Loading...
HomeMy WebLinkAboutPA2023-0087_20230622_Plans_36x24T-01 COVER SHEET Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL VICINITY MAP GENERAL NOTES BMP. NOTES BUILDING DATA PROJECT DESCRIPTION (SCOPE OF WORK): BUILDING CODE: STRUCTURAL: ARCHITECTURAL: TEAM MEMBERS DUPLEX & TWO ADU's SHEET INDEX ARCHITECTURAL BUILDING AND OTHER AREA: ’ NPDES NOTES USE OCCUPANCY AND FLOOR AREA: PROJECT LOCATION GRADE ESTABLISHMENT: DEFERRED SUBMITTAL: “” NOTES T-02 GENERAL NOTES Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL T-03 GENERAL NOTES Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL T-04 GENERAL NOTES Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL S 17°21'14" W 79.80' N 7 1 ° 4 2 ' 1 5 " W 30 . 0 0 ' N 7 1 ° 3 9 ' 1 1 " W 30 . 0 1 ' S 17°21'02" W 79.82' 50' 7.5'7.5' 19'-2"5'-0"50'-7"5'-0" 24 ' - 0 " 3'- 0 " 3'- 0 " 24 ' - 0 " 3'- 0 " 3'- 0 " 24 ' - 0 " 3'- 0 " 3'- 0 " GRADE ESTABLISHMENT A-01 GRADE ESTABLISHMENT CALCULATION Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL GRADE ESTABLISHMENT CAL. A A DN 3:12 B B 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN CLEAN OUT SEE CITY STD-406 3'- 0 " 2'- 4 " 3'- 0 " 3'-0"2'-0"28'-9"2'-6"22'-8"5'-0" 79.82'⅊ 79.80' 30 . 0 0 ' 30 . 0 1 ' ⅊ ⅊ ⅊ 3'- 8 " 3'- 0 " 11 ' - 3 " 3'- 0 " 9'- 1 " 3: 1 2 15'-11" 15 ' - 1 0 " 3: 1 2 3:12 3: 1 2 5' - 1 0 " 23'-10" 20'-9" 36'-0" ·A CERTIFIED BUILDING HEIGHT CERTIFICATION MUST BE SUBMITTED AFTER FRAMING AND INSTALLATION OF THE ROOF MATERIAL. MEASURE FROM AVERAGE CURB AS DETERMINED BY TOPOGRAPHIC SURVEY. ·THE MAXIMUM TIME TO COMPLETE CONSTRUCTION ON A PROJECT IS LIMITED TO THREE YEARS FROM THE DATE OF THE PERMIT FOR ALL PERMITS ISSUED AFTER JUNE 01, 2019 AS REQUIRED BY NBMC SECTION 15.02.095. ·PROVIDE A PROJECT INFORMATION SIGN FOR PROJECTS REQUIRING FENCING (NEW STRUCTURE OR ADDITION AND REMODEL TO AN EXISTING STRUCTURE WITH A COMBINED FLOOR AREA EXCEEDING SEVENTY-FIVE (75) PERCENT OF THE FLOOR AREA OF THE PROPOSED STRUCTURE) IN DESIGNATED “HIGH DENSITY AREAS”. PROJECT SIGN SHALL COMPLY WITH NBMC SECTION 15.60.030. NOTES A-02 SITE PLAN Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL SITE PLAN A A UP 19'-6" 3'- 0 " 3'- 0 " 19'-0"10'-0"6"2'-6"6" 4" 19'-3" 14'-0" 5'-0"4" 12 ' - 6 " 6" 11 ' - 0 " 13'-5"2'-6" 6" 5'-0"6" 5'-0"4"6" 11 ' - 8 " 6" 7' - 6 " 4" 4"5'-0" 4" 4"10'-10" 6" 3'- 0 " 3'- 0 "STAIR 16 STEPS 6.62" RISERS 11" TREADS 2'-6" 2'-6" B B LANDING MAIN HOUSE#1 8' FLAT CEILING LIVING ROOM 8' FLAT CEILING KITCHEN 8' FLAT CEILING BEDROOM 8' FLAT CEILING BEDROOM 8' FLAT CEILING GARAGE 8' FLAT CEILING GARAGE 8' FLAT CEILING WASHER DRYER 3'- 8 " 79.82'⅊ 79.80' 30 . 0 0 ' 30 . 0 1 ' ⅊ ⅊ ⅊ 10.40 F.F. FIRST FLOOR W30W45W25 W45 D10 D 10 D25 D40 D40 D45 7'- 8 " 6" 4" 3'- 8 " 4" 3' - 6 " 4" 7' - 2 " 6" D10 D 10 4" 4"19'-0" 3'-0" 9'- 6 " 4" 9' - 6 " 6" 16 STEPS 6.62" RISERS 10" TREADS UP STAIRLANDING 6" 3'- 0 " Ø=30" W30 W35 D 45 DNUP Ø=30" Ø=30" 4"5'-0"4"4"12'-7"10'-10"6"2'-0"6"11'-8"4" 6'- 5 " 4" 3'- 6 " 6" 8'- 7 " 3'- 8 " 3'- 0 " 4" 4' - 7 " 6" 3'- 8 " 3'- 8 " 9'-0"6"4" 6" 18'-5"6"2'-6" 2'-6" 14'-2"6"13'-9"4'-0"6"2'-6" 5'-0" 3'- 0 " 6" 10 ' - 3 " 6"3'-4" 4" A A B B 1" 1" ADU #1 8' FLAT CEILING ADU #2 8' FLAT CEILING BEDROOM 8' FLAT CEILING MAIN HOUSE#2 8' FLAT CEILING LIVING ROOM 8' FLAT CEILING KITCHEN 8' FLAT CEILING MASTER BEDROOM 8' FLAT CEILING BEDROOM 8' FLAT CEILING STAIR 16 STEPS 6.62" RISERS 11" TREADS SEE SHEET AD-01 FOR GUARDRAIL DETAILS SEE SHEET AD-01 FOR GUARDRAIL DETAILS 79.82'⅊ 79.80' 30 . 0 0 ' 30 . 0 1 ' ⅊ ⅊ ⅊ W40 W05 W05 W 45 W45 W 20 W 20 W 10 D 20 D20 D 40 D40 D45 19.23 F.F. SECOND FLOOR 5'-0" 7'- 2 " 6" 3'- 0 " 6" 3'- 6 " 11 ' - 0 " 6" 4" 5'-8" 6" 3'- 0 " 6" DINING 8' FLAT CEILING 6" 12 ' - 3 " 6" 10 ' - 3 " 6" 6" 4'-0" W10 20 ' - 0 " 6" 3'- 0 " 9'-0"8'-11" 11 ' - 8 " 6" 3'- 0 " 5'-0"6"4"10'-0"4"6'-0"12'-9"6"3'-1"5'-0" 11 ' - 8 " 4" 6" 3'- 0 " 19.23 F.F. SECOND FLOOR W25W25 W45 W45 W 10 D 30 D 20 D45 D 45 D40 D40 A-03 FIRST & SECOND FLOOR PLANS FIRST FLOOR PLAN Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL SECOND FLOOR PLAN DN PROVIDE GAS CONNECTION FIRE PIT AREA JACUZZI A A B B 2% MIN. 2% MIN. SEE SHEET AD-01 FOR GUARDRAIL DETAILS 2% MIN. 2% MIN. 2%MI N . 2%MI N . 2%MI N . 2%MI N . SEE SHEET AD-01 FOR GUARDRAIL DETAILS 79.82'⅊ 79.80' 30 . 0 0 ' 30 . 0 1 ' ⅊ ⅊ ⅊ SEE SHEET AD-01 FOR DRAINAGE DETAILS 2 % MI N . 2 % MI N . 2% MIN. 2% MIN. 2% MIN. 2% MIN. 2% MIN. 5'-0"15'-10"6"3'-0"3'-0"4" 4"7'-0"6" 3'- 3 " 4" 5'- 6 " 4" 9'- 3 " 6" 2' - 0 " 3'- 0 " 6" 2' - 4 " 3'- 0 " 9'- 1 " 6" W 55 W 55 W50 MAX. CEILING HEIGHT 5'-11" DEDUCTED FROM TOTAL SQUARE FOOTAGE MAX. CEILING HEIGHT 5'-11" DEDUCTED FROM TOTAL SQUARE FOOTAGE W60 W 60 D 35 D55 D50 D55 D50 21'-0" 23'-11"36'-0" 12'-2"3'-8"1'-0"4'-0"28'-10"2'-6" 4" 10'-7"1'-5"2'-0"31'-8"2'-6" 3'- 0 " 24 ' - 0 " 3'- 0 " 5'-0" FIRST FLOOR EXTERIOR WALL FIRST FLOOR EXTERIOR WALL PONY WALL PONY WALL 10.40 F.F. FIRST FLOOR 19.23 F.F. (ADU) SECOND FLOOR 18.40 T.PL. (GARAGE) CEILING 28.06 F.F. (ADU) 27.23 T.PL. (ADU) CEILING 28.40 (ADU) MAX. HEIGHT 10.40 F.F. FIRST FLOOR 19.23 F.F. SECOND FLOOR 18.40 T.PL. (MAIN HOUSE) CEILING 27.23 T.PL. 8' - 0 " 10 " 8' - 0 " (MAIN HOUSE) CEILING 28.06 F.F. THIRD FLOOR 10 " 10 ' - 1 " 9.12 GRADE ESTABLISHMENT 1' - 3 " 29 ' - 0 " 38.12 MAX. BUILDING HEIGHT 24 ' - 0 " 33.12 MAX. FLAT ROOF HEIGHT 10 " 8' - 0 " 29 ' - 0 " 24 ' - 0 " 10 " 8' - 0 " 9.12 GRADE ESTABLISHMENT 38.12 MAX. BUILDING HEIGHT 33.12 MAX. FLAT ROOF HEIGHT 3'- 6 " 3'- 6 " GARAGE CEILING AND WALL MUST BE 5/8" TYPE "X" GYP. BOARD w/1-HOUR FIRE RESISTANCE RATED UP TO CEILING INSUL. SEE T24 INSUL. SEE T24 INSUL. SEE T24INSUL. SEE T24 INSUL. SEE T24 INSUL. SEE T24 INSUL. SEE T24 6'- 8 " MI N . C L R . SEE SHEET AD-01 FOR GUARDRAIL DETAILS PONY WALLGLASS RAILING 6' - 8 " MI N . C L R . 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL ·THIRD FLOOR WILL NOT BE USED AS AN ADU ·THERE SHALL BE NO FACILITIES USED FOR FOOD PREPARATION WITHIN, OR BE USED FOR RESIDENTIAL PURPOSES SEPARATELY OR INDEPENDENTLY FROM OCCUPANTS OF PRINCIPLE STRUCTURE THIRD FLOOR NOTES A-04 THIRD FLOOR PLAN SECTION A-A Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL THIRD FLOOR PLAN SECTION A-A 10.40 F.F. FIRST FLOOR 19.23 F.F. SECOND FLOOR 18.40 T.PL. (MAIN HOUSE) CEILING 27.23 T.PL. 8' - 0 " 10 " 8' - 0 " (MAIN HOUSE) CEILING 28.06 F.F. THIRD FLOOR 10 " 10 ' - 1 " 9.12 GRADE ESTABLISHMENT 1' - 3 " 29 ' - 0 " 38.12 MAX. BUILDING HEIGHT 24 ' - 0 " 33.12 MAX. FLAT ROOF HEIGHT 10 " 8' - 0 " 29 ' - 0 " 24 ' - 0 " 10 " 8' - 0 " 3'- 6 " 3'- 6 " SEE SHEET AD-01 FOR GUARDRAIL DETAILS SEE SHEET AD-01 FOR GUARDRAIL DETAILS 10.40 F.F. FIRST FLOOR 19.23 F.F. (ADU) SECOND FLOOR 18.40 T.PL. (GARAGE) CEILING 28.06 F.F. (ADU) 27.23 T.PL. (ADU) CEILING 28.40 (ADU) MAX. HEIGHT 9.12 GRADE ESTABLISHMENT 38.12 MAX. BUILDING HEIGHT 33.12 MAX. FLAT ROOF HEIGHT INSUL. SEE T24 INSUL. SEE T24 INSUL. SEE T24 INSUL. SEE T24 6'- 8 " MI N . C L R . PONY WALL GLASS RAILING 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 29 ' - 0 " 24 ' - 0 " 10.40 F.F. FIRST FLOOR 19.23 F.F. SECOND FLOOR 18.40 T.PL. (MAIN HOUSE) CEILING 27.23 T.PL. 8' - 0 " 10 " 8' - 0 " (MAIN HOUSE) CEILING 28.06 F.F. THIRD FLOOR 10 " 10 ' - 1 " 9.12 GRADE ESTABLISHMENT 1' - 3 " 29 ' - 0 " 38.12 MAX. BUILDING HEIGHT 24 ' - 0 " 33.12 MAX. FLAT ROOF HEIGHT 3'- 6 " 3'- 6 " SEE SHEET AD-01 FOR GUARDRAIL DETAILS SEE SHEET AD-01 FOR GUARDRAIL DETAILS 10.40 F.F. FIRST FLOOR 19.23 F.F. (ADU) SECOND FLOOR 18.40 T.PL. (GARAGE) CEILING 28.06 F.F. (ADU) 27.23 T.PL. (ADU) CEILING 28.40 (ADU) MAX. HEIGHT 9.12 GRADE ESTABLISHMENT 38.12 MAX. BUILDING HEIGHT 33.12 MAX. FLAT ROOF HEIGHT 6'- 8 " MI N . C L R . PONY WALLGLASS RAILING 8' - 0 " 10 " 8' - 0 " 10 " 10 ' - 1 " 1' - 3 " PR O P E R T Y L I N E PR O P E R T Y L I N E 5'-0"5'-0" 2'-6" 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL A-05 SECTION B-B EAST ELEVATION VIEW Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL SECTION B-B EAST ELEVATION 29 ' - 0 " 24 ' - 0 " 10.40 F.F. FIRST FLOOR 19.23 F.F. SECOND FLOOR 18.40 T.PL. (MAIN HOUSE) CEILING 27.23 T.PL. (MAIN HOUSE) CEILING 28.06 F.F. THIRD FLOOR 9.12 GRADE ESTABLISHMENT 29 ' - 0 " 38.12 MAX. BUILDING HEIGHT 24 ' - 0 " 33.12 MAX. FLAT ROOF HEIGHT 3'- 6 " SEE SHEET AD-01 FOR GUARDRAIL DETAILS SEE SHEET AD-01 FOR GUARDRAIL DETAILS 10.40 F.F. FIRST FLOOR 19.23 F.F. (ADU) SECOND FLOOR 18.40 T.PL. (GARAGE) CEILING 28.06 F.F. (ADU) 27.23 T.PL. (ADU) CEILING 28.40 (ADU) MAX. HEIGHT 9.12 GRADE ESTABLISHMENT 38.12 MAX. BUILDING HEIGHT 33.12 MAX. FLAT ROOF HEIGHT 6'- 8 " MI N . C L R . PONY WALL GLASS RAILING 3'- 6 " 8' - 0 " 10 " 8' - 0 " 10 " 1' - 3 " 8' - 0 " 10 " 8' - 0 " 10 " 10 ' - 1 " 1' - 3 " PR O P E R T Y L I N E PR O P E R T Y L I N E 5'-0"5'-0" 2'-6" 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 29 ' - 0 " 24 ' - 0 " 10.40 F.F. FIRST FLOOR 19.23 F.F. (ADU) SECOND FLOOR 18.40 T.PL. (GARAGE) CEILING 28.06 F.F. (ADU) 27.23 T.PL. (ADU) CEILING 28.40 (ADU) MAX. HEIGHT 9.12 GRADE ESTABLISHMENT 38.12 MAX. BUILDING HEIGHT 33.12 MAX. FLAT ROOF HEIGHT PONY WALL 3'- 6 " PONY WALL 8' - 0 " 10 " 8' - 0 " 10 " 1' - 3 " PR O P E R T Y L I N E PR O P E R T Y L I N E 3'-0"3'-0" 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL 10.40 F.F. FIRST FLOOR 19.23 F.F. SECOND FLOOR 18.40 T.PL. (MAIN HOUSE) CEILING 27.23 T.PL. 8' - 0 " 10 " 8' - 0 " (MAIN HOUSE) CEILING 28.06 F.F. THIRD FLOOR 10 " 10 ' - 1 " 9.12 GRADE ESTABLISHMENT 1' - 3 " 29 ' - 0 " 38.12 MAX. BUILDING HEIGHT 24 ' - 0 " 33.12 MAX. FLAT ROOF HEIGHT 3'- 6 " 3'- 6 " SEE SHEET AD-01 FOR GUARDRAIL DETAILS SEE SHEET AD-01 FOR GUARDRAIL DETAILS 123 12 3 GLASS RAILING PR O P E R T Y L I N E PR O P E R T Y L I N E 3'-0"3'-0" 31.56 TOP OF GUARDRAIL 22.73 TOP OF GUARDRAIL A-06 ELEVATION VIEWS Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL WEST ELEVATION NORTH ELEVATION SOUTH ELEVATION DOOR SCHEDULE NO.DESCRIPTION WIDTH HEIGHT NOTE D-20 MAIN ENTRANCE 3'-0"7'-0"CUSTOM DOOR - SHALL HAVE ONE DOOR LEAF 36" WIDE GARAGE ROLL UP 8'-0"7'-6" AUTOMATIC - CHECK MFGR'S INSTRS. FOR REQUIREMENT & DIMENSIONS - FIELD VERIFY 6'-0"6'-8" 9'-0"7'-0" 16'-0" 2'-6"D-40 EXTERIOR SLIDING 2'-10"D-45 INTERIOR SINGLE 2'-6"D-50 INTERIOR SINGLE 2'-10"INTERIOR SINGLE EXTERIOR SLIDING D-10 EXTERIOR SLIDING 7'-0" D-25 D-30 D-35 INTERIOR SINGLE 7'-0" 7'-0" D-55 6'-8" 6'-8" 4'-0"4'-0" 7'-6" 4'-0"3'-2" 6'-0" 2'-6"2'-6" 3'-0"4'-0" 7'-6"3'-8" 6'-6"4'-0" 4'-0" 4'-0" 3'-0"2'-6" 6'-8" 6'-8" 7'-0" WINDOW SCHEDULE NO.ROUGH WIDTH ROUGH HEIGHT HEAD HEIGHT NOTE 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" W-10 W-20 W-25 W-30 W-35 W-40 W-45 W-55 W-60 2'-6"2'-6"7'-0"W-05 TEMPERED - FIX 2'-6"1'-6"6'-8"W-50 TEMPERED - FIX FIX EGRESS WINDOW EGRESS WINDOW TEMPERED - FIX CASEMENT CASEMENT CASEMENT CASEMENT CASEMENT 1.ALL NEW WINDOWS ARE DUAL GLAZED U.N.O. 2.FENESTRATION MUST HAVE TEMPORARY AND PERMANENT LABELS. 3.ALL TEMPERED GLASS TO BE ETCH MARKED. 4.ONE WINDOW IN EACH BEDROOM MUST HAVE AT LEAST 5.7 S.F. OPENABLE AREA WITH FINISHED SILL NO MORE THAN 44" ABOVE FLOOR LEVEL, MIN. OPENING HEIGHT OF 24" & MIN. OPENING WIDTH OF 20" (CLEAR). 5.ALL WINDOWS WHERE GLAZING AREA IS >9 S.F. TO BE TEMPERED 6.ALL WINDOWS WHERE GLAZING AREA'S BOTTOM EDGE IS <18" ABV. F.F. & TOP EDGE IS >36" ABV. F.F. TO BE TEMPERED. 7.WHERE A WINDOW IS LOCATED HIGHER THAN 72" ABOVE ADJACENT GRADE OR FINISHED SURFACE ON THE OPPOSITE SIDE, THE LOWER PART OF THE OPENING SHALL BE 24" MIN. ABOVE THE ROOM FINISH FLOOR SURFACE. R612.2 ALL WINDOW AND DOOR SIZES ARE NOMINAL SIZES, THEY ARE SUBJECT TO CHANGE UPON FINAL MANUFACTURER SELECTION. CONTRACTOR TO PROVIDE CUT SHEETS AND SHOP DRAWINGS TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING. ·EGRESS DOOR. NOT LESS THAN ONE EGRESS DOOR SHALL BE PROVIDED FOR EACH DWELLING UNIT. THE EGRESS DOOR SHALL BE SIDE-HINGED, AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES (813 MM) WHERE MEASURED BETWEEN THE FACE OF THE DOOR AND THE STOP, WITH THE DOOR OPEN 90 DEGREES (1.57 RAD). ·THE CLEAR HEIGHT OF THE DOOR OPENING SHALL BE NOT LESS THAN 78 INCHES (1981 MM) IN HEIGHT MEASURED FROM THE TOP OF THE THRESHOLD TO THE BOTTOM OF THE STOP. OTHER DOORS SHALL NOT BE REQUIRED TO COMPLY WITH THESE MINIMUM DIMENSIONS. EGRESS DOORS SHALL BE READILY OPENABLE FROM INSIDE THE DWELLING WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. (R311.2) ·FLOORS AND LANDINGS AT EXTERIOR DOORS. THERE SHALL BE A LANDING OR FLOOR ON EACH SIDE OF EACH EXTERIOR DOOR. THE WIDTH OF EACH LANDING SHALL BE NOT LESS THAN THE DOOR SERVED. EVERY LANDING SHALL HAVE A DIMENSION OF NOT LESS THAN 36 INCHES (914 MM) MEASURED IN THE DIRECTION OF TRAVEL. THE SLOPE AT EXTERIOR LANDINGS SHALL NOT EXCEED 1/4 UNIT VERTICAL IN 12 UNITS HORIZONTAL (2 PERCENT). (R311.3) DOOR & WINDOW NOTES NOTES AN EMERGENCY ESCAPE AND RESCUE OPENING SHALL MEET ALL OF THE FOLLOWING (R310): ·A NET CLEAR OPENING AREA OF NOT LESS THAN 5.7 SQ. FT. (5.0 SQ. FT. FOR GRADE – FLOOR WINDOW). ·MINIMUM CLEAR OPENING HEIGHT OF 24”. ·MINIMUM CLEAR OPENING WIDTH OF 20”. ·THE BOTTOM OF WINDOW OPENING SHALL NOT BE MORE THAN 44” FROM THE FLOOR. ·SHALL OPEN DIRECTLY INTO A PUBLIC WAY, OR, TO A YARD OR COURT THAT OPENS TO A PUBLIC WAY. YARD OR COURT MUST COMPLY WITH THE DEFINITION: “AN OPEN SPACE, UNOBSTRUCTED FROM THE GROUND TO THE SKY.” THEREFORE, INGRESS/EGRESS OPENINGS WHICH OPEN UNDER OR ONTO DECKS, ROOFS, OR COVERED PATIOS ARE NOT ACCEPTABLE. R310.1 ·WINDOW CONTROL OPENING DEVICE SHALL NOT REDUCE THE REQUIRED NET CLEAR OPENING AREA OF THE WINDOW. R 312.2.2. EGRESS WINDOW A-07 DOOR & WINDOW SCHEDULES Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL MAX. SLOPE (2%) TREADS & EXTERIOR LANDINGS 2% HEAD CLEARANCE MI N . 6 ' - 8 " C L R . AB V . T R E A D N O S I N G MAX. RISE: 7 3/4" MIN. RUN: 10", W/. LANDING MIN. DIM. IN PATH OF TRAVEL EQUAL TO STAIR WIDTH (36" MIN.) MIN. STAIR WIDTH = 36" W/. HANDRAIL(S) ENCROACHING NO MORE THAN 4.5" ON EITHER SIDE. 10" MIN. 7 3 / 4 " M A X . 3/4" - 1 1/4" NOSING ON STAIRS W/. LESS THAN 11" TREADS MAXIMUM RISE OF 7 3 4" AND MINIMUM RUN (TREAD) OF 10". PROVIDE A NOSING BETWEEN 0.75" AND 1.25" ON STAIRWAYS WITH SOLID RISERS WHERE TREAD DEPTH IS LESS THAN 11". STAIRWAY NOTE: MINIMUM CLEAR WIDTH OF 36". MINIMUM HEADROOM OF 6'-8". OPENING NOT TO ALLOW A 6" SPHERE TO PASS THROUGH, TYP. OPENING NOT TO ALLOW A 4" SPHERE TO PASS THROUGH, TYP. 1'-0" HANDRAIL GUARDRAIL GUARDRAIL HANDRAIL GUARDRAIL 42 " M I N A B V . F . F . 1'-0"HANDRAIL HEIGHT SHALL BE 34" TO 38" ABOVE THE NOSING OF TREADS. HANDRAIL WITH CIRCULAR CROSS-SECTIONS SHALL HAVE A DIAMETER OF 1 14" TO 2". HANDRAILS WITH OTHER THAN CIRCULAR CROSS-SECTIONS SHALL HAVE A PERIMETER OF 4" TO 6 14" WITH A MAXIMUM CROSS-SECTION DIMENSION OF 2 14". HANDRAIL SHALL BE CONTINUOUS WITHOUT INTERRUPTION BY NEWEL POST OR OTHER OBSTRUCTION, EXCEPT AT THE LANDING, VOLUTE, OR TURNOUT ON LOWEST TREAD. HANDRAILS WITH A PERIMETER GREATER THAN 6 14" SHALL COMPLY WITH R311.7.8.5 ITEM 2. CLEAR SPACE BETWEEN HANDRAIL AND WALL SHALL BE 1 12" MINIMUM. GUARD HEIGHT SHALL BE A MINIMUM OF 42". OPENINGS BETWEEN INTERMEDIATE BALUSTERS SHALL PRECLUDE THE PASSAGE OF A 4" DIAMETER SPHERE. THE TRIANGULAR OPENINGS FORMED BY THE RISER, TREAD, AND BOTTOM RAIL SHALL PRECLUDE THE PASSAGE OF A 6" DIAMETER SPHERE. OPENINGS BETWEEN INTERMEDIATE BALUSTERS ON THE OPEN SIDE OF STAIRS SHALL PRECLUDE THE PASSAGE OF A 4 38" DIAMETER SPHERE. HANDRAIL NOTE: GUARD NOTE:HANDRAIL (POST MOUNTED) 1.5" MIN. 34 " M I N . , 3 8 " M A X . TO T R E A D N O S I N G 2" 51/4" 5/8" 25/8" 2" 51/4" 7/8" HANDRAIL PROFILE HANDRAIL (WALL MOUNTED) 4.5" MAX. 2" HA N D R A I L 34 " - 3 8 " F R O M F . F . PLYWD. SHT'G WHERE OCCURS SEE STRUC. DWG'S 26 GAUGE MIN. WEEP SCREED TYP. SUB BASE PER STRUC. DWG'S 2-LAYER GRADE D BUILDING PAPER TYP. EXTERIOR FINISH PER PLAN CONC. FOOTING TYP. FINISH GRADING NOTE: WEEP SCREED FOR STUCCO AT A MIN. OF 4" ABOVE EARTH OR 2" ABOVE PAVED AREAS LINE OF CONCRETE SLAB OR PAVED AREA (AS OCCURS) SLOPE 1% MIN SLOPE 2% MIN 8" M I N COVERING 12" GYP. BD. OR OTHE REQUIRED TYP. 2x STUD WALL PER STRUC. DWG'S 2x SILL PLATE PER STRUC. DWG'S 2"MI N PLYWD. SHT'G WHERE OCCURS SEE STRUC. DWG'S 26 GAUGE MIN. WEEP SCREED TYP. COVERING 12" GYP. BD. OR OTHE REQUIRED TYP. 2x STUD WALL PER STRUC. DWG'S 2-LAYER GRADE D BUILDING PAPER TYP. EXTERIOR FINISH PER PLAN2x SILL PLATE PER STRUC. DWG'S CONC. FOOTING TYP. NOTE: WEEP SCREED FOR STUCCO AT A MIN. OF 4" ABOVE EARTH OR 2" ABOVE PAVED AREAS LINE OF CONCRETE SLAB OR PAVED AREA (AS OCCURS) FINISH GRADING SLOPE 1% MIN SLOPE 2% MIN 8" M I N 2"MI N SUB BASE PER STRUC. DWG'S 2X STUDWALL @ 16" O.C. EXT. FINISH EXT. FINISH 2X BLOCKING 26 GA. COPPER (OR EQUIV.) SCUPPER THRU ROOF PARAPET/CURB, SET IN MASTIC & CAULK EDGES 2" MIN. EXTEND MIN. 2" BEYOND F.O. FIN. MATERIAL IF TERMINATING AT EXTERIOR (PROVIDE DRIP EDGE) CONT. 2X SILL PLATE CONT. FLR. JSTS. (WHERE OCCUR) COPPER FLASHING TOP OF FINISH MATERIAL PLYWOOD SHT'G. DRAIN TO EXTERIOR OR THRU WALL TO EXT. (REF. CIVIL PLAN FOR OUTLET) DECK/BALCONY DRAIN DECK/BALCONY FRM'G. 2" D I A . M I N . 2" D I A . 1. 5 " MI N . 10 " M I N . 1. 5 " M A X . D R O P F R O M EXTERIOR FINISH/FLATWORK PER PLANS INTERIOR FLOOR SLAB LINE OF FINISH FLOOR SLOPE 2% MIN. DOOR PER SCHEDULE TO P O F T H R E S H O L D FLASHING DOOR THRESHOLD (PER MFGR.) 3" M I N . EXTERIOR INTERIOR GLASS VICE CLAMP TEMPERED GLASS ADAPTOR BASE PLATE 3 7 / 8 " 8" 1'- 2 " 1 1/4"MIN. HANDRAIL 42 " M I N . 3 3/8" SLOT DRAIN 3/8" LAG SCREWS WITH 8" DEPTH INTO PRIMARY MEMBER, 8" O.C. DECK FRAMING PER STRUCT. 1 1/4" MIN. HOLE EDGE DISTANCE 3X BLK. 2X RIM JOIST FIN. PER PLAN. SLOPE 2% MIN. WOOD DECK 1.5 " M A X . D R O P F R O M 2% MIN. SLOPE LINE OF FINISH FLOOR DOOR PER SCHEDULE EXTERIOR FINISH DECK/ BALCONY SHEATHING FLOOR JOIST PER PLAN SOLID BLOCK HOT MOP / W.P. MEMBRANE TO P O F T H R E S H O L D FLASHINGINTERIOR EXTERIOR 1/8" RIVET 12" ON CENTER PANEL CLIP ROOFING SHT'G PER STRUCT. 5/8" GYPSUM BOARD, PER PLANS, WHERE OCCURS) 2x ROOF RAFTER(PER STRUCT.) BATT INSULATION(WHEN OCCURS, PER PLAN) R6 CLOSED SPRAY BARRIER DECK FINISH ROOFING SHT'G PER STRUCT. BATT INSULATION(WHEN OCCURS, PER PLAN) R6 CLOSED SPRAY BARRIER 2x ROOF RAFTER(PER STRUCT.) 5/8" GYPSUM BOARD, PER PLANS,WHERE OCCURS) OPTIONAL 1" X 4" SHEET METAL GRAVEL STOP -36" SQUARE MIN. SEE NOTES BELOW PRIMARY AND SECONDARY DRAIN STRIPPING FELTS STRAINER CLAMPING RING RUBEROID/ GAFGLAS FLASHING (OR EQUAL) LEAD FLASHING SET IN FLASHING CEMENT BASE/ PLY SHEETS DECK JOIST DECK JOIST/ RIP STAIRS (SEESTRUCT.) DECK CLAMP NOTE: 1.MINIMUM 30" SQUARE, 2-1/2-LB. TO 4-LB. LEAD OR 16 OZ. SOFT COPPER FLASHING. SET PRIMED FLANGE IN ROOF CEMENT IN MOP MB, SA MB, COLD MB OR BUR. SET PRIMED FLANGE IN HEAT SOFTENED MEMBRANE ON TORCH APP OR HW SBS SYSTEMS. PRIME TOP SURFACE BEFORE STRIPPING. 2.MEMBRANE PLIES, METAL FLASHING AND FLASHING PLIES EXTEND UNDER CLAMPING RING. 3.STRIPPING FELTS-EXTEND 4" AND 8" BEYOND EDGE OF FLASHING SHEET, BUT NOT BEYOND EDGE OF SUMP. INSTALL STRIPPING BEFORE INSTALLATION OF CAP SHEET OR GRAVEL. ROOF DRAIN DETAIL 23 567 91011 1 AD-01 CONSTRUCTION DETAIL HANDRAIL & GUARD REQUIREMENTS (TYP.)STAIR REQUIREMENTS (TYP.) WEEP SCREED DETAIL (TYP.) 4 8 12 WEEP SCREED DETAIL (TYP.) ROOF/ DECK DRAINAGE & OVERFLOW (TYP.) THRESHOLD - OUTSWING (SLAB) (TYP.)THRESHOLD - OUTSWING (FRM'G.) (TYP.) ROOF/ DECK DRAINAGE & OVERFLOW (TYP.) Revisions Drawing Title Date: 04/03/2023 Aqx Job No: 2022-628 Drawing No. Drawn: A.B. PROJECT 216 E Balboa Blvd, Newport Beach, CA 92661 DUPLEX & TWO ADU's STUDIO ARCHITECTURAL UNVENTED ENCLOSED RAFTER DETAIL (TYP.)ROOF/ DECK DRAINAGE & OVERFLOW (TYP.) GENERAL NOTES EROSION NOTES REQUIRED INSPECTION GRADING FILLS/CUTS NOTES DOCUMENTATION ADDITIONAL NOTES: OWNER/CLIENT:LEGAL DESCRIPTION:BENCHMARK: ESTIMATED EARTHWORK QUANTITIES: AQ X E N G I N E E R I N G I N C . 15 2 0 B r o o k h o l l o w , S u i t e # 4 5 Sa n t a A n a , C A 9 2 7 0 5 Of f . ( 7 1 4 ) 6 6 2 - 0 5 1 0 FA X . ( 7 1 4 ) 6 6 2 - 1 0 5 0 WW W . A Q X E N G . C O M VICINITY MAP PRECISE GRADING PLAN & EROSION CONTROL PLAN SCOTT & HOLLY MCKHANN SAN CLEMENTE, CA 92672 111 AVENIDA PATERO DE ORO PUBLIC WORKS NOTE 1.AN APPROVED ENCROACHMENT PERMIT IS REQUIRED FOR ALL WORK ACTIVITIES WITHIN THE PUBLIC RIGHT-OF-WAY. 2.A PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT INSPECTION IS REQUIRED BEFORE THE BUILDING DEPARTMENT PERMIT FINAL CAN BE ISSUED. AT THE TIME OF PUBLIC WORKS DEPARTMENT INSPECTION, IF ANY OF THE EXISTING PUBLIC IMPROVEMENTS SURROUNDING THE SITE IS DAMAGED, NEW CONCRETE SIDEWALK, CURB AND GUTTER, AND ALLEY/STREET PAVEMENT WILL BE REQUIRED. ADDITIONALLY, IF EXISTING UTILITIES INFRASTRUCTURE ARE DEEMED SUBSTANDARD, A NEW 1-INCH WATER SERVICE, WATER METER BOX, SEWER LATERAL AND/OR CLEANOUT WITH BOX AND LID WILL BE REQUIRED. 100% OF THE COST SHALL BE BORNE BY THE PROPERTY OWNER (MUNICIPAL CODES 14.24.020 AND 14.08.030). SAID DETERMINATION AND THE EXTENT OF THE RECONSTRUCTION WORK SHALL BE MADE AT THE DISCRETION OF THE PUBLIC WORKS INSPECTOR. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE PUBLIC RIGHT OF WAY AT ALL TIMES DURING THE CONSTRUCTION PROJECT. A STOP WORK NOTICE MAY BE ISSUED FOR ANY DAMAGE OR UNMAINTAINED PORTION OF THE PUBLIC RIGHT OF WAY. 3.AN ENCROACHMENT AGREEMENT IS REQUIRED FOR ALL NON-STANDARD IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY. ALL NON-STANDARD IMPROVEMENTS SHALL COMPLY WITH CITY COUNCIL POLICY L-6. 4.ALL WORK RELATED TO WATER IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A C-34 LICENSED PIPELINE CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR. 5.ALL WORK RELATED TO WASTEWATER IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A C-42 LICENSED SANITATION SEWER CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR. LOT 9 OF BLOCK 4 OF OF NEWPORT BAY TRACT, IN OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY. BOOK 4 PAGE 16 OF MISCELLANEOUS MAPS, IN THE STATE OF CALIFORNIA, AS PER MAP RECORDED IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE. DESCRIPTION: B.M. NUMBER: ELEV. ON THE SOUTHWEST CORNER OF A 4' CATCH BASIN. ALUMINUM BENCHMARK DISC STAMPED "1E-122-14" DESCRIBED BY OCS 2014-FOUND 4"OCS 9.179 1E-122-14 QUAD (YEAR)2015 @ ADDRESS 709 MONUMENT IS LEVEL WITH THE SIDEWALK. BALBOA BLVD, 133' WEST OF THE C/L OF 7TH ST. MONUMENT IS LOCATED ALONG THE SOUTH SIDE OF W APN: 048-091-20 S 17°21'14" W 79.80' N 7 1 ° 4 2 ' 1 5 " W 30 . 0 0 ' N 7 1 ° 3 9 ' 1 1 " W 30 . 0 1 ' S 17°21'02" W 79.82' UPUP LEGEND: 5 AQ X E N G I N E E R I N G I N C . 15 2 0 B r o o k h o l l o w , S u i t e # 4 5 Sa n t a A n a , C A 9 2 7 0 5 Of f . ( 7 1 4 ) 6 6 2 - 0 5 1 0 FA X . ( 7 1 4 ) 6 6 2 - 1 0 5 0 WW W . A Q X E N G . C O M PRECISE GRADING PLAN OWNER/CLIENT:LEGAL DESCRIPTION:BENCHMARK: ’ LOT 9 OF BLOCK 4 OF OF NEWPORT BAY TRACT, IN OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY. BOOK 4 PAGE 16 OF MISCELLANEOUS MAPS, IN THE STATE OF CALIFORNIA, AS PER MAP RECORDED IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE. DESCRIPTION: B.M. NUMBER: ELEV. ON THE SOUTHWEST CORNER OF A 4' CATCH BASIN. ALUMINUM BENCHMARK DISC STAMPED "1E-122-14" DESCRIBED BY OCS 2014-FOUND 4"OCS 9.179 1E-122-14 QUAD (YEAR)2015 @ ADDRESS 709 MONUMENT IS LEVEL WITH THE SIDEWALK. BALBOA BLVD, 133' WEST OF THE C/L OF 7TH ST. MONUMENT IS LOCATED ALONG THE SOUTH SIDE OF W APN: 048-091-20 SCOTT & HOLLY MCKHANN SAN CLEMENTE, CA 92672 111 AVENIDA PATERO DE ORO CONSTRUCTION NOTES: EXISTING BUILDING TO BE REMOVED EXISTING WATER METER TO REMAIN INSTALL 6" AREA DRAIN 1 2 3 7 8 INSTALL 4" SDR 35 PIPE CONSTRUCT NEW BUILDING PER ARCHITECTURAL PLAN 4 6 5 9 EXISTING WALL TO REMAIN INSTALL FRENCH DRAIN/TRENCH DRAIN PER DETAIL HEREON OVER-EXCAVATION LINE INSTALL CURB DRAIN PER CITY STD. 184 (527.63).........EX. ELEVATION 520.00............PROP. ELEVATION --(530)--..........EX. COUNTOUR .....DRAINAGE PATTERN .....PROP. STRUCTURE .....EXISTING WALL SW.................SIDE WALK ..................LIGHT C .....CENTER LINE P .....PROPERTY LINE .....CONSTRUCTION NOTES .....SANDBAG LINE L 9 L LEGEND: T.C.............TOP OF CURB F.L..............FLOW LINE F.G.............FINISH GRADE F.S.............FINISH SURFACE F.F.............FLOOR FINISH H.P.............HIGH POINT P.P.............POWER POLE D/W...........DRIVEWAY W.M...........WATER METER INV.............INVERT ELEVATION T.G.............TOP OF GRATE VICINITY MAP FF=10.40 PROPOSED LF LP EX. GRADE FF=10.40 LP EX. GRADE FF=9.39 LF LP EX. GRADE FF=9.39 LP EX. GRADE BUILDING PROPOSED GARAGE PROPOSED GARAGE PROPOSED GARAGE 11 11 11 LF S 17°21'14" W 79.80' N 7 1 ° 4 2 ' 1 5 " W 30 . 0 0 ' N 7 1 ° 3 9 ' 1 1 " W 30 . 0 1 ' S 17°21'02" W 79.82' UPUP A CONSTRUCT GRAVEL BAG EROSION CONTROL ALONG EROSION CONTROL NOTES: BOUNDARIES OF CONSTRUCTION AREA. THE GRAVEL BAGS SHOULD BE 2 BAGS WIDE AND 2 BAGS HIGH. A E E CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE, PER CASQAB BMP # TC-1 (PROVIDE 12" MIN OF 3" TO 6" AGGREGATE) B EROSION CONTROL PLAN AQ X E N G I N E E R I N G I N C . 15 2 0 B r o o k h o l l o w , S u i t e # 4 5 Sa n t a A n a , C A 9 2 7 0 5 Of f . ( 7 1 4 ) 6 6 2 - 0 5 1 0 FA X . ( 7 1 4 ) 6 6 2 - 1 0 5 0 WW W . A Q X E N G . C O M OWNER/CLIENT:LEGAL DESCRIPTION:BENCHMARK: LOT 9 OF BLOCK 4 OF OF NEWPORT BAY TRACT, IN OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY. BOOK 4 PAGE 16 OF MISCELLANEOUS MAPS, IN THE STATE OF CALIFORNIA, AS PER MAP RECORDED IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE. DESCRIPTION: B.M. NUMBER: ELEV. ON THE SOUTHWEST CORNER OF A 4' CATCH BASIN. ALUMINUM BENCHMARK DISC STAMPED "1E-122-14" DESCRIBED BY OCS 2014-FOUND 4"OCS 9.179 1E-122-14 QUAD (YEAR)2015 @ ADDRESS 709 MONUMENT IS LEVEL WITH THE SIDEWALK. BALBOA BLVD, 133' WEST OF THE C/L OF 7TH ST. MONUMENT IS LOCATED ALONG THE SOUTH SIDE OF W APN: 048-091-20 SCOTT & HOLLY MCKHANN SAN CLEMENTE, CA 92672 111 AVENIDA PATERO DE ORO (527.63).........EX. ELEVATION 520.00............PROP. ELEVATION --(530)--..........EX. COUNTOUR .....DRAINAGE PATTERN .....PROP. STRUCTURE .....EXISTING WALL SW.................SIDE WALK ..................LIGHT C .....CENTER LINE P .....PROPERTY LINE .....CONSTRUCTION NOTES .....SANDBAG LINE L 9 L LEGEND: T.C.............TOP OF CURB F.L..............FLOW LINE F.G.............FINISH GRADE F.S.............FINISH SURFACE F.F.............FLOOR FINISH H.P.............HIGH POINT P.P.............POWER POLE D/W...........DRIVEWAY W.M...........WATER METER INV.............INVERT ELEVATION T.G.............TOP OF GRATE SOIL REPORTS RECOMMENDATIONS AQ X E N G I N E E R I N G I N C . 15 2 0 B r o o k h o l l o w , S u i t e # 4 5 Sa n t a A n a , C A 9 2 7 0 5 Of f . ( 7 1 4 ) 6 6 2 - 0 5 1 0 FA X . ( 7 1 4 ) 6 6 2 - 1 0 5 0 WW W . A Q X E N G . C O M