HomeMy WebLinkAboutPA2022-0315_20221221_Staging Package 1_UpdatedE x i s ting Struct ure Area to be Grubbed O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-1 Stage 1Blues 1905, LLC 2741 Ocean Blvd. Corona Del Mar, CA 92625 12/07/22 Austin Arcaris - 1" = 30'-0"1 Stage 1 1.Have civil engineer set up site monitoring 2.Start demo of and site work prep A.This is to include grubbing of lot B.Striping building to the minimum required existing structure. C.Adding any necessary building shoring recommended by Structural engineer to ensure safe building element removal Stage 1 O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-2 Stage 2 2741 Ocean Blvd. Corona Del Mar, CA 92625 - 1" = 30'-0"1 Stage 2 3.Survey and locate all street side and upper level caissons A.Site wall Caissons locations from SW-2 (shown in green). B.Upper House Caissons shown in Orange. 4.Drill site wall caissons shown in green. Using Geax Rig. 5.Drill house caissons shown in orange. Using Geax Rig. Stage 2 Blues 1905, LLC 12/07/22 Ra m p F o r Ac c e s s Ramp For Access Slope Slope Slo p e O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-3 Stage 3 2741 Ocean Blvd. Corona Del Mar, CA 92625 Austin Arcaris - 1" = 30'-0"1 Stage 3 6.Create ramp through lower garage up to the back side of the existing structure 7.Start drilling lower caissons shown in cyan. Using Geax Rig. Stage 3 Blues 1905, LLC 12/07/22 Ra m p F o r Ac c e s s Ramp For Access Slope Slope Slo p e O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-4 Satge 4 2741 Ocean Blvd. Corona Del Mar, CA 92625 Austin Arcaris - 1" = 30'-0"1 Stage 4 8.Start Soil nail wall drilling where required. A.Approximate locations of soilnails shown in blue. Use Beretta Rig 9.Drill caissons along NE PL line (shown in purple). Use Tescar Rig. 10.Continue soil nail wall and shoring as excavation continues down to new building pad elevations. Use Beretta Rig Stage 4 Blues 1905, LLC 12/07/22 Ra m p F o r Ac c e s s Ramp For Access Slope Slope Slo p e O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-5 Stage 5 2741 Ocean Blvd. Corona Del Mar, CA 92625 Austin Arcaris - 11.As excavation is completed along with soilnails shoot Shotcrete wall as needed. 12.Complete Shotcrete shoring wall down to finish pad elevation. 13.Layout and drill caissons that fall in existing building envelope. (shown in pink). Use Tescar Stage 5 1" = 30'-0"1 Stage 5 Blues 1905, LLC 12/07/22 Slope O C E A N B L V D W A Y L N = Sitewall caisson = House caisson outside existing foot print = House caissons in existing foot print = PL caissons to stabilize shared wall = Soilnails = Lower lawn caissons Scale Project number Date Drawn by Checked by 19600 Fairchild Road, Suite 123Irvine,Ca 92612 ekedalconcrete.comLic. # 487590 As indicated STG-6 Stage 6 2741 Ocean Blvd. Corona Del Mar, CA 92625 Austin Aracris Checker 14.Excavate for gradebeams and mat slabs 15.Set up mat slab pour and pour S.O.G concrete Elements 16.Set up and pour structural concrete house walls 17.Set up any structural deck shoring systems 18.Form and pour structural decks Stage 6 1" = 30'-0"1 Stage 6 Blues 1905, LLC 12/07/22