Loading...
HomeMy WebLinkAbout03_20 Balboa Coves LLC Residence CDP_PA2023-0077CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT July 13, 2023 Agenda Item No. 3 SUBJECT: 20 Balboa Coves, LLC Residence (PA2023-0077) ▪Coastal Development Permit SITE LOCATION: 20 Balboa Coves APPLICANT: Craig Hampton OWNER: 20 Balboa Coves, LLC PLANNER: Melinda Whelan, Assistant Planner 949-644-3221 mwhelan@newportbeachca.gov LAND USE AND ZONING •General Plan Land Use Plan Category: Single Unit Residential Detached (RS-D) •Zoning District: Single-Unit Residential (R-1) •Coastal Land Use Plan Category: Single Unit Residential Detached (0.0-5.9 DU/AC) (RSD-A) •Coastal Zoning District: Single-Unit Residential (R-1) PROJECT SUMMARY A coastal development permit (CDP) to allow the demolition of an existing single-family residence and to construct a 4,232-square-foot, 3-story, single-unit residence including an attached 477-square-foot, 2-car garage. The project includes landscape, hardscape, and subsurface drainage facilities all within the confines of private property. The project also includes a reinforced bulkhead with a cap for coastal hazards protection. The project complies with all applicable development standards and no deviations are requested. RECOMMENDATION 1)Conduct a public hearing; 2)Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 3)Adopt Draft Zoning Administrator Resolution No. _ approving the Coastal Development Permit (Attachment No. ZA 1). 1 20 Balboa Coves, LLC Residence (PA2023-0077) Zoning Administrator, July 13, 2023 Page 2 DISCUSSION Land Use and Development Standards • The subject property is located in the R-1 Coastal Zoning District, which provides for single-unit residential development and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development, because the property is in the Coastal Commission Appeal Area. • The property currently consists of one legal lot developed with a single-unit residence. The neighborhood is predominantly developed with two- and three- story, single-unit residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development and expected future development consistent with applicable development standards. • The proposed single-unit dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 – Development Standards Development Standard Standard Proposed Setbacks (min.) Front (street) 5 feet 5 feet Sides 3 feet 3 feet Second Frontage (water) 15 feet 15 feet Allowable Floor Area (max.) 4,950 square feet 4,232 square feet Allowable 3rd Floor Area (max.) 371 square feet 370 square feet Allowable 3rd Floor Area & Covered (max.) 1,237square feet 583 square feet Open Space (min.) 372 square feet 685 square feet Parking (min.) 2-car garage 2-car garage Height (max.) 24-foot flat roof 29-foot sloped roof 24-foot flat roof 29-foot sloped roof Hazards • A Coastal Hazards Report and Sea Level Rise Analysis was prepared by PMA Consulting, Inc. dated June 6, 2023, for the project. The maximum bay water elevation is 7.7 feet NAVD 88 (North American Vertical Datum of 1988 (NAVD 88) and may exceed the current top of bulkhead elevation of 10.6 feet (NAVD 88) during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3-foot increase in the maximum water level over the next 75 years (i.e., the life of the structure). Therefore, the sea level is estimated to reach approximately 10.8 feet NAVD 88 (the likely range for sea level rise over the 75- 2 20 Balboa Coves, LLC Residence (PA2023-0077) Zoning Administrator, July 13, 2023 Page 3 year design life of the structure based on low-risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). • On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project has been conditioned to raise the bulkhead to an elevation of 10.9 feet (NAVD 88). PMA Consulting, Inc. has confirmed the bulkhead can be raised up to 14.4 feet NAVD88 if needed and in compliance with the updated guidelines. • Once the existing seawall/bulkhead is raised per the report’s recommendations, flooding, wave run-up, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the raised bulkhead. Therefore, the project has been conditioned to raise/cap the bulkhead up to 10.9 feet (NAVD 88). • The finished floor elevation of the proposed single-family residence is 11.18 feet (NAVD 88), which complies with the minimum 9.00-foot (NAVD 88) elevation standard. • The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. • Under NBMC Section 21.30.030(C)(3)(i)(iv) (Natural Landform and Shoreline Protection), the property owner will be required to agree with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The Waiver of Future Protection is included as a condition of approval that will need to be satisfied before the final building inspection. • The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (General Site Planning and Development Standards). The Acknowledgement of Coastal Hazards is included as a condition of approval that will need to be satisfied before the issuance of building permits. 3 20 Balboa Coves, LLC Residence (PA2023-0077) Zoning Administrator, July 13, 2023 Page 4 Water Quality • Under Municipal Code Section 21.35.050 (Water Quality Management Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a preliminary Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQMP has been prepared for the project by Thomas M. Ruiz dated, March 30, 2023. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP before building permit issuance. • The property is adjacent to coastal waters. The project design addresses water quality with a construction erosion control plan and a post-construction drainage system that includes drainage and percolation features designed to retain dry weather runoff and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. Public Access and Views • The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-unit residence located on a standard R-1 lot with a new single-unit residence. Therefore, the project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. • The project site is located within the existing gated community of Balboa Coves and does not provide nor inhibit public coastal access opportunities. The project is designed and sited so as not block or impede existing public access opportunities and occurs within the confines of private property. Existing coastal access conditions will not be affected by the project. The nearest vertical coastal access opportunity is currently provided by Channel Place Park and beach to the west, approximately 500 feet away from the subject site. • The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is on Channel Place Park approximately 500 square feet to the west and 4 20 Balboa Coves, LLC Residence (PA2023-0077) Zoning Administrator, July 13, 2023 Page 5 Sunset View Park approximately 900 feet north of the site across West Coast Highway. Both are not visible from the site. Due to the distance of the proposed development from the public viewpoints and the project’s compliance with height and setbacks, the project will not impact coastal views. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. Class 3 exempts the demolition of up to three single-family residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the demolition of one single-family residence and the construction of a new 4,232-square- foot single-unit residence with an attached 477-square-foot, 2-car garage and therefore qualifies within this exemption. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of this exemption. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the city website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 (Local Coastal Program [LCP] Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. 5 20 Balboa Coves, LLC Residence (PA2023-0077) Zoning Administrator, July 13, 2023 Page 6 Prepared by: CC/msw Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 6 Attachment No. ZA 1 Draft Resolution 7 01-10-2023 RESOLUTION NO. ZA2023-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING A COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-UNIT RESIDENCE AND CONSTRUCT A NEW THREE (3)-STORY SINGLE-UNIT RESIDENCE AND ATTACHED TWO (2)-CAR GARAGE LOCATED AT 20 BALBOA COVES (PA2023-0077) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Craig Hampton, Architect concerning property located at 20 Balboa Coves, requesting approval of a coastal development permit. 2. The lot at 20 Balboa Coves is legally described as Lot 20 of Tract 01011. 3. The applicant proposes coastal development permit (CDP) to allow the demolition of an existing single-unit residence and construct a 4,232-square-foot, 3-story, single-unit residence including an attached 477-square-foot 2-car garage. The project includes landscape, hardscape, and subsurface drainage facilities all within the confines of private property. The project also includes a reinforced bulkhead with a cap for coastal hazards protection. The project complies with all development standards and no deviations are requested. 4. The subject property is designated RS-D (Single-Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The Coastal Land Use Plan category is RSD-A (Single Unit Residential Detached) (0.0 - 5.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zone District. 6. A public hearing was held on July 13, 2023, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. 8 Zoning Administrator Resolution No. ZA2023-### Page 2 of 9 01-10-2023 2. Class 3 exempts the demolition of up to three (3) single-unit residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the demolition of one (1) single-unit residence and the construction of a new 4,232-square- foot, single-unit residence, including an attached 477-square-foot, two (2)-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015 (Coastal Development Permits, Findings, and Decision) of the Newport Beach Municipal Code, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 4,950 square feet and the proposed floor area is 4,232 square feet. b. The proposed development provides the minimum required setbacks, which are 5 feet along the front property line abutting Balboa Coves, 3 feet along each side property line, and 15 feet along the second front property line abutting the water. c. The highest guardrail is less than 24 feet from the established grade (10.89 feet NAVD88) and the highest ridge is no more than 29 feet from the established grade, which complies with the maximum height requirements. d. The project includes garage parking for a total of two (2) vehicles, complying with the minimum two (2)-car garage parking requirement for single-unit residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two (2)- and three (3)-story, single- unit residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. 3. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by PMA Consulting, Inc. dated June 6, 2023, for the project. The maximum bay water elevation 9 Zoning Administrator Resolution No. ZA2023-### Page 3 of 9 01-10-2023 is 7.7 feet NAVD 88 (North American Vertical Datum of 1988 (NAVD 88) and may exceed the current top of bulkhead elevation of 10.6 feet (NAVD 88) during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3-foot increase in the maximum water level over the next 75 years (i.e., the life of the structure). Therefore, the sea level is estimated to reach approximately 10.8 feet NAVD 88 (the likely range for sea level rise over the 75-year design life of the structure based on low- risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). 4. On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any bulkhead structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project has been conditioned to raise the bulkhead to an elevation of 10.9 feet (NAVD 88). PMA Consulting, Inc. has confirmed the bulkhead design can be raised up to 14.4 feet (NAVD 88) if needed and in compliance with the updated guidelines. 5. Once the existing seawall/bulkhead is raised per the report’s recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the capped bulkhead. Therefore, the project has been conditioned to raise or cap the bulkhead and include a curb structure up to 10.9 feet (NAVD88). 6. The finished floor elevation of the proposed single-unit residence is 11.18 feet (NAVD88), which complies with the minimum 9.00 feet (NAVD88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD88) will not exceed the finished floor elevation of the single-unit residence at 11.18 feet (NAVD88 datum) for the anticipated 75-year life of the structure. 7. Under NBMC Section 21.30.030(C)(3)(i)(iv) (Natural Landform and Shoreline Protection), the property owner will be required to agree with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). This requirement is included as a condition of approval that will need to be satisfied before the final building permit inspection, respectively. 8. The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (General Site Planning and Development Standards). This requirement is included as a condition of approval that will need to be satisfied before the issuance of building permits, respectively. 9. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building 10 Zoning Administrator Resolution No. ZA2023-### Page 4 of 9 01-10-2023 Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. 10. The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 11. Under Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality Management Plan (WQMP) is required. A preliminary WQMP has been prepared for the project by Thomas M. Ruiz dated, March 30, 2023. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. 12. Proposed landscaping complies with Implementation Plan Section 21.30.075 (Landscaping). A condition of approval is included that requires drought-tolerant species. Before the issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 13. The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is on Channel Place Park approximately 500 square feet to the west and Sunset View Park approximately 900 feet north of the site across West Coast Highway. Both are not visible from the site. Due to the distance of the proposed development from the public viewpoints and the project’s compliance with height and setbacks, the project will not impact coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship 11 Zoning Administrator Resolution No. ZA2023-### Page 5 of 9 01-10-2023 between the requirement and the project’s impact, and be proportional to the impact. In this case, the project replaces an existing single-unit residence located on a standard R-1 lot with a new single-unit residence. Therefore, the project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. The project site is located within the existing gated community of Balboa Coves and does not provide nor inhibit public coastal access opportunities. The project is designed and sited so as not block or impede existing public access opportunities and occurs within the confines of private property. Existing coastal access conditions will not be affected by the project. The nearest vertical coastal access opportunity is currently provided by Channel Place Park and beach to the west, approximately 500 feet away from the subject site. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit, subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 13TH DAY OF JULY 2023. _____________________________________ Benjamin M. Zdeba, AICP, Zoning Administrator 12 Zoning Administrator Resolution No. ZA2023-### Page 6 of 9 01-10-2023 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Before the final building permits, the existing seawall shall be reinforced and capped to 10.90 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities 3. The existing seawall shall be capped and raised by the recommendations provided in the Coastal Hazards Report and Sea Level Rise Analysis prepared by PMA Consulting, Inc. dated June 6, 2023. 4. Before the final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Before the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the development. This letter shall be scanned into the plan set before building permit issuance. 6. This approval does not authorize any new or existing improvements (including landscaping) on California Coastal Permit Jurisdiction, State tidelands, public beaches, or the public right-of-way. Any improvements located on tidelands, submerged lands, and/or lands that may be subject to the public trust shall require a coastal development permit (CDP) approved by the California Coastal Commission (Coastal Commission). Before the issuance of building permits, the applicant shall provide a copy of said coastal development permit or CDP waiver or documentation from the Coastal Commission that subject improvements are not subject to the permit requirements of the Coastal Act and/or not located within the permit jurisdiction of the Coastal Commission. 13 Zoning Administrator Resolution No. ZA2023-### Page 7 of 9 01-10-2023 7. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 8. This Coastal Development Permit does not authorize any development seaward of the private property. 9. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 10. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 11. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 12. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 13. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 14 Zoning Administrator Resolution No. ZA2023-### Page 8 of 9 01-10-2023 14. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 15. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 16. The applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 17. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained are detrimental to the public health, and welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained to constitute a public nuisance. 18. Before the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 19. Before the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 20. Before issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 21. Before issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. The implementation shall comply with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 22. Before the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive plant species, and water-efficient irrigation design. The plans shall be approved by the Planning Division. 23. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 24. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. 15 Zoning Administrator Resolution No. ZA2023-### Page 9 of 9 01-10-2023 Noise-generating construction activities are not allowed on Saturdays, Sundays, or Holidays. 25. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Code. The maximum noise shall be limited to no more than depicted below for the specified periods unless the ambient noise level is higher: Between the hours of 7:00 AM and 10:00 PM Between the hours of 10:00 PM and 7:00 AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 26. Before the issuance of the building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 27. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 28. This Coastal Development Permit shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 29. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of 20 Balboa Coves, LLC including but not limited to, Coastal Development Permit (PA2023-0077). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. 16 Attachment No. ZA 2 Vicinity Map 17 VICINITY MAP Coastal Development Permit PA2023-0077 20 Balboa Coves Subject Property Subject Property 18 Attachment No. ZA 3 Project Plans 19 CRA I G S. H AM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E . Q UA R T E R S A W N STR E E T ~B OIS E ,IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                         Scale: 1/8" = 1'-0" Date: 6/9/23 Drawn: CSH 1 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/9/23 6/9 / 2 3 9 : 2 5 A M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n SIT E P L A N 6/9/23 N 74°54'30" E 219.78' N78°03'40"E214.80' (10. 9 5 ) (10.91) (10.73) (10.95) EXISTINGRESIDENCE EXISTING RESIDENCE FIREPIT EXIST SEAWALLPROTECT PLACE CAP ONEXIST SEAWALL BBQ REF 10.90 T.CAP EXIST WALLPROTECT EXISTWALL PROTECT 10.90TW TURF PA PA 12.70T W 12.71 T W 16.63TW 16.6 5 T W 16.69TW 16.83TW 13.6 4 TW 12.65TW 17.93TW17.85 T W 17.86TW 13.89T W 11.6NG 13.21TW N 3'-1 " BLD G . 3'-1" BLDG. 15'-1" B L DG. 5'-1"BLDG. 5'-1"BLDG. ELEVATOR GARAGECLG. 82 ENTRYCLG. 82 POWDERCLG. 90 LIVINGCLG. 90 DININGCLG. 90 KITCHENCLG. 90 BAR PORCHCLG. 82 AVERAGE GRADE CALCULATION PER NBZCEXISTING GRADES:10.95+10.95+10.73+10.91 (DIVIDE BY 4) = 10.89 19'-0" DEEP X 10'-0" WIDEPARKING AREA 19'-0" DEEP X 10'-0" WIDEPARKING AREA WATERHEATER NEWHARDSCAPEONTOPOFEXISTWALLWITHNEWCAPEXISTCONCSTEPSPROTECTINPLACE 10.85 T.DECKOVER CONCRETE SHEET INDEX ID 1 2 3 4 5 6 7 8 9 C2 C4 L-00 L-01 L02 L03 L04 L05 Name SITE PLAN LOWER LEVEL FLOOR PLAN UPPER LEVEL FLOOR PLAN THIRD LEVEL FLOOR PLAN ROOF PLAN FRONT/REAR & LEFT SIDE EXTERIOR ELEVATIONS RIGHT SIDE EXTERIOR ELEVATION FRONT/REAR & LEFT SIDE EXTERIOR ELEVATIONS TOPOGRAPHIC SURVEY PRECISE GRADING PLAN PRECISE GRADING PLAN LANDSCAPE COVER SHEET LANDSCAPE CONSTRUCTION PLAN LANDSCAPE CONSTRUCTION DETAILS LANDSCAPE IRRIGATION PLAN LANDSCAPE LIGHTING PLAN LANDSCAPE PLANTING PLAN SCALE: 1/8" = 1'-0" SITE PLAN PROJECT INFORMATION CUSTOM RESIDENCE FOR1010 Kings LLC3419 Via Lido #323Newport Beach, CA 92663 (714) 931-3287 JOB ADDRESS 20 Balboa CovesNewport Beach, CA 92663 LEGAL Lot 20 Tract 1011Block N/AZoning R-1APN: 423 031 21 SITE Lot Area 3,710 sq. ft.Buildable Lot Area 2,475 sq. ft.Project Buildable Area (1.71x) 4,232 sq. ft.Min. Open Volume Req'd. (15% of BA) 371 sq. ft. Project Open Volume (27.7%) 685 sq. ft. Max. Third Floor Area (15%) 371 sq. ft. Project Third Floor Area (14.9%) 370 sq. ft. RESIDENCE (4 bedrooms) NBZC MARKET Lower Level Floor Area 1,506 sq. ft. 1,506 sq. ft. Upper Level Floor Area 1,879 sq. ft. 2,029 sq. ftThird Level Floor Area 370 sq. ft. 520 sq. ftTotal Floor Area 3,755 sq. ft. 4,055 sq. ftGarage Area 477 sq. ft. Covered Front Porch 87 sq. ft. Upper Master Deck 135 sq. ft. Roof Deck 707 sq. ft. Covered Cabana 213 sq. ft. OCCUPANCY: R-3, U TYPE: V-B fire-sprinkled per NFPA 13D DESCRIPTION OF WORK:NEW 3-STORY SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE VICINITY MAP 20 CRA I G S. HAM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E. QUA R T E R S A W N STR E E T ~ BOIS E , IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                            Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 2 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n LO W E R L E V E L F L O O R P L A N 6/8/23 78'-0" 56'-6"21'-6" 6"22'-0"16'-6"5'-6"12'-0" 3'-8"4'-2"4'-2" 28' - 1 1 " 3'- 1 " 6'-2 " 10 ' - 1 1 " 11' - 1 0 " 4" 5'-1 0 " 14 1 / 2 " 8'- 6 " 14 1 / 2 " 20"8'-6"2 0" 78'-0" 22'-6"22'-6"10'-10" 17'-2" 5'-0" 16'-6"6'-0" 3'-1 " 26 ' - 6 " 3'- 1 " 6"22'-0" 2'-6 " 21 ' - 6 " 2'-6 " 5'-1 0 " 10 ' - 1 1 " 5'- 0 " 6'- 4 " 10 ' - 1 1 " 11' - 1 0 " 3'-0 " 8'-1 0 " W/C LA V ELEVATOR UP GARAGECLG. 82 ENTRYCLG. 82 POWDER CLG. 90 LIVINGCLG. 90 DININGCLG. 90 KITCHEN CLG. 90 SHELVES SH E L V E S BAR PORCHCLG. 82 19'-0" DEEP X 10'-0" WIDEPARKING AREA 19'-0" DEEP X 10'-0" WIDE PARKING AREA FR Z R . R E F R . UP 5" UP 5"UP 5" RANGE WATERHEATER SHOWER 62" F.P. DWMICROSINK SCALE: 1/4" = 1'-0" LOWER LEVEL FLOOR PLAN 21 CRA I G S. H AM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E . Q UA R T E R S A W N STR E E T ~B OIS E ,IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                         Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 3 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n UP P E R L E V E L F L O O R P L A N 6/8/23 W D 6'-0"77'-6" 5'-6" 6"75'-2"2'-4" 15'-6"17'-0" 9'-6" 2'-0" 12'-0" 19'-2" 7'-10"3'-6"5'-8"3'-8"4'-2"4'-2"5'-8"13'-6" 28' - 1 1 " 3'- 1 " 13'- 3 " 2'-6 " 13' - 2 " 6'-0"77'-6" 6"15'-6"29'-0"25'-0"5'-8"2'-4" 4'-10"6'-4"4'-4"15'-10"13'-2"10"10'-8"13'-6"2'-0" 3'-8" 12" 2'-8" 3'-1 " 26 ' - 6 " 3'- 1 " 24 " 22 ' - 6 " 24" LAV LAV TUB BEDROOM 4SLOPED CLG. 6:12 SLOPE SHELF & POLE BATH 3CLG. 80 SHOWER BE N C H W/C LA V BEDROOM 3SLOPED CLG. LAVLAV SHOWER W/C UP DN. SH E L F & P O L E SH E L F & P O L E ELEVATOR SHOWER BE N C H W/C 36" FIREPLACE SH E L F & P O L E SHELF & POLE SH E L F & P O L E SHELF & POLE BEDROOM 2 CLG. 80 6:12 SLOPE BATH 2CLG. 80 MASTERCLOSET CLG. 80 MASTER BATHCLG. 80 LAUNDRYCLG. 80 SIN K OPEN MASTERBEDROOMCLG. 90 DECK SKYLIGHTABOVE SKYLIGHT ABOVE +42" GLASS RAILING DECK DRAIN DECK DRAIN DECK DRAIN 2% SLOPE 2% SLOPE VENT +42" RAILING +42" GLASS RAILING +42 " G L A S S R A I L I N G SHOWER BENCH SHOWER SCALE: 1/4" = 1'-0" UPPER LEVEL FLOOR PLAN 22 CRA I G S. HAM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E. QUA R T E R S A W N STR E E T ~ BOIS E , IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                            Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 4 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n TH I R D L E V E L F L O O R P L A N 6/8/23 A12 A12 B12 B12 C12 C12 E12 E12 D12 D12 F12 F12 28' - 1 1 " 3'- 1 " 5'-7 " 21 ' - 4 " 24" 5'-6"75'-8" 56'-6"19'-2" 5'-6"75'-8" 16'-0"40'-6"13'-6" 24" 3'-8" 17'-0"23'-6" 3'-1 " 29' - 7 " 2'-6 " 21 ' - 6 " 2'-6 " 16'-6"16'-6"23'-6" 4'-7"6'-4"5'-7"6'-2"5'-4"12'-0" 6" 24" 6 " 6" 2 4 " DN. UP UP UP ELEVATORLA V SHOWER BE N C H W/C O P E NT OB E L O W BONUS ROOM DECK DECK DECK CABANA SLOPED CLG. 3:1 2 S L O P E 3:1 2 S L O P E SLOPED CLG. 3:1 2 S L O P E 3:1 2 S L O P E 3:12 SLOPE 3:12 SLOPE 3:12 SLOPE 36" FIREPLACE BATH 4 CLG. 80 SKYLIGHTABOVE +42" RAILING DECK DRAIN 2% SLOPE DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN 2% SLOPE 2% SLOPE 2% S LOPE +42" RAILING +42" RAILING +42 " R A I L I N G HEATPUMP +42" RAILING +42 " G L A S S R A I L I N G SCALE: 1/4" = 1'-0" THIRD LEVEL FLOOR PLAN 23 CRA I G S. H AM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E . Q UA R T E R S A W N STR E E T ~B OIS E ,IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                         Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 5 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n RO O F P L A N 6/8/23 SLO P E 2 % RIDGE VA LLEY RIDGE RIDG E RIDG E VALLEY VALLEY VALL E Y 6:1 2 6:1 2 3:123:12 3:123:12 3:1 2 3:1 2 3:1 2 3:1 2 3:123:12 RIDG E 3:12 3:12 3:12 3:12 3:12 SLOPE 2 % SLO P E 2 % SLOP E2%SLO P E 2 % RIDG E 31/ 2 " 3 1/2" 3 1 / 2 " 2 ' - 9 1 / 2 " RO O F 3 1 / 2 " 31 / 2 " 3 1 / 2 " 3 1 / 2 " 3'-0" 3'-0" 3'-0" 3 1 / 2 " 12" 31 / 2 " 2'-6"ROOF 6'-6 " 24"24" 24 " 24" 24" 24" UP UP DECK T.O.W. 34.89 T.O.W. 34.89 T.O.W.33.89 T.O.W. 33.89 T.O.W. 33.89 T.O . W . 3 3 . 8 9 39.89 39.89 39 . 8 9 39. 8 9 SK Y L I G H T S SKYLIGHTABOVE SKYLIGHTABOVE DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK DRAIN SCALE: 1/4" = 1'-0" ROOF PLAN 24 CRA I G S. H AM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E . Q UA R T E R S A W N STR E E T ~B OIS E ,IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                         Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 6 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n FR O N T / R E A R & L E F T S I D E E X T E R I O R EL E V A T I O N S 6/8/23 9'- 1 " 9'-1 " 29 ' - 0 " 10 " 8'- 3 " RIDGE 39.89 F.F. 11.18 3 6 14 AVG. GRADE 10.89 ENTRY F.F. 12.01 1 13 2 12 13 3 6 9 9 8 1 12 6 10 14 9'- 1 " 9'-1 " 29 ' - 0 " 8'- 1 " 7'- 1 " 24 ' - 0 " R A I L I N G RIDGE 39.89 F.F. 11.18 AVG. GRADE 10.89 T.O.W. 34.89 3 6 14 1 12 6 10 3 11 11 12 1 2 9'- 1 " 9'- 1 " 29 ' - 0 " 8'- 1 " 7'- 1 " 24 ' - 0 " R A I L I N G RIDGE 39.89 F.F. 11.18 AVG. GRADE 10.89 T.O.W. 34.89 3 6 14 3 12 1 13 8 14 14 7 7 1 3410 6 6 6 12 8 1313 11 T.O.W. 34.89            !)'* !  !   !)'* !  ( #! !&  *#!#) * %! !"  )$!* !  # ! )!!!!"!* # ( !!! (! !) * $$     )'*   !& )'*    !!!$" ) * "!! !)'*$ "! !! &!)'*  !!    SCALE: 1/4" = 1'-0" FRONT EXTERIOR ELEVATION SCALE: 1/4" = 1'-0" REAR EXTERIOR ELEVATION SCALE: 1/4" = 1'-0" LEFT SIDE EXTERIOR ELEVATION COLORS & MATERIALS 25 CRA I G S. H AM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E . Q UA R T E R S A W N STR E E T ~B OIS E ,IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                         Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 7 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n RIG H T S I D E E X T E R I O R E L E V A T I O N 6/8/23 9'-1 " 9'-1 " 29 ' - 0 " 8'- 1 " 7'- 1 " 24 ' - 0 " R A I L I N G RIDGE 39.89 F.F. 11.18 AVG. GRADE 10.89 T.O.W. 34.89 3 6 14 3 1 13 8 14 77 1 410 6 6 6 13 6 4 1 3 3 11            !)'* !  !   !)'* !  ( #! !&  *#!#) * %! !"  )$!* !  # ! )!!!!"!* # ( !!! (! !) * $$     )'*   !& )'*    !!!$" ) * "!! !)'*$ "! !! &!)'*  !!    SCALE: 1/4" = 1'-0" RIGHT SIDE EXTERIOR ELEVATION COLORS & MATERIALS 26 CRA I G S. HAM P T O N I N C O R P O R A T E D D E S I G N I N G Q U A L I T Y C U S T O M H O M E S S I N C E 19 7 9 55 0 0 E. QUA R T E R S A W N STR E E T ~ BOIS E , IDAH O 83 7 1 6 ( 9 4 9 ) 2 0 9 - 8 8 8 3 c r a i g @ c r a i g s h a m p t o n . c o m w w w . c r a i g s h a m p t o n . c o m                                                                            Scale: 1/4" = 1'-0" Date: 6/8/23 Drawn: CSH 8 OF SHEET SHEETS17 Job:20 BALBOA COVES CD P S U B M I T T A L P A C K A G E 6/8 / 2 3 1 : 5 5 P M 2 0 B A L B O A C O V E S _ L I B E R T O _ D E S I G N P A C K A G E . p l n FR O N T / R E A R & L E F T S I D E E X T E R I O R EL E V A T I O N S 6/8/23 27 JOB: DATE: 7/7/2022 949 422-1869 CELL 949 858-2924 OFFICE LAGUNA HILLS, CA 92653 23016 LAKE FOREST DR. #409 RdM SURVEYING INC. RON MIEDEMA L.S. 4653 RDMSURVEYING@COX.NET DESCRIPTION LEGEND OWNER:TOPOGRAPHIC SURVEY LEGAL DESCRIPTION:BENCH MARK:ADDRESS OF PROJECT: BEFORE STARTING GRADING. MONUMENT PROPERTY CORNERS OR OFFSETS SURVEYOR OR ENGINEER SHALL PERMANENTLY XX 123.45 P.P. WM F.F. G.F. CONC. F.S. M.H. P A.C. T.G. MEAS. ELEVATIONS TOP-GRATE ASPHALT PLANTER MAN-HOLE FINISH SURFACE CONCRETE GARAGE FLOOR FINISH FLOOR WATER METER POWER POLE FENCE PROPERTY LINE BUILDING WALL DECK BRICK REC. BRG. & DIST. NATURAL GRADEN.G. BENCH MARK SCALE 1"=8’ 0’ 8’ 16’ N A L D E S N E C I L R O Y E V R U S D L I F O R N I A S T A T E O F C A RON MIEDEMA No. 4653 20 BALBOA COVES NEWPORT BEACH EASEMENT NOTE: THE PLAT FOR THIS SURVEY WAS PREPARED WITHOUT A TITLE REPORT. UNPLOTTED EASEMENTS MAY EXIST ON THE SUBJECT PROPERTY. N 74 5 4 ’ 3 0 " E 2 1 9 . 7 8 ’ N 78 0 3 ’ 4 0 " E 2 1 4 . 8 0 ’ N 0 9 2 7 ’ 0 0 " E 2 7 . 3 4 ’ N 09 2 7 ’ 0 0 " E 3 6 . 0 0 ’ N 82 4 7 ’ 0 4 " W R A D . N 80 3 3 ’ 0 0 " W R A D . L = 4 . 2 9 ’ R = 1 1 0 . 0 0 ’ D = 2 1 4 ’ 0 4 " LOT 20 LOT 21 LOT 19 LOT 18 LOT 17 RESIDENCE RESIDENCE RESIDENCE RESIDENCE BA L B O A C O V E S 10.83 11.00 11.0 2 ST.LIGHT 10.78 10. 8 1 10.77 2"I.P. 10.77 10.7210.74 10.32FL 10.27FL 10.68 10.77 PK 10.5 5 WM 12.74TW 10.75FS 12.73TW 16.67TW 10.91FS EAV E 19.5 2 16.5 8 T W 10.90FS 10.91 10.74 10.68 CATV16.57TW 12.65TW 1"I.P . 10.7 5 10.75 10.87 10.70 10.66 10.72 EDISON 10.06FL 10.96GF EAVE 31.73 10.16FL 10.86 16. 6 3 T W GM 10.89 10.95 17.9 3 T W EAVE 31.80 10.90 EAVE 31.72 11.19FS 17.85TW 17.8 6 T W 10.82 10.83 17.8 5 T W 13.89TW EAVE 31.74 11.5 N G 10.91 10.81 11.6 N G 13.64TW 10.73FS 13.21TW 12.5 7 T W 10.49FS 11.0 9 10.98 12.51TW 11. 8 7 T W 11.87 T W 10.27 11.25 T W 7.96 11.18TW 6.2NG 10.50TW 7.8NG 10.53TW 10.35 8.0NG 10.56TW 10.34 EAVE 19.31 11.23FF 10.86 8.6NG 10.56TW 10.48FS 10.62TW 10.60TW7.95FS 10.62TW 8.00 7.94 10.69 11.36TW7.93FS 11.3 4 T W 12.69T W 11.60FS 11.37TW 8.2NG 12.70TW 12.71TW 16.63TW 11.77FS 16.65TW 10.95 11. 2 8 10.9 3 11. 0 7 10.9 6 16.69TW 11.6NG 10.9 10.95 16.83TW 16.88TW 10.91F S 11.2NG 11.0NG 16.8 6 T W 10.91GF 11.07 10.98 11.11FF 10.95FS 10.35FL 10.39FL N 44 3 3 ’ 0 1 " E 1 9 . 5 8 ’ T I E O N L Y N 19 5 7 ’ 0 0 " W 2 2 . 9 3 ’ T I E O N L Y N 64 0 8 ’ 1 5 " W 0 . 1 1 ’ N 08 5 8 ’ 4 3 " E 0 . 0 7 ’ L = 6 0 . 0 0 ’ R = 1 1 0 . 0 0 ’ D = 3 1 1 5 ’ 0 7 " N 65 5 7 ’ 4 9 " E R A D . N 46 3 5 ’ 1 9 " E 0 . 2 6 ’ FD. PIPE, LS 4653 LINE OF WATERWAY TOP RAILING27.97 TOP R A I L I N G 28.0 2 TOP RAILING 27.94 TOP RAILING 27.97 TOP RAILING 28.01 TOP R A I L I N G 28.2 5 TOP RAILING 28.21 TOP RAILING28.22 GUTTER GUTTER GUTTER GUTTER GUTTER GUTTER CONC. AC CONC. CONC. CONC. CONC. CONC. CONC. CONC. AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC CONC. CONC. CONC. CONC. CONC. CONC.CONC. CONC. CONC. CONC. CONC. CONC. CONC. CONC.CONC. CONC. CONC. CONC. CONC. CONC. CONC. CONC.CONC.CONC. CONC. CONC. CONC. CONC. CONC. CONC. CONC.CONC. CONC. CONC.CONC.CONC.CONC.CONC.CONC. WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER P P P P P P PPPP X X LOT 20 TRACT NO. 1011 M.M. 36/37-40 COVERED AREA 2.1 2.8 4.0 4.4 2.6 3.5 2.6 4.1 3.3 3.1 10.55CP, 40.50RIDGE,40.50RIDGE,40.50RIDGE, 39.00RIDGE,38.97RIDGE, 28.30RIDGE, 30.72RIDGE, 30.43RIDGE, 26.20RIDGE, 28.28RIDGE, 30.43RIDGE, 30.40RIDGE, 21.55RIDGE,22.18RIDGE, 10.94CP, 7.60NG,4.94NG, 4.55NG, 4.62NG, 4.96NG, 10.56FS, 10.88FS, 10.98FS,10.93CP, 21.84RIDGE, 38.99RIDGE, 39.05RIDGE, 8.52LT LS 4653, 5.591"IP LS6902, 6.37LT LS6902, 6.11LT , -77.01BLDG.LN., CONC. P 20 Balboa Coves LLC Brian Liberto County of Orange Bench Mark NB 2 7 77 Eievation = 8.56 9OF SHEET SHEETS17 CD P S U B M I T T A L P A C K A G E 28 C2 OF SHEET SHEETS17 29 C4 OF SHEET SHEETS17 30  !" #$%&'()*+ !(,-./ -, 0%&&$#1230#4312$2*5,'6*5,'7!8**(99:-;  !"#$%&&"'!( '+<-( + -'+*,-+*9=x -'+*,-+*9 9.,>> '+<?5 *5,' !8**(99 <'-: ? ,'5 (***9/ ;<99<'9/ 7<9-*(,'-<(9/ * 9(-<?<-,+<'9 9 +.,+ *5,' !8**(99 <'- -,' -**(-+ *<* + -;;('-(;('+ ? -'9+*8-+<': x ,>> )*@ 9.,>> !( 7'( <' -;><,'-( ? >-,> -7(9 ,'7 9+,'7,*7 <'789+*5 *,-+<-(:x ,>> )*@;,'9.< 9.,>> !( ? A8,><+5 + ,99 <'9(-+<'9 !5 ,><-,!>( >-,> ,8+.*<+<(9:x +.( -'+*,-+* 9.,>> 98!;<+ ,>> B98!9+<+8+<'9 * (A8,>9B ?* ,*C,> + *5,' !8**(99 <'-x 7 '+ 9-,>( 7*,)<'D9 *E(-+ 7(9-*<+<'9.((+ <'7(">,'79-,( 7(9<D'(* ,>> >,'79-,( )<>> -;>5 )<+. -<+5 ,'7 9+,+( *(D8,>,+<'9 <' *(D,*79 + ),+(* (??(-<('+ >,'79-,<'D/ ,'7 -;>5 )<+. ,>> ,><-,!>( *7<','-(9: 9-( ? )*@x'() ?>,+)*@x'() !!Ax'() >,'+9x'() ><D.+<'D >,'79-,( ,*(, ++,>9x++,> >+ ,*(, F &/#&4 GHIJx++,> .89( ?+*<'+ K<'->87<'D D,*,D( L *-.M F NGHIJx++,> >,'79-,( ,*(, F NGHIJx++,> ''3>,'79-,( ,*(, F NGHIJx++,> >,)' ,*(,F NO KN GHIJMx> ,*(, F NGHIJ %N ! , > ! , - C( 9 ()'%!*"'!+,- *',! !*<,' ><!(*+%N !,>!, -C(9'()*+ !(,-./ -, 0%&&$ >+P %N +*,-+P 1N11 >3N13 -'9+*8-+<' >,'>3N%3 -'9+*8-+<' 7(+,<>9>3N$3 <**<D,+<' >,'>3N23 ><D.+<'D >,'>3N43 >,'+<'D >,' C<-<'<+5 ;,  AÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈË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ÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈËF 1 1 % % % $ 2 4 & # W 0 1N 11 1% 32 ./"# )#, "(,0%&EQRSQTU 2/ %N%$%N !,>!, -C(9/ '()*+ !(,-./ -, 0%&&$/.) (, ! & * $( * ' , ! " 3 % * ' ) & - *%' )&"6"+'!'&7%&  AÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈËF 1 8 *%"3%* ')9"(%3 :;<=>?"!*& D,+( 7(+,<> &V3N B $V3NB 1: %"2 )(9+(*' *(7 -(7,* E,;!9 %: 9<7(K9M *,<>/ ;<7 *,<>/ ,'7 + *,<> + !( %"& )(9+(*' *(7 -(7,* $: !++; *,<> + !( %"W )(9+(*' *(7 -(7,* 2: '<-@>( D, 7(,+<> !+. 9<7(9 4: ,>> .,*7),*( + ;,+-. .89(: .<'D(9 ;89+ !( 9(>? ->9<'D &: D,+( ;89+ ;((+ > 9,?(+5 *(A8<*(;('+9 <? ,><-,!>(: ;<' &NB .(<D.+ ,'7 ;<' %B ->(,*,'-( ?*; ?:9: + !++; ? D,+(: >,+-. ;89+ !( <'9+,>>(7 ;<' &NB ?*; ?>*: #: D,+( + !( ,<'+(7 L 9+,<'(7/ C(*<?5 ->* )<+. )'(* * 7(9<D'(*: <'9+,>> -(* -, ,+ 7* >(,? ,'7 + ? E,;!9: . +'%2'*"3%* '):;<=>?"!*& +8*? X1&B +::) L WB -;8 1V32B %B 1V3&B !(,8?*7 ><;(9+'( 4-; -<'D -, 12B"$&B >7 ;<99<' -*(,; ><;(9+'( )<+. 8*!,' 8++5->*(7 D*8+ ('C5 >,)' ,*+<?<-<,> +8*? $LWB -*89.(7 !>,-@ >,C, *-@ )L2B D*(5 -(*;,<- ?<*( !,>>9 *C<7( 2B 7*,<' ,'7 -'-*(+( !,9( @ ##A"3%* '):;<=>?"!*& *(? 1: !,9,>+<' K!,9,>+M -8'+(*+ )<+. %B 9@<*+ %: >7 ;<99<' -*(,; ><;(9+'( $: +)<' (,D>(9 +(!A$&D3-' !!A 2: +)<' (,D>(9 +(77$&%3! 7*,)(* 7* -;! 4: +)<' (,D>(9 +(*7%2%3D 7*,)(* *(?*<D(*,+* 1 % $ 2 4 WV3&B1V32B1V3%B $V31 B #% $+,3"*')% *'+'(' )"*$+,)3"-'&&',!"(% -")'-%&*,!%*7%-,"47'*%" &7#,5  "(,##)%&*,!% 33 ./"# )#, "(,0%&EQRSQTU 2/ %N%$%N !,>!, -C(9/ '()*+ !(,-./ -, 0%&&$/@) ' '8 * ' , ! " 2 ) ! 9-,>( 3 $L1&B F 1V  !"#$%&' ()'#*#+ %),-.#!) %,*#,!%/0%*123%45567829%:;7<4273%5=63:=25<2>6%=6?@2=6A67<3%B12:1%A4C%D6%@368%43%4%:;A5E247:6%;5<2;7%<;%<16%,=82747:6F%/G0%);A5E247:6%B2<1%<16%H;EE;B27I%2<6A3%23%A4784<;=C%478%A@3<%D6%8;:@A67<68%27%4%E4783:456%5E47%27%;=86=%<;%@36%<16%5=63:=25<2>6%:;A5E247:6%;5<2;7J%/K0%(@DA2<%4%.4783:456%";:@A67<4<2;7%4:L4I6%B12:1%27:E@863%<16%H;EE;B27I%6E6A67<3J%/40%"4<6%/D0%=;M6:<%455E2:47<%/:0%=;M6:<%488=633%/2H%4>42E4DE6N%54=:6E%478O;=%E;<%7@AD6=%/300%/80%*;<4E%E4783:456%4=64%/3?@4=6%H66<0N%27:E@827I%4%D=64L8;B7%;H%<@=H%478%5E47<%A4<6=24E%/60%=;M6:<%<C56%/6FIFN%76BN%=614D2E2<4<68N%5@DE2:N%5=2>4<6N%:6A6<6=CN%1;A6;B76=P273<4EE680%/H0%Q4<6=%3@55EC%<C56%/6FIFN%5;<4DE6N%=6:C:E68N%B6EE0%478%2867<2HC%<16%E;:4E%=6<42E%B4<6=%5@=>6C;=%2H%<16%455E2:47<%23%7;<%36=>68%DC%4%5=2>4<6%B6EE%/I0%);7<4:<%27H;=A4<2;7%H;=%<16%5=;M6:<%455E2:47<%478%5=;56=<C%;B76=%/10%55E2:47<%32I74<@=6%478%84<6%B2<1%3<4<6A67<N%R#%4I=66%<;%:;A5EC%B2<1%<16%=6?@2=6A67<3%;H%<16%5=63:=25<2>6%:;A5E247:6%;5<2;7%<;%<16%-Q .,S%/T0%#7:;=5;=4<6%:;A5;3<%4<%4%=4<6%;H%4<%E643<%H;@=%:@D2:%C4=83%56=%KNUUU%3?@4=6%H66<%<;%4%865<1%;H%329%27:163%27<;%E4783:456%4=64%/@7E633%:;7<=4P2782:4<68%DC%4%3;2E%<63<0V%/W0%E47<%A4<6=24E%314EE%:;A5EC%B2<1%4EE%;H%<16%H;EE;B27IJ%/40%X;=%=632867<24E%4=643N%273<4EE%:E2A4<6%4845<68%5E47<3%<14<%=6?@2=6%;::432;74EN%E2<<E6%;=%7;%3@AA6=%B4<6=%/4>6=4I6%QY),.(%5E47%H4:<;=%UFW0%H;=%Z[\%;H%<16%5E47<%4=64%69:E@827I%682DE63%478%4=643%@327I%=6:C:E68%B4<6=V%X;=%7;7P=632867<24E%4=643N%273<4EE%:E2A4<6%4845<68%5E47<3%<14<%=6?@2=6%;::432;74EN%E2<<E6%;=%7;%3@AA6=%B4<6=%W]%/4>6=4I6%QY),.(%5E47%H4:<;=%UFW0%H;=%KUU\%;H%<16%5E47<%4=64%69:E@827I%682DE63%478%4=643%@327I%=6:C:E68%B4<6=V%/D0%%A272A@A%<1=66%27:1%/WS0%E4C6=%;H%A@E:1%314EE%D6%455E268%;7%4EE%695;368%3;2E%3@=H4:63%;H%5E47<27I%4=643%69:65<%27%<@=H%4=643N%:=66527I%;=%=;;<27I%I=;@78:;>6=3N%;=%82=6:<%366827I%455E2:4<2;73%B16=6%A@E:1%23%:;7<=42782:4<68F%%  !"#$%&%),!*^"FF/_0%*@=H%314EE%:;A5EC%B2<1%4EE%;H%<16%H;EE;B27IJ%/40%*@=H%314EE%7;<%69:668%T[\%;H%<16%E4783:456%4=64%27%=632867<24E%4=643N%478%<@=H%314EE%7;<%D6%5E47<68%27%7;7P=632867<24E%4=643%/D0%*@=H%314EE%7;<%D6%5E47<68%;7%3E;568%4=643%B12:1%69:668%4%3E;56%;H%K%H;;<%>6=<2:4E%6E6>4<2;7%:147I6%H;=%6>6=C%_%H66<%;H%1;=2`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a[%;=%12I16=%@327I%<16%5=;<;:;E%86H2768%27%(G O#))%]UTPTUK_F%/)0%<%<16%<2A6%;H%H274E%27356:<2;7N%<16%56=A2<%455E2:47<%A@3<%5=;>286%<16%Wb% ;B76=%;H%<16%5=;56=<C%B2<1%4%:6=<2H2:4<6%;H%:;A5E6<2;7N%:6=<2H2:4<6%;H%273<4EE4<2;7N%2==2I4<2;7%3:168@E6%478%4%3:168@E6%;H%E4783:456%478%2==2I4<2;7%A427<6747:6 Gc%(#d!#!d%G .,Q%#%d' %*,%..%',+#(#,!(%',+#" "%#!%*& % !"#$%e&e%,X%*& %! Q,'*%G )&%.!"() %,'"#!!) (#d!fffffffffffffffffffffffffffffffffff "* fffffffffffffffffffffffffffffffffff%  AÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËF *(998*( -;('9,+<'D ?8>>3-<*->( !8!!>(**,<'!<*7 12NN ' , 1WN2 381B >,*D( -,,-<+5 ?<>+(* )<+. C,>C(<'9+,>>(7 <' C,>C( !" "?9 98!398*?,-( 7*<><'(+5<-,> 77 -8*C( >,58+"?9 98!398*?,-( 7*<><'(<**(D8>,* 9.,(7 >,58+ A? .(,7(* "?9 98!398*?,-( 7*<><'(;8>+<>( +*(( L 9.*8! 7(+,<>"?9 98!398*?,-( 7*<><'(9>(7 >,58+ "?9 98!398*?,-( 7*<><'(-('+(* ?((7 >,58+ A? .(,7(* 1WN& 38 9*,5 9*<'@>(*)<+. *+,*5 'YY>((93;( ;78>,* .5!*<7 -'+*>>(*8+7* ;7(> 1 % $2 4 & #W 0 1N (>(-+*<- *(;+(3-'+*> C,>C(,9C? 9(*<(9 ?<*( <+ !!A *(? +8*? 9.)(*  AÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈË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ÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈË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`J ab`QJ^bRG bI Qaa SR[\TcTbSR[ SJ^a^J^\G QR[ d\T^IU ^R I^\a[: *\ebTJ QRU `bRIa^`JG Jb \Rc^R\\T eT^bT Jb f\c^RR^Rc gbTh: %: <RIbT] QT`i^J\`J bT [\G^cR\T QG \Q`i eiQG\ bI gbTh ^G SR[\TJQh\R: $: -bRJTQ`JbT ^G T\GebRG^fa\ IbT ]Q^RJQ^R^Rc `STT\RJ `bR[^J^bRG bR G^J\: ,RU [Q]Qc\ JiQJ b``STG Jb G^J\ [ST^Rc `bRGJTS`J^bR ^G `bRJTQ`JbTVG T\GebRG^f^a^JU g^JibSJ \_e\RG\ Jb bgR\T: 2: TbJ\`J \_^GJ^Rc d\c\JQJ^bR ^R`aS[^Rc Qaa \_^GJ^Rc eQThgQU QR[ ^RJ\T^bT JT\\G: *\eaQ`\ [Q]Qc\[ d\c\JQJ^bR g^Ji QeeTbd\[ G^]^aQT ]QJ\T^Qa: 4: -QT\ISaaU ]Q^RJQ^R eT\G\RJ cTQ[\ [T^ea^R\ bI Qaa \_^GJ^Rc JT\\G Jb T\]Q^R: T\d\RJ QRU [^GJSTfQR`\ bI \_^GJ^Rc JT\\G: 8G\ JT\\ eTbJ\`J^bR gi\T\ ^R[^`QJ\[: TbJ\`J \_^GJ^Rc JT\\G Jb T\]Q^R ^R eaQ`\ QcQ^RGJ SRR\`\GGQTU `SJJ^Rc/ fT\Qh^Rc bT Gh^RR^Rc bI TbbJG/ fTS^G^Rc bI fQTh bT G]bJi\T^Rc bI JT\\G: 7T^d^Rc/ eQTh^Rc/ [S]e^Rc/ GJb`he^a^Rc QR[LbT GJbTQc\ bI d\i^`a\G/ \HS^e]\RJ/ GSeea^\G/ ]QJ\T^QaG bT [\fT^G bR Jbe bI Ji\ TbbJ jbR\G QR[LbT g^Ji^R Ji\ [T^ea^R\ bI \_^GJ^Rc JT\\G bT bJi\T eaQRJ ]QJ\T^Qa Jb T\]Q^R ^G GJT^`JaU eTbi^f^J\[: &: ;Q^RJQ^R G^J\ [TQ^RQc\ [ST^Rc aQR[G`Qe\ ^RGJQaaQJ^bR: #: T^bT Jb aQR[G`Qe\ ^RGJQaaQJ^bR/ d\T^IU eaQRJ^Rc QT\QG QT\ cTQ[\[ QJ XL3 N:1 IbbJ Jb I^R^Gi cTQ[\: W: ?^R^Gi cTQ[\ Jb 1B f\abg I^R^Gi eQd^Rc GSTIQ`\ ^R aQgR QT\QG QR[ %B f\abg ^R eaQRJ^Rc QT\QG: 0: *\cTQ[\ QR[ G\\[ Qaa aQgR QT\QG [^GJSTf\[ [ST^Rc `bRGJTS`J^bR JiQJ QT\ RbJ `Qaa\[ bSJ Jb f\ Gb[[\[ bT eaQRJ\[: -bd\T G\\[\[ QT\QG g^Ji Q f^b[\cTQ[Qfa\ ]Sa`i faQRh\J: +i^G g^aa RbJ f\ eQ^[ IbT G\eQTQJ\aU fSJ GiQaa f\ `bRG^[\T\[ ^R`aS[\[ ^R Ji\ `bGJ bI Ji\ eaQRJ^Rc ^J\]G :<b: -bRI^T] Qaa eaQRJ HSQRJ^J^\G: Tbd^[\ eaQRJ ]QJ\T^QaG GSII^`^\RJ Jb `bd\T QT\QG GibgR bR eaQRG QJ Ji\ GeQ`^RcG ^R[^`QJ\[: 11: Tbd^[\ G^Rca\ JTSRh GJQR[QT[ JT\\G SRa\GG RbJ\[ bJi\Tg^G\ 1%: Tbd^[\ ^[\RJ^I^`QJ^bR JQc ITb] Ji\ GSeeaU^Rc RSTG\TU Gibg^Rc `b]]bR QR[ fbJQR^`Qa eaQRJ RQ]\G IbT QJ a\QGJ bR\ eaQRJ bI \Q`i Ge\`^\G [\a^d\T\[ Jb Ji\ G^J\: TbJ\`J Qaa eaQRJG QcQ^RGJ i\QJ/ GSR/ g^R[ QR[ ITbGJ [ST^Rc JTQRGebTJQJ^bR Jb Ji\ G^J\ QR[ gi^a\ f\^Rc i\a[ QJ Ji\ G^J\: 7b RbJ GJbT\ eaQRJG ^R JbJQa [QThR\GG ]bT\ JiQR bR\ [QU: 1$: 7b RbJ [Q]Qc\ eaQRJ TbbJ fQaa [ST^Rc JTQRGebTJQJ^bR bT eaQRJ^Rc: 12: 'bJ^IU Ji\ QT`i^J\`JL[\G^cR\T QJ Ji\ J^]\ bI [\a^d\TU bI QRU eaQRJ ]QJ\T^Qa JiQJ ^G [Q]Qc\[ bT ^R ebbT `bR[^J^bR: 14: ,T`i^J\`JL[\G^cR\T T\G\Td\G Ji\ T^ciJ Jb ^RGe\`J Qaa eaQRJ ]QJ\T^QaG f\IbT\ eaQRJ^Rc: ;QJ\T^Qa ]QU f\ T\k\`J\[ QJ QRU J^]\ [S\ Jb `bR[^J^bR/ IbT] bT [Q]Qc\ f\IbT\ bT QIJ\T eaQRJ^Rc: 1&: *\]bd\ Qaa Tb`h QR[ [\fT^G 1B QR[ aQTc\T ITb] eaQRJ^Rc QT\QG: >\cQaaU [^GebG\ Qaa \_`\GG ]QJ\T^QaG T\GSaJ^Rc ITb] Ji\ gbTh: 1#: *\]bd\ QccT\cQJ\ Jb QR Q[\HSQJ\ [\eJi Jb \RGST\ JiQJ Rb eQTJ bI Ji\ eaQRJ ]QJ\T^Qa ^G ^R `bRJQ`J bT QII\`J\[ fU Ji\ a^]\ ^R Ji\ QccT\cQJ\ QG QeeTbd\[ fU QT`i^J\`J: 1W: <R eaQRJ^Rc Gb^a e^J/ T\]bd\ QRU `TSGi\[ QccT\cQJ\ Jb QR Q[\HSQJ\ [\eJi Jb \RGST\ JiQJ Rb eQTJ bI Ji\ eaQRJ ]QJ\T^Qa ^G ^R `bRJQ`J bT QII\`J\[ fU Ji\ a^]\ bT a^]\GJbR\ ^R Ji\ QccT\cQJ\ 10: Tbd^[\ R\g JbeGb^a JiQJ ^G I\TJ^a\/ IT^Qfa\ QR[ RQJSTQa abQ] GSTIQ`\ Gb^a/ T\QGbRQfaU IT\\ bI GSfGb^a/ `aQU/ `aQU aS]eG/ fTSGi/ g\\[G/ QR[ bJi\T a^JJ\T QR[ IT\\ bI TbbJG/ GJS]eG/ GJbR\G aQTc\T JiQR %B ^R QRU [^]\RG^bR QR[ bJi\T \_JTQR\bSG bT Jb_^` ]QJJ\T iQT]ISa Jb eaQRJ cTbgJi: fJQ^R JbeGb^a ITb] ab`Qa GbST`\G bT ITb] QT\QG iQd^Rc G^]^aQT Gb^a `iQTQ`J\T^GJ^`G Jb JiQJ R\`\GGQTU IbT d^cbTbSG cTbgJi bI Ge\`^I^\[ eaQRJ^RcG: fJQ^R JbeGb^a JiQJ b``STG ^R Q [\eJi bI RbJ a\GG JiQR &B: 7b RbJ bfJQ^R Gb^a ITb] fbcG bT ]QTGi\G: 9\\ Ge\`^Qa eTbd^G^bRG: %N: ;^_ `b]ebGJ QR[ I\TJ^a^j\TG g^Ji JbeGb^a bR Q G^J\ Ge\`^I^` fQG^G QJ TQJ\G QeeTbeT^QJ\ IbT eaQRJ^RcG ^R Q``bT[QR`\ g^Ji Ji\ Ge\`^Qa eTbd^G^bRG: %1: 9JQh\ ab`QJ^bR bI Qaa JT\\G/ i\[c\ a^R\G QR[ eaQRJ^Rc f\[G QR[ RbJ^IU QT`i^J\`J IbT T\d^\g eT^bT Jb eaQRJ^Rc: %%: +i\ eaQRJ^Rc eaQRG QT\ [^QcTQ]]QJ^`: 9ebJ eaQRJ ]QJ\T^QaG QeeTb_^]QJ\aU QG GibgR bR Ji\ aQR[G`Qe\ [TQg^Rc QR[ RbJ^IU \Rc^R\\T IbT T\d^\g f\IbT\ T\]bd^Rc ITb] `bRJQ^R\TG: %$: <RGJQaa Qaa eaQRJ ]QJ\T^Qa ^R Q``bT[QR`\ g^Ji [\JQ^aG QR[ Ge\`^I^`QJ^bRG: %2: *\]bd\ Qaa eaQRJ JU^Rc ]QJ\T^Qa QR[ ]QTh^Rc JQe\G QJ Ji\ J^]\ bI eaQRJ^Rc: %4: <RGJQaa Q ]^R $B aQU\T bI fQTh ]Sa`i QTbSR[ Qaa JT\\G QR[ GiTSfG QR[ ^R Qaa eaQRJ^Rc QT\QG SRa\GG RbJ\[ bJi\Tg^G\: -T\QJ\ Q RQJSTQa GeQ[\[ \[c\ gi\T\ eaQRJ^Rc f\[G ]\\J JSTI QT\QG: 9\\ Ge\`^Qa eTbd^G^bRG: %&: <RGJQaa Q aB ]SGiTbb] `b]ebGJ aQU\T QTbSR[ Qaa JT\\G QR[ GiTSfG QR[ ^R Qaa eaQRJ^Rc QT\QG SRa\GG bJi\Tg^G\ RbJ\[: %#: )QJ\T Qaa eaQRJG ^]]\[^QJ\aU QIJ\T eaQRJ^Rc: ?abb[ eaQRJG Jg^`\ [ST^Rc I^TGJ Jg\RJU3IbST3ibST e\T^b[ bI eaQRJ^Rc: %W: DSU QR[ GJQh\ JT\\G/ QG [^T\`J\[ fU QT`i^J\`J/ ^]]\[^QJ\aU QIJ\T eaQRJ^Rc: Tbd^[\ Q ]^R^]S] bI Jgb cSU g^T\G e\T JT\\ bR Ji\ Sei^aa G^[\ bI JT\\G eaQRJ\[ bR Gabe\G GJ\\e\T JiQR $=1: %0: TSR\ Qaa [\`^[SbSG GiQ[\ JT\\G IbT Q ]^R^]S] abg\GJ fTQR`i i\^ciJ bI 4 I\\J: $N: <RGJQaa QR[ ]Q^RJQ^R Gb[ Jb eT\d\RJ \d^[\RJ G\Q]G: $1: TbJ\`J G\\[\[ QT\QG QR[ Gabe\G QcQ^RGJ \TbG^bR QR[ G\\[ abGG [S\ Jb f^T[G QR[ bJi\T g^a[a^I\ fU QeeaU^Rc GibTJ J\T]/ f^b[\cTQ[Qfa\ \TbG^bR `bRJTba faQRh\JG/ ]QJG/ QR[LbT R\JJ^Rc QIJ\T `b]ea\J^bR bI G\\[^Rc be\TQJ^bRG: ,[i\T\ Jb ]QRSIQ`JST\TVG Ge\`^I^`QJ^bRG IbT T\HS^T\[ eaQ`\]\RJ QR[ GJQh^Rc: $%: ,aa gQJ\T ]Q^R gbTh ]SGJ f\ `b]ea\J\[ eT^bT Jb Ji\ ^RGJQaaQJ^bR bI QRU eTbebG\[ aQR[G`Qe^Rc: $$: 'b JT\\G ]QU f\ eaQRJ\[ bd\T gQJ\T ]Q^RG a\GG JiQR %23^R`i [^Q]\J\T SRa\GG Ji\U T\Q`i Q ]Q_^]S] ]QJST\ i\^ciJ bI $N I\\J QR[ Q ]Q_^]S] ]QJST\ TbbJ [\eJi bI $N ^R`i\G: bJ\RJ^Qa eaQRJ^RcG JiQJ ]\\J Ji^G T\HS^T\]\RJ ^R`aS[\ Ji\ Ibaabg^Rc= ,: TRQ]\RJQa GiTSfG bT fSGi\G ]\\J^Rc Ji\ ]QJST\ i\^ciJ QR[ ]QJST\ TbbJ [\eJi QG eT\d^bSGaU GJQJ\[: !: ?abg\TG bT bJi\T RbR3gbb[U i\TfQ`\bSG eaQRJG: -: ,fbd\ cTbSR[/ T\]bdQfa\ eaQRJ^Rc `bRJQ^R\TG JiQJ `QR f\ ]bd\[ fU `bRGJTS`J^bR \HS^e]\RJ ^R Ji\ \d\RJ JiQJ gQJ\T ]Q^R T\eQ^T kG T\HS^T\[: $2: (_^GJ^Rc JT\\G eaQRJ\[ Qfbd\ gQJ\T ]Q^RG JiQJ [b RbJ ]\\J Ji\G\ T\HS^T\]\RJG [b RbJ R\\[ Jb f\ T\]bd\[: .bg\d\T/ ^I GS`i \_^GJ^Rc JT\\G QT\ T\]bd\[/ Qaa eTbebG\[ JT\\G ^RGJQaa\[ ^R Ji\^T eaQ`\ ]SGJ ]\\J Ji\ Qfbd\3]\RJ^bR\[ T\HS^T\]\RJG: 9ibSa[ ^J f\ R\`\GGQTU IbT Ji\ [\eQTJ]\RJ bI gQJ\T ]QRQc\]\RJ Jb Q``\GG QRU bI ^JG IQ`^a^J^\G/ Ji\ [\eQTJ]\RJ bI gQJ\T ]QRQc\]\RJ GiQaa bRaU f\ T\GebRG^fa\ IbT JUe^`Qa eQd\]\RJ/ G^[\gQah QR[ cTQGG T\GJbTQJ^bR: $4: 'b eaQRJ ]QJ\T^Qa GiQaa f\ ^RGJQaa\[ f\IbT\ f\abg3cTbSR[ ^TT^cQJ^bR GUGJ\] `b]ebR\RJG iQd\ f\\R ^RGJQaa\[ QR[ QT\ be\TQJ^bRQa: $&: +T\\G QR[ GiTSfG ]SGJ f\ ^RGJQaa\[ eT^bT Jb e\T\RR^QaG QR[ cTQGG\G Jb \GJQfa^Gi eTbe\T aQUbSJ QR[ Jb Qdb^[ [Q]Qc\ Jb bJi\T G]Qaa\T eaQRJ^RcG $#: +STI [b\G RbJ \_`\\[ %4O bI Ji\ aQR[G`Qe\ QT\Q/ QR[ JSTI g^aa RbJ f\ eaQRJ\[ ^R RbR3T\G^[\RJ^Qa QT\QG $W: <R`bTebTQJ\ `b]ebGJ QJ Q TQJ\ bI QJ a\QGJ 2 `Sf^` UQT[G e\T 1/NNN GHSQT\ I\\J/ Jb Q [\eJi bI &B ^RJb aQR[G`Qe\ QT\Q/ SRa\GG `bRJTQ[^`J\[ fU Q Gb^aG J\GJ/ QR[ bT T\`b]]\R[QJ^bR ITb] Gb^aG \Rc^R\\T: ?<*( <+ !!A *(? +8*? 9.)(*  AÁÂÄÁÀÅÃÆÆ BCÇDCÐEÁÉÊÁËÈËFBCÇDCÐEÁÉÊÁËÈËF 36