FM SPREWLER NFPA 13D SYSTEM
FMALL CHECKLIST
(RESIDENTIAL)
YES No
1. water meter proper s¢e
d ❑
2 Fire sprinkler system mstatled per the approved plans ❑
3. All construction covers removed from sprinkler heads
El
4. Cover plates are NOT to be installed, but shall be available on the jobsite d ❑
5. All tape and paint removed from sprinkler heads F2 Ela. Finish true ustalled around sprinkler heads ❑
7. Proper signage posted at all required locations / ❑
8. Flow test conducted and tell tested ®// ❑
9. Locationof insPecbes testing valve in approved location l�Yl( ❑
SYSTEMS:
10, Clearances around sprinkler heads and riser - no obstructions / ❑
11. Operating pressure gauge installed at riser showing proper water pressure W ❑
12. Back flow preventer installed ❑
13.. System Installed per manufacturers sPecifications El
FIRE SPRINKLER NFPA 13O SYSTEM FINAL APPROVED: �% _ DO r
PERMIT # l
DATE: 5-7 N - Z 3
BY:
Forms\ Fire Sprinkler NFPA 1FD Syt -FlNAL n,kl' SOFDEN ALOS/12/ill
CITY OF NEWPOR'T BEACH
COS DEVEL,OPNffiNT DEPARTMMNT
BU1LDWG DIVISION
100 Civic Center Drive i P.O, Box 11681 Newport Beach, CA 92658-8915
www-newpord)eachea.gov f (949) 644-3200
F'RE SPREvrff MTA 13D SYSTEM
ROUGH'.NSPEC"i ION CHECKLIST
1 Rrser COn51rUCtiOn and Locatfort oroval
a. Drain valve
b. Baddlow device (single check)
a Beg activation device
d. Inspectors test valve
e. Riser stmd per approved plans
2• Pressure Test
a. System tested at operating pressure for 2 hours
b- Pressure gauge Installed
3` Sprinkler Heads shad not be. Installed 'm the %tn
Ene cemented as Poor io the fithnos
m Dace (temoora test olur s
a. Installation and spacing of temporary test plugs
4. PWinq
a. Material installed per plan
b. Hangers per codes/prevent upward movement
c. Ail CPVC piping shag be Installed by persons who have been
certified by the manufacturer for instdation of CPVC piping
d. Piping protected from damage
5. Beg
a_ Wiring installed- per code
b. Boxes Installed at proper locations
NOTE CPVC plastic pipe in the garage shall not he A�sed. Sprinkle tinat are usted as
Response° or'Residential' must be used.
CORRECTIONS AND
FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED:
BY s�� �ae• PERMf#:� rZ
li}1�VIFY�4�1 I,n DATE_57H
Forms\Fire SPMkf—NFPA 005yz - Rough Inspection Checkirt USA2'/20L