HomeMy WebLinkAboutF2020-0180 - MiscContractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an ovner's
representative. All defects shall be connoted and system left in service before contractor's personnel finally leave the job_
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It is understood the owners representafive's signature in no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances,
Property name Sabo Residence
Date 6/20/2023
Property address
1220 W. Bay Ave., Newport Beach, CA.92661
Accepted by approving authorities (names) Newport Beach Fire Department
Plans
address 100 Civic Center Dr., Newport Beach, CA 92660
Installation conforms to accepted plans Yes ❑ r^io
Equipment used is approved ❑✓ Yes ❑ No
If no, explain deviations
Has person in charge of fire equipment been instructed as Yes ❑ No
to location of control valves and care and maintenance
of this new equipment?
If no, explain
Instructions
Have copies of the following been left on the premises? 0 Yes ❑ No
1. System components instructions 0 Yes ❑ No
2. Care and maintenance instructions ❑✓ Yes ❑ No
3. NPPA 25 ED Yes ❑ No
Location of
system
Supplies buildings
Yearef
Oriffce
Temperature
Make
Model
manufacture
size
Quantity
rating
Senju Sprinkler
SS8464
2021
7/16"
122
205
Sprinklers
Viking
VK949
2021
7/16"
15
200
Viking
VK496
2021
7/16"
6
200
Globe
I.C.
2021
1/2"
8
200
Reliable
RFS42
2021
12125"
4
165
Pipe and
Type of pipe cave
Type of fittings cpvc
fittings
Maximum time to operate
Alarm
Alarm device
through test connection
valve or
flow
Type
Maka
Model
Minutes
Seconds
indicator
Electric Flow Switch
System Sensor
WFDFS
0
60
Dry valve
Q. Q. D.
Make
Model
Serial no_
Make
Model
Serial no.
None
Dry pipe
Time to trip
Time water
Alarm
operating
through test
Water
Aar
Trip point
reached
operated
test
cannectionf
pressure
pressure
air pressure
test outletT
properly
Minutes
Seconds
psi
psi
psi
Minutes
Seconds
Yes
No
Without
Q.ab.
With
O.O.D.
If no, explain
f Measured from the time inspector's test connection is opened
Operation
❑ Pneumatic ❑ Electric ❑Hydraulic
Piping supervised ❑ Yes ❑ No
Detecting media supervised ❑ Yes ❑ No
Does valve operate from the manual trip, remote, or both ❑ Yes ❑ No
control stations?
Deluge and
preaction
Is there an accessible facility in each circuit
If no, explain
valves
for testing?
❑ Yes ❑ No
Does each circuit operate
Does each circuit operate
Maximum time to
Make
Model
supervision loss alarm?
valve release?
operate release
Yes
No
Yes
No
Minutes
Seconds
Location
Make and
Setting
Static pressure
Residual pressure
Flow rate
Pressure,,
and floor
model
(flowing)
reducing
valve test
none
Inlet i
(psi)
Outlet (psi)
Inlet (psi)
Outlet (psi)
Flow (gpm)
Hydrostatic, Hydrostatic tests shall be made at not less than 20D psi (113.6 bar) for 2 hours or 50 psi (3.4 bar)
above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry -pipe valve clappers shall be left
open during the test to prevent damage. All aboveground piping leakage shall be stopped_
Test
description
Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1?h psi (0.1 bar)
in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall
not exceed "i! psi (0.1 bar) in 24 hours.
All piping hydrostatically tested at 200 psi (_ bar) for 24 hours
If no, state mason
Dry piping pneumatically tested ❑ Yes ❑ No
Equipment operates properly ❑✓ Yes ❑ No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives
of sodium silicate, brine, or other corrosive chemicals were not used far testing systems or stopping leaks?
0 Yes o No A U A 9
Drain
Reading of gauge located
tar water
Residual pressure with valve in test
Tests
test
supply test connection:
psi ( bar)
connection open wide: psi ( bar)
Underground mains and lead-in connections to system risers flushed before connection made to
sprinkler piping verified by a copy of the "Contractor's
Material and Test Certificate for Underground Piping." ❑ Yes 0 No Other Explain
Flushed by installer of underground sprinkler piping ❑ Yes 0 No Domestic water line was flushed clear.
If powder -driven fasteners are used in concrete, Q Yes ❑ No
If no, explain
has representative sample testing been satisfactorily
n/a
completed?
Blank testing
Number used
Locations
��ermoved
gaskets
n/a
t^lelding piping ❑ Yes ❑✓ No
If yes .. _
Do you certify as the sprinkler contractor that welding procedures comply ❑ Yes ❑ No
with the requirements of at least AWS 82.1?
Do you certify that the welding was performed by welders qualified in
❑ Yes ❑ No
Welding
compliance with the requirements of at least AVIS B2.1?
Do you certify that the welding was carried out in compliance with a documented
quality control procedure to ensure that all discs are retrieved, that openings in
piping are smooth, that slag and other welding residue are removed, and that ❑ Yes ❑ Na
the internal diameters of piping are not penetrated?
Cutouts
Do you cerffy that you have a control feature to ensure that ❑ Yes ❑ No
(discs)
all cutouts (discs) are retrieved?
Hydraulic
data
nameplate
Nameplate provided
0✓ Yes ❑ No
If no; explain
Date left in service with all control valves open
Remarks
6/20/2023
Name of sprinkler contractor
Residential Fire Systems Inc.
Tests witnessed by
Signatures
For property owner (signed) Title Date
For sprinkler contractor (signed) Title Date
Additional explanations and notes
.11
ejiu Sprinkler
Sell Fire Protection Corporation
8850 Research Dr. Irvine, CA 92618
Tel: 949-333-1281, Fax: 949-333-1681
Packing Slip
Date
Invoice #
5/24/2022
i7G4_01
Bill To
Ship To
Residential Fire Systems Inc
Residential Fire Systems Inc
8085 E Crystal Dr.
9085 E Crystal Dr.
Anaheim. CA ill
Anaheim, CA 92807
USA
Phone# 714-418-6656(Ty)
P.O. No,
Rep
Account #
Ship Via
Ship Date
Terms
SS00513_3CC2
MNI
91-A10291
Hand Delivery
5/24/2022
Net duc in GO days
Item Cade
Description
Shipped O'ly
Backordered
10000-001-0002
Set Up Charge rot Custom CP
—T.
911000-004-06 12
Corer Plate. 3-1/4" 162F, Point Provided 05/l3/2022 Tan Flat
� 70
it
Finish. Pendent for RC
Sales Tax
• �Q� 1,1J[t � G---- - —
;,1 _'.ICIENTIA.I_ FIEF_'3','STE7,n�.
Remm ks
TAG TI IIS ORDER WITH SABO ON 711E BOX,
HAND DELIVER WITH STOCK ORDER.
Tam, and Coaduums Al! sales ut products horn Senju Fire Protection Corporation ore subject to its Terms and Condilinus, mailable nt senjusprinker.conv ones.
and that the huger 11C1,110"lcdget and agree thin the huger has read [lie Ferns and Conditions and agrees to he hound by them.
IVAIMNG: „na.Pn,tmii,.. Ihrel. a„u._ Pasu.,n.nm''.,g,
Senju Sprinkler
Senju Fire Protection Corporation
8850 Research Dr, Irvine, CA 92618
Tel: 949-333-1281, Fax: 949-333-1681
IW
Residential Fire Systems Inc
8085 E Crystal Dr.
Anaheim, CA 92807
USA
Phone# 714-418-6656(Ty)
Ship To
Residential Fire Systems Inc
8085 E Crystal Dr.
Anaheim, CA 92807
USA
Packing Slip
Date Invoice #
3/6l2023 8(i56-01
P.O. No.
Rep
Account #
Ship Via
Ship Date
Terms
SS022323CC
MM
91-A10291
Hand Delivery
3/6/2023
Net due in GO days
Item Code
Description
Shipped Q'ty
Backordered
10000-001.0002
Set Up Charge for Custom CP
90000-004-0612
Cover Plate, 3-1/4" 162F, Paint Provided Vista Paint Sabo Blue
g
Cloth, Pendent for RC
0
PLEASE TAG THIS ORDER WITH "SABO" ON
ALL BOX3S PRIOR TO SHIPPING.
Sales Tax
RECEIVED
MAR 0 6 2023
BY: k fi�AVll61
RESIDENTIAL FIRE SYSTEMS
Remarks
TAG-SABO
Terms and Conditions: All sales of products from Senju Fire Protection Corporation are subject to its Terms and Conditions, available at senjusprinkeccom/terms,
and that the buyer acknowledges and agree that the buyer has read the Terms and Conditions and agrees to be bound by them.
WARNING: Canecr and Repmductivc Harm. wnw.P65Waromgs.ca.eov,