Loading...
HomeMy WebLinkAboutPA2023-0076_20230430_PRR_BldgTmplt: 06/07/19 P ROJECT R EVIEW R EQUES T C O M M U N I T Y D E V E L O P M E N T D E P AR T M E N T Planning Division Please Distribute to: Building – Thai Public Works – Keely/Sinacori Fire – Gillespie/Reid Utilities – Vukojevic Geotechnical – Gutierrez Municipal Operations – Tovar Date: April 17, 2023 Please return PRR and Plans to Staff Planner David Lee, Senior Planner 949-644-3225, dlee@newportbeachca.gov Applicant: Orange County Sanitation District Contact: Harmik Aghanian harmik.aghanian@arcadis.com 818-653-9028 Project Name OC Sanitation District Pump Station Replacement Address: 250 East Coast Highway (PA2023-0076) Site Development Review, Coastal Development Permit, Limited Term Permit (TBD) A request for the reconstruction of an existing OC Sanitation pump station located near the bay bridge (Bay Bridge Pump Station), which includes the construction of a new pump station and force mains. The new pump station includes structures below grade, above grade electrical building, generator room, and a structure for odor control. Please see detailed plans and project description (included in the “Files” section in Energov). REPORT REQUESTED BY: April 28, 2023 PLANNING COMMISSION HEARING DATE: TBD Check all that apply: ❑ No comments on the project as presented. Notes: 1. A second means of egress will be required from the basement and roof levels if the exit access travel distance exceeds 75 feet (100 feet if the building is equipped with an NFPA 13 fire sprinkler system) from the most remote location in on each level to the exit door at the ground floor level (CBC 1006.3.4). The occupancy classification for the pump station is F-1 (CBC 306). 2. The proposed project is in a Soils Liquefaction Seismic Hazard Area. The soils report shall include the analyses described in City of Newport Beach Building Code Policy CBC 1803.5.11-12 and recommendations for the mitigation of the effects of soils liquefaction. Eric Skarin 3270 04/30/23 Signature Ext. Date X Application of Standard Code requirements are not expected to alter the project design. ❑ Recommended conditions of approval are attached. ❑ Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project. ❑ I contacted the applicant on ❑ To schedule an appt. for Code review ❑ To discuss the following (see notes)