HomeMy WebLinkAboutPA2023-0040_20230427_PWQMP-Report_2023-04-25Preliminary Water Quality
Management Plan
(PWQMP)
Project Name:
1401 Quail Street
Newport Beach, CA 92660
Prepared for:
Intracorp SW, LLC
895 Dove Street, Suite 400
Newport Beach, CA 92660
949-757-8464
Prepared by:
Adams-Streeter Civil Engineers, Inc.
16755 Von Karman Ave, Suite 150
Irvine, California 92606
(949) 474-2330
DATE PREPARED: 04-25-2023
Engineer Nicholas A. Streeter Registration No. C70862
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Owner’s Certification
Project Owner’s Certification
Permit/Application No. Pending Grading Permit No. Pending
Tract/Parcel Map No. Building Permit No. Pending
CUP, SUP, and/or APN (Specify Lot Numbers if Portions of Tract)
This Preliminary Water Quality Management Plan (WQMP) has been prepared for Intracorp
SW, LLC by Adams Streeter Civil Engineers. The WQMP is intended to comply with the
requirements of the local NPDES Stormwater Program requiring the preparation of the plan.
The undersigned, while it owns the subject property, is responsible for the implementation of
the provisions of this plan and will ensure that this plan is amended as appropriate to reflect
up-to-date conditions on the site consistent with the current Orange County Drainage Area
Management Plan (DAMP) and the intent of the non-point source NPDES Permit for Waste
Discharge Requirements for the County of Orange, Orange County Flood Control District and
the incorporated Cities of Orange County within the Santa Ana Region. Once the undersigned
transfers its interest in the property, its successors-in-interest shall bear the aforementioned
responsibility to implement and amend the WQMP. An appropriate number of approved and
signed copies of this document shall be available on the subject site in perpetuity.
Owner: Rick Puffer
Title Vice President
Company Intracorp SW, LLC
Address 895 Dove Street , Suite 400, Newport Beach, CA 92660
Email rpuffer@intracorphomes.com
Telephone # 949-757-8464
Signature Date
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Owner’s Certification
Contents Page No.
Section I Discretionary Permit(s) and Water Quality Conditions ..................................... 3
Section II Project Description .......................................................................................... 4
Section III Site Description ........................................................................................... 10
Section IV Best Management Practices (BMPs) ............................................................. 12
Section V Inspection/Maintenance Responsibility for BMPs .......................................... 24
Section VI Site Plan and Drainage Plan ......................................................................... 26
Section VII Educational Materials .................................................................................. 27
Attachments
Attachment A . ............................................................................................. BMP Site Plan
Attachment B . ........................................................................................BMP Calculations
Attachment C . .................................... TGD and Orange County Drainage Structures Map
Attachment D……………………………………………………...Drainage Maps and Calculations
Attachment E . ....................................................................................... Infiltration Study
Attachment F . ................................................................................. Educational Materials
Attachment G . ................................................... Operation and Maintenance Information
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section I
Page 3
Section I Discretionary Permit(s) and
Water Quality Conditions
Project Infomation
Permit/Application No. Pending Tract/Parcel Map No. 427-332-04
Additional Information/
Comments:
Water Quality Conditions
Water Quality
Conditions
(list verbatim)
All significant redevelopment projects, where significant
redevelopment is defined as the addition or replacement of 5,000 or
more square feet of impervious surface on an already developed site.
A project water quality management plan (WQMP) conforming to the
current water discharge requirements permit for the county of orange
(order no. R8-2009-0030) (MS4 permit) prepared by a licensed civil
engineer, shall be submitted to the department of public works for
review and acceptance. The WQMP shall address section XII of the
MS4 permit and all current surface water quality issues. The project
WQMP shall include the permit and all current surface water quality
issues
Watershed-Based Plan Conditions
Provide applicable
conditions from watershed
- based plans including
WIHMPs and TMDLS.
WIHMP:
Not Applicable
303(d) Listed Impairments for San Diego Creek and Newport Bay:
Selenium, Toxaphene, Fecal Coliform, Metals, Copper, Sediment
Toxicity, Chlordane, DDT, PCB’s (Polychlorinated Biphenyls),
Indicator Bacteria, Nutrients, Pesticides, Sedimentation/Siltation
TMDL’s for San Diego Creek and Newport Bay:
Bacteria Indicators/Pathogens, Nutrients, Pesticides,
Sedimentation/Siltation
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 4
Section II Project Description
II.1 Project Description
Description of Proposed Project
Development Category
(Verbatim from WQMP):
All significant redevelopment projects, where significant redevelopment
is defined as the addition or replacement of 5,000 or more square feet of
impervious surface on an already developed site.
Project Area (ft2): 74,212 Number of Dwelling Units: 78 SIC Code: 6513
Narrative Project
Description:
This project is a residential redevelopment.
The project site consists of the demolition of one existing commercial
building, paved parking lot, and certain utilities. The proposed includes
the construction of a multi-story building above an underground
parking garage. Proposed BMPs, locations as shown on WQMP plan in
Attachment C, will treat runoff for the entire site. A private round-a-
bout alley will be constructed for ingress/egress along Spruce Avenue.
Project Area
Pervious Impervious
Area
(acres or sq ft) Percentage Area
(acres or sq ft) Percentage
Pre-Project Conditions 10,060 sq ft 13.6% 64,152 sq ft 86.4%
Post-Project Conditions 10,332sq ft 13.9% 63,880sq ft 86.1%
Drainage
Patterns/Connections
The existing site drainage pattern is generally flowing from the south
corner of the site to the north corner of the site with surface slopes of
around 0.3% to 4.0%. The majority of the site is graded to flow to an
existing concrete swale which discharges at the north corner of the site
to Quail Street. The runoff will then flow southeasterly alongside the
curb and gutter where it will eventually drain into an existing catch
basin located at the northwest corner of the intersection of Quail Street
and Spruce Avenue.
The east side of the building ‘s runoff flows perpendicularly away from
the building, towards the City right-of-way. The runoff will also
eventually drain into the existing catch basin as described above.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 5
The catch basin discharges through a public 18” RCP storm drain that
connects to a public 42” RCP storm drain. The storm drain eventually
discharges to San Diego Creek which leads to Upper Newport Bay.
II.2 Potential Stormwater Pollutants
Pollutants of Concern
Pollutant
Circle One:
E=Expected to
be of concern
N=Not Expected
to be of concern
Additional Information and Comments
Suspended-Solid/ Sediment E N Landscaping will exist.
Nutrients E N Landscaping will exist.
Heavy Metals E N Parking and an entrance/exit street will exist.
Pathogens (Bacteria/Virus) E N Land use does not involve food or animal waste
products.
Pesticides E N Landscaping will exist.
Oil and Grease E N Vehicle traffic expected.
Toxic Organic Compounds E N Landcape maintenance and waste handling
areas will exist.
Trash and Debris E N Trash and debris expected.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 6
II.3 Hydrologic Conditions of Concern
No – Show map – OCFD Drainage Map is included in Attachment C.
Yes – Describe applicable hydrologic conditions of concern below. Refer to Section 2.2.3 in the
TGD.
The project site is located in area that is potentially susceptible to hydromodification impacts. The
site discharge also does not remain in an engineered or stabilized channel in its entire path to a
receiving water body.
In order to address the hydrologic conditions of concern. The 2 year, 24-hr post-development
runoff volume does not exceed the pre-development runoff volume by more than 5 percent. The
totals for the runoff volume can be seen below.
Pre-Development: 6,316 cubic feet
Post-Development: 6,011 cubic feet
Post-Development: 4.8% Decrease
Hydrology calculations and map can be found in Attachment D of this report for reference.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 7
II.4 Post Development Drainage Characteristics
The proposed drainage is to have two different DMA’s, DMA-A and DMA-B. DMA-A will include
the entirety of the building along with the adjacent areas between the building and the right-of-
way/property line on the north, west, and east side of the building. DMA-B will be the area south
of the building, which includes the entire round-a-bout access street and the area leading to the
main entry of the building.
DMA-A will utilize Biotreatment BMPs in the form of Bioretention Planters with Permavoid Boxes
in lieu of gravel and underdrain to treat/retain its required DCV of 2,644 ft3. The reason Permavoid
Boxes will be used instead of gravel is because Permavoid Boxes have a 95% porosity rate
compared to the 40% porosity of gravel. This allows a much greater volume of retainment with a
smaller footprint. Another reason is Permavoid Boxes allows for runoff to be used as a means of
irrigation for the planter box. Permavoid Boxes will infiltrate runoff upwards via capillary rise
through the engineered soil media and then be used to irrigate the landscaped area of the planter
box.
In regards to drainage, the majority of the DMA’s runoff will be collected through roof drains.
Runoff will be discharged directly on top of the Planter Boxes via roof downspout drains. Runoff
will be bio-treated as it infiltrates through the engineered soil media of the planter boxes and then
the runoff will be retained within the Permavoid structures/soil media/ponding. As the planter
boxes are filled and the required DCV is treated/retained, runoff will be captured by an overflow
inlet located at the top of ponding of the planter boxes. Runoff will then be ultimately discharged
to Quail Street and Spruce Avenue via parkway culverts.
DMA-B will utilize a Harvest and Use BMP by using Permavoid Boxes for its required DCV of
1,066 ft3. Unlike DMA-A, runoff will discharge directly underground to the Permavoid Boxes. This
means runoff will not be bio-treated by an engineered soil media before being retained. The
retained runoff will be used for irrigation purposes however.
The runoff of DMA-B will sheet flow to catch basins located on the south side of the proposed
round-a-bout access street. The catch basins will have Flogard Filter Inserts installed to pre-treat
the runoff before entering the storm drain system. The storm drain system will then direct the
runoff to the bottom of a Permavoid Boxes located at the south side of the building. The entirety of
the DCV will be captured and retained within the Permavoid Boxes. Runoff will infiltrate upwards
via capillary rise through the engineered soil media and then be used to irrigate the landscaped
area above the Permavoid Boxes. During large storm events where the Permavoid Boxes are fully
saturated and the required DCV is retained, runoff will be discharged to a parkway culvert that
discharges to Spruce Avenue. The landscaped areas above the Permavoid boxes will also have
supplemental irrigation provided for both cases of DMA-A and DMA-B.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 8
II.5 Property Ownership/Management
The project site is owned by Intracorp SW, LLC. The project site is to be developed into a Podium
structure with retail units and condominium units. A blanket easement will be recorded over the
site for access and maintenance. A property management company will be formed and will be
responsible for the maintenance of all proposed infrastructure and BMP’s.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 9
Section III Site Description
III.1 Physical Setting
Planning Area/
Community Name N/A
Location/Address
West corner of Quail Street and Spruce Avenue
1401 Quail Street Newport Beach, CA 92660
Land Use Proposed Condominium Complex
Zoning Planned Community – PC11 Newport Place
Acreage 1.71 acres
Predominant Soil Type Soil Type D
III.2 Site Characteristics
Precipitation Zone 0.75-inch Design Capture Storm Depth (per TGD Figure XVI-1)
Topography
The existing site is generally flat. The surrounding areas of the
project site are a commercial building and parking lot to the
northwest, a commercial building and parking lot to the southwest,
Spruce Avenue to the southeast, and Quail Street to the northeast.
Drainage
Patterns/Connections
The drainage pattern is generally from north to south. In the site’s
existing condition, there are no on-site drainage systems and the
runoff would eventually flow off-site to a catch basin located at the
northwest corner of the intersection of Quail Street and Spruce
Avenue.
Soil Type, Geology, and
Infiltration Properties
The upper 20 feet of the site is predominantly clay with low
permeability which may not be suitable for infiltration. Although the
soil after 20 feet is sand and has good infiltration rates, groundwater
was encountered at ~25 feet, therefor infiltration is not
recommended.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 10
The maps in the TGD indicate that the site has soil Type D. Based on
this, infiltration is not feasible for the project as well.
Site Characteristics (continued)
Hydrogeologic
(Groundwater) Conditions
Groundwater was encountered at approximately 25 feet below site
grade.
Geotechnical Conditions
(relevant to infiltration)
The site is not in favor of infiltration. This is due to the site having
soil type D and having mostly clay with low permeability within the
upper 20 feet of the ground. Although infiltration tested well after 20
feet, groundwater is located shortly after at approximately 25 feet
below grade. Due to this, the site is not suitable for an infiltration
bmp.
Off-Site Drainage There are no concerns of off-site run on to the project.
Utility and Infrastructure
Information
In the site’s existing condition, there are no on-site drainage systems.
The runoff would eventually flow off-site to a catch basin located at
the northwest corner of the intersection of Quail Street and Spruce
Avenue.
III.3 Watershed Description
Receiving Waters
San Diego Creek Reach 1
Newport Bay, Upper (Ecological Reserve)
Newport Bay, Lower
303(d) Listed Impairments
San Diego Creek (Reach 1): Benthic Community Effects, DDT,
Indicator Bacteria, Malathion, Nutrients, Sedimentation/Siltation,
Selenium, Toxaphene, Toxicity
Newport Bay, Upper (Ecological Reserve): Chlordane, Copper,
DDT, Indicator Bacteria, Malathion, Nutrients, PCBs
(Polychlorinated biphenyls), Sedimentation/Siltation, and Toxicity.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section II
Page 11
Lower Newport Bay: Chlordane, Copper, DDT, Indicator Bacteria,
Nutrients, PCBs, Toxicity.
Applicable TMDLs
San Diego Creek (Reach 1): Nutrients, Pesticides and
Turbidity/Siltation.
Upper Newport Bay (Ecological Reserve): Bacteria
Indicators/Pathogens, Metals, Nutrients, Pesticides, and
Turbidity/Siltation.
Lower Newport Bay: Nutrients, Pesticides
Pollutants of Concern for
the Project
Pollutants of concern: Suspended Solid/Sediments, Nutrients,
Pathogens, Pesticides, Oil & Grease, Trash & Debris.
Primary Pollutants of Concern: Suspended Solid/Sediments,
Nutrients, Pathogens and Pesticides.
Environmentally Sensitive
and Special Biological
Significant Areas
There is no ESA within 200 feet of the project site.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 12
Section IV Best Management Practices (BMPs)
IV. 1 Project Performance Criteria
(NOC Permit Area only) Is there an approved WIHMP or equivalent
for the project area that includes more stringent LID feasibility
criteria or if there are opportunities identified for implementing LID
on regional or sub-regional basis?
YES NO
If yes, describe WIHMP
feasibility criteria or
regional/sub-regional LID
opportunities.
N/A
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 13
Project Performance Criteria (continued)
If HCOC exists,
list applicable
hydromodification
control
performance
criteria (Section
7.II-2.4.2.2 in
MWQMP)
HCOC is not applicable for this project. See section II.3 of the report for
more information.
List applicable LID
performance
criteria (Section
7.II-2.4.3 from
MWQMP)
Priority Projects must infiltrate, harvest and re-use, evapotranspire, or bio
treat/bio filter, the 85th percentile, 24- hour storm event (Design Capture
Volume).
A properly designed Bio treatment system may only be considered if
infiltration harvest re-use and evapotranspiration (ET) cannot be feasibly
implemented for the full design capture volume. In this case, infiltration,
harvest re-use, and ET practices must be implemented to the greatest extent
feasible and bio treatment may be provided for the remaining design
capture volume.
List applicable
treatment control
BMP performance
criteria (Section
7.II-3.2.2 from
MWQMP)
Satisfaction of LID performance criteria also fully satisfies treatment control
performance criteria. If it is not feasible to meet LID performance criteria
through retention and/ or bio treatment provided on site or at a sub-
regional scale, then treatment control of treatment control BMP’s shall be
provided on site or offsite prior to discharge to waters of the US
Calculate LID
design storm
capture volume
for Project.
DCV = design storm capture volume, cu-ft
C = runoff coefficient = (0.75 × imp + 0.15)
Imp = impervious fraction of drainage area (ranges from 0 to 1)
d = storm depth (inches)
A = tributary area (acres)
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 14
DMA A:
Imp = 89.1% d = 0.75 inches A = 1.19acres
DCV = (0.75 x 0.891+0.15) x 0.75 inches x 1.19ac x 43560 sf/ac x
1/12 in/ft
= 2,644 ft3
DMA B:
Imp = 81.0% d = 0.75 inches A = 0.52 acres
DCV = (0.75 x 0.810 +0.15) x 0.75 inches x 0.52 ac x 43560 sf/ac x
1/12 in/ft
= 1,066 ft3
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 15
IV.2. SITE DESIGN AND DRAINAGE PLAN
The following section describes the site design BMPs used in this project and the methods used to
incorporate them. Careful consideration of site design is a critical first step in storm water pollution
prevention from new developments and redevelopments.
Site Design BMPs
Minimize Impervious Area
• Impervious surfaces have been minimized by incorporating landscaped areas throughout the
site surrounding the proposed building. Landscaping will be provided throughout the site
within the common areas as well as around the perimeter of the building.
Preserve Existing Drainage Patterns and Time of Concentration
• Runoff from the site will continue to flow similar to existing conditions. Low-flows and first-
flush runoff will drain to a Permavoid Planter Boxes. The Permavoid Planter Boxes are sized
to be able to treat the required DCV of their respective DMA’s.
Disconnect Impervious Areas
• Landscaping will be provided adjacent to sidewalks and along the perimeter of the building.
Low-flows will drain to the proposed Permavoid Planter Box BMP’s.
Protect Existing Vegetation and Sensitive Areas, and Revegetate Disturbed Areas
• There are no existing vegetated or sensitive areas to preserve on the project site. All
disturbed areas will either be paved or landscaped.
Drainage Management Areas:
• In accordance with the MS4 permit and the 2013 OC TGD, the project site has been divided
into Drainage Management Areas (DMAs) to be utilized for defining drainage areas and
sizing LID and other treatment control BMPs. DMAs have been delineated based on the
proposed site grading patterns, drainage patterns, storm drain and catch basin locations.
The Drainage Management Areas (DMA) locations, design capture volumes (DCV) and treatment
flow rates (QDesign) for each DMA are illustrated and calculated in Attachment A-BMP Site Plan
and Attachment B-BMP Calculations. These have been derived utilizing the “Simple Method” in
accordance with the TGD Section III.1.2.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 16
IV.3 LID BMP SELECTION AND PROJECT CONFORMANCE ANALYSIS
.
IV.3.1 Hydrologic Source Controls
HSC’s are not utilized for this project. Runoff will be treated by Harvest and Use BMPs and Bio-
treatment BMPs.
Name Included?
Localized on-lot infiltration
Impervious area dispersion (e.g. roof top
disconnection)
Street trees (canopy interception)
Residential rain barrels (not actively managed)
Green roofs/Brown roofs
Blue roofs
Impervious area reduction (e.g. permeable
pavers, site design)
Other:
Other:
Other:
Other:
Other:
Other:
Other:
Other:
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 17
IV.3.2 Infiltration BMPs
Name Included?
Bioretention without underdrains
Rain gardens
Porous landscaping
Infiltration planters
Retention swales
Infiltration trenches
Infiltration basins
Drywells
Subsurface infiltration galleries
French drains
Permeable asphalt
Permeable concrete
Permeable concrete pavers
Other:
Other:
Per the soils report, infiltration is not feasible due to high groundwater and poor infiltration
rates. Also, the TGD Map in Attachment C indicates presence of Type D soils which are not
suitable for infiltration.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 18
IV.3.3 Evapotranspiration, Rainwater Harvesting BMPs
Name Included?
All HSCs; See Section IV.3.1
Surface-based infiltration BMPs
Biotreatment BMPs
Above-ground cisterns and basins
Underground detention
Other: Permavoid Boxes
Other:
Other:
Per the soils report, infiltration is not feasible due to high groundwater and poor infiltration
rates. Also, the TGD Map in Attachment C indicates presence of Type D soils which are not
suitable for infiltration.
DMA-B will utilize Permavoid Boxes as a Rainwater Harvest and Use BMP. Runoff of DMA-B
will be collected via catch basins that have Flogard Filters installed as a pre-treatment method.
Runoff will then flow through the storm drain system directly to the underground Permavoid
Boxes. The entirety of DMA-B’s DCV will be retained within the Permavoid Boxes which have a
porosity of 95%. Once the required DCV is retained, the runoff will infiltrate upwards through
via capillary rise and then be used to irrigate the plants/landscaping area above the Permavoid
Boxes.
During large storm events where the Permavoid Boxes are fully saturated and the required DCV
is retained, runoff will be discharged to a parkway culvert that discharges to Spruce Avenue.
This discharge method will be designed to handle a 100-year storm event.
See attachment B for BMP Calculations and fact sheets.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 19
IV.3.4 Biotreatment BMPs
Name Included?
Bioretention with underdrains
Stormwater planter boxes with underdrains
Rain gardens with underdrains
Constructed wetlands
Vegetated swales
Vegetated filter strips
Proprietary vegetated biotreatment systems
Wet extended detention basin
Dry extended detention basins
Other: Bioretention Planters with Permavoid
Boxes
Other:
Per the soils report, infiltration is not feasible due to high groundwater and poor infiltration
rates. Also, the TGD Map in Attachment C indicates presence of Type D soils which are not
suitable for infiltration.
DMA-A will utilize Biotreatment BMPs in the form of Bioretention Planters with Permavoid
Boxes in lieu of gravel and underdrain. The reason DMA-A’s BMP is considered biotreatment is
because runoff will discharge directly on top of the planter boxes, where it will then be bio-
treated by the engineered soil media.
A Permavoid Planter Box effectively operates the same as a bioretention planter with underdrain
without the need for gravel and an underdrain pipe. Runoff will discharge directly on top of the
planter box via roof drain downspouts. Runoff will then infiltrate downwards and be treated by
the engineered soil media. Below the engineered soil media will be the Permavoid Boxes, which
retain the treated runoff as if it were the gravel of a bioretention basin.
Once the Planter Box is at capacity, meaning the ponding, soil media, and Permavoid Boxes are
fully saturated with stormwater, runoff will be collected by an overflow inlet at the top of
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 20
ponding. The overflow inlet will discharge the runoff through an outlet pipe and then to a
parkway culvert where runoff ultimately ends in either Spruce Avenue or Quail Street.
See attachment B for BMP Calculations and fact sheets.
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 21
IV.3.8 Non-structural Source Control BMPs
Non-Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
N1 Education for Property Owners,
Tenants and Occupants
N2 Activity Restrictions
N3 Common Area Landscape
Management
N4 BMP Maintenance
N5 Title 22 CCR Compliance (How
development will comply) Not required onsite
N6 Local Industrial Permit Compliance Does not pertain to site
N7 Spill Contingency Plan No spill concern onsite
N8 Underground Storage Tank
Compliance Not present onsite
N9 Hazardous Materials Disclosure
Compliance Not present onsite
N10 Uniform Fire Code Implementation
N11 Common Area Litter Control
N12 Employee Training
N13 Housekeeping of Loading Docks
N14 Common Area Catch Basin Inspection
N15 Street Sweeping Private Streets and
Parking Lots
N16 Retail Gasoline Outlets Not present onsite
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 22
IV.3.9 Structural Source Control BMPs
Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
S1 Provide storm drain system stenciling
and signage
S2
Design and construct outdoor material
storage areas to reduce pollution
introduction
Outdoor storage is not anticipated
S3
Design and construct trash and waste
storage areas to reduce pollution
introduction
S4
Use efficient irrigation systems &
landscape design, water conservation,
smart controllers, and source control
S5 Protect slopes and channels and
provide energy dissipation No slopes anticipated onsite
Incorporate requirements applicable to
individual priority project categories
(from SDRWQCB NPDES Permit)
Project not located in SDRWQCB
S6 Dock areas Not present onsite
S7 Maintenance bays Not present onsite
S8 Vehicle wash areas Not present onsite
S9 Outdoor processing areas Not present onsite
S10 Equipment wash areas Not present onsite
S11 Fueling areas Not present onsite
S12 Hillside landscaping Not present onsite
S13 Wash water control for food
preparation areas Not present onsite
S14 Community car wash racks Not present onsite
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 23
IV.4 ALTERNATIVE COMPLIANCE PLAN (IF APPLICABLE)
IV.4.1 Water Quality Credits
Description of Proposed Project
Project Types that Qualify for Water Quality Credits (Select all that apply):
Redevelopment
projects that reduce the
overall impervious
footprint of the project
site.
Brownfield redevelopment, meaning
redevelopment, expansion, or reuse of real
property which may be complicated by the
presence or potential presence of hazardous
substances, pollutants or contaminants, and
which have the potential to contribute to
adverse ground or surface WQ if not
redeveloped.
Higher density development projects which
include two distinct categories (credits can only
be taken for one category): those with more than
seven units per acre of development (lower credit
allowance); vertical density developments, for
example, those with a Floor to Area Ratio (FAR)
of 2 or those having more than 18 units per acre
(greater credit allowance).
Mixed use development, such as a
combination of residential, commercial,
industrial, office, institutional, or other land
uses which incorporate design principles
that can demonstrate environmental benefits
that would not be realized through single
use projects (e.g. reduced vehicle trip traffic
with the potential to reduce sources of water
or air pollution).
Transit-oriented developments, such as a mixed
use residential or commercial area designed to
maximize access to public transportation; similar to
above criterion, but where the development center is
within one half mile of a mass transit center (e.g. bus,
rail, light rail or commuter train station). Such
projects would not be able to take credit for both
categories, but may have greater credit assigned
Redevelopment
projects in an established
historic district, historic
preservation area, or
similar significant city
area including core City
Center areas (to be
defined through
mapping).
Developments with
dedication of undeveloped
portions to parks,
preservation areas and
other pervious uses.
Developments
in a city center
area.
Developments
in historic
districts or
historic
preservation
areas.
Live-work developments, a
variety of developments designed
to support residential and
vocational needs together –
similar to criteria to mixed use
development; would not be able
to take credit for both categories.
In-fill projects, the
conversion of empty lots
and other underused
spaces into more
beneficially used spaces,
such as residential or
commercial areas.
Calculation of
Water Quality
Credits
(if applicable)
N/A
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section IV
Page 24
IV.4.2 Alternative Compliance Plan Information
Not Applicable
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section V
Page 25
Section V Inspection/Maintenance
Responsibility for BMPs
BMP Inspection/Maintenance
BMP Responsible
Party(s)
Inspection/
Maintenance
Activities Required
Minimum
Frequency of
Activities
Permavoid Planter
Areas Owner
-Inspect semiannually for
beginning (October) and end of
the wet season (April) Ongoing
Education for
Property Owners,
Tenants and
Occupants
Owner
Educational materials will be
provided to tenants
annually. Materials to be
distributed are found in
Attachment F. Tenants will be
provided these materials
by the Owner prior to
occupancy and periodically
thereafter
Annually
Activity Restrictions Owner
The Owner will prescribe
activity restrictions to protect
surface water quality, through
lease terms or other
equally effective measure, for
the property.
Restrictions include, but are
not limited to, prohibiting
vehicle maintenance or
vehicle washing.
Ongoing
Common Area
Landscape
Management
Owner
Maintenance shall be
consistent with City
requirements. Fertilizer
and/or pesticide usage shall
be consistent with County
Management Guidelines
Monthly
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section V
Page 26
for Use of Fertilizers (OC
DAMP Section 5.5) as well
as local requirements.
Maintenance includes
mowing, weeding, and debris
removal on a weekly
basis. Trimming, replanting,
and replacement of
mulch shall be performed on
an as-needed basis to
prevent exposure of erodible
surfaces. Trimmings,
clippings, and other landscape
wastes shall be
properly disposed of in
accordance with local
regulations. Materials
temporarily stockpiled during
maintenance activities shall
be placed away from
water courses and storm
drain inlets.
Common Area Litter
Control Owner
Litter patrol and
other litter control activities
shall be performed on a
weekly basis and in
conjunction with routine
maintenance activities.
Weekly
Employee Training Owner
Educate all new employees/
managers on storm
water pollution prevention,
particularly good
housekeeping practices, prior
to the start of the rainy
season (October 1). Refresher
courses shall be
conducted on an as needed
basis.
Annually
Street Sweeping
Private Streets and
Parking Lots
Owner
Drive aisles & parking areas
must be swept at least
quarterly (every 3 months),
including prior to the start
of the rainy season (October
1).
Quarterly
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section V
Page 27
Common Area Catch
Basin Inspection Owner
Catch basin inlets and other
drainage facilities shall
be inspected after each storm
event and once per
year. Inlets and other
facilities shall be cleaned prior
to the rainy season, by
October 1 each year.
Annually
Storm Drain
Stencilling and
Signage
Owner
Storm drain stencils shall be
inspected for legibility, at
minimum, once prior to the
storm season, no later
than October 1 each year.
Those determined to be
illegible will be re-stencilled
as soon as possible.
Annually
Use efficient
irrigation systems &
landscape design,
water conservation,
smart controllers,
and source control
Owner
In conjunction with routine
maintenance activities,
verify that landscape design
continues to function
properly by adjusting
properly to eliminate
overspray to hardscape areas,
and to verify that irrigation
timing and cycle lengths are
adjusted in accordance
with water demands, given
time of year, weather, and
day or night time
temperatures. System testing
shall occur twice per year.
Water from testing/flushing
shall be collected and
properly disposed to the
sewer system and shall not
discharge to the storm drain
system.
Twice per year
Preliminary Water Quality Management Plan (PWQMP)
1401 Quail Street
Intracorp SW, LLC Section VII
Page 28
Section VI Site Plan and Drainage Plan
VI.1 SITE PLAN AND DRAINAGE PLAN
• Refer to Attachment A
ATTACHMENT A
BMP SITE PLAN
SPRUCE AVENUE
QU
A
I
L
S
T
R
E
E
T
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D SD SD
SD
SD
SD SD SD SD SD SD SD
VA
N
AC
C
E
S
S
I
B
L
E
TRASH STAGING
10'X12'
TRANS. PAD
10'X12'
TRANS. PAD
16755 Von Karman Ave, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.com
ATTACHMENT B
BMP CALCULATIONS
TECHNICAL GUIDANCE DOCUMENT APPENDICES
III-16 December 20, 2013
Worksheet B: Simple Design Capture Volume Sizing Method
Step 1: Determine the design capture storm depth used for calculating volume
1 Enter design capture storm depth from Figure III.1, d (inches) d= inches
2
Enter the effect of provided HSCs, dHSC (inches)
(Worksheet A) dHSC= inches
3
Calculate the remainder of the design capture storm
depth, dremainder (inches) (Line 1 – Line 2) dremainder= inches
Step 2: Calculate the DCV
1 Enter Project area tributary to BMP (s), A (acres) A= acres
2 Enter Project Imperviousness, imp (unitless) imp=
3 Calculate runoff coefficient, C= (0.75 x imp) + 0.15 C=
4 Calculate runoff volume, Vdesign= (C x dremainder x A x 43560 x
(1/12)) Vdesign= cu-ft
Step 3: Design BMPs to ensure full retention of the DCV
Step 3a: Determine design infiltration rate
1 Enter measured infiltration rate, Kobserved1 (in/hr)
(Appendix VII) Kobserved= In/hr
2
Enter combined safety factor from Worksheet H, Stotal
(unitless) Stotal=
3 Calculate design infiltration rate, Kdesign = Kobserved / Stotal Kdesign= In/hr
Step 3b: Determine minimum BMP footprint
4 Enter drawdown time, T (max 48 hours) T= Hours
5 Calculate max retention depth that can be drawn down within
the drawdown time (feet), Dmax = Kdesign x T x (1/12) Dmax= feet
6 Calculate minimum area required for BMP (sq-ft), Amin =
Vdesign/ dmax Amin= sq-ft
1Kobserved is the vertical infiltration measured in the field, before applying a factor of safety. If field testing measures a rate that is
different than the vertical infiltration rate (for example, three-dimensional borehole percolation rate), then this rate must be adjusted
by an acceptable method (for example, Porchet method) to yield the field estimate of vertical infiltration rate, Kobserved. See Appendix
VII.
TECHNICAL GUIDANCE DOCUMENT APPENDICES
III-16 December 20, 2013
Worksheet B: Simple Design Capture Volume Sizing Method
Step 1: Determine the design capture storm depth used for calculating volume
1 Enter design capture storm depth from Figure III.1, d (inches) d= inches
2
Enter the effect of provided HSCs, dHSC (inches)
(Worksheet A) dHSC= inches
3
Calculate the remainder of the design capture storm
depth, dremainder (inches) (Line 1 – Line 2) dremainder= inches
Step 2: Calculate the DCV
1 Enter Project area tributary to BMP (s), A (acres) A= acres
2 Enter Project Imperviousness, imp (unitless) imp=
3 Calculate runoff coefficient, C= (0.75 x imp) + 0.15 C=
4 Calculate runoff volume, Vdesign= (C x dremainder x A x 43560 x
(1/12)) Vdesign= cu-ft
Step 3: Design BMPs to ensure full retention of the DCV
Step 3a: Determine design infiltration rate
1 Enter measured infiltration rate, Kobserved1 (in/hr)
(Appendix VII) Kobserved= In/hr
2
Enter combined safety factor from Worksheet H, Stotal
(unitless) Stotal=
3 Calculate design infiltration rate, Kdesign = Kobserved / Stotal Kdesign= In/hr
Step 3b: Determine minimum BMP footprint
4 Enter drawdown time, T (max 48 hours) T= Hours
5 Calculate max retention depth that can be drawn down within
the drawdown time (feet), Dmax = Kdesign x T x (1/12) Dmax= feet
6 Calculate minimum area required for BMP (sq-ft), Amin =
Vdesign/ dmax Amin= sq-ft
1Kobserved is the vertical infiltration measured in the field, before applying a factor of safety. If field testing measures a rate that is
different than the vertical infiltration rate (for example, three-dimensional borehole percolation rate), then this rate must be adjusted
by an acceptable method (for example, Porchet method) to yield the field estimate of vertical infiltration rate, Kobserved. See Appendix
VII.
PV323388 Date:
Quail St. Project, Newport CA ECD:0 0
0.75 inches
Dr
a
i
n
a
g
e
Ar
e
a
Im
p
e
r
v
i
o
u
s
Ar
e
a
Ca
t
c
h
m
e
n
t
Ar
e
a
De
s
i
g
n
Ca
p
t
u
r
e
V
o
l
.
Re
q
u
i
r
e
d
Pl
a
n
t
e
r
A
r
e
a
Ca
p
t
u
r
e
&
Us
e
V
o
l
u
m
e
Bi
o
f
i
l
t
r
a
t
i
o
n
Vo
l
u
m
e
Mi
n
i
m
u
m
Pl
a
n
t
F
a
c
t
o
r
So
i
l
De
p
t
h
Po
n
d
i
n
g
De
p
t
h
Pl
a
n
t
e
r
D
e
p
t
h
(I
n
t
e
r
i
o
r
)
At Ai Acat Vcap Ap Vcu Vbf PF Dsoil Dpond Dip
(ft²)(%)(ft²)(ft³)(ft²)(ft³)(ft³)---(in.)(in.)(in.)
51,836 89.1%42,132 2633 1,989 1,860 1,160 0.44 18.0 2.0 35.0 150x2 1,468 1,468 332 7,340 245 121.6
22,651 81.0%16,943 1,059 1,133 1,059 0 0.44 18.0 N/A 30.0 150x2 836 836 190 4,180 140 69.2
74,487 ---59,075 3,692 3,122 2,919 1,160 ---------------0 0 2,304 0 0 2,304 522 11,520 385 190.8
Permavoid Los Angeles LID Table 1.1 REF: 00PV323388c4846G
Permavoid Planter Soil Requirements (non-traffic loading):
∙ 75% (+/- 5%) by weight shall consist of sand meeting the following:
- For soil depths of 6 to 12 inches, average particle size shall be 500mm (0.020 in.)
- For soil depths of 12 to 24 inches, average particle size shall be 300mm (0.012 in.)
∙ Soils shall have a uniformity coefficient of 4.0 or less.
∙ Soils shall have less than 10% fines (passing 200 sieve) by weight.
∙ Soils used for biofiltration shall meet "Attachment H. Biofiltration / Biofiltration
Design Criteria " as provided by the California Regional Water Quality Control Board.
Total
Los Angeles Low Impact Development
BMP Design & Material Summary
Project Number: 4/24/2023
Street Address:
85th Rainfall Depth:
Material Summary
System
Type 85s 85HD PV150 36/90 36/60+
24/30
23/160T
Pairs
Design Summary
Permavoid Units
(Quantity)
Capillary Cones
(Quantity)
Wi
c
k
i
n
g
G
e
o
t
e
x
.
(R
o
l
l
-
f
t
)
Ti
e
Co
n
n
e
c
t
o
r
s
Sh
e
a
r
Co
n
n
e
c
t
o
r
s
CU-2
Es
t
.
S
o
i
l
V
o
l
u
m
e
(C
Y
)
LI
D
B
M
P
ID - #
CUB-1
Quail St. Project, Newport CA Date:
PV323388
CUB 1
Acat 42,132 ft²Ap
D85 0.0625 ft Vcu
Dsoil 18.0 in.Vbf
Wa 0%%PF
Dpond 2.0 in.Dip
Ksat 5.0 in/hr
SF 2.0 ft³#
Tf 2.0 hrs PV-150 #
150x2 11.8 in.23/160 T #
Vpv 95 %Cap. Tex.#
ETo7 21.7 in.By Others #
IE 0.85
Calculate the Design Capture Volume (Vcap):
Vcap =D85 ∙ Acat
Vcap =0.0625ft ∙ 42132.3ft²
#Vcap =2633.3 ft³
Calculate the Permavoid Capture & Use Depth (Dcu):
Dcu =(150x2 ∙ Vpv) + (Dsoil ∙ Wa)
Dcu =(11.8in. ∙ 95%) + (18in. ∙ 0%)
#Dcu =11.22 in. = 0.935 ft
#Calculate the Planter Area (Ap):
#Ap =1989.1 ft²
Calculate the Capture & Use Volume (Vcu):
Vcu =Ap ∙ Dcu
Vcu =1989.1 ft² ∙ 0.935ft
#Vcu =1859.7 ft³
Calculate the Biofiltration Volume (Vbf):
Vbf =1.5 ∙ (Vcap - Vcu)
Vbf =1.5 ∙ (2633.3 ft³ - 1859.7 ft³)
#Vbf =1160.3 ft³
Calculate the Minimum Area Required (Amin):
Amin =Vbf / [Tf ∙ (Ksat/SF) + Dpond]
Amin =1160.3 ft³ / {[2hrs ∙ (5.0in/hr / 2) + 2in.] / 12ipf}
#Amin =1989.1 ft²
Check the Planter Area (Ap) vs. the Minimum Area Required (Amin):
Ap vs.Amin
1989.1 ft² vs.1989.1 ft²
1989.1 ft² = 1989.1 ft²
Ap = Amin ✓ - CHECKED
Calculate the Minimum Required Plant Factor (PF):
PF =(Vcu ∙ IE) / (ETo7 ∙ Ap)
PF =(1859.7 ft³ ∙ 0.85) / [(21.7in. / 12ipf) ∙ 1989.1 ft²]
#PF =0.44
Calculate the 7-Month Estimated Total Water Use (ETWU-7):
ETWU-7 =(ETo7 ∙ PF ∙ Ap) / IE
ETWU-7 =[(21.7in. / 12ipf) ∙ 0.44 ∙ 1989.1 ft²] / 0.85
#ETWU-7 =1859.7 ft³
Check the Capture & Use Volume (Vcu) vs. the 7-Month Estimated Total Water Usage (ETWU-7):
Vcu vs.ETWU-7
1859.7 ft³ vs.1859.7 ft³
#1859.7 ft³ = 1859.7 ft³
Vcu = ETWU-7 ✓ - CHECKED
Los Angeles Low Impact Development
Capture & Use / Biofiltration Planter Design Calculations
Project Name: 4/24/2023
Project Number:
Planter ID Number:Design Summary
1859.7 ft³
1160.3 ft³
35 in.
Catchment Area:Planter Area:1989.1 ft²
85th Percentile Storm Depth:Capture & Use Volume:
Soil Depth:
0.44
Biofiltration Volume:
Plant Factor (min.):
Internal Planter Depth:
Material Requirements
Permavoid Units:1468 Units
1468 Pairs
7-Month Reference Evapotranspiration:
Permavoid Irrigation Efficiency:
Soil Available Water:
Ponding Depth:
Soil Saturated Infiltration Rate:
Safety Factor:
Time To Fill:
Permavoid System Depth:
Permavoid Voids:
Capillary Cones:
Wicking Geotextile Length:232 - 332 ft
Planting Media:121.6 CY
*NOTES: Quantities are for estimation only. Fluctuations in material quatities will occur based on the precise
configuration. Contact ABT-Permavoid for planting media recommendations based on soil depth.
Quail St. Project, Newport CA Date:
PV323388
CU 2
Acat 16,943 ft²Ap
D85 0.0625 ft Vcu
Dsoil 18.0 in.Vbf
Wa 0%%PF
Dpond 0.0 Allowed Dip
Ksat N/A
SF 2.0 ft³#
Tf 2.0 PV-150 #
150x2 11.8 in.23/160 T #
Vpv 95 %Cap. Tex.#
ETo7 21.7 in.By Others #
IE 0.85
Calculate the Design Capture Volume (Vcap):
Vcap =D85 ∙ Acat
Vcap =0.0625ft ∙ 16942.9ft²
#Vcap =1058.9 ft³
Calculate the Permavoid Capture & Use Depth (Dcu):
Dcu =(150x2 ∙ Vpv) + (Dsoil ∙ Wa)
Dcu =(11.8in. ∙ 95%) + (18in. ∙ 0%)
#Dcu =11.22 in. = 0.935 ft
Calculate the Planter Area (Ap):
#Ap =1132.6 ft²
Calculate the Capture & Use Volume (Vcu):
Vcu =Ap ∙ Dcu
Vcu =1132.6 ft² ∙ 0.935ft
#Vcu =1058.9 ft³
0
#
Calculate the Minimum Required Plant Factor (PF):
PF =(Vcu ∙ IE) / (ETo7 ∙ Ap)
PF =(1058.9 ft³ ∙ 0.85) / [(21.7in. / 12ipf) ∙ 1132.6 ft²]
#PF =0.44
Calculate the 7-Month Estimated Total Water Use (ETWU-7):
ETWU-7 =(ETo7 ∙ PF ∙ Ap) / IE
ETWU-7 =[(21.7in. / 12ipf) ∙ 0.44 ∙ 1132.6 ft²] / 0.85
#ETWU-7 =1058.9 ft³
Check the Capture & Use Volume (Vcu) vs. the 7-Month Estimated Total Water Usage (ETWU-7):
Vcu vs.ETWU-7
1058.9 ft³ vs.1058.9 ft³
#1058.9 ft³ = 1058.9 ft³
Vcu = ETWU-7 ✓ - CHECKED
Los Angeles Low Impact Development
Capture & Use / Biofiltration Planter Design Calculations
Project Name: 4/24/2023
Project Number:
Planter ID Number:Design Summary
1058.9 ft³
N/A
30 in.
Catchment Area:Planter Area:1132.6 ft²
85th Percentile Storm Depth:Capture & Use Volume:
Soil Depth:
0.44
Biofiltration Volume:
Plant Factor (min.):
Internal Planter Depth:
Material Requirements
Permavoid Units:836 Units
836 Pairs
7-Month Reference Evapotranspiration:
Permavoid Irrigation Efficiency:
Soil Available Water:
Ponding Depth:
Soil Saturated Infiltration Rate:
Safety Factor:
Time To Fill:
Permavoid System Depth:
Permavoid Voids:
Capillary Cones:
Wicking Geotextile Length:134 - 189 ft
Planting Media:69.2 CY
*NOTES: Quantities are for estimation only. Fluctuations in material quatities will occur based on the precise
configuration. Contact ABT-Permavoid for planting media recommendations based on soil depth.
ABT Permavoid is a multi-functional stormwater management & water conservation system
that mimics the natural water cycle and can save up to 30% on overall site drainage costs.
Since its introduction ABT Permavoid has revolutionized the way about which stormwater is thought. Its unique capabilities allow even
the most challenging developed sites to behave like their natural pre-development counterparts. Whether returned to the community water
cycle through infiltration or utilized locally through capillary irrigation, ABT Permavoid promotes the most natural, environmentally
friendly methods of managing water. It is the clear choice on sites both large and small when designing sustainable, resilient landscapes
that enhance neighborhood aesthetics, mitigate flood risks and during periods of drought, conserve our most precious resource.
RETENTION /
DETENTION
PERMEABLE
INFILTRATION
STRUCTURAL
SUBBASE
WATER
CONVEYANCE
CAPILLARY
IRRIGATION
Modular units with 95% void ratio interlock with patented lateral connectors to create a monolithic
stormwater management system eliminating the need for end of line ponds and tanks.
The ultra-shallow profile promotes stormwater infiltration over the largest area possible, including
under traditional pavements like asphalt and concrete removing the added costs of permeable paving.
The ultra-high strength (104 psi yield) safely and reliably transfers traffic loads to subgrade soils
replacing large volumes of hauled subbase stone.
Stormwater is efficiently transported to discharge locations or landscaped areas for natural reuse
eliminating drainage and irrigation pipes.
Patented wicking cones employ capillary action to bring stormwater directly to the root zone of
landscaped areas while keeping it away from evaporative heat and sunlight for up to 60% savings vs
traditional sprinkler irrigation.
WHICH SIDE ARE YOU ON?
BEFORE AFTER
WATER IS OUR MOST PRECIOUS RESOURCE:
1218
THE FOUNDATION FOR OUR FUTUREWWW.ABTDRAINS.COM
PH: (800) 438 - 6057
PERMAVOID INLET DETAIL - PVIOC-109
Permavoid Planter
at Surface InletRoof Drain Leader
Scour Prevention Stones / Mat Per Plans
Planter Housing Per Plans
Membrane Liner (30 mil HDPE or LLDPE or Approved)
Permavoid Irrigation - (See Permavoid Planter Details)
Roof Drain / Planter Inlet Per Plans
0719
Dsoil
12.0"
Dpond
Freeboard
Dip
THE FOUNDATION FOR OUR FUTUREWWW.ABTDRAINS.COM
PH: (800) 438 - 6057
PERMAVOID INLET DETAIL - PVIOC-101
SLOPE
SLOPE
Catch Basin
and/or Yard Drain
Permavoid Planter
at Pipe Inlet
NOTES:
1. All direct pipe connections to Permavoid systems shall have pre-treatment
measures to prevent sedimentation such as ABT FirstFlush or approved alternates.
2. Water fed through direct pipe connections to Permavoid is not eligible for biofiltration.
Permavoid Irrigation - (See Permavoid Planter Details)
Membrane Liner (30 mil HDPE or LLDPE or Approved)
Watertight Pipe Inlet Connection
ABT TrenchFormer Catch Basin or Approved Equal
w/ ABT FirstFlush Pre-Treatment or Approved Equal
Outlet Pipe Size & Slope Per Plans
TF Catch Basin Invert & Top Of Grate Per Plans
Surface Finishes Per Plans
0719
Dsoil
12.0"
Dip
ATTACHMENT C
ORANGE COUNTY RAINFALL ZONES MAP
O
R
A
N
G
E
C
O
U
N
T
Y
O
R
A
N
G
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
ORANGE COUNTYORANGE COUNTY
LOS ANGELES COUNTYLOS ANGELES COUNTY
ORA
N
G
E
C
O
U
N
T
Y
ORA
N
G
E
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
1.05
0.7
10
.
9
5
0
.
9
0
.
8
5
0
.
8
0
.
7
5
0
.
7
0
.
6
5
0.9
5
0.7
0.
9
0.9
0.7
5
P:
\
9
5
2
6
E
\
6
-
G
I
S
\
M
x
d
s
\
R
e
p
o
r
t
s
\
I
n
f
i
l
t
r
a
t
i
o
n
F
e
a
s
a
b
i
l
i
t
y
_
2
0
1
1
0
2
1
5
\
9
5
2
6
E
_
F
i
g
u
r
e
X
V
I
-
1
_
R
a
i
n
f
a
l
l
Z
o
n
e
s
_
2
0
1
1
0
2
1
5
.
m
x
d
FIGURE
JO
B
TI
T
L
E
SC
A
L
E
1"
=
1
.
8
m
i
l
e
s
DE
S
I
G
N
E
D
DR
A
W
I
N
G
CH
E
C
K
E
D
BM
P
04
/
2
2
/
1
0
DA
T
E
JO
B
N
O
.
95
2
6
-
E
THTH
OR
A
N
G
E
C
O
U
N
T
Y
TE
C
H
N
I
C
A
L
G
U
I
D
A
N
C
E
DO
C
U
M
E
N
T
OR
A
N
G
E
C
O
.
CA
RA
I
N
F
A
L
L
Z
O
N
E
S
SUBJECT TO FURTHER REVISION
0 3.6 7.21.8
Miles
0 6 123
Kilometers
LEGEND
Orange County Precipitation Stations
24 Hour, 85th Percentile Rainfall (Inches)
24 Hour, 85th Percentile Rainfall (Inches) - Extrapolated
City Boundaries
Rainfall ZonesDesign Capture Storm Depth (inches)
0.65"
0.7
0.75
0.80
0.85
0.90
0.95
1.00
1.10"
Note: Events defined as 24-hour periods (calendar days) with greater
than 0.1 inches of rainfall.
For areas outside of available data coverage, professional judgment
shall be applied.
XVI-1
O
R
A
N
G
E
C
O
U
N
T
Y
O
R
A
N
G
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
ORANGE COUNTYORANGE COUNTYLOS ANGELES COUNTYLOS ANGELES COUNTY
ORA
N
G
E
C
O
U
N
T
Y
ORA
N
G
E
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
P:
\
9
5
2
6
E
\
6
-
G
I
S
\
M
x
d
s
\
R
e
p
o
r
t
s
\
I
n
f
i
l
t
r
a
t
i
o
n
F
e
a
s
a
b
i
l
i
t
y
_
2
0
1
1
0
2
1
5
\
9
5
2
6
E
_
F
i
g
u
r
e
X
V
I
-
2
a
_
H
y
d
r
o
S
o
i
l
s
_
2
0
1
1
0
2
1
5
.
m
x
d
FIGURE
XVI-2a
JO
B
TI
T
L
E
SC
A
L
E
1"
=
1
.
8
m
i
l
e
s
DE
S
I
G
N
E
D
DR
A
W
I
N
G
CH
E
C
K
E
D
BM
P
02
/
0
9
/
1
1
DA
T
E
JO
B
N
O
.
95
2
6
-
E
THTH
OR
A
N
G
E
C
O
U
N
T
Y
IN
F
I
L
T
R
A
T
I
O
N
S
T
U
D
Y
OR
A
N
G
E
C
O
.
CA
NR
C
S
H
Y
D
R
O
L
O
G
I
C
SO
I
L
S
G
R
O
U
P
S
SUBJECT TO FURTHER REVISION
Source:
Soils: Natural Resources Conservation Service (NRCS)
Soil Survey - soil_ca678, Orange County & Western Riverside
Date of publication: 2006-02-08
!I
0 3.6 7.21.8
Miles
0 5 102.5
Kilometers
LEGEND
City Boundaries
Hydrologic Soil Groups
A Soils
B Soils
C Soils
D Soils
http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm
O
R
A
N
G
E
C
O
U
N
T
Y
O
R
A
N
G
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
RI
V
E
R
S
I
D
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
OR
A
N
G
E
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
SA
N
B
E
R
N
A
R
D
I
N
O
C
O
U
N
T
Y
ORANGE COUNTYORANGE COUNTY
LOS ANGELES COUNTYLOS ANGELES COUNTY
ORA
N
G
E
C
O
U
N
T
Y
ORA
N
G
E
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
LOS
A
N
G
E
L
E
S
C
O
U
N
T
Y
10
10
3 5
10
30
10
30
10
20
10
10
5
50
3
30
30
30
3
0
20
5
10
20
30
50
10
30
20
P:
\
9
5
2
6
E
\
6
-
G
I
S
\
M
x
d
s
\
R
e
p
o
r
t
s
\
I
n
f
i
l
t
r
a
t
i
o
n
F
e
a
s
a
b
i
l
i
t
y
_
2
0
1
1
0
2
1
5
\
9
5
2
6
E
_
F
i
g
u
r
e
X
V
I
-
2
d
_
D
e
p
t
h
T
o
G
r
o
u
n
d
w
a
t
e
r
O
v
e
r
v
i
e
w
_
2
0
1
1
0
2
1
5
.
m
x
d
FIGURE
XVI-2d
JO
B
TI
T
L
E
SC
A
L
E
1"
=
1
.
2
5
m
i
l
e
s
DE
S
I
G
N
E
D
DR
A
W
I
N
G
CH
E
C
K
E
D
BM
P
02
/
0
9
/
1
1
DA
T
E
JO
B
N
O
.
95
2
6
-
E
THTH
OR
A
N
G
E
C
O
U
N
T
Y
IN
F
I
L
T
R
A
T
I
O
N
S
T
U
D
Y
OR
A
N
G
E
C
O
.
CA
NO
R
T
H
O
R
A
N
G
E
C
O
U
N
T
Y
MA
P
P
E
D
D
E
P
T
H
T
O
F
I
R
S
T
GR
O
U
N
D
W
A
T
E
R
SUBJECT TO FURTHER REVISION
Note: Data are not available for South Orange County at this time.
Source:
Sprotte, Fuller and Greenwood, 1980.
California Division of Mines and Geology;
California Geological Survey
!I
0 2.5 51.25
Miles
0 4 82
Kilometers
LEGEND
Depth To First Groundwater Contours
City Boundaries
OCWD Groundwater Basin Protection Boundary
P:
\
9
5
2
6
E
\
6
-
G
I
S
\
M
x
d
s
\
S
u
c
e
p
t
a
b
i
l
i
t
y
M
a
p
s
_
2
0
1
0
0
5
0
5
\
9
5
2
6
E
_
N
e
w
p
o
r
t
B
a
y
S
u
s
c
e
p
t
i
b
i
l
i
t
y
_
2
0
1
0
0
4
3
0
.
m
x
d
Riverside County
Santa Ana RiverWatershed
Santa Ana RiverWatershed
South OrangeCounty
Anaheim Bay-Huntington HarborWatershed
JohnWayneAirport
Lower PetersCanyonRetarding Basin
Hicks CanyonRetardingBasin
SiphonReservoir
Round CanyonRetardingBasin
Bee CanyonRetardingBasin
EastfootRetardingBasin
Orchard EstatesRetention Basin
Agua ChinonRetardingBasin
VillagePond Park
Sand CanyonReservoir
San JoaquinReservoir
LagunaReservoir
Big CanyonReservoir
BonitaCanyonReservoir
BasinNumber 1
NorthLake
SouthLake
BasinNumber 2
El Modena-IrvineRetarding Basin
HarborView Dam
East HicksCanyonRetarding Basin
RattlesnakeReservoir
TrabucoRetardingBasin MarshburnRetardingBasin
FIGURE 4
JO
B
TIT
L
E
SC
A
L
E
1"
=
1
2
0
0
0
'
DE
S
I
G
N
E
D
DR
A
W
I
N
G
CH
E
C
K
E
D
BM
P
04
/
3
0
/
1
0
DA
T
E
JO
B
N
O
.
95
2
6
-
E
THTH
OR
A
N
G
E
C
O
U
N
T
Y
WA
T
E
R
S
H
E
D
MA
S
T
E
R
P
L
A
N
N
I
N
G
OR
A
N
G
E
C
O
.
CA
SU
S
C
E
P
T
I
B
I
L
I
T
Y
A
N
A
L
Y
I
S
NE
W
P
O
R
T
B
A
Y
-
NE
W
P
O
R
T
C
O
A
S
T
A
L
S
T
R
E
A
M
S
0 9,000 18,000Feet
Susceptibility
Potential Areas of Erosion, Habitat, &Physical Structure Susceptibility
Channel Type
Earth (Unstable)
Earth (Stabilized)
Stabilized
Tidel Influence
<= Mean High Water Line (4.28')
Water Body
Basin
Dam
Lake
Reservoir
Other Lands
Airport/Military
PRELIMINARY MAP – SUBJECT TO FURTHER REVISION
SUSCEPTIBILITY MAP UPDATE (DEC 2012)
ATTACHMENT C
ORANGE COUNTY RAINFALL ZONES MAP
∑
∑
∑
∑
PREPARED BY:
16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.com
1401 QUAIL STREET
PRE-CONSTRUCTION
HYDROLOGY MAP
SHEET 1 OF 2
LEGEND
?
?
SPRUCE AVENUE
QU
A
I
L
S
T
R
E
E
T
∑
∑
∑
∑
∑
∑
∑
∑
∑
∑
PREPARED BY:
16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.com
1401 QUAIL STREET
POST-CONSTRUCTION
HYDROLOGY MAP
SHEET 2 OF 2
LEGEND
____________________________________________________________________________
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2008 Advanced Engineering Software (aes)
Ver. 15.0 Release Date: 04/01/2008 License ID 1204
************************** DESCRIPTION OF STUDY **************************
* PRE-DEVELOPMENT *
* 2 YEAR STORM ANALYSIS *
* 22-2434 QUAIL 1401 *
**************************************************************************
FILE NAME: 2434E.DAT
TIME/DATE OF STUDY: 10:21 12/13/2022
============================================================================
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================
--*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 2.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95
*DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) I ASSUMED FOR RATIONAL METHOD*
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== =======
1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150
GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*PIPE MAY BE SIZED TO HAVE A FLOW CAPACITY LESS THAN
UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED
****************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 21
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
============================================================================
INITIAL SUBAREA FLOW-LENGTH(FEET) = 425.00
ELEVATION DATA: UPSTREAM(FEET) = 48.50 DOWNSTREAM(FEET) = 45.20
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.041
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.611
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL D 1.21 0.20 0.100 57 9.04
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 1.73
TOTAL AREA(ACRES) = 1.21 PEAK FLOW RATE(CFS) = 1.73
****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 20.00 IS CODE = 81
----------------------------------------------------------------------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
MAINLINE Tc(MIN.) = 9.04
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.611
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL D 0.50 0.20 0.100 57
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA AREA(ACRES) = 0.50 SUBAREA RUNOFF(CFS) = 0.72
EFFECTIVE AREA(ACRES) = 1.71 AREA-AVERAGED Fm(INCH/HR) = 0.02
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.10
TOTAL AREA(ACRES) = 1.7 PEAK FLOW RATE(CFS) = 2.45
============================================================================
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 1.7 TC(MIN.) = 9.04
EFFECTIVE AREA(ACRES) = 1.71 AREA-AVERAGED Fm(INCH/HR)= 0.02
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.100
PEAK FLOW RATE(CFS) = 2.45
===========================================================================
END OF RATIONAL METHOD ANALYSIS
____________________________________________________________________________
****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================
(C) Copyright 1989-2008 Advanced Engineering Software (aes)
Ver. 15.0 Release Date: 04/01/2008 License ID 1204
Analysis prepared by:
****************************************************************************
----------------------------------------------------------------------------
Problem Descriptions:
PRE-DEVELOPMENT HYDROGRAPH
2 YEAR STORM ANALYSIS
22-2434 QUAIL 1401
----------------------------------------------------------------------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 1.71
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.020
LOW LOSS FRACTION = 0.250
TIME OF CONCENTRATION(MIN.) = 9.04
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA
ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
----------------------------------------------------------------------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.22
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.07
****************************************************************************
TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.03 0.0000 0.00 Q . . . .
0.18 0.0002 0.04 Q . . . .
0.33 0.0007 0.04 Q . . . .
0.48 0.0012 0.04 Q . . . .
0.63 0.0016 0.04 Q . . . .
0.78 0.0021 0.04 Q . . . .
0.93 0.0026 0.04 Q . . . .
1.08 0.0030 0.04 Q . . . .
1.23 0.0035 0.04 Q . . . .
1.39 0.0040 0.04 Q . . . .
1.54 0.0045 0.04 Q . . . .
1.69 0.0050 0.04 Q . . . .
1.84 0.0055 0.04 Q . . . .
1.99 0.0060 0.04 Q . . . .
2.14 0.0065 0.04 Q . . . .
2.29 0.0070 0.04 Q . . . .
2.44 0.0075 0.04 Q . . . .
2.59 0.0080 0.04 Q . . . .
2.74 0.0085 0.04 Q . . . .
2.89 0.0090 0.04 Q . . . .
3.04 0.0095 0.04 Q . . . .
3.19 0.0101 0.04 Q . . . .
3.34 0.0106 0.04 Q . . . .
3.49 0.0111 0.04 Q . . . .
3.65 0.0116 0.04 Q . . . .
3.80 0.0122 0.04 Q . . . .
3.95 0.0127 0.04 Q . . . .
4.10 0.0133 0.04 Q . . . .
4.25 0.0138 0.04 Q . . . .
4.40 0.0144 0.04 Q . . . .
4.55 0.0149 0.05 Q . . . .
4.70 0.0155 0.05 Q . . . .
4.85 0.0161 0.05 Q . . . .
5.00 0.0167 0.05 Q . . . .
5.15 0.0172 0.05 Q . . . .
5.30 0.0178 0.05 Q . . . .
5.45 0.0184 0.05 Q . . . .
5.60 0.0190 0.05 Q . . . .
5.75 0.0196 0.05 Q . . . .
5.91 0.0202 0.05 Q . . . .
6.06 0.0208 0.05 Q . . . .
6.21 0.0214 0.05 Q . . . .
6.36 0.0221 0.05 Q . . . .
6.51 0.0227 0.05 Q . . . .
6.66 0.0233 0.05 Q . . . .
6.81 0.0240 0.05 Q . . . .
6.96 0.0246 0.05 Q . . . .
7.11 0.0253 0.05 Q . . . .
7.26 0.0259 0.05 Q . . . .
7.41 0.0266 0.05 Q . . . .
7.56 0.0273 0.05 Q . . . .
7.71 0.0280 0.06 Q . . . .
7.86 0.0286 0.06 Q . . . .
8.01 0.0293 0.06 Q . . . .
8.17 0.0300 0.06 Q . . . .
8.32 0.0308 0.06 Q . . . .
8.47 0.0315 0.06 Q . . . .
8.62 0.0322 0.06 Q . . . .
8.77 0.0330 0.06 Q . . . .
8.92 0.0337 0.06 Q . . . .
9.07 0.0345 0.06 Q . . . .
9.22 0.0353 0.06 Q . . . .
9.37 0.0360 0.06 Q . . . .
9.52 0.0368 0.06 Q . . . .
9.67 0.0376 0.06 Q . . . .
9.82 0.0385 0.07 Q . . . .
9.97 0.0393 0.07 Q . . . .
10.12 0.0401 0.07 Q . . . .
10.27 0.0410 0.07 Q . . . .
10.43 0.0418 0.07 Q . . . .
10.58 0.0427 0.07 Q . . . .
10.73 0.0436 0.07 Q . . . .
10.88 0.0445 0.07 Q . . . .
11.03 0.0455 0.08 Q . . . .
11.18 0.0464 0.08 Q . . . .
11.33 0.0474 0.08 Q . . . .
11.48 0.0484 0.08 Q . . . .
11.63 0.0494 0.08 Q . . . .
11.78 0.0504 0.08 Q . . . .
11.93 0.0515 0.09 Q . . . .
12.08 0.0525 0.09 Q . . . .
12.23 0.0538 0.11 Q . . . .
12.38 0.0552 0.12 Q . . . .
12.53 0.0567 0.12 Q . . . .
12.69 0.0582 0.12 Q . . . .
12.84 0.0598 0.13 Q . . . .
12.99 0.0614 0.13 Q . . . .
13.14 0.0631 0.14 Q . . . .
13.29 0.0648 0.14 Q . . . .
13.44 0.0666 0.15 Q . . . .
13.59 0.0684 0.15 Q . . . .
13.74 0.0704 0.16 Q . . . .
13.89 0.0724 0.16 Q . . . .
14.04 0.0745 0.17 Q . . . .
14.19 0.0767 0.19 Q . . . .
14.34 0.0791 0.20 Q . . . .
14.49 0.0817 0.21 Q . . . .
14.64 0.0843 0.22 Q . . . .
14.79 0.0872 0.23 Q . . . .
14.95 0.0902 0.26 .Q . . . .
15.10 0.0935 0.27 .Q . . . .
15.25 0.0971 0.31 .Q . . . .
15.40 0.1011 0.33 .Q . . . .
15.55 0.1053 0.34 .Q . . . .
15.70 0.1098 0.39 .Q . . . .
15.85 0.1158 0.58 . Q . . . .
16.00 0.1244 0.80 . Q . . . .
16.15 0.1446 2.45 . Q. . . .
16.30 0.1627 0.46 .Q . . . .
16.45 0.1676 0.32 .Q . . . .
16.60 0.1714 0.29 .Q . . . .
16.75 0.1747 0.24 Q . . . .
16.90 0.1776 0.22 Q . . . .
17.05 0.1801 0.19 Q . . . .
17.21 0.1824 0.17 Q . . . .
17.36 0.1844 0.15 Q . . . .
17.51 0.1862 0.14 Q . . . .
17.66 0.1880 0.13 Q . . . .
17.81 0.1896 0.13 Q . . . .
17.96 0.1911 0.12 Q . . . .
18.11 0.1925 0.11 Q . . . .
18.26 0.1937 0.08 Q . . . .
18.41 0.1947 0.08 Q . . . .
18.56 0.1957 0.08 Q . . . .
18.71 0.1967 0.07 Q . . . .
18.86 0.1976 0.07 Q . . . .
19.01 0.1985 0.07 Q . . . .
19.16 0.1993 0.07 Q . . . .
19.31 0.2002 0.07 Q . . . .
19.47 0.2010 0.06 Q . . . .
19.62 0.2017 0.06 Q . . . .
19.77 0.2025 0.06 Q . . . .
19.92 0.2032 0.06 Q . . . .
20.07 0.2040 0.06 Q . . . .
20.22 0.2047 0.06 Q . . . .
20.37 0.2054 0.05 Q . . . .
20.52 0.2060 0.05 Q . . . .
20.67 0.2067 0.05 Q . . . .
20.82 0.2074 0.05 Q . . . .
20.97 0.2080 0.05 Q . . . .
21.12 0.2086 0.05 Q . . . .
21.27 0.2092 0.05 Q . . . .
21.42 0.2098 0.05 Q . . . .
21.57 0.2104 0.05 Q . . . .
21.73 0.2110 0.05 Q . . . .
21.88 0.2116 0.05 Q . . . .
22.03 0.2121 0.04 Q . . . .
22.18 0.2127 0.04 Q . . . .
22.33 0.2132 0.04 Q . . . .
22.48 0.2138 0.04 Q . . . .
22.63 0.2143 0.04 Q . . . .
22.78 0.2148 0.04 Q . . . .
22.93 0.2153 0.04 Q . . . .
23.08 0.2158 0.04 Q . . . .
23.23 0.2163 0.04 Q . . . .
23.38 0.2168 0.04 Q . . . .
23.53 0.2173 0.04 Q . . . .
23.68 0.2178 0.04 Q . . . .
23.83 0.2182 0.04 Q . . . .
23.99 0.2187 0.04 Q . . . .
24.14 0.2192 0.04 Q . . . .
24.29 0.2194 0.00 Q . . . .
----------------------------------------------------------------------------
____________________________________________________________________________
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2008 Advanced Engineering Software (aes)
Ver. 15.0 Release Date: 04/01/2008 License ID 1204
Analysis prepared by:
************************** DESCRIPTION OF STUDY **************************
* POST-DEVELOPMENT *
* 2 YEAR STORM ANALYSIS *
* 22-2434 QUAIL 1401 *
**************************************************************************
FILE NAME: 2434P.DAT
TIME/DATE OF STUDY: 17:40 12/12/2022
============================================================================
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================
--*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 2.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95
*DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) I ASSUMED FOR RATIONAL METHOD*
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== =======
1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150
GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*PIPE MAY BE SIZED TO HAVE A FLOW CAPACITY LESS THAN
UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED
****************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 21
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
============================================================================
INITIAL SUBAREA FLOW-LENGTH(FEET) = 100.00
ELEVATION DATA: UPSTREAM(FEET) = 51.50 DOWNSTREAM(FEET) = 49.80
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.000
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.264
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
APARTMENTS D 0.29 0.20 0.200 57 5.00
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200
SUBAREA RUNOFF(CFS) = 0.58
TOTAL AREA(ACRES) = 0.29 PEAK FLOW RATE(CFS) = 0.58
****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.10 IS CODE = 41
----------------------------------------------------------------------------
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET) = 44.50 DOWNSTREAM(FEET) = 41.00
FLOW LENGTH(FEET) = 340.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 8.0 INCH PIPE IS 3.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 3.87
GIVEN PIPE DIAMETER(INCH) = 8.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 0.58
PIPE TRAVEL TIME(MIN.) = 1.46 Tc(MIN.) = 6.46
LONGEST FLOWPATH FROM NODE 10.00 TO NODE 11.10 = 440.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 11.10 TO NODE 11.10 IS CODE = 81
----------------------------------------------------------------------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
MAINLINE Tc(MIN.) = 6.46
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.954
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
APARTMENTS D 0.54 0.20 0.200 57
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200
SUBAREA AREA(ACRES) = 0.54 SUBAREA RUNOFF(CFS) = 0.93
EFFECTIVE AREA(ACRES) = 0.83 AREA-AVERAGED Fm(INCH/HR) = 0.04
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.20
TOTAL AREA(ACRES) = 0.8 PEAK FLOW RATE(CFS) = 1.43
****************************************************************************
FLOW PROCESS FROM NODE 11.10 TO NODE 30.00 IS CODE = 41
----------------------------------------------------------------------------
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET) = 41.00 DOWNSTREAM(FEET) = 38.00
FLOW LENGTH(FEET) = 84.00 MANNING'S N = 0.010
DEPTH OF FLOW IN 8.0 INCH PIPE IS 4.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.24
GIVEN PIPE DIAMETER(INCH) = 8.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 1.43
PIPE TRAVEL TIME(MIN.) = 0.17 Tc(MIN.) = 6.63
LONGEST FLOWPATH FROM NODE 10.00 TO NODE 30.00 = 524.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 30.00 TO NODE 30.00 IS CODE = 10
----------------------------------------------------------------------------
>>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<<
============================================================================
****************************************************************************
FLOW PROCESS FROM NODE 30.00 TO NODE 30.00 IS CODE = 13
----------------------------------------------------------------------------
>>>>>CLEAR THE MAIN-STREAM MEMORY<<<<<
============================================================================
****************************************************************************
FLOW PROCESS FROM NODE 20.00 TO NODE 21.00 IS CODE = 21
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
============================================================================
INITIAL SUBAREA FLOW-LENGTH(FEET) = 135.00
ELEVATION DATA: UPSTREAM(FEET) = 51.50 DOWNSTREAM(FEET) = 49.10
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.161
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.223
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
APARTMENTS D 0.31 0.20 0.200 57 5.16
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200
SUBAREA RUNOFF(CFS) = 0.61
TOTAL AREA(ACRES) = 0.31 PEAK FLOW RATE(CFS) = 0.61
****************************************************************************
FLOW PROCESS FROM NODE 21.00 TO NODE 21.10 IS CODE = 41
----------------------------------------------------------------------------
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET) = 44.60 DOWNSTREAM(FEET) = 38.30
FLOW LENGTH(FEET) = 325.00 MANNING'S N = 0.010
DEPTH OF FLOW IN 8.0 INCH PIPE IS 2.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.26
GIVEN PIPE DIAMETER(INCH) = 8.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 0.61
PIPE TRAVEL TIME(MIN.) = 1.03 Tc(MIN.) = 6.19
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 21.10 = 460.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 21.10 TO NODE 21.10 IS CODE = 81
----------------------------------------------------------------------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
MAINLINE Tc(MIN.) = 6.19
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.002
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
APARTMENTS D 0.57 0.20 0.200 57
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.20
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200
SUBAREA AREA(ACRES) = 0.57 SUBAREA RUNOFF(CFS) = 1.01
EFFECTIVE AREA(ACRES) = 0.88 AREA-AVERAGED Fm(INCH/HR) = 0.04
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.20
TOTAL AREA(ACRES) = 0.9 PEAK FLOW RATE(CFS) = 1.55
****************************************************************************
FLOW PROCESS FROM NODE 21.10 TO NODE 30.00 IS CODE = 41
----------------------------------------------------------------------------
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET) = 38.30 DOWNSTREAM(FEET) = 38.00
FLOW LENGTH(FEET) = 30.00 MANNING'S N = 0.010
ASSUME FULL-FLOWING PIPELINE
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.45
PIPE FLOW VELOCITY = (TOTAL FLOW)/(PIPE CROSS SECTION AREA)
GIVEN PIPE DIAMETER(INCH) = 8.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 1.55
PIPE TRAVEL TIME(MIN.) = 0.11 Tc(MIN.) = 6.30
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 30.00 = 490.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 30.00 TO NODE 30.00 IS CODE = 11
----------------------------------------------------------------------------
>>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<<
============================================================================
** MAIN STREAM CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 1.55 6.30 1.982 0.20( 0.04) 0.20 0.9 20.00
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 30.00 = 490.00 FEET.
** MEMORY BANK # 1 CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 1.43 6.63 1.925 0.20( 0.04) 0.20 0.8 10.00
LONGEST FLOWPATH FROM NODE 10.00 TO NODE 30.00 = 524.00 FEET.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 2.95 6.30 1.982 0.20( 0.04) 0.20 1.7 20.00
2 2.94 6.63 1.925 0.20( 0.04) 0.20 1.7 10.00
TOTAL AREA(ACRES) = 1.7
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 2.95 Tc(MIN.) = 6.303
EFFECTIVE AREA(ACRES) = 1.67 AREA-AVERAGED Fm(INCH/HR) = 0.04
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.20
TOTAL AREA(ACRES) = 1.7
LONGEST FLOWPATH FROM NODE 10.00 TO NODE 30.00 = 524.00 FEET.
============================================================================
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 1.7 TC(MIN.) = 6.30
EFFECTIVE AREA(ACRES) = 1.67 AREA-AVERAGED Fm(INCH/HR)= 0.04
AREA-AVERAGED Fp(INCH/HR) = 0.20 AREA-AVERAGED Ap = 0.200
PEAK FLOW RATE(CFS) = 2.95
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 2.95 6.30 1.982 0.20( 0.04) 0.20 1.7 20.00
2 2.94 6.63 1.925 0.20( 0.04) 0.20 1.7 10.00
============================================================================
============================================================================
END OF RATIONAL METHOD ANALYSIS
____________________________________________________________________________
****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================
(C) Copyright 1989-2008 Advanced Engineering Software (aes)
Ver. 15.0 Release Date: 04/01/2008 License ID 1204
Analysis prepared by:
****************************************************************************
----------------------------------------------------------------------------
Problem Descriptions:
POST-DEVELOPMENT HYDROGRAPH
2 YEAR STORM ANALYSIS
22-2434 QUAIL 1401
----------------------------------------------------------------------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 1.71
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.040
LOW LOSS FRACTION = 0.250
TIME OF CONCENTRATION(MIN.) = 6.30
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA
ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
----------------------------------------------------------------------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.21
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.08
****************************************************************************
TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.04 0.0000 0.00 Q . . . .
0.14 0.0002 0.04 Q . . . .
0.25 0.0005 0.04 Q . . . .
0.35 0.0008 0.04 Q . . . .
0.46 0.0011 0.04 Q . . . .
0.56 0.0015 0.04 Q . . . .
0.67 0.0018 0.04 Q . . . .
0.77 0.0021 0.04 Q . . . .
0.88 0.0024 0.04 Q . . . .
0.98 0.0028 0.04 Q . . . .
1.09 0.0031 0.04 Q . . . .
1.19 0.0034 0.04 Q . . . .
1.30 0.0038 0.04 Q . . . .
1.40 0.0041 0.04 Q . . . .
1.51 0.0045 0.04 Q . . . .
1.61 0.0048 0.04 Q . . . .
1.72 0.0051 0.04 Q . . . .
1.82 0.0055 0.04 Q . . . .
1.93 0.0058 0.04 Q . . . .
2.03 0.0062 0.04 Q . . . .
2.14 0.0065 0.04 Q . . . .
2.24 0.0069 0.04 Q . . . .
2.35 0.0072 0.04 Q . . . .
2.45 0.0076 0.04 Q . . . .
2.56 0.0079 0.04 Q . . . .
2.66 0.0083 0.04 Q . . . .
2.77 0.0086 0.04 Q . . . .
2.87 0.0090 0.04 Q . . . .
2.98 0.0094 0.04 Q . . . .
3.08 0.0097 0.04 Q . . . .
3.19 0.0101 0.04 Q . . . .
3.29 0.0105 0.04 Q . . . .
3.40 0.0108 0.04 Q . . . .
3.50 0.0112 0.04 Q . . . .
3.61 0.0116 0.04 Q . . . .
3.71 0.0119 0.04 Q . . . .
3.82 0.0123 0.04 Q . . . .
3.92 0.0127 0.04 Q . . . .
4.03 0.0131 0.04 Q . . . .
4.13 0.0135 0.04 Q . . . .
4.24 0.0139 0.04 Q . . . .
4.34 0.0142 0.04 Q . . . .
4.45 0.0146 0.05 Q . . . .
4.55 0.0150 0.05 Q . . . .
4.66 0.0154 0.05 Q . . . .
4.76 0.0158 0.05 Q . . . .
4.87 0.0162 0.05 Q . . . .
4.97 0.0166 0.05 Q . . . .
5.08 0.0170 0.05 Q . . . .
5.18 0.0174 0.05 Q . . . .
5.29 0.0178 0.05 Q . . . .
5.39 0.0182 0.05 Q . . . .
5.50 0.0187 0.05 Q . . . .
5.61 0.0191 0.05 Q . . . .
5.71 0.0195 0.05 Q . . . .
5.82 0.0199 0.05 Q . . . .
5.92 0.0203 0.05 Q . . . .
6.02 0.0208 0.05 Q . . . .
6.13 0.0212 0.05 Q . . . .
6.23 0.0216 0.05 Q . . . .
6.34 0.0221 0.05 Q . . . .
6.44 0.0225 0.05 Q . . . .
6.55 0.0229 0.05 Q . . . .
6.65 0.0234 0.05 Q . . . .
6.76 0.0238 0.05 Q . . . .
6.86 0.0243 0.05 Q . . . .
6.97 0.0247 0.05 Q . . . .
7.07 0.0252 0.05 Q . . . .
7.18 0.0257 0.05 Q . . . .
7.28 0.0261 0.05 Q . . . .
7.39 0.0266 0.05 Q . . . .
7.49 0.0271 0.05 Q . . . .
7.60 0.0275 0.05 Q . . . .
7.70 0.0280 0.06 Q . . . .
7.81 0.0285 0.06 Q . . . .
7.91 0.0290 0.06 Q . . . .
8.02 0.0295 0.06 Q . . . .
8.12 0.0300 0.06 Q . . . .
8.23 0.0305 0.06 Q . . . .
8.34 0.0310 0.06 Q . . . .
8.44 0.0315 0.06 Q . . . .
8.55 0.0320 0.06 Q . . . .
8.65 0.0325 0.06 Q . . . .
8.76 0.0330 0.06 Q . . . .
8.86 0.0335 0.06 Q . . . .
8.96 0.0341 0.06 Q . . . .
9.07 0.0346 0.06 Q . . . .
9.18 0.0351 0.06 Q . . . .
9.28 0.0357 0.06 Q . . . .
9.38 0.0362 0.06 Q . . . .
9.49 0.0368 0.06 Q . . . .
9.60 0.0373 0.07 Q . . . .
9.70 0.0379 0.07 Q . . . .
9.80 0.0385 0.07 Q . . . .
9.91 0.0391 0.07 Q . . . .
10.01 0.0396 0.07 Q . . . .
10.12 0.0402 0.07 Q . . . .
10.23 0.0408 0.07 Q . . . .
10.33 0.0414 0.07 Q . . . .
10.43 0.0420 0.07 Q . . . .
10.54 0.0427 0.07 Q . . . .
10.65 0.0433 0.07 Q . . . .
10.75 0.0439 0.07 Q . . . .
10.85 0.0446 0.07 Q . . . .
10.96 0.0452 0.08 Q . . . .
11.06 0.0459 0.08 Q . . . .
11.17 0.0465 0.08 Q . . . .
11.27 0.0472 0.08 Q . . . .
11.38 0.0479 0.08 Q . . . .
11.48 0.0486 0.08 Q . . . .
11.59 0.0493 0.08 Q . . . .
11.70 0.0500 0.08 Q . . . .
11.80 0.0507 0.08 Q . . . .
11.90 0.0515 0.09 Q . . . .
12.01 0.0522 0.09 Q . . . .
12.11 0.0531 0.11 Q . . . .
12.22 0.0540 0.11 Q . . . .
12.32 0.0549 0.11 Q . . . .
12.43 0.0559 0.11 Q . . . .
12.53 0.0569 0.11 Q . . . .
12.64 0.0579 0.12 Q . . . .
12.74 0.0589 0.12 Q . . . .
12.85 0.0599 0.12 Q . . . .
12.95 0.0610 0.12 Q . . . .
13.06 0.0620 0.12 Q . . . .
13.16 0.0631 0.13 Q . . . .
13.27 0.0642 0.13 Q . . . .
13.38 0.0654 0.13 Q . . . .
13.48 0.0665 0.13 Q . . . .
13.59 0.0677 0.14 Q . . . .
13.69 0.0689 0.14 Q . . . .
13.80 0.0702 0.15 Q . . . .
13.90 0.0714 0.15 Q . . . .
14.01 0.0727 0.15 Q . . . .
14.11 0.0741 0.16 Q . . . .
14.22 0.0755 0.17 Q . . . .
14.32 0.0770 0.17 Q . . . .
14.43 0.0785 0.18 Q . . . .
14.53 0.0801 0.18 Q . . . .
14.63 0.0817 0.20 Q . . . .
14.74 0.0835 0.20 Q . . . .
14.85 0.0853 0.22 Q . . . .
14.95 0.0872 0.23 Q . . . .
15.05 0.0893 0.25 Q . . . .
15.16 0.0914 0.26 .Q . . . .
15.27 0.0938 0.29 .Q . . . .
15.37 0.0964 0.30 .Q . . . .
15.48 0.0990 0.29 .Q . . . .
15.58 0.1016 0.32 .Q . . . .
15.68 0.1047 0.40 .Q . . . .
15.79 0.1085 0.47 .Q . . . .
15.90 0.1135 0.69 . Q . . . .
16.00 0.1207 0.96 . Q . . . .
16.10 0.1379 3.00 . . Q . . .
16.21 0.1533 0.55 . Q . . . .
16.32 0.1572 0.35 .Q . . . .
16.42 0.1601 0.30 .Q . . . .
16.52 0.1625 0.27 .Q . . . .
16.63 0.1647 0.24 Q . . . .
16.73 0.1667 0.21 Q . . . .
16.84 0.1684 0.19 Q . . . .
16.94 0.1700 0.18 Q . . . .
17.05 0.1714 0.16 Q . . . .
17.16 0.1728 0.15 Q . . . .
17.26 0.1741 0.14 Q . . . .
17.36 0.1753 0.14 Q . . . .
17.47 0.1764 0.13 Q . . . .
17.58 0.1776 0.13 Q . . . .
17.68 0.1786 0.12 Q . . . .
17.78 0.1797 0.12 Q . . . .
17.89 0.1807 0.11 Q . . . .
17.99 0.1816 0.11 Q . . . .
18.10 0.1825 0.09 Q . . . .
18.20 0.1832 0.08 Q . . . .
18.31 0.1840 0.08 Q . . . .
18.42 0.1847 0.08 Q . . . .
18.52 0.1854 0.08 Q . . . .
18.62 0.1860 0.08 Q . . . .
18.73 0.1867 0.07 Q . . . .
18.83 0.1873 0.07 Q . . . .
18.94 0.1879 0.07 Q . . . .
19.05 0.1885 0.07 Q . . . .
19.15 0.1891 0.07 Q . . . .
19.26 0.1897 0.07 Q . . . .
19.36 0.1903 0.06 Q . . . .
19.47 0.1908 0.06 Q . . . .
19.57 0.1914 0.06 Q . . . .
19.67 0.1919 0.06 Q . . . .
19.78 0.1924 0.06 Q . . . .
19.89 0.1929 0.06 Q . . . .
19.99 0.1934 0.06 Q . . . .
20.09 0.1939 0.06 Q . . . .
20.20 0.1944 0.06 Q . . . .
20.31 0.1949 0.06 Q . . . .
20.41 0.1954 0.05 Q . . . .
20.52 0.1959 0.05 Q . . . .
20.62 0.1963 0.05 Q . . . .
20.73 0.1968 0.05 Q . . . .
20.83 0.1972 0.05 Q . . . .
20.93 0.1977 0.05 Q . . . .
21.04 0.1981 0.05 Q . . . .
21.14 0.1985 0.05 Q . . . .
21.25 0.1989 0.05 Q . . . .
21.36 0.1994 0.05 Q . . . .
21.46 0.1998 0.05 Q . . . .
21.57 0.2002 0.05 Q . . . .
21.67 0.2006 0.05 Q . . . .
21.77 0.2010 0.05 Q . . . .
21.88 0.2014 0.05 Q . . . .
21.98 0.2018 0.04 Q . . . .
22.09 0.2022 0.04 Q . . . .
22.19 0.2025 0.04 Q . . . .
22.30 0.2029 0.04 Q . . . .
22.41 0.2033 0.04 Q . . . .
22.51 0.2037 0.04 Q . . . .
22.61 0.2040 0.04 Q . . . .
22.72 0.2044 0.04 Q . . . .
22.83 0.2047 0.04 Q . . . .
22.93 0.2051 0.04 Q . . . .
23.03 0.2055 0.04 Q . . . .
23.14 0.2058 0.04 Q . . . .
23.25 0.2061 0.04 Q . . . .
23.35 0.2065 0.04 Q . . . .
23.45 0.2068 0.04 Q . . . .
23.56 0.2072 0.04 Q . . . .
23.67 0.2075 0.04 Q . . . .
23.77 0.2078 0.04 Q . . . .
23.88 0.2081 0.04 Q . . . .
23.98 0.2085 0.04 Q . . . .
24.08 0.2088 0.04 Q . . . .
24.19 0.2090 0.00 Q . . . .
----------------------------------------------------------------------------
ATTACHMENT C
ORANGE COUNTY RAINFALL ZONES MAP
1299
4
9
11
5
11
12
6813
8
13
21
3510
14
20
28
48
16
SM
CL
CL
CL
CL
CL
ML
SP
BB-1
R-1
R-2
R-3
R-4
R-5
S-6
R-7
S-8
@Surface: 3" asphalt over 8" CLAY w/ Sand base
Undocumented Artificial Fill (Afu)
@2': Silty SAND, reddish brown, medium dense, predominantlyfine sand, trace medium and coarse sand, some rootlets,slightly moist
@4': Sandy CLAY, dark yellow brown, very stiff, fine sand, lowplasticity, weakly laminated, moist
@6': Sandy CLAY, reddish brown, very stiff, fine sand, low tomedium plasticity, laminated, moist
@8': CLAY, reddish brown mottled gray, very stiff, some finesand, low to medium plasticity, trace MnO, moist
@10': CLAY, reddish brown mottled gray, very stiff, some finesand, low to medium plasticity, some MnO and carbonateblebs, moist
@15': CLAY, gray brown mottled white, very stiff, trace finesand, low plasticity, large carbonate blebs, moist
@20': Sandy SILT, gray brown mottled yellow and orange(heavily Fe-stained), dense, predominantly fine sand, tracemedium sand, friable, very moist
@25': Poorly-graded SAND, gray brown, dense, predominantlymedium sand, trace fine and coarse sand, Fe-stained,micaceous, friable, wet
Hole Diameter
Mo
i
s
t
u
r
e
Ground Elevation
De
p
t
h
Bl
o
w
s
El
e
v
a
t
i
o
n
Pe
r
6
I
n
c
h
e
s
Page 1 of 2
44'
BULK SAMPLE
CORE SAMPLEGRAB SAMPLERING SAMPLESPLIT SPOON SAMPLETUBE SAMPLE
BCGR
ST
LFO
Hollow Stem Auger - 140lb - Autohammer - 30" Drop
So
i
l
C
l
a
s
s
.
5-20-22
SOIL DESCRIPTION
Sampled By
Drilling Co.Drilling Co.
Project
Project No.
See Figure 2 - Geotechnical Map
Intracorp Quail St
13542.001
Drilling Method
8"
Sa
m
p
l
e
N
o
.
Fe
e
t
At
t
i
t
u
d
e
s
SAMPLE TYPES:
Martini Drilling Corp
* * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * *
Co
n
t
e
n
t
,
%
Logged By
Date Drilled
LFO
Fe
e
t
S
(U
.
S
.
C
.
S
.
)
Lo
g
Ty
p
e
o
f
T
e
s
t
s
Gr
a
p
h
i
c
pc
f
Location
Dr
y
D
e
n
s
i
t
y
N
This Soil Description applies only to a location of the exploration at the
time of sampling. Subsurface conditions may differ at other locationsand may change with time. The description is a simplification of the
actual conditions encountered. Transitions between soil types may begradual.
TYPE OF TESTS:-200
ALCN
COCRCU
% FINES PASSINGATTERBERG LIMITSCONSOLIDATIONCOLLAPSECORROSIONUNDRAINED TRIAXIAL
DSEIH
MDPP
RV
DIRECT SHEAR
EXPANSION INDEXHYDROMETER
MAXIMUM DENSITYPOCKET PENETROMETERR VALUE
SASESG
UC
40
35
30
25
20
15
0
5
10
15
20
25
30
SIEVE ANALYSISSAND EQUIVALENTSPECIFIC GRAVITYUNCONFINED COMPRESSIVESTRENGTH
GEOTECHNICAL BORING LOG LB-1
2550/2"
9
24
30
1
2
2
PushPush2
Push
Push
3
SP
SP
SP
CH
CH
CH
R-9
S-10
S-11
S-12
S-13
@30': Poorly-graded SAND, gray brown, very dense,predominantly medium sand, trace fine and coarse sand,Fe-stained, micaceous, friable, wet
@35': Poorly-graded SAND, gray brown, very dense,predominantly medium sand, trace fine and coarse sand,Fe-stained, micaceous, friable, abundant white shellfragments, wet
@40': Same as above
@40.5': Fat CLAY, bluish gray, medium stiff, high plasticity,moist
@45': Fat CLAY, bluish gray, soft, high plasticity, trace whiteshell fragments, wet
@50': Same as above
T.D. 51.5 feet bgsGroundwater encountered at 25 feet bgs.Borehole backfilled with soil cuttings and patched withcold-patch asphalt.
Hole Diameter
Mo
i
s
t
u
r
e
Ground Elevation
De
p
t
h
Bl
o
w
s
El
e
v
a
t
i
o
n
Pe
r
6
I
n
c
h
e
s
Page 2 of 2
44'
BULK SAMPLE
CORE SAMPLEGRAB SAMPLERING SAMPLESPLIT SPOON SAMPLETUBE SAMPLE
BCGR
ST
LFO
Hollow Stem Auger - 140lb - Autohammer - 30" Drop
So
i
l
C
l
a
s
s
.
5-20-22
SOIL DESCRIPTION
Sampled By
Drilling Co.Drilling Co.
Project
Project No.
See Figure 2 - Geotechnical Map
Intracorp Quail St
13542.001
Drilling Method
8"
Sa
m
p
l
e
N
o
.
Fe
e
t
At
t
i
t
u
d
e
s
SAMPLE TYPES:
Martini Drilling Corp
* * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * *
Co
n
t
e
n
t
,
%
Logged By
Date Drilled
LFO
Fe
e
t
S
(U
.
S
.
C
.
S
.
)
Lo
g
Ty
p
e
o
f
T
e
s
t
s
Gr
a
p
h
i
c
pc
f
Location
Dr
y
D
e
n
s
i
t
y
N
This Soil Description applies only to a location of the exploration at the
time of sampling. Subsurface conditions may differ at other locationsand may change with time. The description is a simplification of the
actual conditions encountered. Transitions between soil types may begradual.
TYPE OF TESTS:-200
ALCN
COCRCU
% FINES PASSINGATTERBERG LIMITSCONSOLIDATIONCOLLAPSECORROSIONUNDRAINED TRIAXIAL
DSEIH
MDPP
RV
DIRECT SHEAR
EXPANSION INDEXHYDROMETER
MAXIMUM DENSITYPOCKET PENETROMETERR VALUE
SASESG
UC
10
5
0
-5
-10
-15
30
35
40
45
50
55
60
SIEVE ANALYSISSAND EQUIVALENTSPECIFIC GRAVITYUNCONFINED COMPRESSIVESTRENGTH
GEOTECHNICAL BORING LOG LB-1
6810
10
12
14
7
14
23
81623
7
13
21
3612
13
20
25
513
20
SM
CL
SM
CL
CL
CL
ML
SP
BB-1
R-1
R-2
R-3
R-4
R-5
S-6
R-7
S-8
@Surface: 8" asphalt over 4" CLAY w/ Sand base
Undocumented Artificial Fill (Afu)
@2': Silty SAND, reddish brown, medium dense, fine sand, traceclay, slightly moist
@4': Sandy CLAY, reddish brown mottled gray, very stiff, finesand, trace MnO, moist
@6': Silty SAND, orange brown, dense, predominantly fine sand,trace medium sand, friable, moist
@8': Lean CLAY, reddish brown, hard, low plasticity, some MnOstringers, moist
@10': Lean CLAY, reddish brown, very stiff, low plasticity, someMnO blebs, moist
@15': Sandy CLAY, gray brown, very stiff, fine sand, lowplasticity, abundant carbonate blebs, moist
@20': Sandy SILT, gray brown mottled orange from Fe-staining,dense, fine sand, weakly laminated, friable, moist
@25': Poorly-graded SAND, graybrown mottled orange fromFe-staining, dense, predominantly fine to medium sand, tracecoarse sand, very moist
T.D. 26.5 feet bgsGroundwater encountered at 25 feet bgs.Borehole backfilled with soil cuttings and patched withcold-patch asphalt.
Hole Diameter
Mo
i
s
t
u
r
e
Ground Elevation
De
p
t
h
Bl
o
w
s
El
e
v
a
t
i
o
n
Pe
r
6
I
n
c
h
e
s
Page 1 of 1
43'
BULK SAMPLE
CORE SAMPLEGRAB SAMPLERING SAMPLESPLIT SPOON SAMPLETUBE SAMPLE
BCGR
ST
LFO
Hollow Stem Auger - 140lb - Autohammer - 30" Drop
So
i
l
C
l
a
s
s
.
5-20-22
SOIL DESCRIPTION
Sampled By
Drilling Co.Drilling Co.
Project
Project No.
See Figure 2 - Geotechnical Map
Intracorp Quail St
13542.001
Drilling Method
8"
Sa
m
p
l
e
N
o
.
Fe
e
t
At
t
i
t
u
d
e
s
SAMPLE TYPES:
Martini Drilling Corp
* * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * *
Co
n
t
e
n
t
,
%
Logged By
Date Drilled
LFO
Fe
e
t
S
(U
.
S
.
C
.
S
.
)
Lo
g
Ty
p
e
o
f
T
e
s
t
s
Gr
a
p
h
i
c
pc
f
Location
Dr
y
D
e
n
s
i
t
y
N
This Soil Description applies only to a location of the exploration at the
time of sampling. Subsurface conditions may differ at other locationsand may change with time. The description is a simplification of the
actual conditions encountered. Transitions between soil types may begradual.
TYPE OF TESTS:-200
ALCN
COCRCU
% FINES PASSINGATTERBERG LIMITSCONSOLIDATIONCOLLAPSECORROSIONUNDRAINED TRIAXIAL
DSEIH
MDPP
RV
DIRECT SHEAR
EXPANSION INDEXHYDROMETER
MAXIMUM DENSITYPOCKET PENETROMETERR VALUE
SASESG
UC
40
35
30
25
20
15
0
5
10
15
20
25
30
SIEVE ANALYSISSAND EQUIVALENTSPECIFIC GRAVITYUNCONFINED COMPRESSIVESTRENGTH
GEOTECHNICAL BORING LOG LB-2
5
13
22
9
14
21
71319
6
14
20
61015
4
8
9
717
21
SM
SC
CL
CL
CL
SM
SM
SP
BB-1
R-1
R-2
R-3
R-4
R-5
S-6
S-7
@Surface: 4" asphalt over 4" CLAY base
Undocumented Artificial Fill (Afu)
@3': Silty SAND, yellow brown, dense, predominantly fine sand,trace medium sand, trace clay, weakly laminated, moist
@5': Clayey SAND, gray yellow brown, medium dense, finesand, low plasticity, moist
@7': Sandy CLAY, orange brown, very stiff, fine sand, lowplasticity, trace MnO, some carbonate blebs, slightly moist
@10': Sandy CLAY, reddish brown mottled gray brown, verystiff, fine sand, low plasticity, slightly moist
@15': Sandy CLAY, gray brown, very stiff, fine sand, lowplasticity, abundant carbonate blebs, slightly moist
@17': Changes to yellow Silty SAND in tailings
@20': Silty SAND, gray mottled yellow and orange fromFe-staining, medium dense, fine sand, trace clay, friable, verymoist
@25': Poorly-graded SAND, gray brown, very dense, fine sand,friable, micaceous, very moist
T.D. 26.5 feet bgsGroundwater encountered at 25 feet bgs.Borehole backfilled with soil cuttings and patched withcold-patch asphalt.
Hole Diameter
Mo
i
s
t
u
r
e
Ground Elevation
De
p
t
h
Bl
o
w
s
El
e
v
a
t
i
o
n
Pe
r
6
I
n
c
h
e
s
Page 1 of 1
42'
BULK SAMPLE
CORE SAMPLEGRAB SAMPLERING SAMPLESPLIT SPOON SAMPLETUBE SAMPLE
BCGR
ST
LFO
Hollow Stem Auger - 140lb - Autohammer - 30" Drop
So
i
l
C
l
a
s
s
.
5-20-22
SOIL DESCRIPTION
Sampled By
Drilling Co.Drilling Co.
Project
Project No.
See Figure 2 - Geotechnical Map
Intracorp Quail St
13542.001
Drilling Method
8"
Sa
m
p
l
e
N
o
.
Fe
e
t
At
t
i
t
u
d
e
s
SAMPLE TYPES:
Martini Drilling Corp
* * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * *
Co
n
t
e
n
t
,
%
Logged By
Date Drilled
LFO
Fe
e
t
S
(U
.
S
.
C
.
S
.
)
Lo
g
Ty
p
e
o
f
T
e
s
t
s
Gr
a
p
h
i
c
pc
f
Location
Dr
y
D
e
n
s
i
t
y
N
This Soil Description applies only to a location of the exploration at the
time of sampling. Subsurface conditions may differ at other locationsand may change with time. The description is a simplification of the
actual conditions encountered. Transitions between soil types may begradual.
TYPE OF TESTS:-200
ALCN
COCRCU
% FINES PASSINGATTERBERG LIMITSCONSOLIDATIONCOLLAPSECORROSIONUNDRAINED TRIAXIAL
DSEIH
MDPP
RV
DIRECT SHEAR
EXPANSION INDEXHYDROMETER
MAXIMUM DENSITYPOCKET PENETROMETERR VALUE
SASESG
UC
40
35
30
25
20
15
0
5
10
15
20
25
30
SIEVE ANALYSISSAND EQUIVALENTSPECIFIC GRAVITYUNCONFINED COMPRESSIVESTRENGTH
GEOTECHNICAL BORING LOG LB-3
6
14
22
71115
8
13
19
71218
4
9
10
SP-SM
SP-SM
SP
CL
SP
BB-1
R-1
R-2
R-3
R-4BB-2
S-5
@Surface: 4" asphalt over 5" CLAY base
Undocumented Artificial Fill (Afu)Silty SAND w/ Clay, yellow brown, fine sand, low plasticity,friable, slightly moist
@5': Poorly-graded SAND w/ Silt and Clay, yellow brown, dense,fine sand, low plasticity, friable, slightly moist
@7': Poorly-graded SAND w/ Silt, yellow brown, medium dense,predominantly fine sand, trace medium sand, trace clay,slightly moist
@10': Poorly-graded SAND, orange brown, predominantly fine tomedium sand, medium dense, micaceous, friable, slightlymoist
@11': Lean CLAY, orange brown mottled gray brown, lowplasticity, trace MnO staining, moist
@15': Lean CLAY, gray, very stiff, low plasticity, abundantcarbonate blebs, moist
@20': Poorly-graded SAND, mustard yellow, medium dense,predominantly fine sand, friable, micaceous, moist
T.D. 21.5 feet bgsNo groundwater encountered during drilling.Borehole backfilled with soil cuttings and patched withcold-patch asphalt.
Hole Diameter
Mo
i
s
t
u
r
e
Ground Elevation
De
p
t
h
Bl
o
w
s
El
e
v
a
t
i
o
n
Pe
r
6
I
n
c
h
e
s
Page 1 of 1
41'
BULK SAMPLE
CORE SAMPLEGRAB SAMPLERING SAMPLESPLIT SPOON SAMPLETUBE SAMPLE
BCGR
ST
LFO
Hollow Stem Auger - 140lb - Autohammer - 30" Drop
So
i
l
C
l
a
s
s
.
5-20-22
SOIL DESCRIPTION
Sampled By
Drilling Co.Drilling Co.
Project
Project No.
See Figure 2 - Geotechnical Map
Intracorp Quail St
13542.001
Drilling Method
8"
Sa
m
p
l
e
N
o
.
Fe
e
t
At
t
i
t
u
d
e
s
SAMPLE TYPES:
Martini Drilling Corp
* * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * *
Co
n
t
e
n
t
,
%
Logged By
Date Drilled
LFO
Fe
e
t
S
(U
.
S
.
C
.
S
.
)
Lo
g
Ty
p
e
o
f
T
e
s
t
s
Gr
a
p
h
i
c
pc
f
Location
Dr
y
D
e
n
s
i
t
y
N
This Soil Description applies only to a location of the exploration at the
time of sampling. Subsurface conditions may differ at other locationsand may change with time. The description is a simplification of the
actual conditions encountered. Transitions between soil types may begradual.
TYPE OF TESTS:-200
ALCN
COCRCU
% FINES PASSINGATTERBERG LIMITSCONSOLIDATIONCOLLAPSECORROSIONUNDRAINED TRIAXIAL
DSEIH
MDPP
RV
DIRECT SHEAR
EXPANSION INDEXHYDROMETER
MAXIMUM DENSITYPOCKET PENETROMETERR VALUE
SASESG
UC
40
35
30
25
20
15
0
5
10
15
20
25
30
SIEVE ANALYSISSAND EQUIVALENTSPECIFIC GRAVITYUNCONFINED COMPRESSIVESTRENGTH
GEOTECHNICAL BORING LOG LP-1
Project Number:13542.001 Test Hole Number:LP-1
Project Name:IntraCorp Quail Street Date Excavated:
Earth Description:Alluvium Date Tested:
Liquid Description:Tap water Depth of boring (ft):20
Tested By: BTM/LFO Radius of boring (in):4
Time Interval Standard Radius of casing (in):1
Start Time for Pre-Soak:8:21 AM Length of slotted of casing (ft):5
Start Time for Standard:8:59 AM Depth to Initial Water Depth (ft):
13 Porosity of Annulus Material, n :0.35
5 Bentonite Plug at Bottom:No
Reading Time Time Interval,
Δt (min.)
Initial/Final
Depth to
Water (ft.)
Initial/Final
Water Height,
H0/Hf
(in.)
Total Water
Drop, Δd (in.)
Infiltration
Rate (in./hr.)
8:21 15.00 60.0
8:34 19.50 6.0
8:39 15.00 60.0
8:55 19.50 6.0
8:59 15.00 60.0
9:04 17.32 32.2
9:06 15.00 60.0
9:11 17.36 31.7
9:12 15.00 60.0
9:17 17.41 31.1
9:19 15.00 60.0
9:24 17.39 31.3
9:25 15.00 60.0
9:30 17.42 31.0
9:32 15.00 60.0
9:37 17.38 31.4
9:38 15.00 60.0
9:43 17.38 31.4
9:45 15.00 60.0
9:50 17.42 31.0
9:54 15.00 60.0
9:59 17.40 31.2
10:02 15.00 60.0
10:07 17.12 34.6
10:09 15.00 60.0
10:14 17.48 30.2
10:16 15.00 60.0
10:21 17.44 30.7
10:24 15.00 60.0
10:29 17.45 30.6
10:30 15.00 60.0
10:35 17.51 29.9
10:38 15.00 60.0
10:43 17.49 30.1
10:44 15.00 60.0
10:49 17.45 30.6
10:52 15.00 60.0
10:57 17.50 30.0
10:58 15.00 60.0
11:03 17.41 31.1
10:07 15.00 60.0
11:12 17.41 31.1
11:13 15.00 60.0
11:18 17.41 31.1
11:19 15.00 60.0
11:24 17.54 29.5
11:27 15.00 60.0
11:32 17.53 29.6
11:35 15.00 60.0
11:40 17.57 29.2
11:41 15.00 60.0
11:46 17.57 29.2
11:48 15.00 60.0
11:53 17.50 30.0
11:54 15.00 60.0
11:59 17.51 29.9
Measured Infiltration Rate, I (Average of Last 3 Readings) =6.07 in./hr.
20 5 30.8 6.21
19 5 30.8 6.21
18 5 30.4 6.08
17 5 30.5 6.11
12 5 29.3 5.80
11 5 29.8 5.92
10 5 25.4 4.84
9 5 28.8 5.67
8 5 29.0 5.73
7 5 28.6 5.61
6 5 28.6 5.61
5 5 29.0 5.73
4 5 28.7 5.64
3 5 28.9 5.70
2 5 28.3 5.55
1 5 27.8 5.43
18 5 28.9 5.70
17 5 30.0 5.98
16 5 29.4 5.83
15 5 29.9 5.95
14 5 30.1 6.02
13 5 29.4 5.83
P1 13 54.0 5.56
21 5.98
5.7028.9
Standard Time Interval
Between Readings, mins:
Field Percolation Data - Falling Head Test
20 5 28.9 5.70
P2 15 54.0 4.99
Boring Percolation Test Data Sheet
5/20/2022
5/20/2022
19 5
Infiltration Rate (I) = Discharge Volume/Surface Area of Test Section/Time Interval
22 5 30.1 6.02
5 30.0
ATTACHMENT E
EDUCATIONAL MATERIALS
Help Prevent Ocean Pollution:
For more information,
please call the
Orange County Stormwater Program
at 1-877-89-SPILL (1-877-897-7455)
or visit
www.ocwatersheds.com
To report a spill,
call the
Orange County 24-Hour
Water Pollution Problem
Reporting Hotline
at 1-877-89-SPILL (1-877-897-7455).
For emergencies, dial 911.
The tips contained in this brochure provide useful
information to help prevent water pollution. If
you have other suggestions, please contact your
city’s stormwater representatives or call the Orange
County Stormwater Program.
Printed on Recycled Paper
Tips for Residential
Pool, Landscape and
Hardscape Drains
Pool Maintenance
All pool water discharged to the curb, gutter or
permitted pool drain from your property must meet the
following water quality criteria:
The residual chlorine does not exceed
0.1 mg/L (parts per
million).
The pH is between
6.5 and 8.5.
The water is free
of any unusual
coloration.
There is no discharge
of filter media or acid
cleaning wastes.
Some cities have ordinances that do not allow pool
water to be discharged to the storm drain. Check with
your city.
Landscape and
Hardscape Drains
The following recommendations will help reduce or
prevent pollutants from your landscape and hardscape
drains from entering the street, gutter or storm drain.
Unlike water that enters the sewer (from sinks and
toilets), water that enters a landscape or hardscape
drain is not treated before entering our creeks, rivers,
bays and ocean.
Household Activities
Do not rinse spills of materials or chemicals to any
drain.
Use dry cleanup methods such as applying cat
litter or another absorbent material, then sweep it
up and dispose of it in the trash. If the material is
hazardous, dispose of it at a Household Hazardous
Waste Collection Center (HHWCC). For locations,
call (714) 834-6752 or visit www.oclandfills.com.
Do not hose down your driveways, sidewalks or
patios to your landscape or hardscape drain.
Sweep up debris and dispose of it in the trash.
Always pick up after your pet. Flush waste down
the toilet or dispose of it in the trash.
Tips for Residential Pool, Landscape and Hardscape Drains
Do not store items such as cleaners, batteries,
automotive fluids, paint products, TVs, or
computer monitors uncovered outdoors. Take
them to a HHWCC for disposal.
Yard Maintenance
Do not overwater. Water by hand or set
automated irrigation systems to reflect seasonal
water needs.
Follow directions on
pesticides and fertilizers
(measure, do not estimate
amounts) and do not use
if rain is predicted within
48 hours.
Cultivate your garden
often to control weeds
and reduce the need to
use chemicals.
Vehicle Maintenance
Never pour oil or antifreeze down your
landscape or hardscape drain. Recycle these
substances at a service station, a waste collection
center or used oil recycling center. For
locations, contact the Used Oil Program at 1-800-
CLEANUP or visit www.CLEANUP.org.
Whenever possible, take your vehicle to a
commercial car wash.
If you do wash your vehicle at home, do not
allow the washwater to go down your landscape
or hardscape drain. Instead, dispose of it in
the sanitary sewer (a sink or toilet) or onto an
absorbent surface such as your lawn.
Use a spray nozzle that will shut off the water
when not in use.
Clean beaches and healthy
creeks, rivers, bays and
ocean are important
to Orange County. However,
many common activities such as
pest control can lead to water
pollution if you’re not careful.
Pesticide treatments must be
planned and applied properly
to ensure that pesticides do
not enter the street, gutter or
storm drain. Unlike water in
sanitary sewers (from sinks and
toilets), water in storm drains is
not treated before entering our
waterways.
You would never dump pesticides
into the ocean, so don’t let it
enter the storm drains. Pesticides
can cause significant damage
to our environment if used
improperly. If you are thinking
of using a pesticide to control a
pest, there are some important
things to consider.
For more information,
please call
University of California Cooperative
Extension Master Gardeners at
(714) 708-1646
or visit these Web sites:
www.uccemg.org
www.ipm.ucdavis.edu
For instructions on collecting a specimen
sample visit the Orange County
Agriculture Commissioner’s website at:
http://www.ocagcomm.com/ser_lab.asp
To report a spill, call the
Orange County 24-Hour
Water Pollution Problem
Reporting Hotline
at 1-877-89-SPILL (1-877-897-7455).
For emergencies, dial 911.
Information From:
Cheryl Wilen, Area IPM Advisor; Darren Haver,
Watershed Management Advisor; Mary
Louise Flint, IPM Education and Publication
Director; Pamela M. Geisel, Environmental
Horticulture Advisor; Carolyn L. Unruh,
University of California Cooperative
Extension staff writer. Photos courtesy of
the UC Statewide IPM Program and
Darren Haver.
Funding for this brochure has been provided in full
or in part through an agreement with the State Water
Resources Control Board (SWRCB) pursuant to the
Costa-Machado Water Act of 2000 (Prop. 13).
Help Prevent Ocean Pollution:
The Ocean Beginsat Your Front Door
Responsible
Pest Control
Printed on Recycled Paper
Key Steps to Follow:
Step 1: Correctly identify the pest (insect,
weed, rodent, or disease) and verify that it is
actually causing the problem.
This is important
because beneficial
insects are often
mistaken for pests
and sprayed with pesticides needlessly.
Consult with a
Certified Nursery
Professional at a local nursery or garden center or send a sample of the pest to the Orange
County Agricultural Commissioner’s Office.
Determine if the pest is still present – even
though you see damage, the pest may have left.
Step 2: Determine
how many pests are
present and causing
damage.
Small pest populations
may be controlled
more safely using non-
pesticide techniques. These include removing food sources, washing off leaves with a strong
stream of water, blocking entry into the home
using caulking and replacing problem plants
with ones less susceptible to pests.
Step 3: If a pesticide must be used, choose the least toxic chemical.
Obtain information on the least toxic pesticides
that are effective at controlling the target
pest from the UC Statewide Integrated Pest Management (IPM) Program’s Web site at
www.ipm.ucdavis.edu.
Seek out the assistance of a Certified Nursery
Professional at a local nursery or garden center when selecting a pesticide. Purchase the
smallest amount of pesticide available.
Apply the pesticide to the pest during its most
vulnerable life stage. This information can be found on the pesticide label.
Step 4: Wear appropriate protective clothing.
Follow pesticide labels regarding specific types of protective equipment you should wear.
Protective clothing should always be washed
separately from other clothing.
Step 5: Continuously monitor external conditions when applying pesticides such as
weather, irrigation, and the presence of children
and animals.
Never apply pesticides when rain is predicted within the next 48 hours. Also, do not water
after applying pesticides unless the directions say
it is necessary.
Apply pesticides when the air is still; breezy conditions may cause the spray or dust to drift
away from your targeted area.
In case of an emergency call 911 and/or the
regional poison control number at (714) 634-5988 or (800) 544-4404 (CA only).
For general questions you may also visit www.calpoison.org.
Step 6: In the event of accidental spills,
sweep up or use an absorbent agent to remove
any excess pesticides. Avoid the use of water.
Be prepared. Have a broom, dust pan, or dry
absorbent material, such as cat litter, newspapers
or paper towels, ready to assist in cleaning up
spills.
Contain and clean up the spill right away. Place
contaminated materials in a doubled plastic bag.
All materials used to clean up the spill should
be properly disposed of according to your local Household Hazardous Waste Disposal site.
Step 7: Properly store and dispose of unused
pesticides.
Purchase Ready-To-
Use (RTU) products
to avoid storing
large concentrated
quantities of pesticides.
Store unused chemicals in a locked cabinet.
Unused pesticide chemicals may be disposed of at a Household Hazardous Waste Collection
Center.
Empty pesticide containers should be triple
rinsed prior to disposing of them in the trash.
Household Hazardous Waste Collection Center(714) 834-6752www.oclandfills.com
Integrated Pest Management (IPM) usually combines several least toxic pest control methods for long-term prevention and management of pest problems without harming you, your family, or the environment.
Three life stages of the common lady
beetle, a beneficial insect.
Tips for Pest Control
For more information,
please call the
Orange County Stormwater Program
at 1-877-89-SPILL (1-877-897-7455)
or visit
www.ocwatersheds.com
UCCE Master Gardener Hotline:
(714) 708-1646
To report a spill,
call the
Orange County 24-Hour
Water Pollution Problem
Reporting Hotline
1-877-89-SPILL (1-877-897-7455).
For emergencies, dial 911.
The tips contained in this brochure provide useful
information to help prevent water pollution
while landscaping or gardening. If you have other
suggestions, please contact your city’s stormwater
representatives or call the Orange County
Stormwater Program.
C lean beaches
and healthy
creeks, rivers, bays
and ocean are important to
Orange County. However,
many common activities
can lead to water pollution
if you’re not careful.
Fertilizers, pesticides and
other chemicals that are left
on yards or driveways can
be blown or washed into
storm drains that flow to the
ocean. Overwatering lawns
can also send materials into
storm drains. Unlike water
in sanitary sewers (from sinks
and toilets), water in storm
drains is not treated before
entering our waterways.
You would never pour
gardening products into the
ocean, so don’t let them enter
the storm drains. Follow
these easy tips to help prevent
water pollution.
Printed on Recycled Paper
Tips for Landscape and GardeningTips for Landscape & Gardening
Never allow gardening products or
polluted water to enter the street, gutter
or storm drain.
General Landscaping Tips
Protect stockpiles and materials from
wind and rain by storing them under
tarps or secured plastic sheeting.
Prevent erosion of slopes by planting
fast-growing, dense ground covering
plants. These will shield and bind the
soil.
Plant native vegetation
to reduce the amount
of water, fertilizers, and
pesticide applied to the
landscape.
Never apply pesticides
or fertilizers when rain is
predicted within the next 48 hours.
Garden & Lawn Maintenance
Do not overwater. Use irrigation
practices such as drip irrigation,
soaker hoses or micro spray systems.
Periodically inspect and fix leaks and
misdirected sprinklers.
Do not rake or blow
leaves, clippings or
pruning waste into
the street, gutter
or storm drain.
Instead, dispose
of green waste by
composting, hauling
it to a permitted
landfill, or recycling it through your
city’s program.
Use slow-release fertilizers to
minimize leaching, and use organic
fertilizers.
Read labels and use only as directed.
Do not over-apply pesticides or
fertilizers. Apply to spots as needed,
rather than blanketing an entire
area.
Store pesticides, fertilizers and other
chemicals in a dry covered area to
prevent exposure that may result
in the deterioration
of containers and
packaging.
Rinse empty
pesticide containers
and re-use rinse water
as you would use the
product. Do not dump rinse water
down storm drains. Dispose of empty
containers in the trash.
When available, use non-toxic
alternatives to traditional pesticides,
and use pesticides specifically
designed to control the pest you are
targeting. For more information, visit
www.ipm.ucdavis.edu.
If fertilizer is spilled, sweep up the
spill before irrigating. If the spill is
liquid, apply an absorbent material
such as cat litter, and then sweep it up
and dispose of it in the trash.
Take unwanted pesticides to a
Household Hazardous Waste
Collection Center to be recycled.
Locations are provided below.
Household Hazardous Waste
Collection Centers
Anaheim: 1071 N. Blue Gum St.
Huntington Beach: 17121 Nichols St.
Irvine: 6411 Oak Canyon
San Juan Capistrano: 32250 La Pata Ave.
For more information, call (714) 834-6752
or visit www.oclandfills.com
For more information,
please call the
Orange County Stormwater Program
at 1-877-89-SPILL (1-877-897-7455)
or visit
www.ocwatersheds.com
To report a spill,
call the
Orange County 24-Hour
Water Pollution Problem
Reporting Hotline
at 1-877-89-SPILL (1-877-897-7455).
For emergencies, dial 911.
Proper Maintenance
Practices for
Your Business
The Ocean Beginsat Your Front Door
PROJECT
PREVENTION
Help Prevent Ocean Pollution:
Preventing water
pollution at your
commercial/industrial site
Clean beaches and healthy creeks, rivers,
bays and ocean are important to Orange
County. However, many landscape and
building maintenance activities can lead to
water pollution if you’re not careful. Paint,
chemicals, plant clippings and other materials
can be blown or washed into storm drains that
flow to the ocean. Unlike water in sanitary
sewers (from sinks and toilets), water in storm
drains is not treated before entering our
waterways.
You would never pour soap or fertilizers into
the ocean, so why would you let them enter the
storm drains? Follow these easy tips to help
prevent water pollution.
Some types of industrial facilities are required
to obtain coverage under the State General
Industrial Permit. For more information visit:
www.swrcb.ca.gov/stormwater/industrial.html
Printed on Recycled Paper
Tips for Pool Maintenance
Call your trash hauler to replace leaking
dumpsters.
Do not dump any toxic substance or
liquid waste on the pavement, the
ground, or near a
storm drain. Even
materials that
seem harmless
such as latex paint
or biodegradable
cleaners can
damage the
environment.
Recycle paints, solvents and other
materials. For more information about
recycling and collection centers, visit
www.oclandfills.com.
Store materials indoors or under cover
and away from storm drains.
Use a construction and demolition
recycling company to recycle lumber,
paper, cardboard, metals, masonry,
carpet, plastic, pipes, drywall, rocks,
dirt, and green waste. For a listing of
construction and demolition recycling
locations in your area, visit
www.ciwmb.ca.gov/recycle.
Properly label materials. Familiarize
employees with Material
Safety Data Sheets.
Landscape Maintenance
Compost grass clippings, leaves, sticks
and other vegetation, or dispose of it at
a permitted landfill or in green waste
containers. Do not dispose of these
materials in the street, gutter or storm
drain.
Irrigate slowly and inspect the system
for leaks, overspraying and runoff.
Adjust automatic timers to avoid
overwatering.
Follow label directions for the use and
disposal of fertilizers and pesticides.
Do not apply pesticides or fertilizers if
rain is expected within 48 hours or if
wind speeds are above 5 mph.
Do not spray pesticides within 100 feet
of waterways.
Fertilizers should be worked into the
soil rather than dumped onto the
surface.
If fertilizer is spilled on the pavement
or sidewalk, sweep it up immediately
and place it back in the container.
Building Maintenance
Never allow washwater, sweepings or
sediment to enter the storm drain.
Sweep up dry spills and use cat litter,
towels or similar materials to absorb wet
spills. Dispose of it in the trash.
If you wash your building, sidewalk or
parking lot, you must contain the water.
Use a shop vac to collect the water and
contact your city or sanitation agency
for proper disposal information. Do
not let water enter the street, gutter or
storm drain.
Use drop cloths underneath outdoor
painting, scraping, and sandblasting
work, and properly dispose of materials
in the trash.
Use a ground cloth or oversized tub for
mixing paint and cleaning tools.
Use a damp mop or broom to clean
floors.
Cover dumpsters to keep insects,
animals, rainwater and sand from
entering. Keep the area around the
dumpster clear of trash and debris. Do
not overfill the dumpster.
PROJECT
PREVENTION
Proper Maintenance Practices for your Business
Never Dispose
of Anything
in the Storm
Drain.
ATTACHMENT C
ORANGE COUNTY RAINFALL ZONES MAP
WQMP
Operation & Maintenance (O&M) Plan
Prepared for:
1401 Quail Street
Newport Beach, CA 92660
Legal Project Description:
REAL PROPERTY IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE,
STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:
PARCEL 1 OF PARCEL MAP NO. 341, AS PER MAP FILED IN BOOK 44, PAGE 38
OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID
COUNTY.
EXCEPT THE FULL RIGHTS TO ALL MINERALS, PETROLEUM, GAS AND OTHER
HYDROCARBON SUBSTANCES EXISTING BELOW 500 FEET FROM THE
SURFACE OF SAID REAL PROPERTY DESCRIBED ABOVE, PROVIDED,
HOWEVER, THAT GRANTOR HEREBY EXPRESSLY WAIVES THE RIGHT TO
ENTER UPON THE SURFACE OF SAID REAL PROPERTY FOR THE PURPOSE OF
EXPLORING FOR, OR PRODUCING THE MINERALS, PETROLEUM, GAS AND
OTHER HYDROCARBON SUBSTANCES SO RESERVED, AS RESERVED IN THE
DEED RECORDED AUGUST 22, 1973 IN BOOK 10863, PAGE 782 OF OFFICIAL
RECORDS.
APN: 427-332-04
BMP Inspection/Maintenance
BMP Responsible
Party(s)
Inspection/
Maintenance
Activities Required
Minimum
Frequency of
Activities
Permavoid Planter
Areas Owner
-Inspect semiannually for
beginning (October) and end of
the wet season (April) Ongoing
Education for
Property Owners,
Tenants and
Occupants
Owner
Educational materials will be
provided to tenants
annually. Materials to be
distributed are found in
Attachment F. Tenants will be
provided these materials
by the Owner prior to
occupancy and periodically
thereafter
Annually
Activity Restrictions Owner
The Owner will prescribe
activity restrictions to protect
surface water quality, through
lease terms or other
equally effective measure, for
the property.
Restrictions include, but are
not limited to, prohibiting
vehicle maintenance or
vehicle washing.
Ongoing
Common Area
Landscape
Management
Owner
Maintenance shall be
consistent with City
requirements. Fertilizer
and/or pesticide usage shall
be consistent with County
Management Guidelines
for Use of Fertilizers (OC
DAMP Section 5.5) as well
as local requirements.
Maintenance includes
mowing, weeding, and debris
removal on a weekly
basis. Trimming, replanting,
and replacement of
Monthly
mulch shall be performed on
an as-needed basis to
prevent exposure of erodible
surfaces. Trimmings,
clippings, and other landscape
wastes shall be
properly disposed of in
accordance with local
regulations. Materials
temporarily stockpiled during
maintenance activities shall
be placed away from
water courses and storm
drain inlets.
Common Area Litter
Control Owner
Litter patrol and
other litter control activities
shall be performed on a
weekly basis and in
conjunction with routine
maintenance activities.
Weekly
Employee Training Owner
Educate all new employees/
managers on storm
water pollution prevention,
particularly good
housekeeping practices, prior
to the start of the rainy
season (October 1). Refresher
courses shall be
conducted on an as needed
basis.
Annually
Street Sweeping
Private Streets and
Parking Lots
Owner
Drive aisles & parking areas
must be swept at least
quarterly (every 3 months),
including prior to the start
of the rainy season (October
1).
Quarterly
Common Area Catch
Basin Inspection Owner
Catch basin inlets and other
drainage facilities shall
be inspected after each storm
event and once per
year. Inlets and other
facilities shall be cleaned prior
to the rainy season, by
October 1 each year.
Annually
Storm Drain
Stencilling and
Signage
Owner
Storm drain stencils shall be
inspected for legibility, at
minimum, once prior to the
storm season, no later
than October 1 each year.
Those determined to be
illegible will be re-stencilled
as soon as possible.
Annually
Use efficient
irrigation systems &
landscape design,
water conservation,
smart controllers,
and source control
Owner
In conjunction with routine
maintenance activities,
verify that landscape design
continues to function
properly by adjusting
properly to eliminate
overspray to hardscape areas,
and to verify that irrigation
timing and cycle lengths are
adjusted in accordance
with water demands, given
time of year, weather, and
day or night time
temperatures. System testing
shall occur twice per year.
Water from testing/flushing
shall be collected and
properly disposed to the
sewer system and shall not
discharge to the storm drain
system.
Twice per year
BMP OPERATION & MAINTENANCE LOG
Today’s Date:
Name of Person Performing Activity
(Printed):
Signature:
BMP Name
(As Shown in O&M Plan)
Brief Description of Implementation, Maintenance, and
Inspection Activity Performed
TRAINING / EDUCATIONAL LOG
Date of Training/Educational Activity:
Name of Person Performing Activity
(Printed):
Signature:
Topic of Training/Educational Activity:
Name of Participant Signature of Participant
For newsletter or mailer educational activities, please include the following
information:
▪ Date of mailing
▪ Number distributed
▪ Method of distribution
▪ Topics addressed
If a newsletter article was distributed, please include a copy of it.