HomeMy WebLinkAboutPA2022-0315_20230425_PW PRR 04-25-2023Tmplt: 06/07/19
P ROJECT R EVIEW R EQUEST
C O M M U N I T Y D E V E L O P M E N T D E P A R T M E N T
Planning Division
Please Distribute to:
Public Works - Keely
Date: April 3, 2023
Please return PRR and Plans to Staff Planner
Makana Nova, Senior Planner
949-644-3249, mnova@newportbeachca.gov
Applicant:
Sara Pijuan, KAA Design Group
310-821-1400,
spijuan@kaadesigngroup.com
Contact: Gregg Ramirez, 949-338-1795
gbrplanning@outlook.com
Project Name Dawson Residence CDP
Address: 2741 Ocean Boulevard
(PA2022-0315) Coastal Development Permit
Request for approval of a coastal development permit to allow additions and alterations to
an existing non-conforming 5-level single-family residence with a two-car garage and single
car garage. Two additional garage spaces slightly smaller than the code minimum yet large
enough to reasonable accommodate most vehicles are also provided as part of the existing
home. The addition is 2,511 net square feet to the existing 5,781 square foot home. The
resulting home will be 8,292 square feet on the existing 10,360 square foot residential lot.
The project includes grading, hardscape, drainage, a swimming pool, landscaping, and
other accessory structures. The preliminary grading plan shows 1,020 cubic yards of cut
and export of cut to accommodate the remodel to the existing home.
REPORT REQUESTED BY: April 13, 2023
Zoning Administrator Hearing Date: TBD
Check all that apply:
No comments on the project
as presented.
Notes:CONDITIONS
-An encroachment permit and encroachment agreement shall be
obtained for the existing wall that encroaches into the Way Lane
public right-of-way.
-A sewer clean out shall be installed on the existing sewer lateral
per City Standard 406.
-Landscaping shall comply with the Restrictive Covenant and
Agreement.
-Existing drainage discharge pipes along Way Lane that discharge
into the right-of-way above the roadway surface shall be modified
so that the discharge will sheet flow into the right of way.
David Keely 3349 04/25/23
Signature Ext. Date
Application of Standard Code
requirements are not
expected to alter the project
design.
Recommended conditions of
approval are attached.
Application of Standard Code
requirements or the attached
conditions of approval will
substantially impact or alter
the design of the project.
I contacted the applicant on
To schedule an appt. for
Code review
To discuss the following
(see notes)
OCEAN BOULEVARD
WAY LANESH
E
L
L
L
A
N
E
BLOCK 33
CORONA DEL MAR
M.M. 3/42
N5
0
°
0
0
'
0
0
"
W
6
7
.
6
9
'
N26°48'09"E
1
3
6
.
1
0
'
84.98'
N40°0
0
'
0
0
"
E
72.47'
N20°05'00"E
116.89'
94
.
5
9
'
N10°32'18"E
N4
9
°
3
3
'
5
2
"
W
BLOCK 33
CORONA DEL MAR
M.M. 3/42
ABANDONED
PORTION OF
OCEAN
BOULEVARD PER
RESOLUTION 98-66
INST. NO.
19990570601
T/SLAB=12.71
PAD=11.21 T/SLAB=20.25
PAD=18.75
T/SLAB=20.25
PAD=18.75
JOB NO.SHEET
1 3 9 A v e n i d a N a v a r r o
S an Cl e m e n te , C A 9 2 67 2
9 4 9 .4 9 2 .8 5 8 6
w w w .t o al e ng i ne e r i n g .c o m
C I V I L E N G I N E E R I N G
L A N D S U R V E Y I N G
STO RM WA T ER QUA L I T Y
OF
PLANS PREPARED BY:
PREPARED FOR:
AP
V
D
.
DA
T
E
R
E
V
I
S
I
O
N
S
BY
DA
T
E
APPD.:
DATE:
DWG. NO.
H. SCALE:
V. SCALE:SURVEY DATE:
CHD.:
DRN.:
1"=8'
N/A4/27/2021
3/7/23
O.R.
C.R.
C.R.
22223 1 3
C-1
27
4
1
O
C
E
A
N
B
L
V
D
BL
O
C
K
3
3
,
C
O
R
O
N
A
D
E
L
M
A
R
M
.
M
.
3
/
4
2
27
4
1
O
C
E
A
N
B
O
U
L
E
V
A
R
D
,
N
E
W
P
O
R
T
B
E
A
C
H
,
C
A
PR
E
L
I
M
I
N
A
R
Y
G
R
A
D
I
N
G
A
N
D
DR
A
I
N
A
G
E
P
L
A
N
CITY OF NEWPORT BEACH NOTES LEGEND
TOPOGRAPHIC SURVEY BY:
APEX LAND SURVEYING, INC.
HUNTINGTON BEACH, CA 92646
PHONE: (714) 488-5006
FAX: (714) 333-4440
EMAIL: APEXLSINC@GMAIL.COMEASEMENT NOTES
SCOPE OF WORK
ADDITIONAL NOTES
NOTICE TO CONTRACTOR
REQUIRED CERTIFICATIONS / APPROVALS
In addition to any certifications required by the agencies having jurisdiction over
this project, the following approvals from the Civil engineer of record are required:
1.Foundation forms for improvements on or abutting property lines is required
prior to concrete pour.
2.Location, size, and depth of all drain lines prior to backfill.
3.Stormwater Best Management Practices (BMPs) at each significant
construction stage and at project completion to ensure that BMPs have been
constructed and/or installed in accordance with the approved Grading Plan and
Water Quality Management Plan.
PIPE NOTE TO CONTRACTOR:
PVC SCH40 SHALL BE USED UNDER BUILDING SLABS.
EARTHWORK QUANTITIES: