Loading...
HomeMy WebLinkAboutPA2021-285_20230613_PRR 2nd Review WQMP 6-13-2023Tmplt: 06/07/19 P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: Grading-Geotech/Sergio Gutierrez Date: February 1, 2023 Please return PRR and Plans to Staff Planner Joselyn Perez, Assistant Planner 949-644-3312 jperez@newportbeachca.gov Applicant: Studio William Hefner Contact: Michael Aquino 323-931-1365 Project Name 125 E Bay Front CDP Address: 125 and 125 ½ East Bay Front (PA2021-285) CD2021-073 Coastal Development Permit to demolish an existing duplex and construct one single-family residence with junior accessory dwelling unit. Project includes a basement and dewatering plans, attached here for review. REPORT REQUESTED BY: February 10, 2023 ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply:  No comments on the project as presented. Notes: Priority WQMP is Required for this project. Grading Plans have not been submitted with the Architects CDP submittal, sheets C-1, C-2 and CP-1, need to be looked at. Property drainage shall gravity flow to an approved drainage device. No stormwater shall out-let to the bay. Sergio Gutierrez 3213 6/13/2023 Signature Ext. Date  Application of Standard Code requirements are not expected to alter the project design.  Recommended conditions of approval are attached. X Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project.  I contacted the applicant on  To schedule an appt. for Code review  To discuss the following (see notes)