Loading...
HomeMy WebLinkAboutPA2023-0044_20230516_Bulkhead Conditions Report dated 01-20-23 P M A C O N S U L T I N G , I N C . CONSULTING STRUCTURAL ENGINEERS 28161 Casitas Ct. PH. (714) 717-7542 Laguna Niguel, CA 92677 e-mail: consulting@pma-bg.com January 20, 2023 Caitlin Smith Brandon Architects 151 Kalmus Drive G-1 Costa Mesa, CA 92626 BULKHEAD CONDITIONS REPORT Fletcher Family Revocable Trust; Applicant 439 Harbor Island Drive City of Newport Beach, County of Orange PMA Job #50622 Dear Mrs. Smith, PMA Consulting, Inc. is pleased to provide this report in accordance with Section 21.30.15.E.3 of City of Newport Beach Municipal Code. STATEMENT OF THE PREPARER’S QUALIFICATIONS Plamen Petrov, P.E., the preparer of this report, holds a Master of Science in Structural Engineering from University of Architecture, Structural Engineering & Geodesy of Sofia, Bulgaria, and is a Licensed Civil Engineer by the State of California Certificate No. C66947. For the last 23 years of his professional career, he has been actively involved in the design and entitlement of many Waterfront Developments such as custom homes, seawalls, piers, platforms, floating docks and marinas. A great number of Bulkhead Condition Reports prepared by him have been reviewed and accepted/approved by California Coastal Commission. All the above being said, Plamen Petrov, P.E. shall be considered a qualified preparer for the Bulkhead Conditions Report on this project. OBSERVATION Cursory observation of the existing seawall/bulkhead was conducted by a representative of our office on October 17, 2022. Observed was the visible/exposed portion of the waterfront face of the seawall. Due to the site conditions, tie-backs were not accessible, thus not observed. FINDINGS The existing cast-in-place seawall was found in a good condition, without noticeable signs of distress, except for some minor cracks typical for seawall of this vintage in the area. CONCLUSION Based on our site observation, we conclude that the existing seawall is required to protect the proposed principal structure on the lot. To be able to do so, the seawall shall be 1 repaired/reinforced/raised as reflected on the enclosed Drawings SW-0 thru SW-2. Once the seawall is reinforced in accordance with the enclosed drawings, no repair or replacement of the seawall shall be anticipated in the next 75. If during this period though, the seawall displays any sign of distress that requires immediate attention, it should be repaired or replaced at that time accordingly, without seaward encroachment from its current location. The above conclusion was prepared based on the existing conditions, proposed drawings, and within the inherent limitations of this study, in accordance with generally acceptable engineering principles and practices. We make no further warranty, either expressed or implied. PMA Consulting, Inc. appreciates the opportunity to work with you towards the successful completion of your project. Should you have any questions regarding this report, please give us a call. Respectfully submitted, Plamen Petrov, P.E. Principal Enclosures: Seawall Drawings SW-0 thru SW-2 2 3 4 5