Loading...
HomeMy WebLinkAboutPA2022-0315_20230425_PW PRR 04-25-2023Tmplt: 06/07/19 P ROJECT R EVIEW R EQUEST C O M M U N I T Y D E V E L O P M E N T D E P A R T M E N T Planning Division Please Distribute to: Public Works - Keely Date: April 3, 2023 Please return PRR and Plans to Staff Planner Makana Nova, Senior Planner 949-644-3249, mnova@newportbeachca.gov Applicant: Sara Pijuan, KAA Design Group 310-821-1400, spijuan@kaadesigngroup.com Contact: Gregg Ramirez, 949-338-1795 gbrplanning@outlook.com Project Name Dawson Residence CDP Address: 2741 Ocean Boulevard (PA2022-0315) Coastal Development Permit Request for approval of a coastal development permit to allow additions and alterations to an existing non-conforming 5-level single-family residence with a two-car garage and single car garage. Two additional garage spaces slightly smaller than the code minimum yet large enough to reasonable accommodate most vehicles are also provided as part of the existing home. The addition is 2,511 net square feet to the existing 5,781 square foot home. The resulting home will be 8,292 square feet on the existing 10,360 square foot residential lot. The project includes grading, hardscape, drainage, a swimming pool, landscaping, and other accessory structures. The preliminary grading plan shows 1,020 cubic yards of cut and export of cut to accommodate the remodel to the existing home. REPORT REQUESTED BY: April 13, 2023 Zoning Administrator Hearing Date: TBD Check all that apply:  No comments on the project as presented. Notes:CONDITIONS -An encroachment permit and encroachment agreement shall be obtained for the existing wall that encroaches into the Way Lane public right-of-way. -A sewer clean out shall be installed on the existing sewer lateral per City Standard 406. -Landscaping shall comply with the Restrictive Covenant and Agreement. -Existing drainage discharge pipes along Way Lane that discharge into the right-of-way above the roadway surface shall be modified so that the discharge will sheet flow into the right of way. David Keely 3349 04/25/23 Signature Ext. Date  Application of Standard Code requirements are not expected to alter the project design.  Recommended conditions of approval are attached.  Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project.  I contacted the applicant on  To schedule an appt. for Code review  To discuss the following (see notes) OCEAN BOULEVARD WAY LANESH E L L L A N E BLOCK 33 CORONA DEL MAR M.M. 3/42 N5 0 ° 0 0 ' 0 0 " W 6 7 . 6 9 ' N26°48'09"E 1 3 6 . 1 0 ' 84.98' N40°0 0 ' 0 0 " E 72.47' N20°05'00"E 116.89' 94 . 5 9 ' N10°32'18"E N4 9 ° 3 3 ' 5 2 " W BLOCK 33 CORONA DEL MAR M.M. 3/42 ABANDONED PORTION OF OCEAN BOULEVARD PER RESOLUTION 98-66 INST. NO. 19990570601 T/SLAB=12.71 PAD=11.21 T/SLAB=20.25 PAD=18.75 T/SLAB=20.25 PAD=18.75 JOB NO.SHEET 1 3 9 A v e n i d a N a v a r r o S an Cl e m e n te , C A 9 2 67 2 9 4 9 .4 9 2 .8 5 8 6 w w w .t o al e ng i ne e r i n g .c o m C I V I L E N G I N E E R I N G L A N D S U R V E Y I N G STO RM WA T ER QUA L I T Y OF PLANS PREPARED BY: PREPARED FOR: AP V D . DA T E R E V I S I O N S BY DA T E APPD.: DATE: DWG. NO. H. SCALE: V. SCALE:SURVEY DATE: CHD.: DRN.: 1"=8' N/A4/27/2021 3/7/23 O.R. C.R. C.R. 22223 1 3 C-1 27 4 1 O C E A N B L V D BL O C K 3 3 , C O R O N A D E L M A R M . M . 3 / 4 2 27 4 1 O C E A N B O U L E V A R D , N E W P O R T B E A C H , C A PR E L I M I N A R Y G R A D I N G A N D DR A I N A G E P L A N CITY OF NEWPORT BEACH NOTES LEGEND TOPOGRAPHIC SURVEY BY: APEX LAND SURVEYING, INC. HUNTINGTON BEACH, CA 92646 PHONE: (714) 488-5006 FAX: (714) 333-4440 EMAIL: APEXLSINC@GMAIL.COMEASEMENT NOTES SCOPE OF WORK ADDITIONAL NOTES NOTICE TO CONTRACTOR REQUIRED CERTIFICATIONS / APPROVALS In addition to any certifications required by the agencies having jurisdiction over this project, the following approvals from the Civil engineer of record are required: 1.Foundation forms for improvements on or abutting property lines is required prior to concrete pour. 2.Location, size, and depth of all drain lines prior to backfill. 3.Stormwater Best Management Practices (BMPs) at each significant construction stage and at project completion to ensure that BMPs have been constructed and/or installed in accordance with the approved Grading Plan and Water Quality Management Plan. PIPE NOTE TO CONTRACTOR: PVC SCH40 SHALL BE USED UNDER BUILDING SLABS. EARTHWORK QUANTITIES: