P ROJECT R EVIEW R EQUES T
C O M M U N I T Y D E V E L O P M E N T D E P AR T M E N T
Planning Division
Please Distribute to:
Building – Thai
Public Works – Keely/Sinacori
Fire – Gillespie/Reid
Utilities – Vukojevic
Geotechnical – Gutierrez
Municipal Operations – Tovar
Date: April 17, 2023
Please return PRR and Plans to Staff Planner
David Lee, Senior Planner
949-644-3225, dlee@newportbeachca.gov
Applicant:
Orange County Sanitation District Contact: Harmik Aghanian
harmik.aghanian@arcadis.com
818-653-9028
Project Name OC Sanitation District Pump Station Replacement
Address: 250 East Coast Highway
(PA2023-0076) Site Development Review, Coastal Development Permit, Limited Term Permit (TBD)
A request for the reconstruction of an existing OC Sanitation pump station located near the bay bridge
(Bay Bridge Pump Station), which includes the construction of a new pump station and force mains.
The new pump station includes structures below grade, above grade electrical building, generator room,
and a structure for odor control. Please see detailed plans and project description (included in the “Files”
section in Energov).
REPORT REQUESTED BY: April 28, 2023
PLANNING COMMISSION HEARING DATE: TBD
Check all that apply:
❑ No comments on the project
as presented.
Notes:
1. A second means of egress will be required from the
basement and roof levels if the exit access travel distance
exceeds 75 feet (100 feet if the building is equipped with an
NFPA 13 fire sprinkler system) from the most remote
location in on each level to the exit door at the ground floor
level (CBC 1006.3.4). The occupancy classification for the
pump station is F-1 (CBC 306).
2. The proposed project is in a Soils Liquefaction Seismic
Hazard Area. The soils report shall include the analyses
described in City of Newport Beach Building Code Policy
CBC 1803.5.11-12 and recommendations for the mitigation
of the effects of soils liquefaction.
Eric Skarin 3270 04/30/23
Signature Ext. Date
X Application of Standard Code
requirements are not expected to
alter the project design.
❑ Recommended conditions of
approval are attached.
❑ Application of Standard Code
requirements or the attached
conditions of approval will
substantially impact or alter
the design of the project.
❑ I contacted the applicant on
❑ To schedule an appt. for
Code review
❑ To discuss the following
(see notes)