Loading...
HomeMy WebLinkAboutPA2023-0077_20230404_BULKHEAD-SEAWALL CONDITIONS REPORT DATED 12-18-22 P M A C O N S U L T I N G , I N C . CONSULTING STRUCTURAL ENGINEERS 28161 Casitas Ct. PH. (714) 717-7542 Laguna Niguel, CA 92677 e-mail: consulting@pma-bg.com December 18, 2022 Craig S. Hampton 5500 E. Quartersawn Street Boise, Idaho 83716 BULKHEAD CONDITIONS REPORT 1010 Kings LLC; Applicant 20 Balboa Coves City of Newport Beach, County of Orange PMA Job #50722 Dear Mr. Hampton, PMA Consulting, Inc. is pleased to provide this report in accordance with Section 21.30.15.E.3 of City of Newport Beach Municipal Code. STATEMENT OF THE PREPARER’S QUALIFICATIONS Plamen Petrov, P.E., the preparer of this report, holds a Master of Science in Structural Engineering from University of Architecture, Structural Engineering & Geodesy of Sofia, Bulgaria, and is a Licensed Civil Engineer by the State of California Certificate No. C66947. For the last 22 years of his professional career, he has been actively involved in the design and entitlement of many Waterfront Developments such as custom homes, seawalls, piers, platforms, floating docks and marinas. A great number of Bulkhead Condition Reports prepared by him have been reviewed and accepted/approved by California Coastal Commission. All the above being said, Plamen Petrov, P.E. shall be considered a qualified preparer for the Bulkhead Conditions Report on this project. OBSERVATION A cursory observation of the existing seawall was conducted by a representative of our office on November 12, 2022. Observed was the visible/exposed portion of the waterfront face of the seawall. FINDINGS The seawall, which is a typical retaining wall consisting of continuous concrete footing and CMU stem wall, was found in a good condition without noticeable evidence of distress. CONCLUSION Based on our site observation, we conclude that the existing seawall is required to protect the proposed principal structure on the lot. Due to its current good condition, no repair or 1 replacement of the seawall shall be anticipated in the next 75, other than adding a decorative stone cap to raise the top of wall elevation to +10.90’NAVD88 as reflected on the attached SK-1. If during this period though, the seawall displays any sign of distress that requires immediate attention, it should be repaired or replaced at that time accordingly, without seaward encroachment from its current location. The above conclusion was prepared based on the existing conditions, proposed drawings, and within the inherent limitations of this study, in accordance with generally acceptable engineering principles and practices. We make no further warranty, either expressed or implied. PMA Consulting, Inc. appreciates the opportunity to work with you towards the successful completion of your project. Should you have any questions regarding this report, please give us a call. Respectfully submitted, Plamen Petrov, P.E. Principal Enclosure: SK-1 2 3