 Campus Dr EB I Dove St Airport 42 81,300 1 94 11/21/2022 6-77 Appendix B - MPAH Page 2 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Campus Dr EB Airport MacArthur Blvd 62 26,040 94 11/21/2022 Campus Dr EB Bristol St North Quail St 41 40,450 95 11/21/2022 Campus Dr EB Quail St Dove St 42 58,150 95 11/21/2022 Campus Dr EB MacArthur Ct Von Karman Ave 36 37,044 95 11/21/2022 Coast Highway E NB Avocado Ave Newport Center Dr 50 54,500 70 12/1/2022 Coast Highway E NB Irvine Ter Jamboree Rd 46 154,350 70 12/1/2022 Coast Highway E NB Newport Center Dr Irvine Ter 50 56,250 71 12/1/2022 Coast Highway E NB MacArthur Blvd Avocado Ave 50 39,500 75 12/1/2022 Coast Highway E NB Newport Coast Dr Cameo Highlands Dr 50 176,750 95 12/1/2022 Coast Highway E NB Cameo Highlands Dr Morning Canyon Rd 28 38,900 95 12/1/2022 Coast Highway E NB Morning Canyon Rd Poppy Ave 28 48,220 95 12/1/2022 Coast Highway E NB Poppy Ave Marguerite Ave 28 46,940 95 12/1/2022 Coast Highway E NB Marguerite Ave Goldenrod Ave 28 54,370 95 12/1/2022 Coast Highway E NB Goldenrod Ave MacArthur Blvd 28 35,057 95 12/1/2022 Coast Highway E SB Irvine Ter Newport Center Dr 46 55,600 47 12/1/2022 Coast Highway E SB Avocado Ave MacArthur Blvd 50 41,250 65 12/1/2022 Coast Highway E SB Newport Center Dr Avocado Ave 44 55,830 72 12/1/2022 Coast Highway E SB Jamboree Rd Irvine Ter 46 139,150 76 12/1/2022 Coast Highway E SB MacArthur Blvd Goldenrod Ave 28 35,442 95 12/1/2022 Coast Highway E SB Goldenrod Ave Marguerite Ave 28 58,170 95 12/1/2022 Coast Highway E SB Marguerite Ave Poppy Ave 28 47,190 95 12/1/2022 Coast Highway E SB Morning Canyon Rd Cameo Highlands Dr 30 41,750 95 12/1/2022 Coast Highway E SB Cameo Highlands Dr Newport Coast Dr 50 176,850 95 12/1/2022 Coast Highway E SB Poppy Ave Morning Canyon Rd 28 49,220 95 12/12/2022 Dover Dr NB Coast Highway Cliff Dr 39 40,823 92 11/18/2022 Dover Dr NB Cliff Dr Castaways Ln 30 39,080 1 95 11/18/2022 Dover Dr NB Castaways Ln Westcliff Dr 30 44,100 95 11/18/2022 Dover Dr NB Westcliff Dr Mariners Dr 37 96,795 93 12/5/2022 Dover Dr NB Mariners Dr Irvine Ave 37 34,854 95 12/5/2022 Dover Dr SB Westcliff Dr 16th St 33 44,070 95 11/18/2022 Dover Dr SB 16th St Cliff Dr 30 37,500 95 11/18/2022 Dover Dr SB Cliff Dr Coast Highway 41 52,549 95 11/18/2022 Eastbluff Dr NB Vista Del Sol Jamboree Rd/University Dr 30 120,000 55 12/13/2022 Eastbluff Dr NB Jamboree Rd Vista Del Sol 30 119,250 75 11/15/2022 Eastbluff Dr SB Jamboree Rd/University Dr Vista Del Sol 30 120,000 44 11/15/2022 Eastbluff Dr SB Vista Del Sol Jamboree Rd 30 119,250 55 11/15/2022 Ford Rd EB Jamboree Rd MacArthur Blvd 34 129,320 95 11/15/2022 Ford Rd EB Newport Hills Dr San Miguel Dr 29 79,047 73 12/2/2022 Ford Rd EB San Miguel Dr Hillside Dr 36 14,760 86 12/2/2022 Ford Rd WB MacArthur Blvd Jamboree Rd 34 127,840 95 12/15/2022 Ford Rd WB San Miguel Dr Newport Hills Dr 30 72,600 72 12/2/2022 Ford Rd WB Hillside Dr San Miguel Dr 32 12,960 90 12/2/2022 Hospital Rd Placentia Ave Newport Blvd 57 39,900 65 12/6/2022 Irvine Ave BRISTOL ST MESA DR 42 131,880 89 11/18/2022 Irvine Ave Santa Isabel Ave University Dr 28 96,800 90 11/18/2022 Irvine Ave Mesa Dr Bristol St South 42 129,900 93 11/18/2022 Irvine Ave 16th St Mariners Dr 34 88,400 95 11/18/2022 Irvine Ave I Mariners Dr I Dover Dr 32 38,816 95 1 11/18/2022 Irvine Ave I Dover Dr I Linda Ln 34 21,930 95 1 11/18/2022 6-78 Appendix B - MPAH Page 3 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Irvine Ave Linda Ln Baycrest Rd 34 36,890 95 11/18/2022 Irvine Ave Baycrest Rd Santiago Dr 38 82,460 95 11/18/2022 Irvine Ave Santiago Dr 23rd St 77 103,606 95 11/18/2022 Irvine Ave 23rd St Santa Isabel Ave 76 114,000 95 11/18/2022 Irvine Ave Baycrest Rd Francisco Dr 38 46,626 95 11/18/2022 Irvine Ave Francisco Dr Santiago Dr 38 37,658 95 11/18/2022 Irvine Ave Santiago Dr Francisco Dr 38 37,848 95 11/18/2022 Irvine Ave Francisco Dr Baycrest Rd 38 46,474 95 11/18/2022 Irvine Ave 300' S of Monte Vista Ave Santa Isabel Ave 28 29,372 95 11/18/2022 Irvine Ave Baycrest Rd Santiago Dr 38 82,460 95 11/18/2022 Jamboree Rd Bayside Dr Coast Highway East 60 48,000 95 12/2/2022 Jamboree Rd NB Bristol St North MacArthur Blvd 46 39,380 71 12/1/2022 Jamboree Rd NB Bayview Way Bristol St South 57 58,935 77 11/16/2022 Jamboree Rd NB University Dr/Eastbluff Dr Bayview Way 57 83,439 88 11/14/2022 Jamboree Rd NB Ford Rd Bison Ave 46 152,424 91 11/14/2022 Jamboree Rd NB Bison Ave University Dr/Eastbluff Dr 46 144,680 94 11/14/2022 Jamboree Rd NB Coast Highway East Back Bay Dr 53 37,014 95 11/15/2022 Jamboree Rd NB Back Bay Dr Island Lagoon Dr/Hyatt Newporter 61 42,175 95 11/15/2022 Jamboree Rd NB Island Lagoon Dr/Hyatt Newporter Santa Barbara Dr 46 155,600 95 11/15/2022 Jamboree Rd NB Santa Barbara Dr San Joaquin Hills Rd 47 46,415 95 11/15/2022 Jamboree Rd NB San Joaquin Hills Rd Ford Rd 46 127,968 95 12/15/2022 Jamboree Rd SB Campus Dr Birch St 49 43,740 67 12/1/2022 Jamboree Rd SB Koll Center MacArthur Blvd 58 35,450 71 11/14/2022 Jamboree Rd SB Birch St Fairchild Rd 48 106,560 73 12/1/2022 Jamboree Rd SB Bristol St South Bayview Way 53 51,214 74 12/1/2022 Jamboree Rd SB Bayview Way University Dr/Eastbluff Dr 46 87,498 76 12/1/2022 Jamboree Rd SB MacArthur Blvd Bristol St North 46 38,824 81 11/15/2022 Jamboree Rd SB Fairchild Rd Koll Center 58 42,542 86 11/14/2022 Jamboree Rd SB University Dr/Eastbluff Dr Bison Ave 46 151,880 89 12/1/2022 Jamboree Rd SB San Joaquin Hills Rd Santa Barbara Dr 46 51,920 95 11/15/2022 Jamboree Rd SB Santa Barbara Dr Island Lagoon Dr/Hyatt Newporter 46 146,710 95 11/15/2022 Jamboree Rd SB Island Lagoon Dr/Hyatt Newporter Back Bay Dr 46 31,460 95 11/15/2022 Jamboree Rd SB Back Bay Dr Coast Highway East 45 53,350 95 11/15/2022 Jamboree Rd SB Bison Ave Ford Rd/Eastbluff Dr 46 154,430 95 12/1/2022 Jamboree Rd SB Ford Rd/Eastbluff Dr San Joaquin Hills Rd 46 128,450 95 12/15/2022 MacArthur Blvd NB Jamboree Rd Von Karman Ave 39 99,757 64 11/29/2022 MacArthur Blvd NB Von Karman Ave Birch St 60 146,940 68 11/21/2022 MacArthur Blvd NB Birch St Campus Dr 60 55,080 76 11/21/2022 MacArthur Blvd NB Bonita Canyon Dr/Ford Rd Villaggio 59 97,144 95 11/15/2022 MacArthur Blvd NB Villaggio Bison Ave 55 84,560 95 11/15/2022 MacArthur Blvd NB Coast Highway East San Miguel Dr 34 105,712 95 11/18/2022 MacArthur Blvd NB San Miguel Dr San Joaquin Hills Rd 46 74,798 95 11/18/2022 MacArthur Blvd NB San Joaqin Hills Rd 3400' N of San Joaqin Hills Rd 44 151,350 95 11/18/2022 MacArthur Blvd NB 3400' N of San Joagin Hills Rd Bonita Canyon Dr/Ford Rd 44 140,900 95 11/18/2022 MacArthur Blvd NB Bison Ave City Limit 46 54,470 95 11/18/2022 MacArthur Blvd SB Newport Place Dr Jamboree Rd 61 104,984 59 11/21/2022 MacArthur Blvd SB 1 Birch St I Newport Place Dr 60 147,240 67 11/21/2022 MacArthur Blvd SB Campus Dr Birch St 61 81,960 68 11/21/2022 MacArthur Blvd SB I City Limit Bison Ave 60 75,450 95 11/18/2022 6- 79 Appendix B - MPAH Page 4 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date MacArthur Blvd SB Bison Ave Vilaggio 55 74,060 95 11/18/2022 MacArthur Blvd SB Villaggio Bonita Canyon Dr 55 101,380 95 11/18/2022 MacArthur Blvd SB Bonita Canyon Dr 2600' S Bonita Canyon Dr 46 125,600 95 11/18/2022 MacArthur Blvd SB 2600' S Bonita Canyon Dr San Joaqin Hills Rd 46 171,400 95 11/18/2022 MacArthur Blvd SB San Joaquin Hills Rd San Miguel Dr 44 74,952 95 11/18/2022 MacArthur Blvd SB San Miguel Dr Coast Highway East 34 125,006 95 11/18/2022 Marguerite Ave Harbor View Dr Fifth Ave 55 84,810 95 11/23/2022 Marguerite Ave Fifth Ave Coast Hwy East 36 64,920 95 11/23/2022 Marguerite Ave Harbor View Dr Sausalito Dr 60 62,820 95 11/23/2022 Marguerite Ave Sausalito Dr San Joaquin Hills Rd 60 110,700 95 11/23/2022 Mesa Dr Irvine Ave Acacia St 66 90,090 84 11/15/2022 Mesa Dr Acacia St Mesa Dr/ Birch St 66 13,200 86 11/15/2022 Newport Blvd NB 23rd St 26th St 32 17,120 69 12/5/2022 Newport Blvd NB Via Lido Newport Channel Bridge 42 25,956 70 12/5/2022 Newport Blvd NB 28th St 30th St 38 25,460 71 2/21/2023 Newport Blvd NB 26th St 28th St 38 15,770 80 2/21/2023 Newport Blvd NB 21st St/Balboa Blvd West 23rd St 36 20,844 85 12/5/2022 Newport Blvd NB Finley Ave Via Lido 42 21,084 94 12/5/2022 Newport Blvd NB 32nd St Finley Ave 52 20,880 95 12/5/2022 Newport Blvd NB 30th St 32nd St 35 17,780 95 12/5/2022 Newport Blvd SB 28th St 26th St 41 16,810 50 12/5/2022 Newport Blvd SB Newport Channel Bridge Via Lido 42 22,932 56 12/5/2022 Newport Blvd SB 23rd St 21st St/Balboa Blvd West 32 20,192 60 12/5/2022 Newport Blvd SB 30th St 28th St 41 26,568 71 12/5/2022 Newport Blvd SB 26th St 23rd St 32 17,280 88 12/5/2022 Newport Blvd SB Finley Ave 32nd St 42 21,820 95 12/5/2022 Newport Blvd SB 32nd St 30th St 35 17,640 95 12/5/2022 Newport Blvd SB Via Lido Finley Ave 42 21,546 95 12/5/2022 Newport Center Dr E NB Newport Center Dr Anacapa Dr 36 28,644 74 12/8/2022 Newport Center Dr E NB Santa Rosa Dr Santa Cruz Dr 36 57,296 78 12/8/2022 Newport Center Dr E NB Anacapa Dr San Miguel Dr 36 31,630 85 12/8/2022 Newport Center Dr E NB San Miguel Dr Santa Rosa Dr 36 44,664 85 12/8/2022 Newport Center Dr E SB Anacapa Dr Newport Center Dr 36 29,144 56 12/8/2022 Newport Center Dr E SB San Miguel Dr Anacapa Dr 36 31,380 75 12/8/2022 Newport Center Dr E SB Santa Rosa Dr San Miguel Dr 36 43,360 84 12/8/2022 Newport Center Dr E SB Santa Cruz Dr Santa Rosa Dr 36 53,008 87 12/8/2022 Newport Center Dr NB Coast Highway East Farallon Dr/Granville Dr 36 46,304 60 12/8/2022 Newport Center Dr NB Farallon Dr/Granville Dr Newport Center Dr West 36 32,748 70 12/8/2022 Newport Center Dr SB Newport Center Dr West Farallon Dr/Granville Dr 36 37,020 57 12/8/2022 Newport Center Dr SB Farallon Dr/Granville Dr Coast Highway East 36 40,816 73 12/8/2022 Newport Center Dr W NB Newport Center Dr Santa Barbara Dr 36 53,548 61 12/8/2022 Newport Center Dr W NB Santa Barbara Dr Santa Cruz Dr 36 41,632 62 12/8/2022 Newport Center Dr W SB Santa Cruz Dr Santa Barbara Dr 36 40,018 56 12/8/2022 Newport Center Dr W SB Santa Barbara Dr Newport Center Dr 36 55,924 1 69 12/8/2022 Newport Coast Dr NB Provence Pelican Hill Rd N/Ocean Ridge Dr 41 200,473 66 11/23/2022 Newport Coast Dr NB San Joaquin Hills Rd Sage Hill 41 124,804 76 11/23/2022 Newport Coast Dr NB Sage Hill 173 Freeway Bridge 42 93,870 77 11/23/2022 Newport Coast Dr NB Pelican Hill Rd South jProvence 41 66,321 78 11/23/2022 Newport Coast Dr NB Pelican Hill Rd N/Ocean Ridge Dr IVista Ridge Rd/Pacific Pine Dr 41 140,908 83 11/23/2022 6-80 Appendix B - MPAH Page 5 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Newport Coast Dr NB Vista Ridge Rd/Pacific Pine Dr Ridge Park Rd 41 46,932 83 11/23/2022 Newport Coast Dr NB Ridge Park Rd San Joaquins Hills Rd 41 59,965 83 11/23/2022 Newport Coast Dr NB Coast Highway East Pelican Hill Rd South 41 80,809 85 11/23/2022 Newport Coast Dr SB Sage Hill San Joaquin Hills Rd 41 129,054 76 11/23/2022 Newport Coast Dr SB Vista Ridge Rd/Pacific Pine Dr Pelican Hill Rd N/Ocean Ridge Dr 41 143,408 77 11/23/2022 Newport Coast Dr SB Pelican Hill Rd N/Ocean Ridge Dr Provence 41 200,973 77 11/23/2022 Newport Coast Dr SB Ridge Park Rd Vista Ridge Rd/Pacific Pine Dr 41 47,182 78 11/23/2022 Newport Coast Dr SB San Joaquin Hills Rd Ridge Park Road 41 45,715 81 11/23/2022 Newport Coast Dr SB Provence Pelican Hill Rd South 41 70,821 87 11/23/2022 Newport Coast Dr SB Pelican Hill Rd South Coast Highway East 41 83,809 89 11/23/2022 Placentia Ave Superior Ave City Limits 62 79,050 80 12/6/2022 Placentia Ave Hospital Rd Superior Ave 40 32,400 83 12/6/2022 San Joaquin Hills Rd EB San Miguel Dr Crown Dr 41 39,212 62 11/22/2022 San Joaquin Hills Rd EB Crown Dr Marguerite Ave 41 65,993 64 11/29/2022 San Joaquin Hills Rd EB Newport Ridge Dr West Newport Ridge Dr East 33 77,670 74 11/22/2022 San Joaquin Hills Rd EB Spyglass Hill Rd Newport Ridge Dr West 33 152,385 84 11/22/2022 San Joaquin Hills Rd EB MacArthur Blvd San Miguel Dr 40 44,320 86 11/22/2022 San Joaquin Hills Rd EB Newport Ridge Dr East Newport Coast Dr 33 41,125 91 11/22/2022 San Joaquin Hills Rd EB Marguerite Ave Spyglass Hill Rd 41 116,841 94 11/22/2022 San Joaquin Hills Rd EB Jamboree Rd Santa Cruz Dr 40 61,900 95 11/22/2022 San Joaquin Hills Rd EB Santa Cruz Dr Santa Rosa Dr 40 88,650 95 11/22/2022 San Joaquin Hills Rd EB Santa Rosa Dr MacArthur Blvd 40 68,200 95 11/22/2022 San Joaquin Hills Rd WB Newport Coast Dr Newport Ridge Dr East 33 42,890 66 11/22/2022 San Joaquin Hills Rd WB Crown Dr San Miguel Dr 41 40,212 70 11/22/2022 San Joaquin Hills Rd WB Newport Ridge Dr East Newport Ridge Dr West 33 77,920 74 11/22/2022 San Joaquin Hills Rd WB Marguerite Ave Crown Dr 41 65,993 74 11/22/2022 San Joaquin Hills Rd WB Newport Ridge Rd West Spyglass Hill Rd 33 144,885 81 11/22/2022 San Joaquin Hills Rd WB San Miguel Dr MacArthur Blvd 41 41,565 86 11/22/2022 San Joaquin Hills Rd WB Spyglass Hill Rd Marguerite Ave 41 115,619 93 11/22/2022 San Joaquin Hills Rd WB MacArthur Blvd Santa Rosa Dr 40 70,360 95 11/22/2022 San Joaquin Hills Rd WB Santa Rosa Dr Santa Cruz Dr 40 92,200 95 11/22/2022 San Joaquin Hills Rd WB Santa Cruz Dr Jamboree Rd 40 63,240 95 11/22/2022 San Miguel Dr Newport Center Dr East Avocado Ave 72 68,216 51 12/6/2022 San Miguel Dr Avocado Ave MacArthur Blvd 92 28,520 56 12/6/2022 San Miguel Dr NB Spyglass Hill Rd/Eastgate Dr Ford Rd 29 70,294 37 11/15/2022 San Miguel Dr NB Yacht Coquette (North End) Spyglass Hill Rd/Eastgate Dr 29 45,326 49 11/30/2022 San Miguel Dr NB San Joaquin Hills Rd Pacific View Dr 29 19,665 64 11/30/2022 San Miguel Dr NB Harbor Woods PI Port Sutton Dr 29 53,319 1 73 11/30/2022 San Miguel Dr NB Pacific View Dr Harbor Woods PI 29 14,645 79 11/30/2022 San Miguel Dr NB Port Sutton Dr Yacht Coquette (North End) 29 32,190 80 11/30/2022 San Miguel Dr NB MacArthur Blvd San Joaquin Hills Rd 31 45,335 95 11/30/2022 San Miguel Dr SB Ford Rd Spyglass HillRd/Eastgate Dr 29 67,170 41 11/30/2022 San Miguel Dr SB Spyglass Hill Rd/Eastgate Dr Yacht Coquette (North Side) 29 43,326 42 11/30/2022 San Miguel Dr SB Yacht Coquette (North Side) Port Sutton Dr/Yacht Coquette (S) 29 33,940 47 11/30/2022 San Miguel Dr SB Pacific View Dr San Joaquin Hills Rd 29 22,915 75 11/30/2022 San Miguel Dr SB Port Sutton Dr Harbor Woods PI 29 51,069 81 11/30/2022 San Miguel Dr SB Harbor Woods PI Pacific View Dr 29 15,645 87 11/30/2022 San Miguel Dr SB San Joaquin Hills Rd MacArthur Blvd 30 41,200 93 11/30/2022 Santa Cruz Dr San Joaquin Hills Rd Newport Center Dr West 72 82,656 49 12/9/2022 6-81 Appendix B - MPAH Page 6 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING MPAH Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Santa Rosa Dr Newport Center Dr East San Joaquin Hills Rd 72 39,600 87 12/9/2022 Spyglass Hill Rd Ridgeline Dr El Capitan Dr 44 56,144 47 12/2/2022 Spyglass Hill Rd Harbor Ridge Dr Ridgeline Dr 44 56,452 62 12/2/2022 Spyglass Hill Rd San Miguel Dr Harbor Ridge Dr 44 54,340 69 12/2/2022 Spyglass Hill Rd El Capitan Dr San Joaquin Hills Rd 44 84,480 72 12/2/2022 Superior Av NB Coast Highway West Ticonderga St 38 55,784 50 12/9/2022 Superior Av NB Ticonderga St Placentia Ave 38 56,734 58 12/9/2022 Superior Av NB Placentia Ave City Limit 38 66,500 89 12/7/2022 Superior Av SB Placentia Av Ticonderga St 38 58,976 46 12/9/2022 Superior Av SB Ticonderga St Coast Highway West 38 58,976 74 12/9/2022 Superior Av SB City Limit Placentia Av 38 63,080 80 12/9/2022 University Dr EB Jamboree Rd La Vida/Baypointe Dr 32 21,730 95 11/15/2022 University Dr EB La Vida/Baypointe Dr Bonita Creek Bridge 32 21,280 95 11/15/2022 University Dr EB Bonita Creek Bridge City Limit 44 34,320 95 11/15/2022 University Dr WB City Limit Bonita Creek Bridge 44 36,320 95 11/14/2022 University Dr WB Bonita Creek Bridge La Vida/Baypointe Dr 42 29,600 95 11/15/2022 University Dr WB La Vida/Baypointe Dr Jamboree Rd 42 30,130 95 11/15/2022 Via Lido Bridge (West End) Newport Blvd 26 40,300 76 12/9/2022 Via Lido Newport Blvd Bridge (West End) 26 40,300 78 12/6/2022 Von Karman Ave Campus Dr Birch St 1 76 1 56,952 59 12/6/2022 Von Karman Ave Birch St MacArthur Blvd 76 163,580 61 12/6/2022 Westcliff Dr EB Irvine Ave Dover Dr 25 42,575 93 12/5/2022 Westcliff Dr WB Dover Dr Irvine Ave 25 42,375 93 12/5/2022 6-82 Appendix B - MPAH Page 7 of 7 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date 06th St Balboa Blvd West Ocean Front West 34 5,168 90 1/26/2023 06th St Bay Ave West Balboa Blvd West 34 4,896 100 1/26/2023 07th St Balboa Blvd West Ocean Front West 34 5,100 83 1/26/2023 07th St Bay Ave West Balboa Blvd West 30 5,010 87 12/14/2022 08th St Bay Ave West Balboa Blvd West 33 5,280 79 1/26/2023 08th St Balboa Blvd West Ocean Front West 33 5,280 85 1/26/2023 09th St Bay Ave West Balboa Blvd West 27 4,995 80 12/14/2022 09th St Balboa Blvd West Ocean Front West 28 5,740 88 1/26/2023 09th St North End Bay Ave West 30 3,300 93 1/26/2023 loth St Balboa Blvd West Ocean Front West 27 6,129 85 1/26/2023 10th St North End Bay Ave West 26 936 95 12/14/2022 loth St Bay Ave West Balboa Blvd West 28 5,180 95 12/14/2022 11th St Balboa Blvd West Ocean Front West 28 6,440 77 1/26/2023 11th St Bay Ave West Balboa Blvd West 28 5,208 82 12/14/2022 11th St North End Bay Ave West 30 900 94 1/26/2023 12th St Balboa Blvd West Ocean Front West 28 6,440 81 1/26/2023 12th St Bay Ave West Balboa Blvd West 28 5,180 85 12/14/2022 12th St North End Bay Ave West 29 870 88 1/26/2023 13th St Balboa Blvd West Ocean Front West 28 6,720 79 1/26/2023 13th St North End Bay Ave West 30 900 81 1/26/2023 13th St Bay Ave West Balboa Blvd West 28 6,048 86 12/14/2022 14th St North End Bay Ave West 30 900 81 1/26/2023 14th St Bay Ave West Balboa Blvd West 30 6,450 81 1/26/2023 14th St Balboa Blvd West Ocean Front West 27 6,210 85 1/26/2023 15th St Old Newport Ave Bolsa Ave 18 12,420 77 12/19/2022 15th St Santa Ana Ave Redlands Ave 36 24,120 78 12/19/2022 15th St North End Balboa Blvd West 73 21,900 78 1/26/2023 15th St Bolsa Ave Santa Ana Ave 18 17,280 80 12/19/2022 15th St Redlands Ave Tustin Ave 18 12,060 80 12/19/2022 15th St Balboa Blvd West Ocean Front West 77 17,941 84 1/26/2023 15th St Aliso Ave Irvine Ave 36 23,760 85 12/19/2022 15th St Tustin Ave Aliso Ave 36 23,760 86 12/19/2022 15th St Irvine Ave St Andrew Rd 62 33,720 91 12/19/2022 15th St St Andrew Rd Kings PI 35 41,300 92 12/21/2022 15th St Kings PI St James PI 35 7,350 93 12/21/2022 15th St W Placentia Ave Superior Ave 60 12,900 50 12/19/2022 15th St W Monrovia Ave Placentia Ave 36 46,224 79 12/19/2022 16th St Balboa Blvd West Ocean Front West 27 6,075 86 1/26/2023 16th St W West End Placentia Ave 36 86,400 64 12/20/2022 17th St Balboa Blvd West Ocean Front West 28 6,300 81 1/26/2023 18th St Balboa Blvd West Ocean Front West 28 6,356 79 1/26/2023 18th St North End Balboa Blvd West 28 8,400 91 12/14/2022 19th St Balboa Blvd Sundance Dr 30 27,900 76 12/20/2022 19th St Balboa Blvd West Ocean Front West 30 8,100 76 1/26/2023 19th St North End Balboa Blvd West 28 12,040 89 12/14/2022 20th St 91' S of North End Balboa Blvd West 34 11,050 55 1/26/2023 20th St North End 91' S of North End 34 3,094 89 12/14/2022 6-83 Appendix B - Local Streets Page 1 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date 20th St Balboa Blvd West Ocean Front West 33 11,418 93 1/26/2023 21st St Balboa Blvd West N/s South End 24 10,608 83 12/14/2022 21st St North End Balboa Blvd West 24 10,608 88 12/14/2022 22nd St Balboa Blvd West Ocean Front West 30 9,450 79 12/14/2022 22nd St North End Balboa Blvd West 40 5,200 89 12/14/2022 23rd St Tustin Ave Irvine Ave 35 27,230 62 12/21/2022 23rd St City Limits Tustin Ave 35 33,005 75 12/21/2022 23rd St Balboa Blvd West Ocean Front West 30 10,800 85 12/14/2022 24th St Balboa Blvd Ocean Front West 16 6,240 55 1/26/2023 25th St Balboa Blvd Ocean Front West 16 6,320 86 1/26/2023 26th St Balboa Blvd Ocean Front West 21 8,295 64 1/26/2023 26th St Newport Blvd Balboa Blvd 22 2,750 81 12/14/2022 26th St East End Newport Blvd 29 4,060 84 12/14/2022 27th St Balboa Blvd Ocean Front West 20 7,800 59 1/26/2023 28th St Balboa Blvd West Ocean Front West 34 13,090 36 1/26/2023 28th St Villa Way Newport Blvd East NB 54 11,750 69 12/14/2022 28th St Newport Blvd East NB Newport Blvd West SB 37 4,995 84 12/14/2022 28th St East End Villa Way 14 1,050 1 91 12/14/2022 28th St Newport Blvd West SB Balboa Blvd 60 13,200 93 12/14/2022 29th St Newport Blvd SB Balboa Blvd 33 10,725 58 1/27/2023 29th St Balboa Blvd Ocean Front West 33 12,705 61 1/27/2023 29th St East End Lafayette Ave 24 1,800 90 12/14/2022 29th St Lafayette Ave Newport Blvd NB 24 12,840 91 12/14/2022 30th St Balboa Blvd Ocean Front West 32 12,000 65 1/27/2023 30th St Lafayette Ave Villa Way 29 7,965 91 1/27/2023 30th St Newport Blvd 180' E of Balboa Blvd 34 7,480 92 12/14/2022 30th St Villa Way Newport Blvd 25 11,250 93 12/14/2022 30th St 180' E of Balboa Blvd Balboa Blvd 34 6,120 100 1/27/2023 31st St Villa Way Newport Blvd 24 11,832 88 12/14/2022 31st St Lafayette Ave Villa Way 24 8,424 93 12/14/2022 31st St Balboa Blvd Ocean Front West 32 12,032 93 12/14/2022 32nd St Seashore Dr Ocean Front West 16 3,040 91 12/14/2022 32nd St Balboa Blvd Seashore Dr 36 6,264 100 1/27/2023 33rd St Balboa Blvd Seashore Dr 20 4,960 92 12/14/2022 33rd St Marcus Ave Lake Ave 18 3,960 93 12/14/2022 33rd St Lake Ave Balboa Blvd 18 4,950 93 12/14/2022 33rd St Seashore Or Ocean Front West 16 2,160 93 12/14/2022 33rd St East End Marcus Ave 18 1,350 95 12/14/2022 34th St Marcus Ave Lake Ave 18 3,888 93 12/14/2022 34th St Lake Ave Balboa Blvd 18 5,040 93 12/14/2022 34th St Balboa Blvd Seashore Dr 18 4,756 93 12/14/2022 34th St Seashore Or Ocean Front West 17 1,700 93 12/14/2022 34th St Clubhouse Ave Rivo Alto 16 2,640 95 12/14/2022 34th St Rivo Alto Marcus Ave 16 1,056 95 12/14/2022 35th St Lake Ave Balboa Blvd 20 5,660 76 12/14/2022 35th St Marcus Ave Lake Ave 20 4,300 82 12/14/2022 35th St Balboa Blvd Seashore Dr 20 5,264 87 12/14/2022 35th St I Finley Ave I Rivo Alto 16 1,120 95 1 12/14/2022 35th St I Rivo Alto I Marcus Ave 16 1,360 95 1 12/14/2022 6-84 Appendix B - Local Streets Page 2 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date 35th St Seashore Dr Ocean Front West 20 1,800 95 12/14/2022 35th St Short St Finley Ave 16 4,880 95 12/16/2020 36th St Rivo Alto Marcus Ave 20 2,000 65 1/27/2023 36th St Marcus Ave Balboa Blvd 20 10,000 81 12/14/2022 36th St Seashore Dr Ocean Front West 20 1,780 82 1/27/2023 36th St Balboa Blvd Seashore Dr 20 3,124 90 12/14/2022 36th St Balboa Blvd Seashore Dr 20 540 90 1/27/2023 36th St Finley Ave Short St 16 4,880 91 12/14/2022 36th St Short St Clubhouse Ave 16 5,440 93 12/14/2022 36th St Finley Ave End 16 1,120 93 12/14/2022 37th St Lake Ave 48' E of Park Ln 20 2,300 79 1/27/2023 37th St Balboa Blvd Seashore Dr 20 5,340 91 12/14/2022 37th St Seashore Dr Ocean Front West 20 1,400 91 1/27/2023 37th St 48' E of Park Ln Park Ln 20 960 94 12/14/2022 38th St East End of Bridge Lake Ave 19 2,147 56 1/27/2023 38th St Balboa Blvd Seashore Dr 18 5,448 83 12/15/2022 38th St North End Channel PI 16 544 84 12/15/2022 38th St Lake Ave Balboa Blvd 22 5,984 84 1/27/2023 38th St Finley Ave Marcus Ave 16 4,400 87 12/15/2022 38th St Channel PI Finley Ave 16 3,616 93 12/15/2022 38th St Marcus Ave East End of Bridge 16 1,328 93 12/15/2022 38th St Seashore Dr Ocean Front West 20 1,440 94 1/27/2023 39th St Marcus Ave Rivo Alto 19 703 64 2/6/2023 39th St Balboa Blvd Seashore Dr 18 5,610 77 12/15/2022 39th St River Ave Balboa Blvd 17 2,805 81 12/15/2022 39th St North End Channel PI 16 560 85 12/15/2022 39th St Seashore Dr Ocean Front West 20 1,500 87 1/27/2023 39th St Channel PI Marcus Ave 16 4,400 93 12/15/2022 39th St Rivo Alto River Ave 20 720 96 1/27/2023 40th St River Ave Balboa Blvd 20 3,140 65 1/27/2023 40th St Balboa Blvd Seashore Dr 18 5,844 83 12/15/2022 40th St North End Channel PI 16 560 87 12/15/2022 40th St Seashore Dr Ocean Front West 20 1,320 92 1/27/2023 40th St Rivo Alto River Ave 20 700 94 1/27/2023 40th St Channel PI Marcus Ave 16 2,080 95 12/15/2022 40th St Marcus Ave Rivo Alto 16 560 95 12/15/2022 41st St River Ave Balboa Blvd 20 3,080 57 1/27/2023 41st St Rivo Alto River Ave 20 720 85 1/27/2023 41st St Balboa Blvd Seashore Dr 18 6,060 89 12/15/2022 41st St Seashore Dr Ocean Front West 20 1,480 92 1/27/2023 42nd St River Ave Balboa Blvd 20 3,160 50 1/27/2023 42nd St Rivo Alto River Ave 20 700 73 1/27/2023 42nd St Balboa Blvd Seashore Dr 18 6,350 83 12/15/2022 42nd St Seashore Dr Ocean Front West 19 1,406 91 1/27/2023 43rd St Rivo Alto River Ave 21 1,806 59 1/27/2023 43rd St Balboa Blvd Seashore Dr 18 6,210 79 12/15/2022 43rd St River Ave l Balboa Blvd 21 3,255 86 12/15/2022 43rd St ISeashore Dr I Ocean Front West 20 1 1,540 1 94 1 1/27/2023 44th St I Balboa Blvd ISeashore Dr 21 1 7,770 1 80 1 12/15/2022 6-85 Appendix B - Local Streets Page 3 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date 44th St Seashore Dr Ocean Front West 20 1,560 90 1/27/2023 44th St Channel PI Balboa Blvd 21 2,100 93 12/15/2022 45th St Balboa Blvd Seashore Dr 21 8,295 85 12/15/2022 45th St Seashore Dr Ocean Front West 20 1,500 90 1/27/2023 46th St Balboa Blvd Seashore Dr 21 9,198 83 12/15/2022 46th St Seashore Dr Ocean Front West 20 1,500 88 12/16/2020 47th St Seashore Dr Ocean Front West 20 1,460 88 1/27/2023 47th St River Ave Neptune Ave 21 6,615 93 12/15/2022 47th St Neptune Ave Seashore Dr 20 1,680 93 12/15/2022 48th St River Ave Neptune Ave 20 5,200 87 12/15/2022 48th St Seashore Dr Ocean Front West 20 1,440 96 1/27/2023 49th St Seashore Dr Ocean Front West 20 1,260 93 1/27/2023 49th St River Dr Neptune Ave 20 4,900 95 12/20/2022 50th St Seashore Dr Ocean Front West 20 1,240 93 1/30/2023 50th St River Ave Neptune Ave 20 4,600 95 12/20/2022 51stSt Seashore Dr Ocean Front West 20 1,060 89 1/30/2023 51st St River Ave Seashore Dr 20 6,600 95 12/20/2022 52nd St Seashore Dr Ocean Front West 20 1,060 86 1/30/2023 52nd St River Ave Neptune Ave 20 4,300 95 12/20/2022 53rd St Seashore Dr Ocean Front West 20 1,300 88 1/30/2023 53rd St River Ave Neptune Ave 20 3,620 95 12/20/2022 54th St River Ave Neptune Ave 38 5,320 93 12/20/2022 54th St Seashore Dr Ocean Front West 20 1,400 93 1/30/2023 54th St Neptune Ave Seashore Dr 27 2,025 95 12/20/2022 55th St Seashore Dr Ocean Front West 18 1,260 89 1/30/2023 56th St Seashore Dr Ocean Front West 20 1,640 93 1/30/2023 57th St Seashore Dr Ocean Front West 19 1,615 88 1/30/2023 58th St Seashore Dr Ocean Front West 19 1,691 89 1/30/2023 59th St Seashore Dr Ocean Front West 20 1,720 94 1/30/2023 60th St North End Coast Highway West 28 4,340 84 12/20/2022 60th St Seashore Dr Ocean Front West 19 1,691 84 1/30/2023 61st St Lancaster St Coast Highway West 20 12,900 81 12/20/2022 61stSt Seashore Dr Ocean Front West 19 1,615 91 12/20/2022 62nd St Ocean Front Alley West Ocean Front West 18 1,260 85 1/30/2023 62nd St Lancaster St Newport Shores Dr 29 11,745 87 12/20/2022 62nd St Newport Shores Dr Coast Highway West 18 2,970 91 12/20/2022 62nd St Seashore Dr Ocean Front Alley West 18 990 93 12/20/2022 62nd St Canal St Cedar St 29 24,940 94 12/20/2022 62nd St Cedar St Lancaster St 29 13,920 94 12/20/2022 A St Ocean Front East South End 60 32,100 49 12/16/2022 A St Balboa Blvd East Ocean Front East 20 4,200 91 2/6/2023 A St Bay Ave East Balboa Blvd East 20 2,700 92 2/6/2023 Abalone Ave Park Ave Bay Front South 28 11,620 71 8/3/2021 Abalone Ave Abalone PI Balboa Ave 28 3,920 82 8/3/2021 Abalone Ave Balboa Ave Park Ave 28 11,760 89 8/3/2021 Abalone Dr Crystal Ave Abalone PI 28 6,160 91 8/3/2021 Abalone PI Abalone Dr Crystal Ave 24 4,440 91 8/3/2021 Acacia Ave I Coast Highway East ISecond Ave 27 1 29,025 89 1 7/14/2021 Acacia Ave ISecond Ave I Pacific Dr 27 1 19,359 89 1 7/14/2021 6-86 Appendix B - Local Streets Page 4 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Acacia St Orchard Dr Mesa Dr 50 56,100 73 7/14/2021 Adams St Bay Ave East Balboa Blvd East 19 4,750 44 2/7/2023 Adams St Balboa Blvd East Ocean Front Alley East 19 2,185 75 2/6/2023 Adams St North End Bay Ave East 21 3,255 81 2/6/2023 Agate Ave Bay Front North Park Ave 23 15,318 32 6/28/2021 Agate Ave Park Ave Bay Front South 30 15,150 37 6/28/2021 Alba St Eastbluff Dr Aralia St 36 4,932 89 6/25/2021 Aldean PI 15th St End 35 9,100 81 12/19/2022 Aldebaran Cir Galaxy Dr End 55 9,925 87 12/22/2022 Alder PI Alta Vista Dr End 32 9,760 87 6/25/2021 Aleppo St Aralia St Alta Vista Dr 37 24,975 79 6/25/2021 Aleppo St Alta Vista Dr End 32 12,320 85 6/25/2021 Aliso Ave 15th St Clay St 35 22,505 91 12/19/2022 Aliso Ave Beacon St Cliff Dr 35 14,700 92 12/19/2022 Aliso Ave Clay St Beacon St 35 23,345 93 12/19/2022 Almond PI Alta Vista Dr End 32 7,840 83 6/25/2021 Alta Vista Dr Bison Ave Bellis St 36 37,620 61 8/9/2021 Alta Vista Or Bellis St Aralia St 36 67,680 77 8/9/2021 Alta Vista Or Carob St Bison Ave 36 79,920 89 8/9/2021 Altura Dr Marapata Dr Angelita Dr 34 31,450 65 6/28/2021 Alvarado PI Bay Front North Bay Ave East 34 17,000 99 2/6/2023 Amethyst Ave Balboa Ave Park Ave 27 11,475 61 8/2/2021 Amethyst Ave Bay Front North Balboa Ave 27 15,525 63 8/2/2021 Amethyst Ave Park Ave Bay Front South 27 11,070 68 8/2/2021 Amigos Way Domingo Or Domingo Dr 36 37,980 79 8/9/2021 Anacapa Dr Newport Center Dr East Farallon Dr 48 36,384 97 7/14/2021 Anade Ave Bay Ave East Edgewater Ave East 34 17,340 96 2/7/2023 Angelita Dr Kewamee Dr Bayadere Ter 38 40,280 48 6/28/2021 Anita Ln Estelle Ln Marian Ln 33 36,366 86 12/22/2022 Anniversary Ln Irvine Ave End 28 61,852 71 12/22/2022 Antigua Cir Santiago Dr End 33 7,945 94 12/22/2022 Antigua Way Santiago Dr (North End) Mariners Or 37 74,460 88 12/22/2022 Antigua Way Mariners Dr Santiago Dr (South End) 35 35,210 89 12/22/2022 Apolena Ave Balboa Ave Park Ave 27 11,502 67 8/2/2021 Apolena Ave Bay Front North Balboa Ave 27 15,471 68 8/2/2021 Apolena Ave Park Ave Bay Ave South 27 11,178 76 8/2/2021 Aralia St Aleppo St End 35 62,125 82 6/25/2021 Arbutus St Aleppo St Alta Vista Or 36 41,040 79 6/25/2021 Arbutus St Alta Vista Or End 32 7,200 83 6/25/2021 Ashford Ln Glenwood Ln Santiago Dr 33 10,995 89 12/22/2022 Avocado Ave Waterfront Dr Coast Highway East 86 99,420 73 7/14/2021 Avocado Ave 160' N of Pacific Or Waterfront Dr 16 1,472 90 7/14/2021 Avocado Ave Pacific Dr 160' N of Pacific Dr 16 2,560 95 7/14/2021 Avocado Ave San Miguel Dr Bus Station 36 56,210 97 7/14/2021 Avocado Ave NB Bus Station San Joaquin Hills Rd 23 2,093 98 7/14/2021 Avocado Ave SB 167' S/O San Joaquin Hills Bus Station 22 3,674 97 7/14/2021 Avocado Ave SB San Joaquin Hills Rd 167' S/0 San Joaquin Hills 22 3,674 98 7/14/2021 Avon St West End Riverside Ave 21 18,747 90 12/22/2022 Avon St Riverside Ave Tustin Ave 34 15,572 95 12/22/2022 6-87 Appendix B - Local Streets Page 5 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Azure Ave Orchid St Bay View Ave 35 22,050 92 7/29/2021 B St North End Balboa Blvd East 20 1,800 67 2/6/2023 B St Ocean Front East South End 60 19,200 92 12/16/2022 B St Balboa Blvd East Ocean Front East 20 2,700 98 2/6/2023 Babcock St SB City Limit 16th St West 33 10,098 83 12/21/2022 Back Bay Dr Beginning of PCC Section End of PCC Section 22 1,980 0 6/25/2021 Back Bay Dr Backbay Sewer Pump Station Access Rd 22 13,354 44 6/25/2021 Back Bay Dr San Jaoquin Hills Rd Beginning of PCC Section 22 59,620 75 6/25/2021 Back Bay Dr Staired Path to Landmark Eastbluff Dr 22 79,004 79 6/25/2021 Back Bay Dr Beginning of PCC Section End of PCC Section 22 6,600 79 6/25/2021 Back Bay Dr Shellmaker Rd Beginning of PCC Section 22 17,600 85 6/25/2021 Back Bay Or Access Rd Staired Path to Landmark 22 52,668 85 6/25/2021 Back Bay Dr End of PCC Section San Joaquin Hills Rd 22 36,278 87 6/25/2021 Back Bay Dr End of PCC Section Backbay sewer pump station 22 68,332 87 6/25/2021 Back Bay Dr Jamboree Rd Entrance to Newport Dunes 61 67,710 88 6/25/2021 Back Bay Dr Entrance to Newport Dunes Shellmaker Rd 48 58,800 88 6/25/2021 Balboa Ave Collins Ave Marine Ave 28 48,300 32 6/29/2021 Balboa Ave Marine Ave Grand Canal 28 5,040 76 8/3/2021 Balboa Ave Grand Canal Bay Front East 28 13,440 82 8/3/2021 Balboa Blvd 19th St End (North City Limit) 30 22,500 66 12/21/2022 Balboa Blvd E EB B St D St 22 21,802 59 12/16/2022 Balboa Blvd E EB Main St B St 27 18,765 63 12/16/2022 Balboa Blvd E EB D St G St 22 23,452 63 12/16/2022 Balboa Blvd E EB G St J St 22 21,670 90 1/30/2023 Balboa Blvd E EB J St L St 22 8,470 92 1/30/2023 Balboa Blvd E EB M St Channel Dr 18 7,074 92 1/30/2023 Balboa Blvd E EB L St M St 22 15,092 96 1/30/2023 Balboa Blvd E WB G St D St 22 23,452 60 12/16/2022 Balboa Blvd E WB B St Main St 27 18,765 64 12/16/2022 Balboa Blvd E WB D St B St 22 21,802 71 12/16/2022 Balboa Blvd E WB J St G St 22 21,670 91 1/30/2023 Balboa Blvd E WB Channel Rd M St 22 8,646 1 93 1/30/2023 Balboa Blvd E WB M St L St 22 15,092 93 1/30/2023 Balboa Blvd E WB L St J St 22 8,470 94 1/30/2023 Bamboo St Bison Ave Bellis St 36 64,980 71 6/25/2021 Basswood St Alta Vista Dr Alta Vista Dr 33 35,425 76 6/25/2021 Bay Ave E Palm St Main St 26 10,850 76 12/16/2022 Bay Ave E 6th St Island Ave 28 10,360 86 12/16/2022 Bay Ave E Main St A St 21 5,670 86 2/6/2023 Bay Ave E Island Ave Medina Way 28 15,008 88 2/6/2023 Bay Ave E Medina Way Fernando St 28 14,420 94 2/6/2023 Bay Ave E Fernando St Adams St 30 17,250 95 2/6/2023 Bay Ave E Adams St Palm St 29 7,975 97 2/6/2023 Bay Ave W loth St 9th St 33 15,510 88 12/16/2022 Bay Ave W 9th St 7th St 30 26,100 91 2/6/2023 Bay Ave W 13th St loth St 34 44,880 93 2/6/2023 Bay Ave W 19th St 18th St 42 24,350 94 12/16/2022 Bay Ave W 7th St 16th St 28 12,600 95 12/16/2022 Bay Ave W 15th St 113th St 34 31,280 95 2/6/2023 6-88 Appendix B - Local Streets Page 6 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Bay Farm PI Upper Bay Dr End 34 14,450 87 7/29/2021 Bay View Ave Mesa Or Orchard Dr 35 42,000 82 7/29/2021 Bay View Ave Orchard Dr Zenith Ave 35 42,000 84 7/29/2021 Bayadere Ter Sabrina Ter Angelita Dr 33 76,230 79 6/28/2021 Baycrest Rd Irvine Ave Tradewinds Ln 38 9,044 91 12/21/2022 Bayport Way Francisco Dr North End 34 9,742 91 12/22/2022 Bayport Way Holiday Rd South End 33 7,656 93 12/22/2022 Bayside Dr El Paseo Dr Jamboree Rd 37 85,420 57 7/2/2021 Bayside Dr Carnation Ave El Paseo Dr 37 126,200 79 7/2/2021 Bayside Dr Marguerite Ave Carnation Ave 37 74,855 91 7/2/2021 Bayside Dr Coast Highway East End 38 45,106 93 7/2/2021 Bayview Dr Ocean Blvd Goldenrod Ave 28 4,396 95 7/19/2021 Bayview Dr Heliotrope Ave Iris Ave 28 7,280 95 7/19/2021 Bayview Dr Goldenrod Ave Heliotrope Ave 28 7,028 96 7/19/2021 Bayview PI Bristol St South Bayview Way 54 75,170 79 7/29/2021 Bayview Way Jamboree Rd End 72 14,544 71 7/29/2021 Bayview Way Shearwater PI Bayview PI 37 32,838 76 7/29/2021 Bayview Way EB Bayview PI Jamboree Rd 33 21,371 91 7/29/2021 Bayview Way WB Jamboree Rd Bayview PI 32 19,744 90 7/29/2021 Beacon Bay Harbor Island Rd End 24 28,080 89 7/2/2021 Beacon St Santa Ana Ave Cliff Dr 34 7,140 83 12/19/2022 Beacon St Westminster Ave Holmwood Or 34 8,160 86 12/19/2022 Beacon St Tustin Ave Aliso Ave 35 21,000 91 12/19/2022 Beacon St Aliso Ave Irvine Ave 35 22,330 91 12/19/2022 Beacon St La Jolla Dr Santa Ana Ave 33 3,465 95 12/19/2022 Bedford Ln Rutland Rd Buckingham Ln 36 23,076 91 12/22/2022 Begonia Ave Pacific Dr Coast Highway East 28 52,780 89 7/14/2021 Bellis St Bamboo St Alta Vista 37 27,010 75 6/25/2021 Bellis St Alta Vista Or End 32 15,200 86 6/25/2021 Berkshire Ln Oxford Ln Cambridge Ln 34 32,198 84 12/22/2022 Beryl Ln Priscilla Ln Vivian Ln 34 41,864 81 12/22/2022 Birch St Mesa Dr End 36 9,552 89 7/14/2021 Bison Ave Bamboo St Jamboree Rd 36 41,780 87 6/25/2021 Bixia St Eastbluff Dr Bamboo St 35 5,250 86 6/25/2021 Blackthorn St Bellis St Bison Ave 34 47,090 84 6/25/2021 Blue Gum Ln Westcliff Dr End 32 25,500 49 12/22/2022 Blue Key Sandcastle Or End 32 26,700 95 6/29/2021 Blue Water Dr Salt Air Dr Crown Dr North 32 35,028 96 6/29/2021 Bodega Bay Dr San Mateo Way End 36 48,780 59 7/2/2021 Bolsa Ave Broad St Clay St 38 7,714 81 12/19/2022 Bolsa Ave Clay St 15th St 36 14,616 93 12/19/2022 Bonaire Way Holiday Rd South End 33 10,255 91 12/22/2022 Bonaire Way Francisco Dr North End 33 7,425 91 12/22/2022 Bonnie Doon Ter Dolphin Ter Patolita Or 37 39,479 64 6/28/2021 Bonnie Doon Ter Patolita Dr Ramona Dr 37 54,797 65 6/28/2021 Bonnie Doon Ter Ramona Dr Malabar Dr 37 12,950 81 6/28/2021 Bowsprit Dr MacArthur Blvd Dove St 44 13,464 90 7/29/2021 Braemar Way Francisco Or End 34 9,810 91 12/22/2022 6-89 Appendix B - Local Streets Page 7 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Breakers Or Ocean Blvd Breakers Dr 20 18,000 80 8/6/2021 Breakers Dr Breakers Dr End 25 25,875 90 8/6/2021 Brighton Rd Cameo Shores Rd Camden Or 33 48,370 91 7/1/2021 Broad St Santa Ana Ave San Bernardino Ave 20 5,600 58 2/9/2023 Broad St Westminster Ave Santa Ana Ave 35 25,375 1 86 12/19/2022 Broad St San Bernardino Ave Redlands Ave 35 9,975 87 12/19/2022 Broad St Bolsa Ave Westminster Ave 36 22,608 93 12/19/2022 Broad St Santa Ana Ave San Bernardino Ave 16 4,480 93 12/19/2022 Buck Gully Dr Sandcastle Dr End 36 5,786 96 6/29/2021 Buckeye St Bellis St Bison Ave 32 38,080 81 6/25/2021 Buckingham Ln Westcliff Dr Cornwall Ln 36 22,320 89 12/22/2022 Bunya St Bellis St Bison Ave 32 49,760 70 6/25/2021 Buttonshell Ln Holiday Rd Nautilus Ln 33 14,130 90 12/22/2022 C St Balboa Blvd East Ocean Front East 20 1,600 44 2/7/2023 C St North End Balboa Blvd East 15 1,170 52 2/7/2023 Cabrillo Ter Serra Dr De Anza Dr 23 19,787 94 6/28/2021 Cacao St Eastbluff Dr Catalpa St 36 5,400 84 6/25/2021 Cambria Dr El Capitan Dr Drakes Bay Dr 32 80,320 81 7/2/2021 Cambridge Ln Devon Ln Highland Dr 34 27,902 83 12/22/2022 Camden Dr Cameo Shores Rd Milford Dr 33 44,385 91 7/1/2021 Camelback St La Felicidad Bison Ave 78 55,821 76 7/28/2021 Camelback St Jamboree Rd La Felicidad 40 60,825 89 7/28/2021 Cameo Highlands Dr Coast Highway East Garrett Dr 37 49,321 97 7/1/2021 Cameo Shores Rd Coast Highway East Orrington Rd 37 37,777 91 7/1/2021 Cameo Shores Rd Orrington Rd Brighton Rd 37 35,372 92 11/25/2019 Camphor St Catalpa St Alta Vista Dr 37 31,339 74 6/25/2021 Canal Cir Canal St Canal St 29 7,685 92 12/20/2022 Canal St 62nd St Canal Cir (West End) 30 8,100 93 12/20/2022 Canal St Canal Cir (West End) Sunset Dr 30 12,600 93 12/20/2022 Canal St Sunset Dr Grant St 30 29,070 93 12/20/2022 Candlestick Ln Glenwood Ln Sandalwood Ln 35 23,250 91 12/22/2022 Carmel Bay Dr Point Loma Dr Spyglass Hill Rd 36 58,860 70 7/2/2021 Carnation Ave Ocean Blvd Seaview Ave 30 8,910 63 8/2/2021 Carnation Ave First Ave Coast Highway East 27 38,475 68 7/1/2021 Carnation Ave Bayside Dr First Ave 37 12,366 75 7/2/2021 Carob St Camphor St End 34 80,240 78 6/25/2021 Cassia St Camphor St Carob St 32 39,840 75 6/25/2021 Castaways Ln Dover Dr Castaways (private) North 54 24,948 92 12/22/2022 Catalina Dr Old Newport Blvd Broad St 34 57,800 83 12/19/2022 Catalina Dr Broad St Clay St 34 10,982 83 12/19/2022 Catalina Dr Clay St 15th St 34 23,018 86 12/19/2022 Catalpa St Camphor St Carob St 35 52,500 81 6/25/2021 Catamaran Dr Keel Dr End 36 37,350 96 6/29/2021 Cedar St Prospect St Newport Shores Dr 29 19,430 88 12/20/2022 Cedar St Ocean Front Alley West Ocean Front West 19 1,349 89 1/30/2023 Cedar St Newport Shores Dr Coast Highway West 19 3,515 93 12/20/2022 Cedar St East End Prospect St 29 8,700 95 12/20/2022 6-90 Appendix B - Local Streets Page 8 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Cedar St Seashore Dr Ocean Front Alley West 19 1,083 95 12/20/2022 Ceiba PI Carob St End 54 11,780 77 6/25/2021 Celtis PI Alta Vista Dr End 54 10,260 84 6/25/2021 Centella PI Holiday Rd South End 33 12,177 91 12/22/2022 Centella PI Santiago Dr North End 37 12,305 93 12/22/2022 Central Ave Via Lido End 40 12,600 88 2/6/2023 Cercis PI Alta Vista Dr End 32 7,040 91 6/25/2021 Channel PI Balboa Blvd Rivo Alto (River) 21 6,195 93 12/16/2022 Channel PI 39th St Rialto 16 7,040 93 12/16/2022 Channel PI Rivo Alto 39th St 16 11,888 95 12/16/2022 Channel Rd Granada Dr End 38 55,670 78 2/6/2023 Channel Rd Balboa Blvd Granada Dr 36 5,976 94 2/6/2023 Cherry Tree Ln Redland Dr End 34 6,800 67 12/22/2022 Chestnut PI Alta Vista Dr End 32 7,040 86 6/25/2021 China Cove Ramp Ocean Blvd Fernleaf Ave 19 5,320 57 8/5/2021 Chubasco Dr Evita Dr Zahma Dr 37 25,530 70 6/28/2021 Churchill Ct Emerson St End 20 2,700 84 2/6/2023 Citrus PI Alta Vista Dr End 32 9,120 83 6/25/2021 Civic Center Dr Avocado Ave Newport Center Dr 48 74,832 97 7/14/2021 Clay St Westminster Ave Orange Ave 32 25,600 73 12/19/2022 Clay St Irvine Ave Tustin Ave 34 46,126 85 12/19/2022 Clay St Tustin Ave Westminster Ave 34 66,674 89 12/19/2022 Clay St 15th St St Andrews Rd 34 25,840 95 12/21/2022 Clay St St Andrews Rd Irvine Ave 34 22,372 95 12/21/2022 Cliff Dr Kings PI Signal Rd S5 23,430 71 12/21/2022 Cliff Dr Dover Dr Kings PI 55 41,580 80 12/21/2022 Cliff Dr Signal Rd St Andrews Rd 55 55,550 80 12/21/2022 Cliff Dr Beacon St Santa Ana Ave 34 25,160 84 12/19/2022 Cliff Dr St Andrews Place Irvine Ave 55 64,519 85 12/21/2022 Cliff Dr Riverside Ave Beacon St 33 35,046 86 12/19/2022 Cliff Dr Irvine Ave Riverside Ave 56 92,820 92 12/19/2022 Cliff Dr Santa Ana Ave La Jolla Dr 52 15,600 93 12/19/2022 Clubhouse Ave Newport Island Channel Rivo Alto 17 17,441 95 12/16/2022 Coast Blvd 61st St End 30 3,990 93 12/20/2022 Collins Ave Bay Front North Balboa Ave 28 12,320 48 8/2/2021 Collins Ave Balboa Ave Park Ave 28 12,012 1 59 8/2/2021 Collins Ave Park Ave Bay Front South 27 11,313 64 8/2/2021 Colton St Ocean Front Alley West Ocean Front West 21 924 66 1/30/2023 Colton St Sunset Dr Newport Shores Dr 29 22,040 79 12/20/2022 Colton St Sunset Dr Prospect St 29 11,792 82 12/20/2022 Colton St Newport Shores Dr End 18 3,060 87 12/20/2022 Colton St Seashore Dr Ocean Front Alley West 18 1,080 87 12/20/2022 Columbus Cir Serra Dr End 22 3,464 88 6/28/2021 Commodore Rd Tradewinds Ln Mariners Dr 38 75,300 90 12/22/2022 Constellation Dr Santiago Dr End 38 5,130 95 12/21/2022 Coral Ave Balboa Ave Park Ave 27 11,259 61 8/2/2021 Coral Ave Bay Front North Balboa Ave 27 15,525 62 8/2/2021 6-91 Appendix B - Local Streets Page 9 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Coral Ave Bay Front South Park Ave 27 11,070 65 8/2/2021 Coral PI Irvine Ave St Andrews Ave 35 28,070 95 12/19/2022 Corinthian Way MacArthur Blvd Birch St 44 38,544 86 8/9/2021 Cornwall Ln Pembroke Ln Dover Dr 34 24,808 84 12/22/2022 Coronado St Edgewater Ave East Bay Ave East 34 14,960 65 2/6/2023 Coronado St Bay Ave East Balboa Blvd East 28 5,180 71 2/6/2023 Coronado St Balboa Blvd East Ocean Front East 27 4,752 87 2/6/2023 Cortes Cir Serra Dr End 22 2,980 81 6/28/2021 Cortland Dr Rockford PI Cameo Highlands Dr 37 25,974 97 7/1/2021 Cortland Dr Cameo Highlands Dr Garrett Dr 37 36,593 97 7/1/2021 Court Ave 19th St 20th St 28 8,540 65 2/9/2023 Court Ave 20th St McFadden PI 28 5,600 77 2/7/2023 Court Ave 20th St McFadden PI 28 2,380 87 12/16/2022 Cove St Fernleaf Ave End 24 3,960 63 8/5/2021 Cove St Way Ln End 24 2,200 82 8/5/2021 Crown Dr Sea Ln Crown Dr North 37 42,624 96 6/29/2021 Crown Dr North Crown Dr San Joaquin Hills Rd 36 49,320 96 6/29/2021 Crystal Ave Park Ave Bay Front South 28 11,480 73 8/3/2021 Crystal Ave Abalone Dr Balboa Ave 24 11,520 87 8/3/2021 Crystal Ave Balboa Ave Park Ave 28 12,040 88 8/3/2021 Cumberland Ln Sussex Ln Dover Dr 34 15,390 86 12/22/2022 Cutter Rd Beacon Bay End 24 9,120 89 7/2/2021 Cypress St Edgewater PI Bay Ave East 20 5,460 85 2/6/2023 Cypress St Bay Ave East Balboa Blvd East 20 5,800 87 2/6/2023 Cypress St (S/A Heights) Mesa Dr Orchard Dr 36 47,520 87 7/29/2021 Cypress St (S/A Heights) Orchard Dr CulDe Sac 36 35,280 90 7/29/2021 Cypress St (S/A Heights) Cul De Sac Bristol St South 36 9,360 91 7/29/2021 D St Balboa Blvd East Ocean Front East 19 1,520 39 2/7/2023 D St North End Balboa Blvd East 20 1,500 40 2/7/2023 Dahlia Ave South End Way Ln 27 3,915 64 8/5/2021 Dahlia Ave Coast Highway East Fifth Ave 27 4,455 68 8/5/2021 Dahlia Ave 200' S of First St Coast Highway East 27 40,230 90 8/4/2021 Dahlia Ave Ocean Blvd Seaview Ave 27 7,425 91 8/5/2021 Dahlia PI Seaview Ave End 27 3,753 44 8/5/2021 Dana Point Way San Martin Way Montecito Dr 36 6,084 84 7/2/2021 Dana Rd Superior Ave Flagship Rd 36 21,600 79 12/21/2022 Dawnview Ln Redland Dr Redland Dr 33 5,280 69 12/21/2022 De Anza Dr Seaward Rd De Sola Ter 35 26,250 89 6/28/2021 De Sola Ter Seaward Rd End 24 28,015 79 6/28/2021 Deborah Ln Vivian Ln Sylvia Ln 34 22,122 86 12/22/2022 Deborah Ln Mariners Dr Vivian Ln 34 8,262 89 12/22/2022 Devon Ln Oxford Ln Cambridge Ln 33 25,290 81 12/22/2022 Diamond Ave Bay Front North Balboa Ave 28 13,888 55 8/2/2021 Diamond Ave Balboa Ave Park Ave 1 28 1 12,040 61 8/2/2021 Diamond Ave Park Ave Bay Front South 27 11,286 66 8/2/2021 Diana Ln Priscilla Ln Vivian Ln 34 27,108 93 12/22/2022 Dolphin Ter Bonnie Doone Ter Patolita Dr 33 41,778 70 6/28/2021 6-92 Appendix B - Local Streets Page 10 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Dolphin Ter Patolita Dr Ramona Dr 33 43,098 79 6/28/2021 Dolphin -Striker Way Dove St End 44 16,740 89 7/30/2021 Domingo Dr Mar Vista Dr Mar Vista Or 36 60,300 68 8/9/2021 Donnie Rd 22nd St End 33 20,320 90 12/22/2022 Dorchester Rd Rockford Rd Cameo Highland Rd 33 27,225 97 7/1/2021 Dorchester Rd Cameo Highland Rd Garrett Rd 33 30,030 97 7/1/2021 Doris Ln Dover Or Ruth Ln 36 8,676 83 12/22/2022 Dorothy Ln Estelle Ln Marian Ln 34 31,280 84 12/22/2022 Dorothy Ln Mariners Dr Estelle Ln 33 7,854 86 12/22/2022 Dove St Birch St Bristol St North 44 176,670 83 7/30/2021 Dove St Campus Dr Birch St 37 21,645 92 7/30/2021 Dover Or End Leila Ln 29 15,768 92 12/21/2022 Dover Or Leila Ln Mariners Or 29 14,500 94 12/21/2022 Dover Or Westcliff Dr Dover Dr (Arterial) 36 5,460 94 12/21/2022 Dover Dr Mariners Dr Doris Ln 29 14,790 95 12/21/2022 Dover Dr Doris Ln Nottingham Rd 29 17,110 95 12/21/2022 Dover Or Nottingham Rd Norfolk Ln 29 19,285 95 12/21/2022 Dover Or Norfolk Ln Westcliff Or 29 14,210 95 12/21/2022 Drakes Bay Dr Point Aguello Way Point Conception Way 32 44,192 66 7/2/2021 Drakes Bay Dr Goleta Point Or Point Aguello Way 32 9,358 80 7/2/2021 Drakes Bay Dr Point Conception Way Montecito Dr 32 15,822 80 7/2/2021 Driftwood Rd Shorecliff Rd Morning Canyon Rd 27 29,700 79 6/28/2021 E St Balboa Blvd East North End 20 1,560 39 2/7/2023 E St Balboa Blvd East Ocean Front East 20 1,660 41 2/7/2023 East Coastal Peak Ridge Park Rd 1195' S of Ridge Park Rd 37 44,215 97 6/24/2021 Eastgate Dr Newport Hills Dr East San Miguel Dr 56 11,110 59 7/28/2021 Ebbtide Rd Crown Dr Sandpiper Dr 33 43,461 95 6/29/2021 El Capitan Or Point Arguella Way Point Conception Way 44 71,282 74 7/2/2021 El Capitan Or Spyglass Hill Rd Point Arguello Way 44 54,384 77 7/2/2021 El Modena Ave Cliff Dr Beacon St 35 14,350 75 12/19/2022 El Modena Ave Beacon St Clay St 35 23,345 93 12/19/2022 El Modena Ave Clay St 15th St 35 22,925 93 12/19/2022 El Paseo Or Bayside Dr Malabar Dr 34 18,700 53 6/28/2021 Emerald Ave Park Ave Bay Front South 27 9,153 44 6/28/2021 Emerald Ave Bay Front North Park Ave 27 8,640 46 6/28/2021 Emerson St Tustin Ave City Limits 30 10,200 73 12/21/2022 Essex Ln Cambridge Ln Oxford Ln 34 28,424 88 12/22/2022 Estelle Ln Highland Or Santiago Or 33 11,946 75 12/22/2022 Estelle Ln Ruth Ln Highland Dr 33 45,744 82 12/22/2022 Eton PI Dover Or End 33 7,879 91 12/22/2022 Evening Canyon Rd Shorecliff Rd Morning Canyon Rd 28 63,360 75 6/28/2021 Evening Star Ln Polaris Dr End 33 34,840 87 12/22/2022 Evita Dr Seadrift Dr Chubasco Dr 58 12,760 74 6/28/2021 F St North End Balboa Blvd East 20 2,900 55 2/7/2023 FSt Balboa Blvd East Ocean Front East 26 5,850 63 12/16/2022 Fairfield Or Cameo Shores Rd Milford Dr 33 44,715 91 8/6/2021 Fairhill Dr 123rd St End 34 18,462 74 12/22/2022 6-93 Appendix B - Local Streets Page 11 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Fern St Ocean Front Alley West Ocean Front West 20 1,400 77 1/30/2023 Fern St Canal St Coast Highway West 30 8,190 87 12/20/2022 Fern St Seashore Or Ocean Front Alley West 17 1,054 89 12/20/2022 Fernando Street Edgewater Ave East Bay Ave East 30 10,680 86 12/16/2022 Fernleaf Ave Ocean Blvd Seaview Ave 30 8,850 37 7/19/2021 Fernleaf Ave 250' S of First St Coast Highway East 27 34,020 86 8/4/2021 Fernleaf Ave Coast Highway East Fifth Ave 27 9,990 90 8/5/2021 Fernleaf Ave Cove St China Cove Ramp 21 6,510 91 8/5/2021 Fernleaf Ave Seaview Ave 150' N Seaview Ave 27 4,050 91 7/19/2021 Fernleaf Ave 150' N Seaview Ave Bayside Dr 28 9,520 91 7/19/2021 Fifth Avenue Jasmine Ave Marguerite Ave 28 18,390 84 6/28/2021 Fifth Avenue Marguerite Ave Marigold Ave 36 11,520 89 6/28/2021 Fifth Avenue Marigold Ave Poppy Ave 36 42,300 89 6/28/2021 Fifth Avenue Dahlia Ave Heliotrope Ave 33 29,535 98 7/1/2021 Fifth Avenue Heliotrope Ave Iris Ave 32 9,280 98 7/1/2021 Finley Ave 38th St Channel PI 16 3,520 93 12/16/2022 Finley Ave Newport Blvd Clubhouse Ave 16 3,040 95 12/16/2022 Finley Ave Clubhouse Ave End 16 10,640 95 12/16/2022 Finley Ave Rialto 38th St 16 560 95 12/16/2022 First Ave Heliotrope Ave Iris Ave 27 7,290 69 7/14/2021 First Ave Goldenrod Ave Heliotrope Ave 27 7,290 87 7/14/2021 First Ave Iris Ave Jasmine Ave 27 7,290 88 7/14/2021 First Ave Dahlia Ave Fernleaf Ave 27 7,290 90 7/14/2021 First Ave Fernleaf Ave Goldenrod Ave 27 7,290 92 7/14/2021 First Ave Begonia Ave Carnation Ave 27 7,290 95 7/14/2021 First Ave Acacia Ave Begonia Ave 27 7,344 96 7/14/2021 First Ave Carnation Ave Dahlia Ave 27 7,317 96 7/14/2021 Flagship Rd Dana Rd Placentia Ave 37 39,220 60 12/21/2022 Ford Rd Hillside Dr East End 32 22,320 84 7/28/2021 Ford Rd EB West End San Miguel Dr 30 26,900 89 7/28/2021 Ford Rd WB Newport Hills Or West End 29 25,433 87 12/12/2019 Fourth Ave Iris Ave Jasmine Ave 27 7,425 70 7/1/2021 Fourth Ave Marigold Ave Narcissus Ave 27 7,209 70 7/1/2021 Fourth Ave Marguerite Ave Marigold Ave 27 7,290 74 7/1/2021 Fourth Ave Orchid Ave Poinsettia Ave 27 7,290 80 7/1/2021 Fourth Ave Jasmine Ave Larkspur Ave 27 7,182 86 7/1/2021 Fourth Ave Acacia Ave Begonia Ave 27 7,209 90 7/19/2021 Fourth Ave Avocado Ave Acacia Ave 27 7,155 91 7/19/2021 Fourth Ave Begonia Ave Carnation Ave 27 7,155 91 7/19/2021 Fourth Ave Carnation Ave Dahlia Ave 27 7,155 91 7/19/2021 Fourth Ave Heliotrope Ave Iris Ave 27 7,236 92 7/1/2021 Fourth Ave Goldenrod Ave Heliotrope Ave 27 7,020 93 7/1/2021 Fourth Ave Larkspur Ave Marguerite Ave 27 7,560 95 7/1/2021 Fourth Ave Narcissus Ave Orchid Ave 27 7,371 95 7/1/2021 Fourth Ave Poinsettia Ave Poppy Ave 27 7,263 96 7/1/2021 Francisco Dr Tustin Ave Irvine Ave 37 47,730 85 12/21/2022 Francisco Dr Irvine Ave Tradewinds Ln 36 8,496 91 12/21/2022 6-94 Appendix B - Local Streets Page 12 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Fullerton Ave Cliff Dr Beacon St 35 14,805 93 12/19/2022 Fullerton Ave Beacon St Clay St 35 23,345 93 12/19/2022 Fullerton Ave Clay St 15th St 35 22,505 93 12/19/2022 G St Ocean Blvd Ocean Front East 30 6,000 57 2/7/2023 G St North End Balboa Blvd East 20 3,620 64 2/7/2023 G St Balboa Blvd East Ocean Blvd 36 6,344 81 12/16/2022 Galatea Ter Bayadere Ter Angelita Dr 33 57,750 82 6/28/2021 Galaxy Dr Santiago Dr (South End) Rigel Cir 37 53,983 49 12/21/2022 Galaxy Dr Mariners Dr Holiday Dr 34 49,368 49 12/21/2022 Galaxy Dr Rigel Cir Mariners Dr 37 72,372 70 12/21/2022 Galaxy Dr Hoilday Dr Santiago Or (North End) 34 74,868 70 12/21/2022 Garnet Ave Park Ave Bay Front South 25 9,800 36 6/28/2021 Garnet Ave Bay Front North Park Ave 27 12,987 54 6/28/2021 Garrett Dr Cortland Dr Cameo Highlands Dr 37 31,080 97 7/1/2021 Gary PI 15th St End 33 8,580 86 12/19/2022 Glenwood Ln Candlestick Ln Ashford Ln 33 22,320 91 12/22/2022 Golden Cir Anniversary Ln Anniversary Ln 33 40,161 73 12/22/2022 Goldenrod Ave Seaview Ave End 30 6,900 43 7/19/2021 Goldenrod Ave Ocean Blvd 150' S of Seaview Ave 27 10,125 46 7/19/2021 Goldenrod Ave Sea Ln Harbor View Dr 33 33,264 62 7/19/2021 Goldenrod Ave Fifth Ave Sea Ln 36 10,152 79 7/19/2021 Goldenrod Ave 150' S of Seaview Ave Seaview Ave 28 4,200 86 7/19/2021 Goldenrod Ave End Coast Highway East 28 31,472 91 7/19/2021 Goldenrod Ave Coast Highway East Fourth Ave 27 5,130 93 7/19/2021 Goldenrod Ave Fourth Ave Fifth Ave 27 9,450 93 7/19/2021 Goldenrod Ave Harbor View Dr Crown Dr 33 38,445 94 6/29/2021 Goldenrod Ave Crown Or Wavecrest Dr 35 22,225 96 6/29/2021 Goleta Point Dr Drakes Bay Dr Morro Bay Dr 32 53,820 78 7/2/2021 Gorham Or Cameo Shores Rd Milford Dr 33 46,200 88 7/1/2021 Granada Ave M St Channel Rd 30 10,800 86 2/6/2023 Grant St Seashore Dr Ocean Front Alley West 17 1,105 88 12/20/2022 Grant St North End Coast Highway West 29 9,425 92 12/20/2022 Grant St Ocean Front Alley West Ocean Front West 21 1,470 92 1/30/2023 Granville Or Newport Center Or Gate 26 10,088 97 7/14/2021 Grove Ln Westcliff Dr End 32 23,004 74 12/22/2022 H St North End Balboa Blvd East 20 3,640 1 88 2/6/2023 Half Moon Bay Dr Point Loma Dr Point Arena Way 32 32,904 67 7/2/2021 Hampden Rd Milford Dr Cameo Shores Rd 37 34,410 91 8/6/2021 Hampden Rd Cameo Shores Rd End 37 8,131 91 8/6/2021 Hampshire Cir Antigua Way Antigua Way 34 25,534 91 12/22/2022 Hampshire Ct Hampshire Cir End 50 9,200 91 12/22/2022 Hampshire Ln Santiago Dr Antigua Way 34 8,500 88 12/22/2022 Hampshire Ln Lincoln Ln Santiago Dr 34 8,500 90 12/22/2022 Harbor Island Dr Bayside Dr Harbor Island Rd 43 34,250 1 89 7/2/2021 Harbor Island Dr Harbor Island Rd E End 37 68,894 91 7/2/2021 Harbor Island Dr Harbor Island Dr N End 36 6,840 93 7/2/2021 Harbor Island Rd Harbor Island Dr S End 30 17,550 81 7/2/2021 6-95 Appendix B - Local Streets Page 13 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Harbor View Dr MacArthur Blvd Goldenrod Ave 38 26,030 97 6/29/2021 Harbor View Dr Goldenrod Ave Marguerite Ave 38 73,910 97 6/29/2021 Harding St Adams St Cypress St 20 4,800 92 2/6/2023 Harrow PI Dover Dr End 33 7,615 81 12/22/2022 Haven PI Irvine Ave St Andrews Rd 35 19,005 74 12/21/2022 Hazel Dr Poppy Ave (south side) Coast Highway East 21 29,875 95 6/28/2021 Hazel Dr 577' N of Coast Highway East Poppy Ave (north side) 29 11,397 95 6/28/2021 Hazel Dr Coast Highway East 577' N of Coast Highway East 30 17,310 96 6/28/2021 Heather Ln Irvine Ave End 34 36,390 89 12/22/2022 Heliotrope Ave Bayview Dr Seaview Ave 27 9,450 81 8/6/2021 Heliotrope Ave Ocean Blvd Bayview Dr 27 10,800 85 8/6/2021 Heliotrope Ave Bayside Dr Coast Highway East 28 28,420 85 8/6/2021 Heliotrope Ave Seaview Ave End 27 8,478 88 8/6/2021 Heliotrope Ave Coast Highway East Fifth Ave 27 21,195 93 7/1/2021 Heron Way Keel Dr Outrigger Dr 32 8,480 97 6/29/2021 Highland Dr Mariners Dr Irvine Ave 37 71,965 82 12/22/2022 Highland Dr Westcliff Dr Nottingham Rd 38 60,496 87 12/22/2022 Highland Dr Nottingham Rd Mariners Dr 38 70,604 87 12/22/2022 Highland St Ocean Front Alley West Ocean Front West 19 1,330 85 1/30/2023 Highland St Seashore Or Ocean Front Alley West 17 1,224 90 12/20/2022 Highland St North End Coast Highway West 30 7,800 93 12/20/2022 Hilaria Way Flagship Or South End 36 14,632 63 12/21/2022 Hilaria Way North End Flagship Dr 38 8,740 87 12/21/2022 Holiday Rd Irvine Ave Tustin Ave 38 49,020 82 12/21/2022 Holiday Rd Santiago Dr Tradewinds Ln 38 56,430 83 12/21/2022 Holiday Rd Galaxy Dr Santiago Dr 38 6,270 93 12/21/2022 Holly Ln Tustin Ave Irvine Ave 34 43,724 84 12/21/2022 Holmwood Dr Catalina Dr Broad St 34 46,920 87 12/21/2022 Hospital Rd Newport Blvd Old Newport Blvd 70 11,200 93 12/19/2022 Hospital Rd Superior Ave Placentia Ave 44 42,944 95 12/19/2022 ISt Ocean Blvd Ocean Front East 30 3,540 84 2/6/2023 I St Balboa Blvd East Miramar Dr 37 14,060 86 2/6/2023 1 St Miramar Dr Ocean Blvd 36 6,120 87 2/6/2023 1 St North End Balboa Blvd East 20 4,560 91 2/6/2023 Indian Spring Ln Irvine Ave End 52 6,556 91 12/22/2022 Indus St Kline Dr West End 33 28,400 91 6/24/2021 Inlet Dr Marguerite Ave Keel Dr 36 5,400 89 6/29/2021 Inlet Isle Dr Topside Ln Sandcastle Dr 32 37,066 93 6/29/2021 Iris Ave Bayside Dr Coast Highway East 27 19,494 70 8/4/2021 Iris Ave Ocean Blvd Seaview Ave 28 17,500 93 7/1/2021 Iris Ave Seaview Ave North End 28 8,960 93 7/1/2021 Iris Ave Coast Highway East Fifth Ave 27 25,515 95 7/9/2021 Irvine Ave Cliff Dr Clay St 38 41,534 82 2/13/2023 Irvine Ave Clay St 15th St 38 23,940 95 12/19/2022 Irvine Ave 15th St 16th St 62 78,554 95 12/22/2022 Irvine Ter Coast Highway East Bonnie Doone Ter 64 7,360 26 6/28/2021 Isabella Ter Seaward Rd End 24 8,800 73 6/28/2021 6-96 Appendix B - Local Streets Page 14 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Island Ave Edgewater Ave East Bay Ave East 34 18,258 87 2/6/2023 Island Ave Balboa Blvd West Ocean Front West 34 5,270 90 2/6/2023 Island Ave Bay Ave East Balboa Blvd West 33 5,412 91 12/16/2022 Island View Dr Salt Air Dr Lighthouse Ln 32 26,080 96 6/29/2021 J St North End Balboa Blvd East 20 4,800 85 2/6/2023 Jade Ave Park Ave Bay Front South 28 11,620 88 8/3/2021 Jade Cove San Martin Way End 32 10,300 84 7/2/2021 Jasmine Ave Ocean Blvd 88' N of Ocean Blvd 28 2,464 54 7/1/2021 Jasmine Ave Bayside Dr Coast Highway East 28 13,440 87 8/5/2021 Jasmine Ave 88' N of Ocean Blvd Seaview Ave 28 12,096 93 7/1/2021 Jasmine Ave Seaview Ave North End 27 7,641 93 7/1/2021 Jasmine Ave Coast Highway East Third Ave 27 13,716 96 6/28/2021 Jasmine Ave Third Ave Fifth Ave 27 20,520 96 6/28/2021 K St Balboa Blvd East North End 19 4,085 76 2/6/2023 Kathleen Ln Beryl Ln Highland Dr 34 8,840 88 12/22/2022 Kathleen Ln Teresita Ln Beryl Ln 34 9,270 95 12/22/2022 Keel Dr Outrigger Or End 32 46,108 88 6/29/2021 Keel Dr Catamaran Dr Outrigger Dr 32 21,014 91 6/29/2021 Kent Ln Pembroke Ln Sussex Ln 34 8,500 81 12/22/2022 Kent Ln Sussex Ln Dover Dr 34 14,110 84 12/22/2022 Ketch Rd Beacon Bay End 24 7,440 89 7/2/2021 Kewamee Dr Seadrift Dr Avocado Ave 37 42,550 38 6/28/2021 Key Bay Park Green Dr End 64 5,120 97 6/29/2021 Key View Sandcastle Dr End 34 5,410 97 6/29/2021 Key West Park Green Dr End 32 8,860 97 6/29/2021 Kings PI St James Rd Kings Rd 35 66,080 95 12/22/2022 Kings Rd Cliff Rd St Andrews Rd 35 52,850 89 12/22/2022 Kings Rd St Andrews Rd Kings PI 35 67,025 95 12/22/2022 Kline Dr South End Orchard Or 28 19,000 85 6/29/2021 Kline Dr Pegasus St North End 33 21,060 93 6/29/2021 K-Thanga Dr Dolphin Ter Bonnie Doone Ter 33 9,075 69 6/28/2021 LSt Balboa Blvd East Plaza Del Norte 44 9,504 65 2/7/2023 L St Plaza Del Norte Ocean Blvd 36 21,132 82 2/6/2023 LSt Ocean Blvd Ocean Front East 30 2,760 91 2/6/2023 La Felicidad Camelback St La Salud 44 13,200 90 7/28/2021 La Jolla Dr Santa Ana Ave End 16 2,800 84 12/19/2022 La Jolla Dr End Cliff Dr 20 4,540 95 12/19/2022 La Jolla Dr Cliff Or Beacon St 20 14,300 95 12/19/2022 La Linda Ct 23rd St End 32 6,368 66 12/21/2022 La Linda PI 23rd St End 37 22,076 77 12/21/2022 La Salud La Felicidad South End 44 20,964 83 7/28/2021 La Salud North End La Vida 44 23,956 88 7/28/2021 La Salud La Vida Corsica Dr N 44 58,740 90 7/28/2021 La Salud Corsica Dr N La Felicidad 44 44,220 90 7/28/2021 La Vida University Dr La Salud 44 40,092 83 7/28/2021 Lafayette Ave 31st St Via Lido 60 23,100 60 12/16/2022 Lafayette Ave 28th St 31st St 24 21,140 93 12/16/2022 6-97 Appendix B - Local Streets Page 15 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Lake Ave 38th St 50' S of 38th St 25 1,250 78 2/6/2023 Lake Ave 50' S of 38th St 36th St 25 8,000 93 12/16/2022 Lake Ave 35th St 34th St 26 5,330 94 12/16/2022 Lake Ave 36th St 35th St 26 5,330 95 12/16/2022 Lake Ave 34th St 33rd St 26 5,330 95 12/16/2022 Lake Ave 33rd St 32nd St 26 5,330 95 12/16/2022 Lake Park Ln 23rd St Tustin Ave 25 10,750 53 12/22/2022 Lancaster St 30'S of End End 30 900 91 2/9/2023 Lancaster St 62nd St 61stSt 30 2,370 94 12/21/2022 Lancaster St Canal St 30' S of End 29 1,740 95 12/21/2022 Larkspur Ave Bayside Dr Coast Highway East 28 6,916 81 7/19/2021 Larkspur Ave Ocean Blvd Seaview Ave 28 13,160 93 7/1/2021 Larkspur Ave Seaview Ave North End 28 10,080 93 7/1/2021 Larkspur Ave Coast Highway East Fifth Ave 27 37,962 95 7/9/2021 Laurel PI Irvine Ave End 36 18,360 89 12/21/2022 Leeward Ln Tradewinds Ln Holiday Rd 33 61,545 76 12/21/2022 Leila Lane Dover Dr(Cul-de-Sac) Diana Ln 33 7,920 89 12/22/2022 Lido Park Dr Lafayette Ave 28th St 54 38,662 61 12/16/2022 Lighthouse Ln Salt Air Dr Blue Water Dr 32 35,580 91 6/29/2021 Lincoln Ln Estelle Ln Marian Ln 34 53,742 83 12/22/2022 Linda Ln Irvine Ave Priscilla Ave 34 7,956 94 12/22/2022 Lindo Ave Alley N of Bay Ave West North End 23 1,587 57 2/9/2023 Lindo Ave Bay Ave West Alley N of Bay Ave West 23 12,719 93 12/16/2022 Little River Cir Carmel Bay Or End 32 5,180 59 7/2/2021 Lugonia St Prospect St Newport Shores Dr 29 29,725 75 12/20/2022 Lugonia St Ocean Front Alley West Ocean Front West 19 1,349 77 1/30/2023 Lugonia St Newport Shores Dr Coast Highway West 19 3,173 87 12/20/2022 Lugonia St Seashore Dr Ocean Front Alley West 19 1,121 93 12/20/2022 M St Ocean Blvd Ocean Front East 30 2,700 90 2/6/2023 M St Balboa Blvd East Seville Ave 30 16,500 92 2/6/2023 M St Seville Ave Ocean Blvd 30 13,200 94 2/6/2023 Main St Balboa Blvd East Ocean Front East 26 5,460 86 2/6/2023 Main St Bay Ave East Balboa Blvd East 20 3,700 93 2/6/2023 Malabar Dr Seadrift Dr/El Paseo Or Bonnie Doone Ter 37 25,456 83 6/28/2021 Malibu Cir Mission Bay Or End 32 7,560 68 7/2/2021 Mar Vista Dr Vista Del Oro Eastbluff Dr 36 81,648 60 8/9/2021 Marapata Dr Sabrina Ter Kewamee Dr 37 25,530 73 6/28/2021 Marcus Ave Rialto Channel PI 16 11,760 87 12/16/2022 Marcus Ave 36th St Rialto 26 4,264 88 12/16/2022 Marcus Ave 32nd St 33rd St 26 5,538 93 12/16/2022 Marcus Ave 33rd St 34th St 26 5,954 93 12/16/2022 Marcus Ave 34th St 35th St 26 5,434 93 12/16/2022 Marcus Ave 35th St 36th St 26 5,720 93 12/16/2022 Margaret Dr Tustin Ave Irvine Ave 34 43,306 70 12/21/2022 Marguerite Ave 195' S of Coast Highway East Coast Highway East 38 7,410 63 8/6/2021 Marguerite Ave Seaview Ave 195' S of Coast Highway East 40 16,200 89 8/6/2021 Marguerite Ave San Joaquin Hills Rd Pacific View Dr 36 26,406 91 6/29/2021 6-98 Appendix B - Local Streets Page 16 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Marguerite Ave Ocean Blvd Seaview Ave 40 17,120 93 8/6/2021 Marian Ln Highland Or Ruth Ln 38 39,824 80 12/22/2022 Marian Ln Lincoln Ln Highland Dr 38 11,202 90 12/22/2022 Marigold Ave Ocean Blvd Seaview Ave 27 9,990 52 11/22/2019 Marigold Ave Fourth Ave Fifth Ave 27 8,910 62 3/26/2020 Marigold Ave Seaview Ave Coast Highway East 28 16,380 84 3/26/2020 Marigold Ave Coast Highway East Third Ave 27 22,275 93 7/9/2021 Marigold Ave Third Ave Fourth Ave 27 9,315 93 7/19/2021 Marine Ave Park Ave Balboa Ave 37 17,390 46 8/2/2021 Marine Ave Bay Front South Park Ave 27 12,880 54 8/2/2021 Marine Ave Balboa Ave South Bridge End 37 21,867 56 8/2/2021 Marine Ave South Bridge End North Bridge End 20 8,000 93 8/2/2021 Marine Ave North Bridge End Bayside Dr 20 10,800 93 8/2/2021 Mariners Dr Dover Dr Santiago Dr 38 84,056 83 12/21/2022 Mariners Dr Irvine Ave Dover Dr 38 55,100 87 12/21/2022 Mariners Dr Santiago Dr East End 37 48,084 88 12/21/2022 Marlin Way Shipway Ln Terrapin Way 33 25,725 89 12/22/2022 Martingale Way Corinthian Way End 44 26,228 1 90 7/30/2021 Mc Fadden PI Balboa Blvd West End 22 13,200 84 12/16/2022 Meadow Ln Tustin Ave End 35 9,325 78 12/22/2022 Medina Way Balboa Blvd East End 19 3,040 84 2/6/2023 Medina Way Bay Ave East Balboa Blvd East 20 3,600 87 12/21/2020 Medina Way Edgewater Ave East Bay Ave East 20 10,400 89 2/6/2023 Mendoza Ter Seaward Rd End 23 17,445 80 6/28/2021 Mesa Dr Mesa Dr/Birch St Cypress St 37 42,180 92 7/29/2021 Mesa Dr Cypress St End 37 49,765 92 7/29/2021 Mesa View North Ford Rd Bonita Canyon Dr 43 17,200 89 7/28/2021 Mesa View South Bonita Canyon Dr Ford Rd 43 17,200 87 7/28/2021 Michael PI 15th St End 34 8,840 86 12/19/2022 Milford Dr Hampden Rd Orrington Rd 37 32,375 81 7/1/2021 Milford Dr Orrington Rd Camden Dr 37 32,137 91 7/1/2021 Miramar Dr L St M St 29 16,965 69 2/6/2023 Miramar Dr M St Channel Rd 30 17,700 72 2/6/2023 Miramar Dr Balboa Blvd East L St 30 41,610 76 2/6/2023 Mission Bay Dr Point Loma Dr Spyglass Hill Rd 36 65,448 59 7/2/2021 Monrovia Ave 15th St West End 39 20,865 70 12/21/2022 Monrovia Ave City Limit 15th St West 39 64,545 74 12/21/2022 Montecito Dr Dana Point Way Drakes Bay Dr 32 57,518 60 7/2/2021 Montecito Dr Cambria Dr Dana Point Way 32 33,664 74 7/2/2021 Monterey Cir Carmel Bay Dr End 32 18,696 68 7/2/2021 Montero Ave Bay Ave East Edgewater Ave East 33 16,500 99 2/7/2023 Morning Canyon Rd Coast Highway East Shorecliff Rd 27 41,964 83 6/28/2021 Morning Canyon Rd Serra Dr Seaward Rd 35 32,200 90 6/28/2021 Morning Canyon Rd Seaward Rd Coast Highway East 35 12,250 94 6/28/2021 Morning Star Ln Polaris Dr End 33 24,775 87 12/22/2022 Morro Bay Dr Goleta Point Dr (South End) Goleta Point Dr (North End) 32 42,894 58 7/2/2021 Muir Beach Cir Goleta Point Dr End 32 19,740 76 7/2/2021 Narcissus Ave 1175 S of Fifth Ave I Fifth Ave 30 4,890 34 1 7/9/2021 Narcissus Ave lCoast Highway East 175' S of Fifth Ave 27 38,610 84 7/9/2021 Narcissus Ave I Fifth Ave lGeranium 36 12,384 92 7/9/2021 6-99 Appendix B - Local Streets Page 17 of 28 Appendix B Complete Street Listing Current Conditions V1�IV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Narcissus Ave Ocean Blvd Seaview Ave 27 9,882 93 7/1/2021 Narcissus Ave Seaview Ave Coast Highway East 27 14,931 93 7/1/2021 Nautilus Lane Toyon Ln Buttonshell Ln 33 11,760 92 12/22/2022 Neptune Ave 46th St 51st St 24 25,800 88 12/20/2022 Neptune Ave 51st St End 25 18,750 88 12/20/2022 Newport Coast Dr SB 73 Freeway Bridge Sage Hill 44 98,340 82 12/21/2020 Newport Hills Dr E Port Sutton Dr Newport Hills Dr West 38 75,430 82 7/9/2021 Newport Hills Dr E Ford Rd Port Ramsgate PI 36 51,100 83 7/9/2021 Newport Hills Dr E Port Seaborne Way Port Sutton Dr 36 65,124 83 7/9/2021 Newport Hills Dr E Port Ramsgate PI Port Seabourne Way 37 57,350 87 7/9/2021 Newport Hills Dr W Port Seabourne Wy Ford Rd 38 89,148 73 7/9/2021 Newport Hills Dr W Port Carlow PI Port Seabourne Wy 38 49,210 1 80 7/9/2021 Newport Hills Dr W Newport Hills Dr East Port Carlow PI 36 55,800 83 7/9/2021 Newport Place Dr MacArthur Blvd Dove St 62 36,530 76 7/29/2021 Newport Ridge Dr East San Joaquin Hills Rd Park Crest 40 59,300 97 6/24/2021 Newport Ridge Dr East Park Crest St Michael 40 88,600 97 6/24/2021 Newport Ridge Dr West St Michael Whitesands 40 56,800 97 6/24/2021 Newport Ridge Dr West Whitesands San Joaquin Hills Rd 40 47,700 97 6/24/2021 Newport Shores Dr Walnut St 61st St 20 16,540 91 12/20/2022 Newport Shores Or Orange St Walnut St 20 12,640 93 12/20/2022 Nordina St Ocean Front Alley West Ocean Front West 19 1,235 76 1/30/2023 Nordina St Seashore Or Ocean Front Alley West 17 1,445 93 12/20/2022 Norfolk Ln Dover Dr Devon Ln 33 7,260 90 12/22/2022 North Star Ln White Cliffs Dr End 33 30,550 86 12/22/2022 Nottingham Rd Dover Dr Santiago Dr 38 66,804 85 12/22/2022 Ocean Blvd Carnation Ave Goldenrod Ave 41 45,920 1 0 7/19/2021 Ocean Blvd G St L St 36 54,900 55 2/7/2023 Ocean Blvd L St Channel Rd 36 48,060 63 2/7/2023 Ocean Blvd Iris Ave Marguerite Ave 48 44,640 89 7/19/2021 Ocean Blvd Goldenrod Ave Iris Ave 41 32,062 94 7/19/2021 Ocean Blvd Marguerite Ave Poppy Ave 41 64,985 94 7/19/2021 Ocean View Ave Tustin Ave Cliff Dr 24 22,128 92 12/21/2022 Old Newport BI Hospital Rd City Limit 26 39,375 64 12/21/2022 Old Newport BI 1530' N Hospital Rd City Limit 15 4,500 69 12/21/2022 Old Newport BI S95' N of Coast Highway Hospital Rd 30 28,500 70 2/9/2023 Old Newport BI Hospital Rd City Limit 32 58,560 74 2/9/2023 Old Newport BI 270' N of Coast Highway 475' N of Cosast Highway 32 6,560 79 2/9/2023 Old Newport BI Coast Highway 270' N of Coast Highway 46 12,420 89 12/19/2022 Old Newport BI 475' N of Coast Highway 595' N of Coast Highway 30 3,600 89 12/19/2022 Olive St Seashore Dr Ocean Front West 17 2,924 91 12/20/2022 Onyx Ave Bay Front North Balboa Ave 27 15,525 67 8/2/2021 Onyx Ave Balboa Blvd Park Ave 27 11,340 69 8/2/2021 Onyx Ave Park Ave Bay Front South 27 11,070 74 8/2/2021 Opal Ave Park Ave Bay Front South 24 13,200 13 6/28/2021 Opal Ave Collins Ave Park Ave 23 12,627 18 6/28/2021 Orange Ave Old Newport Blvd 15th St 36 15,696 1 91 12/19/2022 Orange St Ocean Front Alley West Ocean Front West 33 1,716 88 1/30/2023 Orange St Coast Highway West Ocean Front Alley West 32 5,312 93 12/20/2022 Orange St Canal St Coast Highway West 35 16,380 94 12/20/2022 Orchard Dr Santa Ana Ave End 33 47,142 83 6/24/2021 6-100 Appendix B - Local Streets Page 18 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Orchard Dr Bay View Ave End 35 5,180 89 7/29/2021 Orchard Dr Irvine Ave Birch St 40 32,000 91 7/29/2021 Orchard Or Cypress St Orchid St 35 16,275 91 7/29/2021 Orchard Dr Birch St Cypress St 36 22,680 92 7/29/2021 Orchid Ave Third Ave Fifth Ave 28 21,448 59 6/28/2021 Orchid Ave Coast Highway East Third Ave 28 23,800 88 6/28/2021 Orchid Ave Ocean Blvd Coast Highway East 27 29,862 91 7/1/2021 Orchid Hill PI Upper Bay Or End 34 14,450 88 7/29/2021 Orchid St Orchard Or Azure Ave 35 17,500 88 7/29/2021 Orchid St Zenith Ave Orchard Or 35 33,495 89 7/29/2021 Orrington Rd Cameo Shores Rd Milford Or 33 47,025 86 7/1/2021 Outrigger Dr Keel Dr Sandcastle Dr 33 47,255 92 6/29/2021 Oxford Ln Devon Ln Highland Dr 34 26,440 72 12/22/2022 Pacific Or Begonia Ave Acacia Ave 27 8,910 95 8/9/2021 Pacific Or Acacia Ave Avocado Ave 27 8,235 95 8/9/2021 Pacific View Or San Miguel Dr End 36 97,800 81 12/5/2019 Palm St Ferry Entrance Bay Ave East 34 4,080 89 2/13/2023 Palm St Balboa Blvd East Ocean Front Alley East 31 2,325 93 12/16/2022 Palm St Bay AveEast Balboa Blvd East 34 6,562 95 12/16/2022 Palm St Ocean Front Alley East Ocean Front East 31 4,185 95 12/16/2022 Paloma Dr Holiday Rd City Limit 35 22,750 82 12/21/2022 Paper Ln Anniversary Ln End 33 13,365 57 12/22/2022 Park Ave Collins Ave Sapphire Ave 48 25,920 55 8/3/2021 Park Ave Pearl Ave Collins Ave 48 35,460 56 8/3/2021 Park Ave Sapphire Ave Amethyst Ave 48 26,304 57 8/3/2021 Park Ave West End Pearl Ave 48 28,560 60 8/3/2021 Park Ave Amethyst Ave West Side of Bridge 46 23,060 68 8/3/2021 Park Ave East Side of Bridge Bay Front East 40 22,820 87 8/3/2021 Park Ave West Side of Bridge East Side of Bridge 20 5,600 89 11/1/2019 Park Green Or Sausalito Or Sandcastle Dr 40 44,400 96 6/29/2021 Park Ln 38th St 36th St 24 10,608 92 12/16/2022 Patolita Or Dolphin Ter Bonnie Doone Ter 33 16,170 78 6/28/2021 Patrice Rd Flagship Rd South End 37 11,655 68 12/21/2022 Patrice Rd Bolero Way Flagship Rd 37 18,500 80 12/21/2022 Peach Tree Ln Redland Or End 34 6,868 74 12/22/2022 Pearl Ave Bay Front North Park Ave 23 13,386 39 6/28/2021 Pearl Ave Park Ave Bay Front South 23 10,695 86 6/28/2021 Pebble Dr Goldenrod Ave Sandpiper Or 34 42,398 96 6/29/2021 Pegasus St Santa Ana Ave Kline Or 33 38,841 83 7/29/2021 Pelican Hill Rd N Pelicans Or Pelican Hill Cir (North Side) 19 50,996 96 6/24/2021 Pelican Hill Rd N Pelican Hill Cir (North Side) Pelicans Dr 19 50,996 97 6/24/2021 Pelican Hill Rd N Newport Coast Dr North Pelicans Dr 19 23,902 97 6/24/2021 Pelican Hill Rd N Pelicans Or Newport Coast Dr 19 23,902 97 6/24/2021 Pelican Hill Rd S Newport Coast Or Pelican Hill Cir S 24 142,100 97 6/24/2021 Pelican Hill Rd S Pelican Hill Cir (North Side) Pelican Hill Cir (South Side) 24 31,798 97 6/24/2021 Pelican Hill Rd S Pelican Hill Cir (South Side) Pelican Hill Cir (North Side) 24 32,448 97 6/24/2021 Pelican Hill Rd S Pelican Hill Cir (South Side) Newport Coast Dr 24 142,600 97 6/24/2021 Pembroke Ln I Mariners Dr Cornwall Ln 34 32,220 83 12/22/2022 Perham Rd Cameo Shores Rd Milford Or 33 45,540 85 7/1/2021 Pescador Dr Nottingham Rd Santiago Dr 33 50,271 89 12/22/2022 6-101 Appendix B - Local Streets Page 19 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Piazza Genoa Via Lido Soud Via Genoa 45 8,640 82 12/16/2022 Piazza Lido Via Florence Via Havre 58 29,580 88 12/16/2022 Piazza Lido Via Havre Via Koron 24 10,272 92 12/16/2022 Pirate Rd Cliff Dr Clay St 35 28,735 95 12/22/2022 Plaza Del Norte L St I St 30 11,250 75 2/13/2023 Plaza Del Sur I St L St 30 16,050 75 2/13/2023 Poinsettia Ave Fourth Ave Fifth Ave 30 9,540 18 6/28/2021 Poinsettia Ave Coast Highway East Fourth Ave 28 33,936 59 3/26/2020 Poinsettia Ave Seaview Ave Coast Highway East 28 17,864 91 6/28/2021 Poinsettia Ave Ocean Blvd Seaview Ave 28 15,316 91 7/1/2021 Point Arena Way Point Loma Dr Point Sur Dr 32 22,140 63 7/2/2021 Point Arguello Way El Capitan Dr Drakes Bay Dr 36 6,120 1 78 7/2/2021 Point Conception Way El Capitan Dr Drakes Bay Dr 36 6,798 92 7/2/2021 Point Loma Dr Mission Bay Dr Point Arena Way 32 43,950 48 7/2/2021 Point Mendocino Way Spyglass Hill Rd Bodega Bay Dr 36 6,120 63 7/2/2021 Point Sur Dr Carmel Bay Dr Point Arena Wy 32 21,390 69 7/2/2021 Polaris Dr Galaxy Dr Evening Star Ln 36 44,352 68 12/21/2022 Polaris Dr Evening Star Ln Santiago Dr 36 62,148 73 12/21/2022 Poppy Ave Coast Highway East Second Ave 30 9,000 24 6/28/2021 Poppy Ave 190'S Coast Highway East Coast Highway East 21 3,990 87 8/5/2021 Poppy Ave Ocean Blvd 190' S Coast Highway East 24 27,840 90 8/5/2021 Poppy Ave Second Ave Fifth Ave 27 31,050 90 6/28/2021 Pork Barrel Way (35th 1/2 St) Finley Ave S End 16 1,280 95 12/16/2022 Port Abbey PI Newport Hills Drive West Port Sheffield PI (East End) 32 30,080 75 7/9/2021 Port Abbey PI Port Sheffield PI (West End) Newport Hills Drive West 32 24,704 81 7/9/2021 Port Aberdeen PI Port Whitby PI Port Durness PI 32 44,628 78 7/1/2021 Port Albans Cir Newport Hills Dr East End 54 9,450 85 7/19/2021 Port Albans PI Newport Hills Dr East Port Cardigon PI 32 22,240 74 7/19/2021 Port Ashley PI Port Stirling PI (West End) Newport Hills Drive West 32 11,200 79 7/9/2021 Port Ashley PI Newport Hills Drive West Port Stirling PI (East End) 32 19,840 88 7/9/2021 Port Barmouth PI Port Westbourne PI (West End) Newport Hills Drive West 32 19,200 75 7/9/2021 Port Barmouth PI Newport Hills Drive West Port Westbourne PI (East End) 32 27,200 77 7/9/2021 Port Bishop PI Newport Hills Dr East Port Carney PI 33 32,435 78 7/28/2021 Port Bristol Cir Port Cardiff PI (West Side) Newport Hills Drive East 32 37,120 71 7/19/2021 Port Bristol Cir Newport Hills Drive East End 32 35,040 79 7/19/2021 Port Cardiff PI Newport Hills Drive East Port Bristol Cir (East End) 32 16,800 81 7/19/2021 Port Cardiff PI Port Bristol Cir (West End) Newport Hills Drive East 32 30,656 85 7/19/2021 Port Cardigan PI Newport Hills Dr East Port Albans PI 32 26,880 1 77 7/28/2021 Port Carlisle PI Port Whitby PI Port Lerwick PI 32 47,252 83 7/1/2021 Port Carlow Cir Newport Hills Dr West End 54 6,210 82 7/28/2021 Port Carlow PI Newport Hills Dr West Port Renwick PI 32 30,688 69 7/28/2021 Port Carney PI Newport Hills Dr East Port Bishop PI 33 16,998 74 7/28/2021 Port Charles PI Port Margate PI (West End) Newport Hills Drive West 32 21,280 69 7/9/2021 Port Charles PI Newport Hills Drive West Port Margate PI (East End) 36 36,000 75 7/9/2021 Port Chelsea PI Newport Hills Drive East Port Ramsgate PI (East End) 32 17,568 78 7/19/2021 Port Chelsea PI Port Ramsgate PI (West End) Newport Hills Drive East 32 31,584 1 81 7/19/2021 Port Claridge PI Newport Hills Dr East Port Nelson PI 33 29,445 72 7/28/2021 Port Dunbar Dr Spyglass Hill Rd Port Harwick PI 36 6,942 81 7/1/2021 Port Dunleigh Cir Newport Hills Dr East lEnd 32 21,696 82 7/19/2021 Port Durness PI Port Harwick PI I Port Whitby PI 36 26,238 79 7/1/2021 6-102 Appendix B - Local Streets Page 20 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Port Durness PI Port Whitby PI Port Aberdeen PI 36 46,364 80 7/1/2021 Port Edward Cir Newport Hills Or East End 32 10,400 71 7/28/2021 Port Edward PI Newport Hills Dr East Port Locksleigh PI 33 28,860 71 7/28/2021 Port Harwick PI Port Dunbar Dr Port Durness PI 36 14,208 83 7/1/2021 Port Hemley Cir Newport Hills Dr West End 54 5,940 77 7/28/2021 Port Kimberly PI Newport Hills Dr West Port Manleigh PI 32 27,456 77 7/28/2021 Port Laurent PI Newport Hills Dr East Port Trinity PI 33 28,535 76 7/28/2021 Port Lerwick PI Port Whitby PI Port Carlisle PI 32 31,744 83 7/1/2021 Port Locksleigh PI Newport Hills Or East Port Edward PI 33 32,500 74 7/28/2021 Port Manleigh Cir Newport Hills Or West Newport Hills Dr West 32 24,000 77 7/28/2021 Port Manleigh PI Newport Hills Dr West Port Kimberly PI 32 25,024 72 7/28/2021 Port Margate PI Port Charles PI (East Side) Newport Hills Drive West 32 26,880 69 7/9/2021 Port Margate PI Port Charles PI (West Side) Newport Hills Drive West 32 12,096 73 7/9/2021 Port Nelson PI Newport Hills Dr West Port Charles PI (East Side) 33 30,713 68 7/28/2021 Port Provence PI Newport Hills Or East Port Weybridge PI (East Side) 32 27,784 69 7/19/2021 Port Provence PI Port Weybridge PI (West End) Newport Hills Dr East 32 37,120 71 7/19/2021 Port Ramsey PI San Miguel Dr Port Whitby PI 36 6,008 93 7/1/2021 Port Ramsgate PI Port Chelsea PI (West End) Newport Hills Drive East 32 20,256 70 7/19/2021 Port Ramsgate PI Newport Hills Drive East Port Chelsea PI (East End) 32 13,760 85 7/19/2021 Port Renwick PI Newport Hills Or West Port Carlow PI 32 27,264 73 7/28/2021 Port Seabourne Way Newport Hills Or West Newport Hills Dr East 40 63,760 80 7/9/2021 Port Sheffield PI Newport Hills Drive West Port Abbey PI (East Side) 32 20,800 70 7/9/2021 Port Sheffield PI Port Abbey PI (West Side) Newport Hills Drive West 32 16,224 71 7/9/2021 Port Stanhope Cir Newport Hills Or West End 38 5,330 85 7/28/2021 Port Stanhope PI Newport Hills Or West Port Tiffin PI 32 23,200 76 7/28/2021 Port Stirling PI Newport Hills Drive West Port Ashley PI (East Side) 32 24,960 75 8/6/2021 Port Stirling PI Port Ashley PI (West Side) Newport Hills Drive West 32 19,680 84 8/6/2021 Port Sutton Dr San Miguel Dr Newport Hills Dr East 49 15,756 70 7/28/2021 Port Taggart PI Newport Hills Dr West Port Wheeler PI 32 31,840 73 7/28/2021 Port Tiffin Cir Newport Hills Or West End 54 6,210 86 7/28/2021 Port Tiffin PI Newport Hills Or West Port Stanhope PI 32 23,360 75 7/28/2021 Port Townsend Cir Port Bishop PI End 33 9,735 76 7/28/2021 Port Trinity Cir Newport Hills Or East End 33 82 7/28/2021 Port Trinity PI Newport Hills Or East Port Laurent PI 33 74 7/28/2021 Port Westbourne PI Port Barmouth PI (West Side) Newport Hills Drive West 32 68 7/9/2021 Port Westbourne PI Newport Hills Drive West Port Barmouth PI (East Side) 32 M1,760 70 8/6/2021 Port Weybridge PI Newport Hills Drive East Port Provence PI (East Side) 33 72 7/19/2021 Port Weybridge PI Port Provence PI (West End) Newport Hills Drive East 32 83 7/19/2021 Port Wheeler PI Newport Hills Or West Port Taggart PI 32 33,824 70 7/28/2021 Port Whitby PI Port Ramsey PI Port Durness PI 36 37,220 91 7/1/2021 Portside Way Windover Dr Wavecrest Dr 32 18,432 96 6/28/2021 Powell PI 15th St End 34 7,480 84 12/21/2022 Prairie Road SB Bonita Canyon Dr Ford Rd 35 12,250 90 7/28/2021 Prairie Road NB Ford Rd Bonita Canyon Dr 46 16,100 89 7/28/2021 Priscilla Ln Beryl Ln Diana Ln 34 23,572 92 12/22/2022 Private Rd Irvine Ave Irvine Ave 33 31,110 80 12/21/2022 Production PI Monrovia Ave Placentia Ave 1 38 48,070 66 12/21/2022 Prospect St Ocean Front Alley West Ocean Front West 18 576 81 1/30/2023 Prospect St Seashore Dr Ocean Front Alley West 18 972 88 12/20/2022 Prospect St Canal St Cedar St 29 24,824 95 12/20/2022 6-103 Appendix B - Local Streets Page 21 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Prospect St Cedar St Newport Shores Dr 29 22,765 95 12/20/2022 Prospect St Newport Shores Dr Coast Highway West 24 4,320 95 12/20/2022 Prospect St Coast Highway West Seashore Dr 46 3,450 95 12/20/2022 Quail St Campus Dr Birch St 36 21,060 75 7/29/2021 Quail St Birch St Westerly PI 60 37,020 75 7/29/2021 Quail St Westerly PI Spruce St 44 40,128 83 7/29/2021 Quail St Spruce St Dove St 44 56,144 84 7/29/2021 Quiet Cove Tiller Way End 32 16,540 97 6/29/2021 Ramona Dr Dolphin Ter Santanella Ter 33 16,863 75 6/28/2021 Ramona Dr Santanella Ter Bonnie Doone Ter 33 9,240 77 6/28/2021 Redlands Ave Clay St Cliff Dr 34 24,820 91 12/21/2022 Redlands Ave 15th St Clay St 34 23,120 93 12/21/2022 Redlands Or South End 23rd St 33 6,699 67 12/21/2022 Redlands Dr Dawnview Ln Santa Isabel Ave 33 25,344 69 12/21/2022 Redlands Dr 23rd St Dawnview Ln 33 18,150 70 12/21/2022 Redlands Dr Orchard Or Indus St 33 18,645 90 12/9/2019 Ridge Park Rd Newport Coast Dr Tesoro 37 67,081 97 6/24/2021 Ridge Park Rd Tesoro Campo Bello 37 47,471 97 6/24/2021 Ridge Park Rd Campo Bello Vista Ridge Rd 37 55,167 97 6/24/2021 Ridge Park Rd Vista Ridge Rd West Coast Peak 37 50,986 97 6/24/2021 Ridge Park Rd West Coast Peak Talmont 37 44,992 97 6/24/2021 Ridge Park Rd Talmont East End 37 40,835 97 6/24/2021 Ridge Park Rd San Joaquin Hills Rd Newport Coast Dr 37 53,613 97 6/24/2021 Rigel Cir Galaxy Dr End 56 12,020 58 12/21/2022 River Ave 38th St 40th St 28 12,040 76 2/13/2023 River Ave 40th St 42nd St 28 12,600 78 2/13/2023 River Ave Balboa Blvd 51st St 38 41,800 88 12/20/2022 River Ave 51st St End 38 47,500 90 12/20/2022 River Ave AIIey #325 Balboa Blvd 25 8,250 91 12/16/2022 River Ave 42nd St Channel PI 28 9,520 95 12/16/2022 Rivera Ter Seaward Rd End 23 8,544 77 6/28/2021 Riverside Ave Cliff Or 15th St 34 47,600 77 12/21/2022 Riverside Ave Avon St Cliff Dr 52 49,036 91 12/21/2022 Riverside Ave Coast Highway West Avon St (West Side) 52 24,700 93 12/22/2022 Riverside Dr Orchard Dr End 33 18,960 86 8/9/2021 Riverside Or Indus St End 33 8,430 90 7/29/2021 Rockford PI Rockford Rd End 37 11,050 97 7/1/2021 Rockford Rd Surrey Dr Cortland Dr 37 24,827 97 7/1/2021 Rocky Point Rd Goleta Point Dr End 32 16,380 57 7/2/2021 Roxbury Rd Cameo Shores Rd Milford Dr 33 39,501 80 7/1/2021 Ruby Ave Bay Front North Balboa Ave 28 12,768 73 8/2/2021 Ruby Ave Balboa Ave Park Ave 28 12,180 73 8/2/2021 Ruby Ave Park Ave Bay Front South 27 11,286 87 8/2/2021 Ruth Ln Estelle Ln Marian Ln 34 22,654 85 12/22/2022 Rutland Rd Mariners Or Westcliff Dr 36 48,600 85 12/22/2022 Sabrina Ter Seadrift Or Angelita Dr 33 56,826 58 6/28/2021 Salt Air Cir Salt Air Or End 32 13,520 97 6/29/2021 Salt Air Or I Salt Air Cir I Lighthouse Ln 32 18,420 97 6/29/2021 San Bernardino Ave I Clay Ave ICliff Dr 20i 17,200 1 61 2/9/2023 San Bernardino Ave I Clay Ave ICliff Or 14 1 12,040 1 90 12/21/2022 6-104 Appendix B - Local Streets Page 22 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date San Bernardino Ave 15th St Clay Ave 34 21,420 92 12/21/2022 San Clemente Dr Santa Barbara Dr Santa Cruz Dr 48 54,720 96 7/14/2021 San Joaquin Hills Rd Backbay Dr 800' E of Backbay Dr 31 29,386 76 6/25/2021 San Joaquin Hills Rd EB 800' E of Backbay Dr Jamboree Rd 30 32,960 68 8/9/2021 San Joaquin Hills Rd WB Jamboree Rd 800' E of Backbay Dr 47 44,498 82 8/9/2021 San Martin Way Bodega Bay Dr San Mateo Way 36 30,450 67 7/2/2021 San Mateo Way Bodega Bay Dr San Martin Way 32 21,980 76 7/2/2021 San Nicolas Dr Newport Center Dr East Avocado Ave 78 84,240 97 7/14/2021 Sand Key Park Green Dr End 33 17,783 96 6/29/2021 Sand Point Way Windover Dr Wavecrest Dr 36 11,580 95 6/29/2021 Sandalwood Ln Santiago Dr Candlestick Ln 35 14,670 94 12/22/2022 Sandcastle Dr Tiller Way Inlet Isle Dr 36 93,168 88 6/29/2021 Sandcastle Dr Inlet Isle Dr Park Green Dr 36 23,544 88 8/6/2021 Sandcastle Dr Seacrest Dr Catamaran Dr 36 52,740 93 8/6/2021 Sandcastle Dr Park Green Dr Seacrest Dr 36 35,100 95 8/6/2021 Sandcastle Dr Marguerite Ave Tiller Way 36 6,948 97 6/29/2021 Sandpiper Dr Ebbtide Rd Setting Sun Dr 33 14,855 97 6/29/2021 Sandune Ln Inlet Isle Dr End 32 23,240 94 6/29/2021 Santa Ana Ave Clay St 15th St 20 12,540 52 2/9/2023 Santa Ana Ave Cliff Dr Clay St 20 33,100 53 2/9/2023 Santa Ana Ave Old Newport Blvd Cliff Dr 24 18,000 89 12/19/2022 Santa Ana Ave 15th St City Limit 19 12,160 92 12/19/2022 Santa Ana Ave Clay St 15th St 36 22,572 93 12/19/2022 Santa Ana Ave Cliff Dr Clay St 34 56,270 1 94 12/19/2022 Santa Barbara Dr Jamboree Rd Newport Center Dr West 73 184,325 86 8/9/2021 Santa Isabel Ave Irvine Ave Tustin Ave 56 16,240 90 12/22/2022 Santana Dr Dolphin Ter Bonnie Doone Ter 33 12,375 81 6/28/2021 Santanella Ter Patolita Dr Malabar Dr 33 52,965 73 6/28/2021 Santiago Dr Pescador Dr Polaris Dr 37 15,178 46 12/21/2022 Santiago Dr Irvine Ave Galaxy Dr 36 31,464 58 12/21/2022 Santiago Dr Mariners Dr Nottingham Rd 36 84,960 63 12/21/2022 Santiago Dr Nottingham Rd Pescador Dr 36 52,020 68 12/21/2022 Santiago Dr Galaxy Dr Antigua Way 36 84,492 69 12/21/2022 Santiago Dr Antigua Way Mariners Dr 36 34,308 84 12/21/2022 Santiago Dr Tustin Ave Irvine Ave 37 48,375 88 12/21/2022 Sapphire Ave Balboa Ave Park Ave 27 11,313 66 8/2/2021 Sapphire Ave Park Ave Bay Front South 28 12,180 67 8/2/2021 Sapphire Ave Bay Front North Balboa Ave 27 14,580 86 8/2/2021 Sausalito Dr Marguerite Ave End 36 23,100 97 6/29/2021 Schooner Rd Beacon Bay End 24 6,960 89 7/2/2021 Scott Dr Corinthian Way Dove St 44 22,572 90 7/30/2021 Sea Gull Ln Sherington PI 16th St 37 33,300 90 12/22/2022 Sea Ln Crown Dr Harbor View Dr 38 40,964 94 6/29/2021 Sea Ln Harbor View Dr Goldenrod Ave 37 49,580 1 94 8/5/2021 Seabreeze Ln Tiller Way Surfview Ln 32 36,520 97 6/29/2021 Seacrest Dr Catamaran Dr Sandcastle Dr 32 47,200 95 6/29/2021 Seadrift Dr Malabar Dr Zahma Dr 37 61,420 39 6/28/2021 Seashore Dr 32nd St 33rd St 33 7,425 66 2/13/2023 Seashore Dr 1 Prospect St l0range St 28 29,820 75 12/20/2022 Seashore Dr 153rd St 160th St 28 42,000 83 12/20/2022 6-105 Appendix B - Local Streets Page 23 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Seashore Or Orange St End 27 41,625 85 12/20/2022 Seashore Or 46th St 53rd St 28 42,000 90 12/20/2022 Seashore Or 60th St Prospect St 28 17,640 91 12/20/2022 Seashore Or 39th St 36th St 28 19,320 92 12/16/2022 Seashore Or 42nd St 39th St 28 18,200 92 12/16/2022 Seashore Or 42nd St 45th St 28 17,640 92 12/16/2022 Seashore Or 46tth St 45th St 28 5,740 93 12/16/2022 Seashore Or 36th St 33rd St 28 19,320 95 12/16/2022 Seaview Ave Jasmine Ave Marguerite Ave 30 16,890 42 7/1/2021 Seaview Ave Carnation Ave Goldenrod Ave 30 25,710 46 7/1/2021 Seaview Ave Marguerite Ave Narcissus Ave 30 18,450 48 7/1/2021 Seaview Ave Goldenrod Ave Jasmine Ave 30 27,270 61 7/1/2021 Seaview Ave Poinsettia Ave Poppy Ave 28 7,560 83 7/1/2021 Seaview Ave Narcissus Ave Orchid Ave 28 7,040 85 7/1/2021 Seaview Ave Orchid Ave Poinsettia Ave 28 7,425 85 7/1/2021 Seaward Rd De Anza Dr Serra Dr 35 31,990 75 6/28/2021 Seaward Rd Serra Dr Coast Highway East 35 12,215 77 6/28/2021 Seaward Rd Coast Highway East Evening Canyon Rd 37 9,195 78 6/28/2021 Seaward Rd Isabella Ter De Anza Or 35 54,040 81 6/28/2021 Seaward Rd Evening Canyon Rd Driftwood Rd 27 7,749 84 6/28/2021 Second Ave Marguerite Ave Narcissus Ave 27 15,498 75 3/26/2020 Second Ave Avocado Ave Carnation Ave 28 25,144 76 8/5/2021 Second Ave Carnation Ave Heliotrope Ave 28 33,600 86 8/5/2021 Second Ave Orchid Ave Poinsettia Ave 27 7,236 89 6/28/2021 Second Ave Poppy Ave Hazel Ave 27 3,375 94 6/28/2021 Second Ave Poinsettia Ave Poppy Ave 27 7,290 95 6/28/2021 Second Ave Jasmine Ave Marguerite Ave 27 14,472 96 6/28/2021 Second Ave Narcissus Ave Orchid Ave 27 7,263 96 6/28/2021 Serenade Ter Dolphin Ter Ramona Dr 33 33,000 79 6/28/2021 Serra Dr Seaward Rd De Anza Dr 35 45,675 85 6/28/2021 Serrano Ave M St Granada Ave 30 5,550 87 2/13/2023 Setting Sun Dr Pebble Dr Sandpiper Dr 33 32,576 97 6/29/2021 Seville Ave M St Channel Rd 30 14,550 65 2/13/2023 Seville Ave Balboa Blvd East M St 30 20,250 83 2/13/2023 Shell St Way Ln End 32 3,770 70 8/5/2021 Sherington PI Irvine Ave Sea Gull Ln 37 52,984 91 12/22/2022 Shipway Ln Tradewinds Ln Skylark Ln 38 29,716 93 12/22/2022 Shorecliff Rd Evening Canyon Rd End 27 26,559 61 6/28/2021 Short St Newport Blvd Clubhouse Ave 32 4,320 92 12/16/2022 Short St Clubhouse Ave End 16 5,040 95 12/16/2022 Sierra Vista Tustin Ave End 32 20,132 80 12/22/2022 Signal Rd Kings Rd 15th St 35 41,650 94 12/22/2022 Silver Ln Anniversary Ln End 33 11,220 51 12/22/2022 Skylark Ln Commodore Rd Holiday Rd 38 41,344 86 12/22/2022 Skylark Ln Highland Or Commodore Rd 37 9,065 88 12/22/2022 Snug Harbor Rd Cliff Or Clay St 35 32,760 95 12/22/2022 Somerset Ln Highland Or Highland Dr 34 50,330 87 12/22/2022 Sonora St Ocean Front Alley West Ocean Front West 19 1,330 86 1/30/2023 Sonora St lSeashore Or 10cean Front Alley West 16 1,520 1 91 12/20/2022 Spruce Ave I Bristol St South I Azure Ave 35 63,840 1 85 7/29/2021 6-106 Appendix B - Local Streets Page 24 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Spruce St Bristol St North Quail St 60 36,000 88 7/29/2021 St Andrews Rd Clay St 15th St 34 20,400 91 12/22/2022 St Andrews Rd Kings Rd Clay St 34 35,530 93 12/22/2022 St James PI 15th St St James Rd 35 24,635 93 12/22/2022 St James Rd 15th St St lames PI 35 35,275 94 12/22/2022 Starboard Way Windover Dr Wavecrest Dr 32 11,424 95 6/29/2021 Starlight Cir Commodore Rd Glenwood Ln 35 8,155 93 12/22/2022 Starlight Cir Glenwood Ln End 33 8,935 94 12/22/2022 Summit St Seashore Dr End 18 3,150 85 12/20/2022 Sundance Dr 19th St End 29 17,400 84 12/21/2022 Sunset Dr Lugonia St End 29 10,527 92 12/20/2022 Surfline Way Windover Dr Wavecrest Dr 32 22,556 94 6/29/2021 Surfview Ln Tiller Wy Seabreeze Lane 32 24,040 97 6/29/2021 Surrey Dr Rockford Rd Cameo Highland Dr 33 36,399 97 7/1/2021 Surrey Dr Cameo Highland Dr Garret Dr 33 21,120 97 7/1/2021 Sussex Ln Dover Dr Cumberland Ln 34 41,570 85 12/22/2022 Sylvia Ln Beryl Ln Deborah Ln 34 16,308 89 12/22/2022 Tahuna Ter Marapata Dr Angelita Dr 33 40,755 60 6/28/2021 Teller Ave Campus Dr Birch St 44 39,100 59 7/30/2021 Teresita Ln Kathleen Ln Vivian Ln 35 19,150 82 12/22/2022 Terrace Ridge Newport Ridge Dr West End 38 23,000 85 12/13/2019 Terrapin Way Shipway Ln Marlin Way 33 15,450 86 12/22/2022 The Arcade 22nd St 21st St 10 1,670 95 2/13/2023 Third Ave Marigold Ave Narcissus Ave 28 7,420 69 7/1/2021 Third Ave Marguerite Ave Marigold Ave 28 7,616 74 7/1/2021 Third Ave Jasmine Ave Larkspur Ave 27 7,290 78 7/1/2021 Third Ave Dahlia Ave Fernleaf Ave 27 7,155 88 7/19/2021 Third Ave Begonia Ave Carnation Ave 27 7,155 90 7/19/2021 Third Ave Heliotrope Ave Iris Ave 27 7,101 96 7/1/2021 Third Ave Iris Ave Jasmine Ave 27 7,290 96 7/1/2021 Third Ave Larkspur Ave Marguerite Ave 27 7,452 96 7/1/2021 Third Ave Narcissus Ave Orchid Ave 28 7,392 96 7/1/2021 Third Ave Orchid Ave Poinsettia Ave 28 7,420 96 7/1/2021 Third Ave Poinsettia Ave Poppy Ave 28 7,560 96 7/1/2021 Third Ave Avocado Ave Acacia Ave 27 7,290 96 7/19/2021 Third Ave Acacia Ave Begonia Ave 27 7,155 96 7/19/2021 Tiburon Bay Dr Carmel Bay Dr Point Arena Way 32 31,104 64 7/2/2021 Tiller Way Sandcastle Dr Sausalito Dr 36 53,100 1 94 6/29/2021 Topaz Ave Park Ave Bay Front South 24 13,920 58 7/30/2021 Topaz Ave Collins Ave Park Ave 23 5,474 65 7/30/2021 Topside Ln Sandcastle Dr Inlet Isle Dr 32 20,782 96 6/29/2021 Toyon Ln Holiday Rd Nautilus Ln 33 15,285 88 12/22/2022 Tradewinds Ln Santiago Dr Commodore Rd 38 86,450 90 12/21/2022 Tremont Ln Cameo Shores Rd Milford Dr 33 46,860 88 7/1/2021 Turquoise Ave Bay Front South Park Ave 28 14,000 59 7/30/2021 Tustin Ave Santiago Dr 23rd St 34 44,370 1 75 6/29/2021 Tustin Ave 150' South of Windward Ln Santiago Dr 18 11,900 76 12/21/2022 Tustin Ave Clay St 115th St 35 22,155 81 12/19/2022 Tustin Ave Emerson St I Francisco Dr 37 31,503 81 12/21/2022 Tustin Ave South End ISanta Isabel Ave 37 12,700 82 12/21/2022 6-107 Appendix B - Local Streets Page 25 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Tustin Ave Santa Isabel Ave North End 37 25,400 82 12/21/2022 Tustin Ave Ocean View Ave Cliff Dr 26 12,480 89 12/19/2022 Tustin Ave Cliff Or Clay St 35 28,245 91 12/19/2022 Tustin Ave Coast Highway West Ocean View Ave (S)) 34 13,600 95 12/22/2022 Twin Lakes Cir Carmel Bay Or End 32 6,684 67 7/2/2021 University Or Irvine Ave South End 40 50,400 80 12/22/2022 Upper Bay Or Mesa Or Orchid Hill PI 36 18,972 88 7/29/2021 Via Antibes Via Lido Soud Via Lido Nord 36 8,928 95 12/16/2022 Via Antibes Via Lido Nord Via Lido Soud 36 8,928 95 12/16/2022 Via Barcelona Via Lido Soud Via Lido Nord 20 6,540 90 12/16/2022 Via Cordova Via Lido Soud Via Lido Nord 20 9,000 87 12/16/2022 Via Dijon Via Lido Soud Via Lido Nord 20 11,400 89 12/16/2022 Via Eboli Via Lido Soud Via Lido Nord 20 14,040 86 12/16/2022 Via Fermo Via Lido Soud Via Firenze 16 4,096 93 12/16/2022 Via Firenze Via Lido Nord Piazza Lido 16 7,152 91 12/16/2022 Via Firenze Piazza Lido Via Lido Soud 16 5,696 93 12/16/2022 Via Florence Via Lido Soud Piazza Lido 24 6,480 95 12/16/2022 Via Genoa Via Lido Soud Piazza Lido 43 18,920 80 12/16/2022 Via Genoa Piazza Lido Via Lido Nord 43 19,178 82 12/16/2022 Via Graziana Via Havre Piazza Lido 18 8,820 92 12/16/2022 Via Graziana Piazza Lido Via Lido Nord 16 7,520 92 12/16/2022 Via Havre Via Lido Soud Piazza Lido 23 10,925 85 12/16/2022 Via Ithaca Via Lido Soud Via Lido Nord 20 19,400 87 12/16/2022 Via Jucar Via Lido Soud Via Lido Nord 23 21,275 92 12/16/2022 Via Koron Via Lido Soud Via Lido Nord 23 20,930 93 12/16/2022 Via Lido Bridge (West End) Via Lido Soud 22 28,420 95 12/15/2022 Via Lido Nord Via Zurich Via Waziers 33 17,820 93 12/15/2022 Via Lido Nord Via Waziers Via San Remo 33 21,813 93 12/15/2022 Via Lido Nord Via San Remo Via Palermo 33 17,853 93 12/15/2022 Via Lido Nord Via Palermo Via Lorca 33 21,318 93 12/15/2022 Via Lido Nord Via Lorca Via Genoa 33 25,377 93 12/15/2022 Via Lido Nord Via Genoa Via Dijon 33 18,843 93 12/15/2022 Via Lido Nord Via Dijon Via Antibes 33 17,490 93 12/15/2022 Via Lido Nord Via Antibes Via Lido Soud (West Side) 20 9,200 93 12/15/2022 Via Lido Nord Via Lido Soud (East Side) Via Zurich 33 18,647 94 12/15/2022 Via Lido Soud Via San Remo Via Venezia 33 17,160 91 12/15/2022 Via Lido Soud Via Zurich Via Lido Nord (East Side) 53 24,965 91 12/15/2022 Via Lido Soud Via Lido Nord (West Side) Via Antibes 20 6,800 92 12/15/2022 Via Lido Soud Via Orvieto Via San Remo 33 22,110 92 12/15/2022 Via Lido Soud Via Antibes Via Dijon 33 20,625 93 12/15/2022 Via Lido Soud Via Dijon Via Genoa 33 27,060 93 12/15/2022 Via Lido Soud Via Genoa Via Koron 33 28,050 93 12/15/2022 Via Lido Soud Via Koron Via Orvieto 33 21,780 93 12/15/2022 Via Lido Soud Via Venezia Via Zurich 33 21,780 94 12/15/2022 Via Lorca Via Lido Soud Via Lido Nord 20 17,500 93 12/16/2022 Via Malaga Via Oporto Via Lido 22 6,490 93 12/16/2022 Via Marina Tustin Ave End 33 18,538 91 12/22/2022 Via Mentone Vai Lido Soud Via Lido Nord 20 17,000 93 12/16/2022 Via Nice Via Lido Soud IVia Lido Nord 20 16,200 1 92 12/16/2022 Via Oporto IVia Lido ICentral Ave 29 17,400 1 86 2/17/2023 6-108 Appendix B - Local Streets Page 26 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date Via Oporto 32nd St Via Lido 23 13,225 93 12/16/2022 Via Orvieto Via Lido Soud Via Lido Nord 23 18,055 95 12/16/2022 Via Palermo Via Lido Soud Via Lido Nord 22 16,764 92 12/16/2022 Via Quito Val Lido Soud Via Lido Nord 20 14,200 92 12/16/2022 Via Ravenna Via Lido Soud Via Lido Nord 20 13,200 89 12/16/2022 Via San Remo Via Lido Soud Via Lido Nord 23 15,240 95 12/16/2022 Via Trieste Via Lido Soud Via Lido Nord 20 12,000 93 12/16/2022 Via Undine Via Lido Soud Via Lido Nord 20 11,400 93 12/16/2022 Via Venezia Via Lido Soud Via Lido Nord 20 10,700 93 12/16/2022 Via Waziers Via Lido Soud Via Lido Nord 23 11,845 95 12/16/2022 Via Xanthe Via Lido Soud Via Lido Nord 20 9,800 93 12/16/2022 Via Yella Via Lido Soud Via Lido Nord 20 9,300 91 12/16/2022 Via Zurich Via Lido Soud Via Lido Nord 21 9,030 91 12/16/2022 Villa Way 29th St 32nd St 22 17,160 87 12/16/2022 Villa Way 28th St 29th St 25 8,000 95 12/16/2022 Vista Baya West End Tustin Ave 33 19,891 77 12/22/2022 Vista Baya Tustin Ave East End 24 13,305 77 12/22/2022 Vista Del Oro Eastbluff Dr (South End) Vista Caudal 36 103,068 47 6/25/2021 Vista Del Oro Vista Entrada Vista Del Sol 35 76,475 63 6/25/2021 Vista Del Oro Vista Caudal Vista Entrada 35 36,400 64 6/25/2021 Vista Del Oro Vista Del Sol Vista Nobleza 35 74,900 74 6/25/2021 Vista Del Oro Vista Umbrosa Eastbluff Dr (North End) 35 26,425 82 6/25/2021 Vista Del Oro Vista Nobleza Vista Umbrosa 35 65,800 88 6/25/2021 Vista Del Sol Vista Del Oro Eastbluff Dr 60 28,200 84 6/25/2021 Vista Ridge Rd Ocean Heights Or Ridge Park Rd 37 22,903 93 8/6/2021 Vista Ridge Rd Newport Coast Or Altezza Dr 37 55,241 96 6/24/2021 Vista Ridge Rd Ocean Heights Or Coastal Canyon Dr 37 76,479 96 6/24/2021 Vista Ridge Rd Altezza Or Ocean Heights Dr 37 68,709 97 6/24/2021 Vista Ridge Rd Coastal Canyon Dr Ocean Heights Dr 37 62,715 97 6/24/2021 Vivian Ln Beryl Ln Diana Ln 34 28,196 86 12/22/2022 Walnut St Prospect St Newport Shores Dr 29 25,694 69 12/20/2022 Walnut St Ocean Front Alley West Ocean Front West 19 1,330 77 1/30/2023 Walnut St Seashore Or Ocean Front Alley West 18 990 88 12/20/2022 Walnut St Newport Shores Or Coast Highway West 19 3,135 89 12/20/2022 Warwick Ln Marian Ln Nottingham Rd 33 8,052 82 12/22/2022 Warwick Ln Estelle Ln Marian Ln 33 24,486 83 12/22/2022 Washington St Edgewater PI Bay Ave East 18 1,800 87 2/13/2023 Washington St Balboa Blvd East Ocean Front Alley East 14 1,190 93 12/16/2022 Washington St Bay Ave East Balboa Blvd East 20 2,800 94 12/16/2022 Washington St Ocean Front East Ocean Front Alley East 14 1,890 95 12/16/2022 Waterfront Dr Avocado Ave Acacia Ave 30 8,430 91 8/9/2021 Wavecrest Dr Surfline Wy Sand Point Wy 36 41,660 94 6/29/2021 Way Ln Fernleaf Ave Shell St 15 6,285 74 8/5/2021 Way Ln Dahlia Ave Fernleaf Ave 15 4,710 75 8/5/2021 Wayne Rd Rockford Rd Cameo Highlands Dr 33 22,935 97 7/1/2021 West Wind Way Polaris Dr End 34 29,448 94 12/22/2022 Westcliff Dr Dover Or Santiago Dr 32 48,992 83 12/22/2022 Westerly PI IDoveSt lQuail St 44 61,864 87 7/29/2021 Westminster Ave Old Newport Blvd 15th St 36 61,920 95 12/21/2022 White Cliffs Dr Polaris Dr I North Star Ln 38 8,400 86 12/22/2022 6-109 Appendix B - Local Streets Page 27 of 28 Appendix B Complete Street Listing Current Conditions r►II I %2VIV PAVEMENT ENGINEERING Local Streets Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date White Sails Way Crown Dr Harbor View Dr 33 34,485 95 6/29/2021 Windover Dr Surfline Way Sand Point Way 36 38,328 95 6/29/2021 Windward Ln Tustin Ave Irvine Ave 33 42,570 82 12/21/2022 Windward Ln Tradewinds Ln Leeward Ln 33 48,060 90 12/21/2022 Yawl Rd Beacon Bay End 24 6,000 89 7/2/2021 Zahma Dr Kewamee Dr Chubasco Dr 37 19,610 68 6/28/2021 Zenith Ave Spruce Ave Orchid St 35 9,940 74 7/29/2021 Zenith Ave Bayview Ave Spruce Ave 35 9,905 88 7/29/2021 Zurich Cir Via Zurich Via Zurich 16 7,200 93 12/16/2022 6-110 Appendix B - Local Streets Page 28 of 28 MPavement Management Plan Agency Submittal OCTA XIII. Appendix C — GIS Digital Data Introduction The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition. Maintaining an inventory of pavement condition will enhance OCTA's GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report. Structure of GIS Data The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above. The GIS data requirements are discussed below. Most commercial and open -source GIS software provides industry -standard tools to manage GIS data to meet these requirements. GIS Digital Data Format The GIS data must be submitted in either one of the following formats: • Esri Shapefile, or • Esri File Geodatabase Metadata The GIS data are required to have associated metadata. The minimum metadata items required are: • Title of Dataset • Tags (A set of words that can be used by GIS to search for the resource. For example: "pavement", "transportation", "roads") • Summary (A brief purpose statement of the dataset) • Description (A brief narrative of the dataset's content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible. Projection The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system: Page 1 14 6-111 M OCTA Pavement Management Plan Agency Submittal • NAD 1983 State Plane California VI FIPS O406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes The required segment attributes are: • Street name • Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment • Current pavement condition index (PCI) • Current PCI inspection date • Length of road segment in feet • Width of road segment in feet • Paved area of road segment in square feet or square yards • Projected PCI at end of Seven -Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided. An example of a GIS attribute table for road segments is shown below (Note that there are additional attributes such as surface, functional class, and number of travel lanes). OBJECTID Sec ID Street Name Fru 1 I 41 4022 ARBOROCOD HE 2 44 4025 ARBORWOOD B 45 4031 ARBORWOOD WI 4 J 46 4137 ARBORWOOD VAL 5 47 4195 ARBORWOOD CI TR N m Te PCI Imp Date Length Width Area Surtace FuncCka � Lanes NGE LN CANYONWOOD 89 1/11/2013 254 40 12192 AC SECONDARY 2 YALE CT 92 1/11/2013 374 48 17952 AC SECONDARY 2 NTH ROP BETHESDA 89 1/11/2013 866 48 41568 AC SECONDARY 2 ECT HEDGELN 89 1/11/2013 1691 48 81168 AC SECONDARY 2 USGLEN WINTHROP 90 1/11/2013 434 48 20932 AC SECONDARY 2 AVE UNIVERSITY DR 99 12119/2012 WB 58 2NI34 AC SECONDARY 4 CARTHUR BLVD VON (CARMAN AVE 93 12/19/2012 16D 30 64570 AC SECONDARY 4 KARMAN AVE TELLER AVE 93 12/1912012 1310 30 39300 AC SECONDARY 4 LER AVE JAMBOREE RD 95 12/19/2012 700 24 ISM AC SECONDARY 4 MBOREE RD CARLSON AVE 98 12/19/2012 1164 68 88752 AC SECONDARY 2 EADOWOOD ARBORINOOD 89 1/11/2013 1026 47 48477 AC SECONDARY 2 HELSON DR PALATINE 100 12/19/2012 1146 65 74490 7AC SECONDARY 4 Page 1 15 6-112 Page 1 15 6-112 M OCTA Pavement Management Plan Agency Submittal XIV. Appendix D — Quality Assurance/Quality Control Plan Introduction When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management system. The Quality Assurance/Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for updates of the pavement management system. Objectives This document constitutes a formal QA/QC Plan for the City of Newport Beach. It was prepared in February, 2023. Specifically, it is intended for the 2023 Pavement Management Plan Update. The focus is on the collection of network -level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as "Network -level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices.") This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority (OCTA)'s "Countywide Pavement Management Plan Guidelines" (section 2.4), adopted in May 2010. Structure of QA/QC Plan The following components are addressed in this QA/QC Plan: • Condition survey procedures used • Accuracy required for data collection • Inspector qualifications and experience • Safety Page 1 16 6-113 M OCTA Condition Survey Procedures Pavement Management Plan Agency Submittal The governing document in performing condition surveys for the City of Newport Beach is ASTM D6433 "Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys." Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type. Asphalt Concrete AC Pavements 1. Alligator (fatigue) cracking 2. Bleeding 3. Block cracking 4. Bumps and sags 5. Corrugation 6. Depression 7. Edge cracking 8. Joint reflection cracking 9. Lane/Shoulder drop off 10. Longitudinal & Transverse cracking 11. Patching and utility cut patching 12. Polished aggregate 13. Potholes 14. Railroad crossing 15. Rutting 16. Shoving 17. Slippage cracking 18. Swell 19. Weathering 20. Raveling Portland Cement Concrete (Jointed) 1. Blowup/buckling 2. Corner breaks 3. Divided slab 4. Durability ("D") cracking 5. Faulting 6. Joint seal damage 7. Lane/shoulder drop off 8. Linear cracking 9. Patching (large) and utility cuts 10. Patching (small) 11. Polished aggregate 12. Popouts 13. Pumping 14. Punchout 15. Railroad crossing 16. Scaling, map cracking and crazing 17. Shrinkage cracks 18. Spalling (corner) 19. Spalling (joint) Page 1 17 6-114 M OCTA Pavement Management Plan Agency Submittal Any exceptions to the above procedures were discussed before any surveys were performed. These exceptions are usually related to distresses or situations that are not covered in the manuals. Examples include roller check marks or edge cracking on streets with no curbs and gutters. Others include the raveling of surface seals or the use of open -graded asphalt concrete mixes where the surface appears to have large voids present. All surveys were performed as walking surveys on MPAH, and a combination of walking and windshield on local streets. A minimum 10% sampling rate was utilized. Field crews were typically composed of one -person crew and sometimes more when a street with high traffic volume was surveyed. The safety of field personnel is paramount in all instances. The sample unit selected must be representative of the entire pavement section. This assumes that the section is homogenous; if it is not homogeneous, then the section must be split according to the criteria agreed upon by the agency. Typically, the criteria used are: • Pavement condition • Construction age, if known • Maintenance history, if known • Traffic volumes (or functional classification as a surrogate) • Surface types (e.g. asphalt concrete or Portland cement concrete) • Geometric elements (e.g. widths) Any modifications to the section inventory data are documented in the pavement management report. A sample unit must be between 2,500 ± 1,000 square feet in conformance with ASTM D6433 protocols. Typical sample unit dimensions are 100 feet long by the width of the street. Streets that are wider than 40 feet wide will have shorter lengths (generally 50 feet) or if they are divided by a raised median, separate sample units will be taken in each direction. Any pavement areas that are not representative of the section will be noted and surveyed as an additional sample unit. Accuracy Required for Data Collection The accuracy required for data collection has two components, both of which are further described in the following paragraphs. • Re -inspections • PCI comparisons with past surveys Random and Systematic Re -Inspections Random Re -inspections Random re -inspections will include a representative selection across the following categories: • Functional classes (i.e. MPAH, locals); • Surface types (e.g. asphalt concrete or Portland cement concrete); • Pavement conditions (e.g. good, fair, poor); • Inspectors; • Geographical areas, if applicable. 18 6-115 MPavement Management Plan Agency Submittal OCTA Systematic Re -inspections For systematic re -inspections, this could be due to noticed trends such as specific treatment types (e.g. open - graded mixes), a specific inspector or geographical area. In such cases, more than 5% will be re -inspected. Acceptability Criteria At the time of re -inspection, the actual distresses will be re -inspected and verified, and any corrections made, if necessary. Distress types and severities must be the same and re -measured quantities within ±10% of the original measured quantity. If corrections are required on more than 10% of the re -inspected sample unit, then an additional 5% will be re- inspected. This will continue until more than 95% of the re -inspected sections meet the acceptability criteria. PCI Comparison with Past Surveys As another level of quality control, the new PCIs are compared with the previous PCIs. If they differ by more than ±10 PCI points, these sections are automatically flagged for further investigation. If PCI Increases 10 points The section is investigated to see if a maintenance and rehabilitation event has occurred since the last survey, but has not been recorded. Typically, it may include activities such as: • Crack sealing activities— changes medium or high severity cracking to low severity • Patching activities — alligator cracking that has been removed and patched, so that the resultant PCI is increased. • Surface seals • Overlay • Others Therefore, an up-to-date maintenance and rehabilitation history file in the pavement management database is desirable, both for historical accuracy as well as to provide additional quality control. If PCI decreases 10 points The section is checked to see if the average deterioration rate (usually 3 to 4 points per year) is exceeded. If the drop in PCI is within range of what is acceptable, no further action is required. If the drop is more than the acceptable range, a re -inspection will be performed. The default performance curves in the pavement management software form the basis for what is acceptable. Page 1 19 6-116 MPavement Management Plan Agency Submittal OCTA Inspector's Qualifications and Experience GMU inspectors have attended formal training on pavement condition distress surveys, and all of them are certified by OCTA. This training was conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA's requirements. Inspector Name Date of ASTM D6433 Training Training Conducted By: Jeffrey Matsushita February 2022 GMU and University of California, Davis Jasdeep Bains July 2022 GMU and California State University, Chico Ali Zalghout December 2019 OCTA and Colorado State University (Mo Shahin) Resumes of the technicians utilized on this project are included as an attachment. Safety Procedures GMU administers a health and safety program in compliance with the Cal Occupational Safety and Health Administration (OSHA) Title VIII, Section 3203. The program is documented in GMU'S Workplace Safety Manual. Generally, the safety procedures include: • Inspectors to wear Class 2 or 3 safety vest at all times; • Stopped vehicles to be parked at locations away from moving traffic (e.g. nearby parking, shoulders, etc.); • Inspectors to survey the street from the curb or shoulder, especially when Arterials are being surveyed. On streets where there is a high volume of traffic or high speeds, additional measures may be necessary, such as: • Surveys to occur during off-peak periods or on weekends; • Additional inspector to watch out for traffic; and • Traffic flaggers in extreme cases. All GMU employees are required to acknowledge that they have read the GMU Safety Manual carefully. This manual is updated annually, and all employees receive an updated copy. Attachment —Appendix D: Resumes of Field Inspectors ---End of QA/QC Plan --- Page 120 6-117 JASDEEP SINGH BAINS Staff Pavement Engineer V 1"Wr1 V PAVEMENT ENGINEERING Jasdeep possesses over three years of experience in pavement PROFESSION engineering consisting of pavement evaluation, construction Civil Engineer inspection, and laboratory testing. His current work consists of performing pavement evaluations for several EDUCATION municipalities and private sector clients, providing B.S. Civil Engineering construction management and materials testing services to California State University, Chico assure compliance with project construction specifications. He has provided materials testing services for local agencies PROFESSIONAL EXPERIENCE such as the cities Irvine, Garden Grove, Stanton, and Laguna GMU Geotechnical, Inc. Niguel as well as construction management for private clients (June 2022 —Present) Staff Pavement Engineer including Canyon Lake Property Owners' Association, Casta Rancho Santa Margarita, California Del Sol Homeowners' Association (HOA), and Harbor Ridge HOA. California Pavement Preservation Center Jasdeep's experience in pavement evaluation and (May 2019 — Jan 2021) construction includes: Research Assistant Chico, CA • Pavement Management Plans (PMP) for local HONORS AWARDS Cities and HOAs • Honor of Distinguished • Budget analysis and Maintenance and Capstone Project from ASCE Rehabilitation (M&R) planning using PAVER Region 9 • Field Data Collection using Manual surveys CERTIFICATIONS • Pavement Condition Index (PCI) calculations • OCTA Certified Pavement and analysis Inspector • Nuclear Gauge Certification • Falling Weight Deflectometer (FWD) testing and analysis • Slurry Seal observation and testing • Materials testing and observation of construction practices SELECT PROJECT EXPERIENCE Pavement Management Plan Update, City of Newport Beach, CA. (Ongoing) Performing pavement distress surveys, collecting distress data, and performing PAVER analysis. Pavement Management Plan Update, Rancho Mission Viejo, CA (September 2022) Performed pavement distress surveys, collected distress data, and performed PAVER analysis. 6-118 Pavement Management Plan Update, Dove Canyon HOA in Rancho Santa Margarita, CA Update (January 2023). Performed pavement distress surveys, collected distress data, and performed PAVER analysis. Pavement Management Plan Update, Garden Grove, CA Performed pavement distress surveys, collected distress data, and performed PAVER analysis. City of Garden Grove Various Streets Rehab 2022 (October 2022) Performed materials testing and observation for construction of various streets and helped city inspector point out possible areas of interest. City of Stanton Citywide Street Resurfacing (August 2022) Performed materials testing and observation for construction of various streets and helped city inspector collect tickets and track quantities. ICOP Irvine Co. Office Properties (February 2023) Located localized repair areas and mapped out utilities and areas requiring edge -milling. 6-119 CERTIFICATE Of Prequalification This certificate has been presented to jLqsdee P BaIns0 for successfully meeting the requirements of the OCTA 2022-2023 Pavement Inspector Pre qualification Program using MANUAL survey techniques EXPIRATION: 6.30.2025 www.WestCoastEC.com/OCTA JEFFREY MATSUSHITA Staff Pavement Engineer PROFESSION Civil Engineer EDUCATION B.S. Civil Engineering, University of California, Davis AFFILIATIONS Civil Engineering Honors Society (Chi Epsilon) CERTIFICATIONS - Engineer in Training (EIT) - OCTA Pavement Inspector A00M " I I %31"VIIJ Jeffrey possesses three years of experience in pavement engineering consisting of pavement evaluation, construction management, construction inspection, and laboratory testing. His current work consists of performing pavement evaluations for several municipalities and private sector clients, providing construction management and testing services to assure compliance with project construction specifications, and preparing documents for contract administration. He has provided construction management and testing services for local agencies such the cities Lake Forest, Rancho Santa Margarita, and Laguna Niguel as well as private clients including Canyon Lake Property Owners' Association, Ocean Ranch Homeowners' Association (HOA), and Harbor Ridge HOA. SELECT PROJECT EXPERIENCE Pavement Management Plan Update, City of Laguna Niguel, CA: Performed pavement distress survey Pavement Management Plan Update, City of Newport Beach, CA: Performed pavement distress survey Pavement Management Plan, Newport Mesa Unified School District, Newport Beach, CA: Performed pavement distress survey, created inventory of PCC sections for repair Parkway Drive and Denholm Drive Project, City of El Monte, El Monte, CA: Performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications Pavement Evaluation, Dove Canyon, Rancho Santa Margarita, CA: Mark sections for coring, performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices El Toro Raised Medians, City of Lake Forest, Lake Forest, CA: Marked sections for coring locations, created report appendices, identified areas for localized repair, drafted localized repair areas in AutoCAD, 23241 Arroyo Vista, Rancho Santa Margarita, CA 92688 1 ph: 949.888.6513 1 fax: 949.888.1380 1 web: www.gmugeo.com 6-121 Residential Road Resurfacing Phase 1 and 2, City of South Gate, CA: Performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices, drafted coring location map in AutoCAD On -Call Pavement Design Services, City of San Fernando, CA: Performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices, drafted map according to PCI in AutoCAD Annual Roadway Resurfacing Project, City of Dana Point, CA: Drafted field density test maps in AutoCAD Mission Bay Drive Pavement Rehabilitation, City of Newport Beach, CA: Drafted field density test maps in AutoCAD Newport Blvd and Balboa Blvd Pavement Evaluation, City of Newport Beach, CA: Marked sections for coring, performed paving coring to identify thicknesses of pavement cross section and provided UCCS soil classifications, created report appendices, drafted field density test maps in AutoCAD Via Lido Soud and Nord Pavement, City of Newport Beach, CA: Drafted field density test maps in AutoCAD Turtle Rock Park Parking Lot Rehab, City of Irvine, CA: Drafted field density test maps in AutoCAD Jeffrey Matsushita 6-122 CERTIFICATE Of Prequalification This certificate has been presented to 0 eff Matsushlta for successfully meeting the requirements of the OCTA 2021-2022 Pavement Inspector Prequalification Program using MANUAL survey techniques EXPIRATION: 6.30.2024 www.WestCoastEC.com/OCTA M OCTA Pavement Management Plan Agency Submittal XV. Appendix E — Pavement Management Data Files The Pavement Management data files shall be submitted to OCTA in spreadsheet format. This must include the following information: • Street name and limits for all public streets • Street identifiers (Branch ID, Section ID) • Direction (if applicable) • Beginning and ending of each section • Length, widths, and true areas • Functional Classification (MPAH, Local) • Number of travel lanes • PCI and date of inspection • Type of recommended treatment • Cost of recommended treatment • Street geometry as linear features The Pavement Management data files are attached here on a CD/flash drive, or included as Appendix E XVI. Appendix F — GIS Maps — Current Conditions (Optional) If included, attach and label Appendix F. Page 121 6-124 — — ADAMS A - — ! coast toll Santiago De Santa Ana Costa Mesa I Li ndnl L a — � �T a Q C -- -- r, i C _ C i _ Sar Ir N i a v CALIFORNIA 0 0 I ro n I N N O C� z 0 3000' 3 a Mtn rll,rinl lianr PCI RANGE LEGEND f`ark Pl. r.-I��.�c PCI RANGE 85 - 100 GOOD PCI RANGE 75 85 h:ine N Cmhus ,P !!/ T — FAIR PCI RANGE 60 74 PCI RANGE 41 - 59 peek cc unl fveac I I.11l PCI RANGE 0-40 Unrr Of Califcrn" Ofil Ilia. Ir.w_ In I II l Irvine lvledlcal Sch It m DI'I I_n it n -rnn 11 .I fll l GIN ;y,ICa h'esec+i��d�'Qlti� rystal Cove 4T� IC!'_C The N l.ti—1 R/1— Nlatinnal Rnnnrlariac n;;tacat RnFP Flevatinn Pronram C;POnr 6-125