HomeMy WebLinkAboutPA2021-285_20230613_PRR 2nd Review WQMP 6-13-2023Tmplt: 06/07/19
P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: Grading-Geotech/Sergio Gutierrez
Date: February 1, 2023
Please return PRR and Plans to Staff Planner
Joselyn Perez, Assistant Planner 949-644-3312 jperez@newportbeachca.gov Applicant: Studio William Hefner Contact: Michael Aquino 323-931-1365 Project Name 125 E Bay Front CDP
Address: 125 and 125 ½ East Bay Front
(PA2021-285) CD2021-073
Coastal Development Permit to demolish an existing duplex and construct one single-family residence with junior accessory dwelling unit. Project includes a basement and dewatering plans, attached here
for review.
REPORT REQUESTED BY: February 10, 2023
ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply:
No comments on the project as presented.
Notes:
Priority WQMP is Required for this project. Grading Plans
have not been submitted with the Architects CDP submittal, sheets
C-1, C-2 and CP-1, need to be looked at. Property drainage shall
gravity flow to an approved drainage device. No stormwater shall
out-let to the bay.
Sergio Gutierrez 3213 6/13/2023
Signature Ext. Date
Application of Standard Code requirements are not expected to alter the project design.
Recommended conditions of approval are attached. X Application of Standard Code
requirements or the attached conditions of approval will substantially impact or alter the design of the project.
I contacted the applicant on
To schedule an appt. for Code review
To discuss the following (see notes)