Loading...
HomeMy WebLinkAboutPA2022-0315_20230518_EXHIBIT BF:\Users\PLN\Shared\Official Documents\Design Guidelines Rev: 08-26-2016 Exhibit B – Prescriptive Compliance Option Checklist/Submittal Requirements Applicability:  New or rehabilitated projects landscape projects (including new single-family, multifamily, public, institutional or commercial projects) with an aggregate landscape area equal to or greater than five hundred (500) square feet but less than 2,500 square feet.  Graywater or rainwater on-site capture with less than 2,500 sq. ft. of landscape area Preparation by a Licensed Professional is not required for the Prescriptive Compliance Option. Refer to the Landscape Design Standards (Appendix H) for comprehensive information about submittal requirements and copies of the appendices referenced below. Prescriptive Compliance Submittal Requirements: Sheet # (All submittal items must be inserted into the plan set): 1. Project information: Date, project name, project address and/or lot number(s), total landscape area (square feet), project type, water supply type, contact information for the project applicant and property owner ____ 2. Written notes/confirmation that: Turf area does not exceed 25% of landscape planting area (prohibited on slope areas and parkways less than 10 feet wide) 75% of landscape area must be plated with climate adapted plants with an average WUCOLS plant factor of 0.3. Compost at a rate of four cubic yards per 1,000 square feet to a depth of six inches 3-inch mulch layer applied to all planting areas (excluding turf areas) Automatic irrigation controllers will use evapotranspiration or soil moisture sensor data and will have manual shut-off valves _____ 3. Written statement: “I agree to comply with the requirements of the prescriptive compliance option to the MWELO.” ____ Certification of Completion Package (Prior to final):  Landscape Installation Certificate of Completion (Appendix E)  Irrigation audit report (Appendix G) or enrollment in a regional or local water suppliers water conservation program  Post installation irrigation schedule and landscape/irrigation maintenance schedule